Introduction
The Safran Project Systems Guide is the reference guide to Safran Project tables and definitions. The
guide contains four parts:
A brief introduction on how to access and view tables and field definitions by using the Database
Query feature within Safran Project
Who should read this guide
This guide is written to assist support personnel, application developers and system integrators.
Together with the Safran Enterprise Developers guide and the Safran Details Developer Guide it
provides a complete reference for application developers and systems integrators.
System Guide for Safran Project 7.2
3
Table Overview
A total of more than 150 tables are used to store your Safran Project data.
Table Description
activities All activity network related data.
activities_temp Table for temporary storage of activities
during data manipulation.
activity_bars Table for storage of manually created
annotations
activity_texts Table to store text field information for the
activities from the userfield set
activity_history NOT IN USE: Used to store complete activity
history by Status Update.
act_impact Activity Information for alternative schedules
activity_path Stores parameters used to generate path list
for selected activities.
act_risk Stores Ativity uncertainty data, (Min. Most
Likely, Max and Profile)
act_risk_px Stores seleced PX data to the database
assign_coms Stores assign field commands
available_outline Stores availability defined for outline codes.
available_ref Stores availability defined for reference fields
System Guide for Safran Project 7.2
4
bar_edit_views Stores info on all views created from the
barchart editor
baseline_a Copies of activities for every Baseline Update
baseline_dibb Storage of plan adjustments at baseline
times
baseline_log Log of all Baseline Updates
baseline_r Copies of resources for every Baseline Update
bitmap_blobs Reserved for future use
bl_rates Rates at baseline time
bl_res_rates rates/resources at baseline time
calendars All calendar definitions
chg_doc_links Documents linked to changes
chg_sch_impact Schedule impact for changes
code_configuration Stores the field configurations for code set
codeset Stores all code sets
constraints All logic constraints related network data
contract_items_periodic CPR- data - plan adjustments stored by cut-off
contract_perf_data CPR - data project standards
contract_perf_periodic CPR - data periodic, per cut off
cpr_oc_variances CPR data variance analyses per outline element
cpr_omb300_milestones CPR OMB300 milestones
System Guide for Safran Project 7.2
5
cpr_omb300_narratives CPR- OMB 300 narratives
cpr_thresholds CPR- Variance Analysis Thresholds
cpr_thresholds_periods CPR - Variance Analysis Periodic
cross_plan_links Futue: Planner SQL ( links between projects)
detail_level_config Not in use
detail_net_config Configuration of Safran Details: Calendars etc.
edit_hist_curtain Stores Editor Histogram curtain information
edit_hist_entries Stored Editor Histogram entries
edit_hist_grids Stores Editor Histogram grid and grid line
information
edit_hist_groups Stores user defined hatch, color etc. for stack on
values in the Barchart Editor Histogram
edit_hist_views Stores editor histogram View information
enterprise_codes Codes for Enterprise reference fields
enterprise_fields Enterprise fields
enterprise_values values for enterprise fields
External_ids External interface table
filter_group Stores filter groups
filter_in_group Stores filter in filter groups
filter_list Storage of saved filters
forecast Obsolete
System Guide for Safran Project 7.2
6
forecast_data Data from performed forecasts
forecast_log Log of performed forecasts
globals Global definitions
globalset Global set definition
group_access Access definitions for user groups.
group_members Members of user groups.
historic_wpn Controls usage of work patterns/calendars to ensure
consistency.
history_a Activity history data for archived sub-projects
HostId SAP-Safran specific table that is used to map activity
elements in SAP to resources in Safran
ilap_network_configuratio
n
Contains the ILAP Configurations for the Network
(Project in ILAP).
ilap_exchange_config Contains the named ILAP Exchenge Configurations
for use in ILAP-export or ILAP-import.
Impact_log Holds the name /description of the alternative
schedules.
install_config Installation configuration (security etc.)
level_config Configuration of summary networks
job Details data/not in use
job_constraints Details data /not in use
map_external_fields Userfield mapping for import/export between
Safran Project and Prima Vera
System Guide for Safran Project 7.2
7
mp_master Network groups
mp_member Networks in (members of) network groups
msp_net_index Stores information from Microsoft Project. Data set
when schedule is published from MsP.
msp_net_index_temp Temporary network and index table for Microsoft
Project schedules published to Safran. ( Currently
not in use)
msp_ufield_mapping S4MsP - userfield mapping
msp_web_reports Stores report details for reports published to SWA (
Safran Web Access)
msp_web_reports_images Store report in JPG and Pdf format for published
report.
net_calc_master Rule sets
net_calcs Rules within the rule sets
networks All network definitions
outline_codes Future Use: for MSP outline code compatibility
pa_config Used in periodic aggregation window to store
aggregation parameters.
pa_config_filters Used in periodic aggregation window to store all
aggregation filters.
path_details Stores activity ID’s for generated path list for
selected activities
period_plan_r Stores periodic baseline planned earned at resource
level. is used by periodic histograms.
period_status_a Periodic status and planned data for activities.
