3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment Program requirement development Facility hazard assessment including OSHA’s safety, fall protection, electri- cal, hygiene, fire and explosions. Facility services assessment and design including water, storm, sanitary and process sewers, natural gas, electricity, steam, lighting and chemical sup- plies. Equipment selection for facilities meeting ASME, ANSI, NFPA, ASHRAE, JCAHO, BOCA, VA, FDA, ISO, OSHA, DEA, HUD and EPA regulations Construction Cost Estimates & Capital Appropriation Requests Energy Cost Reduction, Process Optimization Programs for support equip- ment Safety Engineering Design Piping, Mechanical, and Pollution Control Structural, Civil, Electrical and Controls Safety Program eTraining Solutions & Operational Support eTraining Solution Suite for Management of trainees Coursework development Safety Job Procedures
Transcript
Page 1: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

3

SAFETY AND RISK MANAGEMENT

Management, Facility Assessment, Engineering and Training

Risk and Hazard Assessment

• Program requirement development

• Facility hazard assessment including OSHA’s safety, fall protection, electri-

cal, hygiene, fire and explosions.

• Facility services assessment and design including water, storm, sanitary and

process sewers, natural gas, electricity, steam, lighting and chemical sup-

plies.

• Equipment selection for facilities meeting ASME, ANSI, NFPA, ASHRAE,

JCAHO, BOCA, VA, FDA, ISO, OSHA, DEA, HUD and EPA regulations

• Construction Cost Estimates & Capital Appropriation Requests

• Energy Cost Reduction, Process Optimization Programs for support equip-

ment

Safety Engineering Design • Piping,

• Mechanical, and Pollution Control

• Structural,

• Civil,

• Electrical and Controls

Safety Program eTraining Solutions & Operational Support

• eTraining Solution Suite for Management of trainees

• Coursework development

• Safety Job Procedures

Page 2: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

4

Process and Flammability Hazards

• Fire and Explosion hazards

• Chemical Exposure hazards

• Toxicity Release hazards

• Piping and equipment maintenance and change out

• Review of gas monitoring and hazardous notifica-

tion systems

• Review and assessment of Emergency response sys-

tems

Fall Protection

• Permanent Structures

• Platforms, flooring, Swingates, guardrails,, toe-plates, access and

emergency ladder systems

• Temporary and Construction Structures

• Lifelines , harnessing and anchoring devices

• COTS solutions or engineered customization

Electrical Hazards

• Bonding and grounding

• Electrical enclosures assessment for hazardous

conditions realated to moisture, dust, and explo-

sive mixtures

• ARC/Flash hazards

• Overloaded circuits

• Electrical cable and conduit routing

• Labels

• Short circuit calculations and assessment of current-limiting graduated response

for electrical fault in the facility

Workplace Design and Ergonomics

• Accessibility of normal and emergency apparatus

• Work space review for posture, fatigue and stress

related factors

• Loading and unloading hazards

• Maintenance practices

• Information displays

• Warning lights and labels

• Training and COTS solutions

Hygiene

• Investigation and review of existing systems for improvements in contamination

control, ventilation and Clean Room design

• Equipment selection for hands free design and operation

• Cleanable surfaces and porous free materials

RISK AND HAZARD ASSESSMENT

Page 3: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

6

SAFETY ENGINEERING DESIGN SERVICES

Electrical:

Power systems 2.4 KV, 480 V and 110 V

Secure Systems

Emergency and Backup including Diesel Generator with ATS

Lighting

VFDs, Motors, and Drives

Environmental Control

Airborne Contamination Controls

Waterborne Contamination and Purity strategies

Infection Control Methodologies

Hazardous Collection and design.

HVAC, Industrial Ventilation

Investigation and review of existing systems for improve-

ments in contamination control, ventilation, heating, air

conditioning

HVAC system design including chillers, AHU’s, con-

densing units, fans for supply air, outdoor air, exhaust air,

entrances, non-air-conditioned areas, exterior stairs, con-

necting corridor, noise and vibration criteria. Zoning cri-

teria, all air systems, room fan-coil units, air handling

units.

Ventilating systems for occupied areas, trash collection

areas, emergency generator rooms, transformer rooms and elevator machine rooms.

Hazard Assessment & Safety Programs

Hazard assessment and risk management services are of-

fered to identify and manage hazards, improve code compli-

ance, facilitate OSHA man dated Process Safety Manage-

ment and develop . Emergency Management Plans. Our

services in include: Process Safety and Risk Manage-

ment Plan and Hazard Analysis/Assessment

Page 4: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

7

TRAINING PROGRAM MANAGEMENT

Multi-faceted Training Program Development and Implementation

Training Design & Development

• Front End Analysis

• Needs Assessment

• COTs ( Commercial Off the Shelf Packages)

Availability Review

• Coursework Development Framework

• Multi-mode Training Delivery Design

• Beyond Training ® Operational Support Requirements

• Program Cost & Schedule Development

Training Program Management • Content & Storyboard Development

• Module Development

• Interactive test and review

• Module Review & Validation

• Training Aids Developments

• Class Room delivery design

• Quality Control Program

eTraining

• Anytime anywhere training implementation

• Internet and Intra net deployment

• Registration and easy to use interface

• Multi-layered administration: Core competency

benchmarking, Certificate Development, Course-

work management for sections

• Secured ,

Class Room / Hands On Training

• Instructor Led Training with prepared modules

• Class room exercises

Operations Support & Beyond Training©

• Standard Operating Procedure (SOP) development

• Bench marking

• Reference requirements

• Non-training document integration with training

modules

FUME EXHAUST OPERATION SCREEN #2

• Fume Exhaust

Fan Operation

& Status

• Scrubber

Recirculation

Pump

Operation &

Status

• Fume Exhaust

Fan Current

Draw

Page 5: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

8

Safety eCourse Development Services

Develop New or Convert Existing Material

www.enertronics.com

Types of Training

• New Employee or Sales Orientation

• Operations

• Maintenance

• Safety

• Mechanical, Electrical, Systems etc.

