Balfour Beatty - Digital Project Delivery
BIM - Better Information Management
About Challenge Solution
Implementation The Tech Results
Implications NDL Questions
Agenda
Communication is key – a common language
• In your mind or on a blank piece of paper
• X marks the spot
• Travel 1 mile South
• Travel 1 mile East
• Travel 1 mile North
• Back where you started?
4
5
6
7
8
Blackfriars Station – a common language?
9
Common Data
Environment
Client EIR
BIM Execution
Plan
Information
Management Plan
Site Mobilisatio
n
IT Model Office
Digital Site
Survey
Designers Using BIM
Digital Planning
Digital Cost
Estimation
Digital Safety Health
Environment and
Wellbeing Digital
Temporary Works
Integration
Digital
Supply Chain
Integration
Tier 2.3
Digital Procurem
ent –
Tracking Deliveries
Digital Site
Setting Out i.e. Machine Control
Digital Progress
Recording
Digital Quality /
Form Collection
Digital Asset Data
Collection
Digital Asset
Management
GIS/ Handover
Knowledge Sharing
Digital Project Delivery – Processes
Dartford HD GPR – Working with Supply Chain 2014 onwards
450 Design
Clashes
400 Existing Service
Clashes
Mobile digital technology on Site – 500No+ devices
12
Safer Dig
The Objective: To be safe
Want to be Lean and efficient
– Reduce errors
– Improve accuracy
– Save time and money
Minimise disruption
– S74’s
– Lane Rentals
Safety First!
Does not replace onsite protocols or discovery
Better planned
– Fewer surprises
– The more efficient the job
Helps with reduced notice jobs
Safer Dig
The Challenge:
Can we automate this?
The Challenge
300+
Information
providers
Manual production
of map packs
Human error
(Eastings &
Northings)
Reduce Cost
Scale
Different
Systems
Formats
Scales
Solution – NDL SX
Found it from work with councils in planning and highways
– Read & Write to any system
– Non invasive
– Workforce automation robotics engine
– Transaction queuing and management
Balfour Beatty Wrapper / Front-End for Staff
Implementation
Started with Gas and Water
Implemented a dev and test
environment on windows servers
Fully Virtualised Environment
Developed Balfour Beatty portal
Implemented queuing
Developed scripts for the NDL
robot to drive the common systems
– Replace the human operator
– Work the way they work
– Work at the speed they work
Security Layer
Transaction monitoring dash board
The Tech
Portal
Dashboard
Manager
Map Pack
Document Room User / Contract
Credentials Queue - SQL
target systems
Gas Electric Water Telecoms
SQL
Server
Implementation Challenges
Target Systems do change
– 1st and 2nd line support
– .Net Developers - Rarely needed
– ITIL Change Management processes
Care to be a ‘well behaved user’
Back office availability
– Queue
Now asynchronous queuing / load balancing
Eastings and Northings entered once
No more manual intervention
25 – 30 minutes saved per job
Now have a bulk import option
– Plan tasks – direct
Full Audit Trail
The results
55 target systems
8000 jobs
120,000 maps
The results
Maps delivered consistently and to scale
Jobs are planned more easily
Crews are better informed and safer
Moved from just Gas & Water to Power
Transmission
Future wider use across Balfour Beatty
COMPUTER SAYS NO?
Wider implications
B.I.M.
– Interact with sub contractor systems
– Bulk Data Migration into/out of BIM
Automate the supply chain / network
Take data from the field
Get it to the right place
About NDL
Tools Supplier
– Integration and Automation
– Cross platform mobile
Serving
– LG
– Health
– Social Housing
Find out more at www.ndl.co.uk Join a webinar:- 9th November?
Thank you for your time