System Guide for Safran Project 7.2
8
period_status_r Periodic status and planned data for resources.
periodic_rates Rate record periodic rates
perm_renumbering Used for activity permanent renumbering
planner_subprojects Planner SQl subprojects
prj_comments Sub Project comments
prj_docs Documents linked to Sub Projects
prj_labels Defined f fields for sub projects
prj_pers Sub Project Person register
prj_types Sub Project Types
prj_wbs sub project wbs codes
profile_intv Profile interval definitions related to a profile.
profiles Profile definitions related to a profile set.
profileset Profile set definitions.
project_config Project configuration data.
project_costcodes Codes for contract performance reports
project_costdata Data by project for contract performance reports
project_costitem_hist Historical data for contract performance reporting
project_costitems Items by wbs/obs codes for contract performance
reports
project_member Filter by project
System Guide for Safran Project 7.2
9
pt_act_bitmaps Table of pictures to the barchart editor
pt_act_bitmaps_visible Visible pictures to a layout
pt_act_grids Table of grids drawn for an activity to a layout
pt_act_grids_visible Visible grids to a layout
pt_fonts Font definitions to the columns area
pt_links_draw_level Contains information on link/ logic drawing level. Is
a part of the layout
ptavle_collapsed_groups Save of exploded/collapsed group levels
ptavle_curtain Stores curtain definition data
ptavle_curtain_visible Stores info on weather the entries in the
ptavle_curtain table are visible for a view.
ptavle_grids Stores grid-lines created from the Other-tab on the
Grids-window in the barchart editor.
ptavle_grids_visible Stores info on weather the entries in the
ptavle_grids table are visible for a view.
ptavle_page_breaks Holds page breaks defined for a layout
qty_config Quantity formulas for projects.
rap_act Utility table for production of reports.
rap_act2 Utility table for production of reports.
rap_act3 Utility table for production of reports.
rap_act_psr Utility/temporary table for progress summary report
rap_agg_fields Utility table for production of reports.
System Guide for Safran Project 7.2
10
rap_oc Temporary table used when grouping on Outline
codes (Progress summary report , Histogram)
rap_resources Utility table for production of reports.
rap_rfield_values Utility table for production of reports.
rate_records Rate record definitions
rate_set Set of complex rates
rep_config All report configurations created by the report
generators and editors.
rep_config_data Report configuration data.
rep_config_fields Report configuration data.
rep_config_group_prop Properties for stacked histograms and spread lines
rep_config_resources Report configuration data.
rep_groups Report groups.
rep_in_group List of reports to a group.
rep_in_package Reports linked to a report package.
rep_package Report package definition.
rep_package_filters Report Package filters
resource_avail Resource availability for scheduling.
resource_def Resource definitions.
resource_rates Resource rates, links resource definitions and rate
records
System Guide for Safran Project 7.2
11
resource_set Holds all resource sets.
resources All resource related network data
resources_temp Utility table for network import
revision_dibb Adjustments to baseline/last revised plan at revision
time.
sequence_log Sequence number log for all tables where sequence
number is used.
sp_document_links Stores information about the link for documents
that have been linked to activitites. (Renamed from
documents links as that name was also used by
Oracle)
standard_bar_texts Stores text information for the symbols. Each
symbol has 6 entries in this table.
standard_bars Symbol configurations. Stores symbol- colors, dates,
hatch etc.
standard_bars_dev Configurations for deviations on symbols. Created in
the bar/properties window.
std_bars_view_config Symbol visible configurations.
sub_projects Sub project register
subnet_access Access control for sub-nets.
subnet_temp temporary table used by the Editors
subnets Subnet definitions.
subpro_pers_selection Currently not in use
symbol_inherit_draw_
order
Defines the draw order for symbols when there is a
mix of local and inherited symbols in the setup
System Guide for Safran Project 7.2
12
symbol_set Holds all symbol sets.
temp_bl_agg Utility for Baseline update.
temp_groups Utility table (for level update and reports)
user_access User access definition
user_group User group definition
user_locking Lock control table
userfield_formulas Holds formulas for userfields
userfield_config Holds field values for userfield defined in
Userfield_config
users User definitions
version Version control.
vo_reg Variation order register.
weekref Week reference data for projects.
window_defaults User window configurations.
windows Windows having access restrictions.
wpn_def Calendar definition for calendar sets.
wpn_rest Rest days and holidays definitions for calendars.
System Guide for Safran Project 7.2
13
Table Desc Descriptions This chapter provides details on the various Safran Project database tables and field definitions with
descriptions.