Course Design

• Needs Analysis

• Collaboration

• Define Tasks

• Defining performance levels

• Align with On-the-Job– Training

and Instructor Training

Convert Existing Training Material

• Technical Manuals

• Procedures

• Drawings

• Powerpoint presentations

• Existing Modules

Graphics & Multimedia Features

• Simplify Process

• Combine HMI

• Insert videos

• Animate Complex Processes

• Use Voiceovers

• Randomize Questions

Low Cost Structure

• Lower cost by half to one-third of

comparative services

• Reduce costs for multiple sections

• Decrease costs by converting ex-

isting material

• Customize and budget for effec-

tiveness

Page 6: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

9

Electronic Reference Library

• Organize Reference with Training Modules

• Job Aids

• Electronic Catalog

• Seamless transition fro trainee to mainte-

nance expediter or vice versa

Work Order Integration

• Equipment Description

• Illustrative Procedures

• Safe and Reliable Implementation

• Set Performance Levels

Integrate References with Training Modules

eTraining + eDocument = eLibrary

Powerful Search

• Training Modules

• Reference Documentation

• Meta data on images and drawings

• Search results organized from specific to

general

www.enertronics.com

Page 7: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

5

14 Element Program

1. 1910.119(c) - Employee Participation • Employers to involve employees to participate in the PSM program.

• Written plan of action for implementing employee consultation on the development of process hazard analy-

ses and other elements of process hazard management contained within 1910.119.

2. 1910.119(d) - Process Safety Information • Employers to develop and maintain Process Safety Information about the technology, process and material

of the covered substance. Process information that can assist in the identification, management and control

of hazards. A written plan of action and record of equipment

3. 1910.119(e) - Process Hazard Analysis • Employers to conduct Process Hazard Analysis and identify, manage and control hazards.

4. 1910.119(f) - Operating Procedures • Provide clear instruction for conducting activities involved in covered processes that are consistent with the

process safety information.

• The operating procedures must address steps for each operating phase, operating limits, safety and health

considerations, and safety systems and their functions.

5. 1910.119(g) - Training • Employees and contractor employees understand the nature and causes of problems arising from process

operations, and increases employee awareness with respect to the hazards particular to a process.

• Initial Training, Refresher Training, and Documentation.

6. 1910.119(h) - Contractors • Employers who use contractors to perform work in and around processes that involve highly hazardous

chemicals to establish a screening process so that they hire and use contractors who accomplish the desired

job tasks without compromising the safety and health of employees at a facility.

7. 1910.119(i) - Pre-Start up Review • Employers to perform a pre-startup safety review for all new installations and for significant modifications.

8. 1910.119(j) - Mechanical Integrity • Assure that equipment used to process store, or handle highly hazardous chemicals is designed, constructed;

installed, and maintained to minimize the risk of releases of such chemicals.

9. 1910.119(k) - Safe Work/Hot Work Permit • Require employers to control, in a consistent manner, non-routine work conducted in process areas. Specifi-

cally concerned with the permitting of hot work operations associated with welding and cutting in process areas.

10. 1910.119(l) - Management of Change • Requirement for management of all modifications to equipment, procedures, raw materials and processing

conditions other than "replacement in kind" by identifying and reviewing them prior to implementation of

the change.

11. 1910.119(m) - Incident Investigation • Employer is required to investigate each incident which resulted in, or could reasonably have resulted in a

catastrophic release of highly hazardous chemical in the workplace. An investigation shall be initiated no

later than 48 hours following the incident.

12. 1910.119(n) - Emergency Planning and Response • Require the employer to address what actions employees are to take when there is an unwanted release of

highly hazardous chemicals.

13. 1910.119(o) - Compliance Audit • Require the employer to certify every three years compliance with all the sections of PSM standard.

14. 1910.119(p) -Trade Secrets • Require the employer to ensure that Trade secrets do not impede exchange of information related to safe

operation of the facility.

Process Safety Management Program

Page 8: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

1049

BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System upgrade including fan, VFD, piping and controls Engineering and Equipment Design

I,III,IV,V

Indiana

Fall Protection: Accessibility platforms, non-slip gratings, safety toe-plates, handrails Electrical: temrminations, ANSI enclosures, and explosion proof ratings

2,000 2010

1035

GI 8 East Upgrade at Richard L Roudebush VAMC Hospital, Indianapolis

I, II, III, IV, V

Indiana

Fall protection, electrical and ergonomic issues related to the design of a 10,000 sq ft GI clinic in a 10 story hospital. Ergonomics included design of manual cleaning and sterilization stations with comfortable working access and posture for a wide range of healthcare workers. Hygiene including "hands-free" operation of sinks and toilet facilities. Stainless steel fixtures and materials for easy cleaning. Included adjustable sinks heights, pass through windows with access, heavy patient load considrrations. Fall protection included platforms of Air Handling Unit at roof top. .

2,000 2011

1037

Building 6 Renovation at Aleda E Lutz VAMC Saginaw, Michigan

I, II, III, IV, V

Michigan

Fall protection, electrical and ergonomic issues related to the design of mechanical systems. Hygiene including "hands-free" operation of sinks and toilet facilities for a converted boilerhouse.

4,500 2011

1046

Chlorine Monitoring III,IV

Indiana

Review, make recommendations and equipment selection for the customers chlorine gas hazard monitoring system. To include additional monitoring devices and communication to a central notification system and the utilties dispatch and fire department dispatch center. Intergrate the two systems in to the plants emergency response system.

100 2011

1043

Chlorine Process Hazard Analysis (PHA)

III,IV

Indiana

29 CFR 1910.119 OSHA PSM Process Hazard Analysis. Safe handling of 2-ton chlorine cylinder with a catastrophic risk radius of 1.3 mile. Mitigation strategies with alrams, training, operating procedures and additional handling devices.

500 2010

1042

Chlorine P and I D III,IV,V

Indiana

Process Safety Management to update and generate nine chlorine site facility process and instrumentation schematics as well as locations for safety equipment and functioning. Installation review, operations analysis. Liquid Chlorine used: evaporators, chlorinators, eductors, process water, solution water. Chlorine Gas used: chlorinators, eductors, process water, solution water

30 2010

1041 Chlorine PSM Compliance Audit / Assessment

I,III,IV,V Indiana Review and update of the costumers PSM program, questionaire and operating procedures. 15 2011

1040

BOF - Caster Project Management

I,II, III,IV

Indiana

Fall protection, electrical and ergonomic issues related to the design of Material Handling system related to transfer of raw material at 200 ton / hour. Included review of load stations, maintenance platforms and accessibility requirements.

25,000 2011

USGSDOI- US Geological Survey -LMERS - National Park Service

II, VIndiana

The feasibility study required assessment of fall protection features for conversion. Ergonomics issues related to laboratory design, work stations and handling procedures for a a Class III

50 2011

1022Security Upgrade - Outpatient Pharmacy and Agent Cashier

II,III, IVIllinois

Upgrade security systems and additional features to include cameras, windows, reflected ceiling relocating and wall relocation

600 2010

1039

LMF Engineering, piping and controls Engineering and Equipment Design

I, II, IV,V

Indiana

LMF Hot Well water system drainage study, engineering design

2,000 2010

1034

Consolidate Scope Sterilization at Richard L Roudebush VAMC Hospital, Indianapolis

II, III, V

Indiana

Ergonomic assement and mitigation included design of sterilization stations, pass through windows, height of sinks, contamination challenges combined with weight and ergonomics considerations

500 2010

1044

BOF - Caster Project Management - Ergonomically designed trolly

I,III,IV,V

Indiana

Ergonomics: Assessment and implenetation design of manual-trolley around hazardous molten steel in limited confined space. Bending and turning stresses, load distribution to permit low center of gravity and prevention of flipping hazard.

30,000 2010

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 9: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

1032

Storm Sewer Drainage System for BOF at Steel Mill

Indiana

Provide Design Concept drawings to include sewer manholes, drain piping and perforated french drain piping to take care of constant flooding issues between the BOF and Caster facilities. 250 In progress

981Process Safety Management - Propane System Coordinator

I,III,IV,VIndiana

Maintenance report keeping, equipment changeovers, HAZOP Training, 16,000 2009

Energy FAA

Energy Audit for FAA facilities - Southern Region

I, II, III, VI Florida, Georgia,

North Carolina,

Tennessee

Provide Analysis on FAA facilities for energy reduction and conservation. Recommend Energy Conservation Measures related to light occupancy changes, operation of chillers, Air Handling Unit modifications, Pump modifications. Cooling tower operations

120 2009

1030

Electrical Upgrade - Buildings 58, 98, 104

III, IV

Illinois

Hazards asseemment and mitigation included existing access and electrical issues, ground and fault protection issues and mitigation strategies by coordination studies, fencing and proper classification of equipment installation.

1,100 2009

1031

Structural Evaluation and Analysis Building 103

III, IV

Illinois

Electrical hazard assessment after a fire. Provided evaluation and analysis of the structural integrity and make recommendations in the form of a report to the VA for Building 103, Nursing Unit No. 4 Mechanical Room which was damaged when the electrical transformer outside the south end of the building caught fire. Inspection included roofing and insulation, wall and roof framing and review of the structural drawings

100 2009

1031

PHA Analysis Sessions for Co-Generation Plant under construction

I,III,IV,V

Illinois

Fall protection assessment included valves access and platforms, electrical hazards during maintenance and operation and ergonomical considerations for equipment maintenance and removal. and piping review,

18,500 2009

1033

Emergency Department addition to building 58

II, III, V

Illinois

Electrical and ergonomic issues related to the design of a 9,000 sq ft Emergency Department. Ergonomics issues were combined with security consideration during late hours and included design of manual transfer of patients from the ambulances, heavy patient load considrations and lifts. Hygiene included fixtures and sink "hands-free".

3,000 2009

990-05BOF Stack Replacement and Upgrade - Engineering detail design

I,III,IV,VIndiana

New stack shell design, access platforms, ladders, Gas flow measurements, electrical and lighting, lifeline and fall protection anchors

1,500 2009

ABE-01Columbarium Expansion - Abraham Lincoln National Cemetery

IIIllinois

Hazard assessement and abatement included falling and slipping hazards around adjoining creek, cleanable, yet non slip walking services. Height of niches for access.

2100 2009

1021

SPD Suite - HVAC and Pure Water System Upgrade

II,III,V

Illinois

Air borne Contamination Control: Upgrade of HVAC, Operational objectives with Energy cost sensitive approach. Ventilation, heating system, chilled water system. Pure Water system: RO unit, Circulation system

400 2008

1020

New Storage Building with multiple truck bays including electricity, lighting and heating. New Soil Pit design to replace for ground maintenance soil storage at Cemeteries (Design-Build)

II,III,IV,V

Kentucky

Site layout, sewers, foundations, block framing, overhead doors, Electrical, fire hydrant, roof, Fire Detection

420 2008

997

BOF Alloy Feed Conveying System - Engineering Study Design. Bin sizing, equipment specifications and Request for Proposal

II,III, V

Indiana

Site Utilities, Equipment Layout, Furnace chutes, structural floor layout, electrical, controls, weigh belt feeders, alloy feed receipt

21,000 2008

1014Fuel Loading Station - Engineering Services (Detailed Design

I,II,IV,Indiana

Assessment and mitigation fuel loading stations and loading considerations including fall protection and electrical ground safety.

750 2008

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 10: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

1015

Engineering Services for Natural Gas Mixing Station to supply in the case of an emergency to Coke Oven Gas Main Pipe Line - Design and installation

I,IV

Indiana

Falll protection, mixing station building, ventilation, Natural Gas, Coke Oven Gas, steam tracing relocation, condensate relocation

1,000 2008

1017

Engineering Services to provide ETRAINING for operators and maintenance personnel at LMF Water Treatment Plant

I,III,IV

Indiana

Training courseware design and implementation.for operations and maintenance.

50 2008

1023PHA Analysis Sessions for Co-Generation Plant,

I,III,IV,VIllinois

Hazard Analysis, risk analysis, Energy usage review and reduction, new Power Plant facility design process and piping review,

15,000 2008

1016

BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System upgrade including fan, VFD, piping and controls Study and Equipment Recommendations

I,III,IV,V

Indiana

Hood Cooling water system monitoring, heat exchanger fans, Air humidity and speed recording, BOF Furnace consumption

2,000 2007

990-01

Electrical Upgrade, NEC Violations, 5 hospital buildings and complex, 200,000 sq ft area

III,IV Illinois

Hazard mitigation per NEC rules compliance. Mitigation strategies included: Electrical conduit overfill, new panel, conduits, clearances, tap violations, grounding procedure, support of electrical equipment and heat removal issues.