Table: activities Primary key: net_id, seq
Field Name Type Description
seq int Internal sequence number for
activity.
an varchar (50) Activity Name
du int Duration
pc float Percent Complete
rdu int Remaining duration
wpn int Calendar
tse datetime Target Start early
tsl datetime Target Start Late
tce datetime Target Complete Early
tcl datetime Target Complete Late
acs datetime Actual Start
acf datetime Actual Finsih
System Guide for Safran Project 7.2
14
es datetime Early Start
ef datetime Early Finish
ls datetime late Start
lf datetime Late Finish
tf int Total Float
ff int Free Float
des varchar (255) Activity Description
subnet_id int Sub-Networks Id
net_id int Networks Id
r1 int User Field, reference type
r2 int User Field, reference type
r3 int User Field, reference type
r4 int User Field, reference type
r5 int User Field, reference type
r6 int User Field, reference type
r7 int User Field, reference type
r8 int User Field, reference type
r9 int User Field, reference type
System Guide for Safran Project 7.2
15
r10 int User Field, reference type
r11 int User Field, reference type
r12 int User Field, reference type
r13 int User Field, reference type
r14 int User Field, reference type
r15 int User Field, reference type
r16 int User Field, reference type
r17 int User Field, reference type
r18 int User Field, reference type
r19 int User Field, reference type
r20 int User Field, reference type
d1 datetime User Field
d2 datetime User Field
d3 datetime User Field
d4 datetime User Field
n1 float User Field
n2 float User Field
n3 float User Field
System Guide for Safran Project 7.2
16
n4 float User Field
i1 float User Field
i2 float User Field
i3 float User Field
i4 float User Field
on_target smallint Flag for automatic linear progress
jobflag smallint Flag for “all job packs defined”
current_progress float Current progress
frontline_date datetime Frontline date against baseline
cancelled datetime Cancelled date
d5 datetime User Field
d6 datetime User Field
d7 datetime User Field
d8 datetime User Field
remarks text Remarks
original_qty float Original (1.st Baseline) Quantity
approved_vo_qty float Approved Variations Quantity
estimated_vo_qty float Quantities for estimated variation
System Guide for Safran Project 7.2
17
subcontr_vo_qty float Quantities for subcontracted
work/variations
internal_vo_qty float Quantities for internal variation
orders
jobpack_est_qty float Jobpack estimated quantities
expended_qty float Actual Expended quantities
esa datetime Early Start Analysed
current_as datetime Current Actual Start
current_af datetime Current Actual Finish
current_planned_p
rog
float Current planned progress
base_planned_prog float Baseline planned progress
oes datetime Original early start
oef datetime Original early finish
ols datetime Original late start
olf datetime Original late finish
bes datetime Baseline early start
besa datetime Baseline early start Analysed
bef datetime Baseline early finsih
bls datetime Baseline late start
System Guide for Safran Project 7.2
18
blf datetime Baseline late finish
ces datetime Current early start
cesa datetime Current early start actual
cef datetime Current early finish
cls datetime Current late start
clf datetime Current late finsih
original_qty1 float Original (1.st baseline) quantity1
(summary of qty1 in resources)
csh float Baseline scope (configurable
summary)
rsh float Current Scope (configurable
summary)
tsh float Total Scope (configurable
summary)
curr_frontline_date datetime Frontline date against Current
plan
ess datetime Early start scheduled
efs datetime Early finish scheduled
tfs int Total float scheduled
ffs int Free float scheduled
hammock tinyint Hammock flag
System Guide for Safran Project 7.2
19
analyse_opt int Future use
fsd datetime Fixed start date
ffd datetime fixed finish date
manual_prog_flag smallint Is activity manually progress
updated?; 1=yes, 0=No
current_pc float Time%completed, Is related to
Current_progress
rdua int Remainig duration analysed
ctf int Current total float
cff int Current free float
loos tinyint Live plan out of sequence flag,
Computed by live analyses
coos tinyint Current plan out of sequence flag,
computed by current analyses
out_of_sync tinyint Progress out of sync flag. is set to
1 for activity during baselin
update if volume progress and
time progress is not matching for
at least one resource.