500 2008

1013

Engineering Study and Equipment Recommendations for Pickle Line Strip Surface Inspection System

I,IV,V

Indiana

Pickle Line existing utilities field and drawing surveys, piping modifications, equipment modifications new equipment installation 700 2006

1012

Engineering Study and Recommendation for Pickle Line Fume Exhaust System Upgrade and Replacement - Environmental Controls

I,IV,V

Indiana

Pickle Line existing utilities field and drawing surveys, piping modifications, equipment installation, demolition

2,500 2006

996Air Compressor Upgrade Engineering Study, Design and Installation

III,IVIndiana

Site Utilities, Water , natural gas, sewers, foundation pad, electrical, demolition, Air Reservoir tanks, piping, silencer 2,500 2006

GAF-01

GAF piping and valve stations replacement and upgrade - Engineering study and piping installation design

IV, V

Indiana

piping design, new pump installation, pipe supports, steam piping, condensate piping, liquid asphalt piping

400 2006

991-01

New Storage Building with multiple truck bays including a washbay, site utilities, natural gas, electricity, water, sanitary and storm sewers ( Design-Build)

II,III,IV,V

Illinois

Site Utilities, Water,natural gas, sewers, foundation, framing, brick exteriors, insulated, Electrical, HVAC, roof, Fire Detection

400 2006

GAF-02GAF Materials - Engineering Construction Management

IV, VIndiana

Assessment and mitigation of tank car loading considerations including fall protection and electrical ground safety. 400 2008

976 Gas Cleaning System review for damper operations and furnace control for two-furnace operations for increased productivity

I, III, IV, V Indiana Scrubber, Venturi, Waste Water Treatment,Electrical, HVAC, CO Detection and Suppression,

250

2006

992 BOP PHA Gas Cleaning Engineering Study

I,III,IV,V Indiana Duct layout, Furnaces, Water sprays, Heat analysis, Safety concerns, Maintenance recommendations 20 2006

989-01 BP Propylene Facility - Engineering Services

I,II, IV, V Indiana Tank - decompression and cleaning 15 2006

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 11: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

990-01-02BOF Stack Replacement and Upgrade - Study design

I,III,IV,VIndiana

Foundation and structural assessments, current gas flume assessment, new stack reinforcement design, access platforms, ladders and stairs, Gas flow measurements

1,000 2006

975 Engineering study that surveyed and identified savings in complex of 400,000 lb/hr of steam system with 10,000 ft of steam piping.

IV, V Indiana Site Investigation, Survey Documentation, Report Development

200

2005

976 Commissioning Services for a Light Oil Loadout Station Upgrade, including new operator panel, flowmeter & vapor recovery system

I, III, IV, V Illinois Checklist Development, Operator Training, Troubleshooting, Electrical, HVAC, Fire Detection, Fire Suppression

800

2005

978 New Boilerhouse Utility Piping, Four(4) 150,000 lb/hr of Steam at 900 psig including coke oven gas, natural gas, instrument air (IA), nitrogen (N2), potable water & service water with supports & tie-in locations - Detailed Design

IV, V Indiana Process Tie-In, N2 / IA Switchover Station Design, Multi-Team Coordination

25,000

2005

960-04 2500 GPM Emergency Water System for an industrial plant, including tie-in into existing water supply, pumping & recirculation piping, pump controls & fuel oil tank conversion to water service - Detailed Design

I, III, IV, V Indiana Pump Selection, Control Scheme Development, Tank Modifications, Piping Design

1,000

2005

963-01 Etraining System for Process Heater and Gas Cleaning Systems at a Sinter Plant, modules

I, III, IV, V Indiana Process Review, Site Walkdown, Module Development

120

2005

966-2 Two(2) 39,000 cfm Fume Exhaust Systems for Process Line, including scrubber & fan specifications, hood & ductwork designs - Detailed Design

I, III, IV, V Indiana Equipment Layout, Hood & Duct Design, Lifting Mechanism & Building Designs, Electrical, HVAC, Fire Detection, Fire Suppression

1,200

2005

975A Pre Carbon Facility - Fuel Change over - COG Distribution Analysis, Suitability Review and Facility Definition for six(6) 60 MM BTU/HR Coke Oven Gas Trains.

I, II, V Indiana Coke Oven Gas Piping, Tie-In Locations, Energy Savings Evaluation, Electrical, HVAC, roof, Fire Detection, Fire Suppression

2,500

2005

976-02 Engineering Services for new electrically driven, 15 HP pumps with platform & piping for a chemical loadout station - Detailed Design

I, III, IV

Illinois

Structural Design, Pump Location, Light Oil Piping Design, Electrical

800

2005

977-02A New Boilerhouse Desuperheated Water Generation, including reverse osmosis skids, 1st Pass 1000 gpm, 2nd pass 100 gpm, tank, & transfer pumps, deaerator with controls & interconnecting piping - Detailed Design

I, III, IV, V Indiana Foundations, Space Utilization, Control Scheme, Piping Installation, Electrical

1,200

2005

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 12: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

984-01Cross Country Oil Line system, 4000 ft, steam heated

I, III, IVIndiana

Flexibility, loops, control system, multiple users2,000 2005

960 Engineering Study and evaluation of a 110,000 GPM Cooling Water System, including system replacement scenarios & Emergency Pumping System

Indiana Pump & Driver Selection,

10,000

2004

972 Feasibility Study for a heating station roof conversion from an open loop cooling system to a closed loop cooling, 100 MM BTU/hr system

I, III, IV Indiana Envelope Determination, Existing Utility Evaluation, Calculations, Electrical, HVAC, roof, Fire Suppression

1,000

2004

956-2 Chemical Loadout Station Vapor Recovery Upgrade, including vapor recovery, plc controls, utility piping & loadout platform - Detailed Design

III, IV, V Illinois Valve Station Design, Pipe Routing, Structural Platform Design

800

2004

959-1 Engineering Study for new air compressor facility at a Pickling Line, including site walkdowns, drawing research and flow measurements

IV, V Indiana Compressor Selection, Equipment Location Scenarios, System Evaluation

700

2004

959-2 New Air Compressor Facility for a Pickling Line, including 2 x 2000 cfm compressor station layout, selection, control scheme development and piping layout - Detailed Design

I, III,IV Indiana Structural Base Design, Piping & Support Design, Power Tie-In Location, Electrical, Fire Detection

700

2004

960-02 Engineering Study and evaluation of a 100,000 gpm Plant Water System, including taking and analyzing flow measurements

Indiana Plant Water System Walkdown, Flow Measurements, Piping Replacement

10,000

2004

965-1 & 965-2

Etraining system for Hot Strip Mill Operations & Maintenance

IV, V Indiana Module Development, Process Review, 100

2004

966-1 Two (2) 39,000 cfm Fume Exhaust System for Electr Tinning Lines, including scrubber & fan specifications, hood & ductwork designs - Conceptual Design Study

III, IV, V Indiana Equipment Location Scenarios, Utility Tie-In Determination, Duct Routing Selection, Electrical, HVAC, Fire Detection, Fire Suppression

30

2004

970-01 Process Safety Management & Training Services for a chemical loadout station upgrade

I, II, V Illinois Training Manual Development, PSM Plan Modification

80

2004

QBOP-1 Training System update for a Q-Bop Propane System, OSHA required

IV Indiana Module Update100

2004

945 Gas Cleaning Stack Performance improvement, review and recommendations for the gas cleaning system

I,IV Pennsylvania Process Review, Report Development

2,000

2003

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 13: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

946 Chrome Plating Facility 2000 cfm Fume Exhaust Upgrade, including, ductwork design, plating solution evaporation system & storage tank design - Detailed Design

I,II,III Indiana Tank Design, Pipe Mat'l Selection, Equipment Selection, Platform Design, HVAC, Electrical

1,200

2003

947 Galv Line Compressed Air Knife Study

I, IV Indiana Process Evaluation, Piping Modifications 3,000 2003

948 Computer Based Training for 2000 scfm Fume Exhaust System Upgrade at a Chrome Plating Facility

I, III, IV Indiana Graphic Design, Module Development, Classroom Training

1,000

2003

950 Drawing Revisions for power generation facility

III Illinois Electronic Document Management, CAD Work 10,000 2003

952 PSM Administration for a propane system at Q-BOP

I,IV,V Indiana Classroom Training Sessions, Audit Performance10,000

2003

953 Engineering Study of Hood Cooling Water system for a two (2) molten 285 Ton Furnaces

I,II Indiana Data Gathering & Evaluation, Report Development

2,000

2003

927A Oxygen System Upgrade for a Building Including new oxygen control stations, piping, alarms & controls - Detailed Design

II,III,IV Illinois Alarms, Power & Control Wiring, Oxygen Piping, Site Preparation, Electrical, HVAC, Fire Detection

500

2003

956-1 Conceptual Study for a Chemical Loadout Station Vapor Recovery Upgrade, including location selection, tie-ins for new utilities and Control Panel Location

I,II Illinois Location Options, Utiility Tie-Ins, Electrical

800

2003

929 USS-GW Q-BOP Propane Facility PSM Administration 2002

I, III, IV Indiana Audit Performance10,000

2002

930 As-Built Documentation III Illinois CAD Based Drawing Modifications, Electrical 10 2002937 Plant wide 4000 scfm, 3000

linear feet Compressed Air System Demand Management & Leakage Reduction Surveys

IV Indiana Field Survey, Piping Modifications, Operational Efficiency Improvement

2,500

2002

942 Rewinder - Rewind End Upgrade & As-Built Documentation; Aluminum Core Structural Analysis

IV, V Indiana Stress Calculations, Equipment Installation, CAD Drawing Development 100

2002

944 As-Built Drawing Documentation for a power generation facility

III Illinois CAD Work, Drawing Management10

2002

922-2 Compressor Facility, Including Compressors (2000 cfm x 4), Dryer, Receivers (2 x 15,000 gal.), Piping Modifications & Control Systems - Detailed Design

I, III,IV Indiana Compressors, Dryers, Receivers, Location Selection, Piping, Electrical, HVAC, Fire Suppression

2,000

2002

922-3 Computer Based Mechanical & Electrical Training Programs for Air Compressor Facility Operation & Maintenance

III Indiana Training Program Development

50

2002

927-1,2 Chrome Line Plating Solution Temperature Control for improvement in yield and quality

IV Indiana Piping Design,Equipment Selection, Process Calculations

300

2002

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 14: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

MG-1 Precipitator Penthouse Seal Air System Replacement

I,II, IV, V Illinois Site Review, Data Gathering & Review, Report Development100

2002

VA-Danville

(925)

2300 cfm HVAC Unit & 350 Ton Chiller Upgrade for Buildings 98 & 101 at a VA Hospital - Detailed Design

I,III,IV Illinois Power & Control Wiring, HVAC Selection & Installation, Site Preparation, Electrical, HVAC

600

2002

VA-Saginaw

(928)

Medical Air System Upgrade for a VA Hospital, including compressor installation & piping modifications - Detailed Design

II,III, IV, V Michigan Alarms, Power & Control Wiring, Medical Air Piping, Equipment Installation, Electrical, HVAC, roof, Fire Detection, Fire Suppression 300