d9 datetime Userfield
d10 datetime Userfield
d11 datetime Userfield
d12 datetime Userfield
System Guide for Safran Project 7.2
20
d13 datetime Userfield
d14 datetime Userfield
d15 datetime Userfield
d16 datetime Userfield
d17 datetime Userfield
d18 datetime Userfield
d19 datetime Userfield
d20 datetime Userfield
n5 float Userfield
n6 float Userfield
n7 float Userfield
n8 float Userfield
n9 float Userfield
n10 float Userfield
i5 float Userfield
i6 float Userfield
i7 float Userfield
i8 float Userfield
System Guide for Safran Project 7.2
21
i9 float Userfield
i10 float Userfield
l1 tinyint Userfield
l2 tinyint Userfield
l3 tinyint Userfield
l4 tinyint Userfield
l5 tinyint Userfield
l6 tinyint Userfield
l7 tinyint Userfield
l8 tinyint Userfield
l9 tinyint Userfield
l10 tinyint Userfield
l11 tinyint Userfield
l12 tinyint Userfield
l13 tinyint Userfield
l14 tinyint Userfield
l15 tinyint Userfield
l16 tinyint Userfield
System Guide for Safran Project 7.2
22
l17 tinyint Userfield
l18 tinyint Userfield
l19 tinyint Userfield
l20 tinyint Userfield
r21 int Userfield, reference type
r22 int Userfield, reference type
r23 int Userfield, reference type
r24 int Userfield, reference type
r25 int Userfield, reference type
r26 int Userfield, reference type
r27 int Userfield, reference type
r28 int Userfield, reference type
r29 int Userfield, reference type
r30 int Userfield, reference type
fcdu int Forecast duration
fcesa datetime Forecast plan early start actual
fcef datetime Forecast early finish
resa datetime Revised plan early start actual
System Guide for Safran Project 7.2
23
res datetime Revised plan early start
ref datetime revised plan early finsih
rls datetime revised plan late start
rlf datetime revised plan late finish
rev_frontline date datetime Progress frontline for revised plan
revised_planned_p
rog
float Revised planned progress
fcqty float Forecast qty
dur_fmt number(2) duration format
o1 numeric(8) outline code
o2 numeric(8) outline code
o3 numeric(8) outline code
o4 numeric(8) outline code
o5 numeric(8) outline code
o6 numeric(8) outline code
o7 numeric(8) outline code
o8 numeric(8) outline code
o9 numeric(8) outline code
o10 numeric(8) outline code
System Guide for Safran Project 7.2
24
o11 numeric(8) outline code
o12 numeric(8) outline code
o13 numeric(8) outline code
o14 numeric(8) outline code
o15 numeric(8) outline code
o16 numeric(8) outline code
o17 numeric(8) outline code
o18 numeric(8) outline code
o19 numeric(8) outline code
o20 numeric(8) outline code
o21 numeric(8) outline code
o22 numeric(8) outline code
o23 numeric(8) outline code
o24 numeric(8) outline code
o25 numeric(8) outline code
o26 numeric(8) outline code
o27 numeric(8) outline code
o28 numeric(8) outline code
System Guide for Safran Project 7.2
25
o29 numeric(8) outline code
o30 numeric(8) outline code
row_no integer Barchart Editor: row numver in
outline view
outline_leve tinyint Barchart Editor: indent level in
outline view
link_summary integer not in use
cpc float computed percent complete
rev_scope float revised scope
r31 int userfield reference type
r32 int userfield reference type
r33 int userfield reference type
r34 int userfield reference type
r35 int userfield reference type
r36 int userfield reference type
r37 int userfield reference type
r38 int userfield reference type
r39 int userfield reference type
r40 int userfield reference type
r41 int userfield reference type
System Guide for Safran Project 7.2
26
r42 int userfield reference type
r43 int userfield reference type
r44 int userfield reference type
r45 int userfield reference type
r46 int userfield reference type
r47 int userfield reference type
r48 int userfield reference type
r49 int userfield reference type
r50 int userfield reference type
u1 varchar(10) duration user field
u2 varcharsql(1
0)
duration user field
u3 varchar(10) duration user field
u4 varchar(10) duration user field
u5 varchar (10) duration user field
u6 varchar (10) duration user field
u7 varchar (10) duration user field
u8 varchar (10) duration user field
u9 varchar (10) duration user field
System Guide for Safran Project 7.2
27
u10 varchar (10) duration user field
evm_method varchar (2) earned value method
evm_parm varchar (100) Earned Value paramter
min_dur integer Minimum duration, used wih
activity fit option
act_exi tinyint Activity excistence flag
act_fit tinyint Activity duration fit flag
alap tinyint As late as possible constraint flag
external_seq_test int
act_type Smallint Activity type: start milestone,
finish milestone, hammock
look_ahead integer Minimum continuous duration
sort_field int
r51 int userfield reference type
r52 int userfield reference type
r53 int userfield reference type
r54 Int userfield reference type
r55 int userfield reference type
r56 int userfield reference type
r57 int userfield reference type
System Guide for Safran Project 7.2
28
r58 int userfield reference type
r59 int userfield reference type
r60 int userfield reference type
d21 datetime Userfield
d22 datetime Userfield
d23 datetime Userfield
d24 datetime Userfield
d25 datetime Userfield
d26 datetime Userfield
d27 datetime Userfield
d28 datetime Userfield
d29 datetime Userfield
d30 datetime Userfield
d31 datetime Userfield
d32 datetime Userfield
d33 datetime Userfield
d34 datetime Userfield
d35 datetime Userfield
System Guide for Safran Project 7.2
29
d36 datetime Userfield
d37 datetime Userfield
d38 datetime Userfield
d39 datetime Userfield
d40 datetime Userfield
System Guide for Safran Project 7.2
30
Table: activity_bars Primary key:
Field Name Type Description
seq int Internal sequence number
an_seq int Activity sequence number
net_id int network ID
standard_id int Style Id
date_from datetime Bar from date
date_until datetime bar until date
extra_text varchar Text for bar
Table: activity_texts Primary key: seq, net_id, field_nr
Field Name Type Description
seq int Internal sequence number for
activity text
net_id int Network ID
field_nr small int Field number for each of the 40
text fields
field_value varchar
(1000)
Hold the text field value for
activities.
System Guide for Safran Project 7.2
31
Table: activity_history (NOT IN USE from Safran Project v7) Primary key: seq, net_id, cut_off_date
Field Name Type Description
net_id int Network ID
cut_off_date datetime Cut-Off date
seq int Internal sequence number for
activity
an varchar
(50)
Activity Id
du int Duration
pc float Percent Complete
rdu int Remaining duration
wpn int Calendar
tse datetime Target start early
tsl datetime Target start late
tce datetime Target complete early
tcl datetime Target comlete late
acs datetime Actual start
acf datetime Actual finsih
System Guide for Safran Project 7.2
32
es datetime Early start
esa datetime Early start actual
ef datetime Early finsih
ls datetime Late start
lf datetime Late finsih
tf int Total float
ff int Free float
des varchar Description
f1 varchar
(255)
User Field
f2 varchar(
255)
User Field
f3 varchar(25
5)
User Field
f4 varchar(25
5)
User Field
r1 int User Field, Reference type
r2 int User Field, Reference type
r3 int User Field, Reference type
r4 int User Field, Reference type
r5 int User Field, Reference type
System Guide for Safran Project 7.2
33
r6 int User Field, Reference type
r7 int User Field, Reference type
r8 int User Field, Reference type
r9 int User Field, Reference type
r10 int User Field, Reference type
r11 int User Field, Reference type
r12 int User Field, Reference type
r13 int User Field, Reference type
r14 int User Field, Reference type
r15 int User Field, Reference type
r16 int User Field, Reference type
r17 int User Field, Reference type
r18 int User Field, Reference type
r19 int User Field, Reference type
r20 int User Field, Reference type
d1 datetime User Field
d2 datetime User Field
d3 datetime User Field
System Guide for Safran Project 7.2
34
d4 datetime User Field
d5 datetime User Field
d6 datetime User Field
d7 datetime User Field
d8 datetime User Field
n1 float User Field
n2 float User Field
n3 float User Field
n4 float User Field
i1 int User Field
i2 int User Field
i3 int User Field
i4 int User Field
on_target smallint Flag for automatic linear progress
jobflag smallint Flag for “all jobpacks defined”
cancelled datetime Cancelled date
current_as datetime Current actual start
current_af datetime Current actual finish
System Guide for Safran Project 7.2
35
current_progress float Current progress
approved_vo_qty float Approved Variations quantity
estimated_vo_qty float Estimate Variations quantity
subcontr_vo_qty float Sub-contracted Variations quantity
internal_vo_qty float Internal variations quantity
ctf int Current total float
current_planned_pr
og
float Current planned progress
base_planned_prog float Baseline planned progress
oes datetime Original early start
oef datetime Original early finish
ols datetime Original late start
olf datetime Original late finsih
bes datetime Baseline early start
besa datetime Baseline early start actual
bef datetime Baseline early finsih
bls datetime Baseline late start
blf datetime Baseline late finish
ces datetime Current early start
System Guide for Safran Project 7.2
36
cesa datetime Current early start actual
cef datetime Current early finish
cls datetime Current late start
clf datetime Current late finish
csh float Baseline scope
rsh float Current scope
tsh float Total scope
curr_frontline_date datetime Frontline date against current plan
manual_prog_flag smallint Is activity manually progress
updated:1=Yes, 0=No
current_pc float Time % completed, Is related to
Current progress.