2002

888 QBOP Computer Based Training Program for Propane Facility Operation & Maintenance Departments

I, IV Indiana Training Program Development

30

2001

903 Dust Emission Control for Industrial waste recycling plant - Engineering Study

IV Indiana Temperature Measurements, Process Review1,200

2001

905 QBOP Process Safety Administration for a Propane System at a Integrated Steel Mill

IV Indiana Data Organization

1,000

2001

917 New 8000 cfm Air Compressor Facility Location for a Tinning Line - Study

IV Indiana Facility Location Selection, Utility Tie-Ins, Usage Requirements

1,000

2001

918 UV Light Installation for Coating Line - Detailed Design

II,V Illinois Web Path Modifications, Structural Calculations25

2001

920 Control Valve Relocation & Piping Modifications for a Rolling Mill - Detailed Design

II, III Indiana Piping Design, Outage Requirements, Electrical

10

2001

921 New 10,000 sf Coating Facility As-Built Documentation

III, IV Illinois Site Measurement & Documentation10

2001

923 Industrial Facility Effluent Monitoring Station - Detailed Design

III, IV Indiana Equipment Selection, Process Review50

2001

924 QBOP USS-GW - QBOP Propane Facility CBT

III, IV Indiana Module Review, Program Modifications 10,000 2001

890-10 Bubbler Tank Design for a Pickling Line Fume Exhaust Upgrade

I, III, IV Indiana Tank & Piping Design50

2001

890-12 OWTP additional engineering services

IV Indiana Process Review 2,500 2001

890-13 Engineering Services for Waste Treatment Facility

IV, V, VI Indiana Portable Tank & Pump Selection, Vendor Coordination 2,500 2001

890-14 Fume Exhaust System Engineering Services

IV Indiana Process Modification, Data Gathering 2,000 2001

890-15 75" P.L. & OWTP Fume Exhaust Additional Services

II, IV Indiana Process Evaluation, Piping Changes2,000

2001

890-8 66" pickle line fume exhaust additional engineering services

II,III, IV Indiana Piping Design, Electrical1,200

2001

890-9 75" pickle line fume exhaust additional engineering services

IV, V Indiana Process Site Review1,500

2001

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 15: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

903A Gas Cleaning System Upgrade and replacement of scrubber with a 280,000 acfm baghouse - Engineering Study & Conceptual Design

III, IV Indiana Baghouse Location, Foundation Design, Electrical Power Requirements

5,600

2001

922-1 Compressed Air, 8000 scfm, 3000 lf, 8" dia. plant wide system. Investigation for Energy Savings and New Compressor Facility Planning - Engineering Study

Indiana Compressors, Dryers, Receivers, Location Selection, Piping Design

2,000

2001

787 LMF Vacuum Degassing Process - Contact Cooling Water Treatment - Study

IV Indiana Report Development, Calculations30

2000

815 Blast Furnace Supervisor's Welfare Building- Location Study

IV Indiana Building Location, Foundation Design, Electrical, HVAC, roof, Fire Detection, Fire Suppression 500

2000

844 Plant Air System upgrade study for combined Tin Mill & Sheet Mill

Indiana Equipment Selection & Layout700

2000

865 Propane Supply System with 21000 gallon tanks, pumps, heat exchangers, vaporizers and piping - Process Safety Management - OSHA Regulated

IV Indiana Manual Preparation, Program Facilitator

10,000

2000

869 Q-BOP Propane Supply System with three 7000 gallon tanks, pumps, heat exchangers, vaporizers and piping - Commissioning Plan

IV Indiana Manual Development, Checklist Development

35,000

2000

873 Continuous Annealing line deionized water supply for Quench Tank study

Indiana Equipment Location, Process Investigation600

2000

876 Plant Wastewater System - Detail Engineering

IV Indiana Pipe Routing & Design250

2000

888 QBOP Propane Facility Training Program CBT, Manual, Classes

I, III, IV, V Indiana Manual Development, Training Class Organization125

2000

891 Conceptual Design of a water softening system for a Rolling Mill

IV, V Indiana Equipment Location, Process Development2,000

2000

892 Hot water system upgrade for a locker room of an industrial facility

Indiana System Review, Equipment Selection200

2000

893 LTV bof hood cooling system as-builts

IV Indiana Drawing Revisions 10 2000

898 DI water System Design , Quench Tank Plant Water Filtration for High purity Uses -

Indiana Equipment Design, Equipment Location

100

2000

899 Conceptual Design for a potable water supply upgrade to a Rolling Mill

Indiana Conceptual Piping Design, Equipment Selection50

2000

901 Tundish Yard As-Built Modifications

Indiana Drawing Modifications (CAD Based) 10 2000

902 LTV - HVAC Service Water Pit modifications (conc. floor & remote valve actuation)

Indiana Structural Design, Vendor Contact

10

2000

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 16: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

904 Fume Exhaust System Performance Study for Plating Line

V Indiana Technology Selection, Scrubber Location, Airflow Calculation1,000

2000

919 Dust Suppression Sprinkler System for bulk material transfer company, 1000 gpm, 22 poles Study & Design

IV, V Illinois Hydraulic Calculations, Troubleshooting, Controls, Piping, Equipment Selection, Electrical, Fire Suppression

1,250

2000

865-1 Q-BOP Propane Facility Fire Protection System - PSM -Design Review, Commissioning support, Prevent. Maintenance

I, IV, V Indiana Fire Protection, Fire Suppression

2,000

2000

882-1 Manufacturing Facility - Web Path and Structural Modifications - Detailed Design

Indiana Structural Design

10

2000

889-01 Caster Refractory Spraying Robot Site prep (rails, hoses, utilities...) for Caster tundish Aisle

I, IV, V Indiana Rail Design, Utility Tie-In, Clearance Review

1,000

2000

889-02 Jib crane installation & manual preparation for Caster Tundish Aisle Additional

Indiana Selection of Equipment, Foundation Design

50

2000

890-1 Cleaning & Pickling rinse acid Drain Line Modifications - Detailed Design

IV Indiana Mixing Tank Design, Drain Pipe Routing, Conductivity Control

30

2000

890-2 Cleaning & Pickling Rinse Acid Modifications - Treatability Study

IV Indiana Stream Sampling, Flow Mixing50

2000

890-5 Operation & Maintenance Manual Development for two (2) Pickling Lines

Indiana Data Accumulation & Organization50

2000

897tin Tin mill eyewash stations potable water supply study

IV, V Indiana Field Survey, Site Investigation50

2000

903-1 Sinter Plant Fugitive emissions control with improved hood design and enhanced dust collection system of a plant with 400 lb/hr of dust loading

IV Indiana Baghouse Sizing, Flow Determination, Hood Design

800

2000

906bop Natural Gas consumption study for scrap preheating and facility heating

IV Indiana Site Review, Data Gathering, Flow Diagram Development1,000

2000

VA Heating, Ventilation & Air-conditioning of dedicated Clean and Soiled rooms in a SPD facility with 4000 cfm each outside air - Study & Design

II, III, IV, V Tennessee Equipment Selection, Exhaust Duct Routing, Flow Determination, Electrical, HVAC, roof, Fire Detection, Fire Suppression 1,100

2000

810 2000 scfm Compressed air system for BOF Plant - Study and conceptual design

Indiana Compressors, Dryers, Piping Design, Electrical

1,800

1999

846 HVAC Water Supply Upgrade for Caster Building -Detailed Design

Indiana Pipe Routing, HVAC, Fire Suppression500

1999

851 Caster Maintenance Office Sanitary Lift Station Upgrade - Detailed Design

Indiana Equipment Design, Electrical Design, Pump Selection2,700

1999

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 17: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

853 Galvanizing Line Air Knife Nitrogen Wiping System Installation - Piping and support design, reducing and flow control stations, Detailed Design

IV, V Indiana Valve Stand Design, Pipe Routing, Electrical, Fire Detection, Fire Suppression

750

1999

860 Steam-based Hot Water Supply for 200 persons - Study

Indiana Heat Exchanger Evaluation400

1999

863 Plant 4,000,000 BTU /Hr Gas-Fired Hot Water Heater Installation - Detailed Design

IV, V Indiana Hot Water Heaters, Piping Design, Electrical, HVAC, Fire Detection, Fire Suppression 250

1999

864 Sheet Mill compressor upgrade, Demolition Plan & Detailed Design

IV, V Indiana Equipment Sizing, Equipment Layout, Utility Search1,100

1999

866 75" Pickle Line Acid Rinse Water Flow Restriction Study

IV, V Indiana Piping Layout20,000

1999

871 Sinter plant air emissions upgrade, improved hood design, breaker end separator upgrade

IV, V Indiana Site Walkdown, Process Design, Equipment Modifications

1,000

1999

872 BOF Command Tower Sewage and Mill Water Lift Stations - Detailed Design

IV, V Indiana Lift Stations, Piping Layout, Electrical

200

1999

874 5 stand water conditioning for 300 GPM Shape Control System - Study

IV, V Indiana Equipment Selection, Plant Hook Up, Equipment Location, Process Investigation 1,100

1999

875 Construction & Commissioning Assistance for a QBOP Propane Supply System Installation including Scheduling, Construction Review, Expediting, Testing, Factory Acceptance Tests, Commissioning Benchmarks, Operator Interfaces

IV, V Indiana Commissioning, checkout and scheduling

2,500

1999

879 Performance Improvement for Air Knives coating plant - Instrument Air conversion to Nitrogen Detailed Design

Indiana Pipe Sizing, Pipe Routing

2,000

1999

880 Vacuum Generating Process, Contact Cooling Water Treatment Study

IV, V Indiana Water Sampling, Data Review1,000

1999

895 Remote Annunciation and Control for Air Compressor Installation - Detailed Design

IV, V Indiana Control Wiring, Power Wiring, Electrical

85

1999

896 Caster - Tundish Refractory Robot Spraying Station Installation - Commissioning Assistance

IV, V Indiana Commissioning, checkout and scheduling

1,700

1999

882-2 Manufacturing Facility - Adhesive Delivery System - Detailed Design

IV, V Indiana Piping Design, Equipment Location, HVAC, Fire Detection15

1999

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 18: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

897util Plant wide study of Boiler and Cogeneration system for operation and hazards in a 1,500,000 lb/hr steam eight boilers, 150 MWe electricity system HAZOP study for TurboBlower BoilerHouse

IV, V Indiana Report Development, Sitework, Electrical

2,500

1999

903-2 200,000 scfm Gas cleaning system with venturi scrubbers, cyclonic separators and a 2500 gpm circulating water system. -Study

IV, V Indiana Site Investigation, Vendor Contacts, Report Preparation, 6000 Hp Motor Review

1,000

1999

804 Compressed Air System Upgrade -

Indiana Location Options, Utility Location 300 1998

808 BOF Dust Transfer, bulk material handling system

IV, V Indiana Baghouse Location, Duct Routing & Design, HVAC 125 1998

818 Blast Furnace Spare Parts / Modular Office Building Installation & Site Prep, 2500 sq. ft - Detailed Design

Indiana Building Design, Building Location, Utility Search, Electrical, HVAC, Fire Detection, Fire Suppression

700

1998

823 Galvanizing Line Compressed Air Supply for Air Knives - Screw Compressor Replacement with centrifugal units 3 x 3000 cfm - Study and Detailed Design

IV, V Indiana Equipment Selection, Equipment Layout, Piping Design, Electrical

2,000

1998

824 BOF Post combustion System with control and reducing stations for 4000 scfm flow rate - Detailed Design

IV, V Indiana Equipment Location, Process Development, Valve Stand Design, Pipe Routing, Electrical

3,000

1998

831 BOF Gas Quenching system enhancement with atomized air dual media spray nozzle of a 100 million BTU/hr, 2000 gpm system - Study

IV, V Indiana Nozzle Selection, Nozzle Ring Design

100

1998

834 Waste Stream Dewatering for Electrolytic tinning Line - Detailed Design

IV, V Indiana Dewatering Skid Design, Equipment / Material Selection700

1998

839 Productivity improvement of a BOF by enhancement of auxiliary feed and heat removal system, Review of Gas Cleaning System including furnace operations, hood design and cooling, induced draft fan and auxiliary systems - Study

IV, V Ohio Production Improvement

2,500

1998

841 Blast Furnace Cold Blast Mains Nitrogen purging for combustible concentration control ( 0- 3000 scfm, 80 psig, 10 changeovers system) - Study

II, IV, V Indiana Valve Stand Location,

800

1998

843 Tin Line Quench Tank Temperature Control System for strip coating quality improvement

II, IV, V Indiana Process Investigation,Technology & Equipment Selection

800

1998

845 BOF Hood Cooling Water System review to eliminate production snags - Study

I, IV, V Indiana EPA Limits, CO hazards, cooling of furnaces

50

1998

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 19: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

847 Tinning Line chemical section hot water generation as-built documentation

IV, V Indiana Equipment Documentation, Flow Diagram Development

5

1998

848 Chrome Plating Line Solution Evaporation System as-built documentation

IV, V Indiana Equipment Documentation

30

1998

852 Shower and Locker facility, 1,800 sf,- Location Study

II, V Indiana Building Layout, Utility Search, Electrical, HVAC, roof, Fire Detection, Fire Suppression 800