subnet_id int Id of Subnetwork
f5 varchar(25
5)
User field
f6 varchar(50) User field
f7 varchar(50) User field
f8 varchar(50) User field
f9 varchar(50) User field
f10 varchar(50) User field
System Guide for Safran Project 7.2
37
f11 varchar(50) User field
f12 varchar(50) User field
f13 varchar(50) User field
f14 varchar(50) User field
f15 varchar(50) User field
f16 varchar(50) User field
f17 varchar(50) User field
f18 varchar(50) User field
f19 varchar(50) User field
f20 varchar(50) User field
d9 datetime User field
d10 datetime User field
d11 datetime User field
d12 datetime User field
d13 datetime User field
d14 datetime User field
d15 datetime User field
d16 datetime User field
System Guide for Safran Project 7.2
38
d17 datetime User field
d18 datetime User field
d19 datetime User field
d20 datetime User field
n5 float User field
n6 float User field
n7 float User field
n8 float User field
n9 float User field
n10 float User field
i5 int User field
i6 int User field
i7 int User field
i8 int User field
i9 int User field
i10 int User field
l1 tinyint User field
l2 tinyint User field
System Guide for Safran Project 7.2
39
l3 tinyint User field
l4 tinyint User field
l5 tinyint User field
l6 tinyint User field
l7 tinyint User field
l8 tinyint User field
l9 tinyint User field
l10 tinyint User field
l11 tinyint User field
l12 tinyint User field
l13 tinyint User field
l14 tinyint User field
l15 tinyint User field
l16 tinyint User field
l17 tinyint User field
l18 tinyint User field
l19 tinyint User field
l20 tinyint User field
System Guide for Safran Project 7.2
40
r21 int User field, Reference type
r22 int User field, Reference type
r23 int User field, Reference type
r24 int User field, Reference type
r25 int User field, Reference type
r26 int User field, Reference type
r27 int User field, Reference type
r28 int User field, Reference type
r29 int User field, Reference type
r30 int User field, Reference type
rev_frontline_date datetime Progress frontline for revised plan
revised_planned_pr
og
float Revised planned progress
cpc float computed percente complete
rev_scope float revised scope
u1 varchar(10) duration user field
u2 varchar(10) duration user field
u3 varchar(10) duration user field
u4 varchar(10) duration user field
System Guide for Safran Project 7.2
41
u5 varchar(10) duration user field
u6 varchar(10) duration user field
u7 varchar(10) duration user field
u8 varchar(10) duration user field
u9 varchar(10) duration user field
u10 varchar(10) duration user field
o1 integer outline userfield
o2 integer outline userfield
o3 integer outline userfield
o4 integer outline userfield
o5 integer outline userfield
o6 integer outline userfield
o7 integer outline userfield
o8 integer outline userfield
o9 integer outline userfield
o10 integer outline userfield
o11 integer outline userfield
o12 integer outline userfield
System Guide for Safran Project 7.2
42
o13 integer outline userfield
o14 integer outline userfield
o15 integer outline userfield
o16 integer outline userfield
o17 integer outline userfield
o18 integer outline userfield
o19 integer outline userfield
o20 integer outline userfield
o21 integer outline userfield
o22 integer outline userfield
o23 integer outline userfield
o24 integer outline userfield
o25 integer outline userfield
o26 integer outline userfield
o27 integer outline userfield
o28 integer outline userfield
o28 integer outline userfield
o30 integer outline userfield
System Guide for Safran Project 7.2
43
Table: act_impact Primary key: net_id, an_seq, set_nr
Field Name Type Description
an_seq int activity sequence number
net_id int Network Id
set_nr int Alternatice schedule set no
du int alternative duration
dur_fmt tinyint duration format
act_exist tinyint existence option
esa datetime ealy start anlysed
es datetime early start
ef datetime early finish
ls datetime late start
lf datetime late finish
tf integer total float
ff integer free float
wpn integer calendar
frontline_date dateteime frontline date(baseline)
System Guide for Safran Project 7.2
45
Table: activity_path Primary key: seq
Field Name Type Description
seq int Internal sequence number
net_id int Network Id
user_name varchar DB user who generated the path
start_act int Sequence number for Start activity
relate_type int Relation type from start activity,
predecessors (1) or successors (2)
generate_date datetime Date for generation of activity path
Table: act_risk Primary key: net_id, an_seq
Field Name Type Description
an_seq int activity Sequence number
net_id int Network Id
maxdu int max duration
mindu int min duration
defdu int
System Guide for Safran Project 7.2
46
distribute int distribution profile/function
notes var (2000) notes
crit_ix float criticality index
meandu int analyzed mean duartion
mean start date mean start date
mean finish date mean duration
ees date earliest early start date
les date latest erly start date
eef date earliest earl finish date
lef date lates early finish date
tfmax int total float max value
tfmin int total float min value
du_sens float duration sensitivity
sch_sens float schedule sensitivity
mean_cost float mean cost
std_dev_dur float standard deviation for duration
std_dev_cost float standard deviation for cost
Table: act_risk_Px Primary key: net_id, an_seq, percentage
System Guide for Safran Project 7.2
47
Field Name Type Description
an_seq int activity Sequence number
net_id int Network Id
percentage int Selected percentage
du int corresponding du
start_date datetaime activity start date for selected