1998

854 1,800 sf Welfare Building Installation for Hot Strip Mill -Detailed Design

II Indiana Utility Location, Building Design, Building Location, Electrical, HVAC, roof, Fire Detection, Fire Suppression 800

1998

859 LMF Vacuum Degassing Process As-Built Documentation

Indiana CO scrubber, steam jet ejectors1,200

1998

877 6 stand oily wastewater treatment & cost reduction study

IV Indiana Process Investigation500

1998

883 Caster Tundish Handling Clearance Study

Indiana Crane Handling, Logistics design 25 1998

793 LMF Vessel Roof Water Spray Cooling System - Study

IV Indiana Cooling Tower1,250

1997

796 Upgrade Sheet Mill Plant Air Compressors and Distribution System - Instrumentation and Controls, Automatic operation and remote monitoring - Study

II, III Indiana Piping, Equipment Layout, Electrical

1,800

1997

800 Energy savings by BOF Scrap Pre-Heating Impact - Natural gas system, lance handling system

IV Indiana Concurrent Furnace Operations

15

1997

801 Continuous Caster - Emergency / Backup Air system for Air Mist Cooling - Study

IV Indiana Pipe Routing

1,000

1997

809 Office Building - Hot Water Recirculating Heating System Upgrade 5 MM BTU/Hr - Detailed Design

II, V Indiana Pumps, Piping Design, Electrical, HVAC, roof, Fire Detection

70

1997

813 Fuel Oil Transportation - Truck Loading and Unloading Stations - Study and conceptual design. 200,000 gallon per day

I, IV Indiana Unloading Stations, Truck Movement, Electrical, Fire Detection

700

1997

814 BOF - Flux Handling at Unloading station with provision for a 42,000 cfm Dust Collection System - Study and conceptual design

I, IV, V Indiana Baghouse Selection, HVAC, electrical

600

1997

816 Integrated Steel Facility Fuel Oil Pipeline 3000', 8", Lakefront to Merchant Mill - Conceptual design and cost estimate preparation

II Indiana Piping, Stanchions

2,700

1997

817 Steel Producing Complex- Upgrade Plant Air Distribution System - Study and conceptual design

II Indiana Equipment Location, Equipment Selection

100

1997

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 20: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

819 BOF - 1300 gpm Lance Cooling Water System Upgrade - Study

IV, V Indiana Pump Upgrade, Pipe Upgrade, Heat Exchanger Upgrade, Electrical 200

1997

821 BOF Gas Cleaning System Draft Monitoring of 500,000 scfm particulate laden gas - Detailed Design

IV, V Indiana Pressure Transmitter Selection, Outage Requirements, HVAC

1,000

1997

825 66" Pickle Line acid supply vent line study

II, IV, V Indiana Pipe Routing, Pipe Supporting 200 1997

827 LTV-Galv. Line Air Compressor Replacement detailed design

II Indiana Demolition Plan, Compressor Layout, Air Piping Tie-In, Electrical, Fire Suppression 1,000

1997

828 Tin Mill 5,000 gal. sulfuric acid tank replacement-detailed design

I, II, IV, V Indiana Tank Design, Pipe Material Selection1,000

1997

829 Tin line 10" steam line installation for chemical treatment section - Detailed Design

I,II, IV Indiana Pipe Routing & Supporting

500

1997

850 2400 gpm Slip Stream Filtration, platforms and piping - Detailed Design

I, IV, V Indiana Equipment Selection, Pipe Routing500

1997

791 BOF Steam Injection Nozzle Relocation and Reorientation - Examination of Waste Gas Cleaning System Conditioning and Precipitor performance

IV, V Indiana Evaporator Chamber

80

1996

792 5 Stand Tandem Mill Hydraulic Oil Cooler Performance Analysis, Added 500,000 BTU Heat Exchangers - Study

IV, V Indiana Process Requirements, Heat Exchanger Location

10

1996

794 Sinter Plant Air Emissions Upgrade, Conversion of Electrostatic Precipitator to Drop-out Chamber Study

II, IV, V Indiana Drop-out Box Internals Design, HVAC

700

1996

795 5 Stand Tandem Mill Hydraulic Oil Cooler Performance Analysis, Added 500,000 BTU Heat Exchangers - Detailed Design

IV, V Indiana Heat Exchanger Selection, Piping Layout, Electrical Design

400

1996

797 BOF Hood Cooling Water Expansion/Mixing Tank Developed internal tank modifications to upgrade flow distribution and reduce residence time, and pressure drop to eliminate high-hood pressure aborts.

IV, V Indiana Tank Internals Design

100

1996

798 BOF Hood Cooling System Expansion Tank - design modification with a nitrogen blanket system. Gas Cleaning System review

IV, V Indiana Control Valve, Piping, Electrical

100

1996

799 Process Safety Management for Coke Oven Gas Desulfurization Facility, Program Development & Manual Preparation

IV, V Indiana Manual Development

10

1996

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene

Page 21: SAFETY AND RISK MANAGEMENT of Qualifications - Hazard...3 SAFETY AND RISK MANAGEMENT Management, Facility Assessment, Engineering and Training Risk and Hazard Assessment • Program

Project Number Project Title Hazard /

Abatement Location Hazard Risk ConsiderationsEst.

Project Cost

Year Complet

ed

EnerTronics Engineering Corp.

Hazard Abatement

Project Listings: Period 2008-2011

802 Slag Splash Process at Basic Oxygen Furnace - Detail Engineering relating to nitrogen system

II, IV Michigan Piping Layout, Furnace, Lance

20

1996

803 As-Built Documentation for a rolling Mill performance upgrade

Indiana Drawing Modifications (CAD Based)50

1996

806 Steel Mill Shops process sewer upgrade oil separation pit Detailed Design

Indiana Separation Pit Design

2,500

1996

830 BOF-Post Combustion Commissioning Assistance

I, IV Indiana Check out, Checklist Development, Troubleshooting300

1996

787A LMF Cooling Tower, Performance Upgrade - Study

I, IV Indiana Cooling load, Fan, Fill, Distribution piping300

1996

Legend: I - Fall Protection, II - Ergonomics, III - Electrical, IV-Flammability V - Hygiene


Recommended