pecentage
finish_date datetime activity finish date for selected
pecentage
Table: assign_coms Primary key: save_name, login_name
Field Name Type Description
save_name varchar (50) assign fields save name
login_name varchar (200) user Id login
field_num numeric(8) field, activity table, internal
number
exp_1 varchar2(200) expression
operator integer operator
exp_2 varchar2(200) expression
System Guide for Safran Project 7.2
48
express_1_start_pos integer start position
express_1_numb_ch
ars
integer number of characters
express_2_start_pos integer start position
express_2_numb_ch
ars
integer number of characters
wpn integer calendar number
selection_type integer filter/selected rows, all
dur_fmt integer duration format
filter long varchar
(32767)
filter expression, name
Table:available_outline Primary key:
Field Name Type Description
net_id Integer Network ID, sequence number
field_no Integer outline userfield (1-30)
oc_level Integer outline level
oc_short varchar (255) short code
avail_from datetime availability from date
System Guide for Safran Project 7.2
49
avail_until datetime availability until date
avail_qty float quantity available
wpn Integer calendar
Table:available_ref primary key
Field Name Type Description
net_id Integer Network ID, sequence number
field_no Integer Refrence field number (1-30)
ref_seq Integer referenne id
avail_from datetime availability from date
avail_until datetime availability until date
avail_qty float quantity available
wpn Integer calendar
Table: bar_edit_views Primary key:
Field Name Type Description
System Guide for Safran Project 7.2
50
login_name varchar (200) User
view_name varchar(50) Barchart Editor View name
timenow text Timenow style
non_work varchar Non - work drawing configuration
link_styles varchar Link style drawing configuration
critical varchar Critical style drawing configuration
filter_name varchar Filter name
sort_express text Sort
fields text Selected fields, order
field_wid text Width of fields
field_align text Allignment
level_properties varchar Summary draw configuration
year_line varchar Configuratiuon for Timeline 1
month_line varchar Configuratiuon for Timeline 2
week_line varchar Configuratiuon for Timeline 3
day_line varchar not in use
hour_line varchar not in use
timespan varchar Start/finsih of timeline, timeline
density
System Guide for Safran Project 7.2
51
title1 text Print Preview Title
title2 text Print Preview Title
title3 text Print Preview Title
title4 text Print Preview Title
title5 text Print Preview Title
title6 text Print Preview Title
title7 text Print Preview Title
title8 text Print Preview Title
title9 text Print Preview Title
footer1 varchar Print Preview footer
footer2 varchar Print Preview footer
footer3 varchar Print Preview footer
left_bitmap text Bit map reference, full path
right_bitmap text Bit map reference, full path
background_bit
map
text Bit map reference, full path
various varchar Configuration parameters
filter_express text Filter expression
div_page_setup text Page setup parameters
System Guide for Safran Project 7.2
52
frontline text Frontline drawing configuration
legend_text text Legend text
field_head text Field headers
view_version int Saved version number
field_color varchar2(1000
)
text color
field_bck_color varchar2(1000
)
back ground color
field_thousand_s
ep
long varchar
(32767)
thousand separator for selected
field
field_numb_dec long varchar
(32767)
number of decimals for selected
field
field_date_forma
t
long varchar
(32767)
field date format
field_text_wrap long varchar
(32767)
field tedxt wrap
hist_rep_name varchar (50) editor hsitogram name
link_styles varchar (50) link style drawing definition
hour_line varchar (50) not used in Safran Project
filter_owner varchart (200) Filter owner
hist_rep_owner varchart (200) Editor Histogram owner
System Guide for Safran Project 7.2
53
Table: baseline_a Primary key: baseline_id, seq
Field Name Type Description
baseline_id int Baseline ID
seq int Internal sequence number for
activity
an varchar(50) Activity Id
du int Duration
pc float Percent complete
rdu int Remaining duration
wpn int Calendar
tse datetime Target start early
tsl datetime Target start late
tce datetime Target complete early
tcl datetime Target complete late
acs datetime Actual start
acf datetime actual finsih
es datetime early start
ef datetime early finish
System Guide for Safran Project 7.2
54
ls datetime late start
lf datetime late finish
tf int total float
ff int free float
des varchar description
subnet_id int Sub network ID
net_id int Network ID
on_target smallint Flag for automatic linear progress
jobflag smallint Flag for “all jobpacks defined”
current_progress float Current progress
cancelled datetime cancelled date
approved_vo_qty float Approved variations quantity
estimated_vo_qty float Estimated Variations quantity
subcontr_vo_qty float Subcontracted variations quantity
internal_vo_qty float Internal variations quantity
jobpack_est_qty float Jobpack estimated quantity
expended_qty float Actual expended quantitu
csh float Baseline scope
System Guide for Safran Project 7.2
55
rsh float Current scope
tsh float Total scope
esa datetime Early start analysed
fsd datetime Fixed start date
ffd datetime Fixed finsih date
current_pc float Time % completed, Is related to
current progress
out_of_sync tinyint Progress out of sync flag. is set to 1
for activity during baselin update if
volume progress and time progress
is not matching for at least one
resource.
System Guide for Safran Project 7.2
56
Table: baseline_dibb Primary key: seq, baseline_id
Field Name Type Dsecription
seq int Internal sequence number
an_seq int Activity Sequence number
res_seq int Resource sequence number
net_id int Network ID
baseline_id int Baseliine ID
pl_earned_early float Earned at cutoff - prev. planned
(early)
pl_earned_late float Earned at cutoff - prev. planned
(late)
pl_c_earned_early float Earned cost at cutoff - prev.
planned cost (early)
pl_c_earned_late float Earned cost at cutoff - prev.
planned cost (late)
Table: baseline_log Primary key: baseline_id
Field Name Type Description
baseline_id int Baseline ID
System Guide for Safran Project 7.2
57
baseline_rev varchar Baseline revison code
baseline_dato datetime Baseline run date
cut_off datetime Baseline Cut-Off date
description varchar Description
login_name varchar
(200)
User log in identification
net_id int Network ID
Table: baseline_r Primary key: baseline_id, seq
Field Name Type Description
baseline_id int Baseline ID
seq int Resource internal sequence
number in table resources
an_seq int Activity internal sequence number
res_seq int Resource internal sequence
number in table resource _defs
qty float Quantity
dur int Duration
lagr int lag on resource (relative to activity)
System Guide for Safran Project 7.2
58
type smallint Resource type
profile int (Resource ) Profile ID
vo_seq int variation order sequence number (
If record is a Varition order line)
current_progress float Current progress
actual_qty float Actual expended quantity
qty1 float (Contract) Quantity 1
csh_flag smallint Flag for inclusion of quantities in
csh at activity level
rsh_flag smallint Flag for inclusion of quantities in
rsh at activity level
tsh_flag smallint Flag for inclusion of quantities in
tsh at activity level
wpn int Calendar
net_id int Network ID
earned_job_qty float Earned against job scope (if
present)
cost float Cost Quantity
cost1 float Cost 1(Contract) Cost quantity
Table: bitmap_blobs Primary key: bpath, btype, bid
System Guide for Safran Project 7.2
59
Field Name Type Description
bpath varchar (255) path
btype char(1) type
bid int id
bdata long bitmap blob data
thumb image thumbnail image
Table: bl_rates Primary key: baseline_id, rate_seq, seq
Field Name Type Description
baseline_id int Project baseline id
rate_set int rate set
rate_seq int rate sequence number
seq int baseline rate sequence
input_date date input date; baseline rate from date
rate double rate corresponding to input_date
Table: bl_res_rates Primary key: baseline_id, res_ses, account
System Guide for Safran Project 7.2
60
Field Name Type Description
baseline_id int Project baseline id
res_seq int resource sequence number
account int account
budget_rate int budget rate for resource
Table: calendars Primary key: cal_id
Field Name Type Description
cal_id int Calenddar ID
cal_name varchar Calendar name
cal_start datetime Calendar start date
cal_finish datetime Calendar finish date
owner varchar Owner (Username)
cal_type varchar Calendar Type, daybased=d,
hourly=t
System Guide for Safran Project 7.2
61
Table: chg_doc_links Primary key: net_id, seq, label
Field Name Type Description
net_id int Network Id
seq int variation order sequence number
label varchar (255) Document label
doc_path varchar (255) document path
Table: chg_sch_impact Primary key: net_id, vo_seq, an_seq
Field Name Type Description
net_id int Network Id
vo_seq int variation order sequence number
an_seq int activity sequence number
est_impact int estimated duartion/schedule
impact
app_impact int approved duration/schedule impact
remarks varchart (
3200)
notes/remarks
System Guide for Safran Project 7.2
62
Table: code_configuration Primary key: id
Field Name Type Description
id int Codeset Id
name varchar Codeset description
owner varchar Owner (Username)
Table: codeset Primary key: config_id, code, rfield_nr
Field Name Type Description
config_id int Codeset ID
code int Internal ID
description varchar (255) Description
short varchar (50) Short code
rfield_nr int Reference field number i network
sort_field int Userdefined sort
Table:constraints Primary key: net_id, pan_seq, san_seq, ntypec
System Guide for Safran Project 7.2
63
Field Name Type Description
pan_seq int Seq. number in activity for
preceeding activity.
san_seq int Seq. number in activity for
succeeding activity.
net_id int Network ID
ntypec tinyint Constraint type (FS, SF,FF,SS)
lagc int Lag time on constraint
split_target datetime Constraint target start ( for sub
network and float control)
wpn int Calendar
Table: contract_items_periodic Primary key: project_id, wbs_obs,oc_seq,cut_off_date
Field Name Type Description
cut_off_date dateteime cut off date
bcws_period float budget cost of work scheduled
current period adjustment
bcws_period float budget cost of work performed
current period adjustment
acwp_period float actual cost of work performed
current period adjustment
bcws_cum float budget cost of work scheduled
cumulative adjustment
System Guide for Safran Project 7.2
64
bcwp_cum float budget cost of work performed
cumulative adjustement
acwp_cum float actual cost of work performed
cumulativeadjustement
bac float budget at completion
eac float estimate at completion
rep_adj_cv float reprogramming adjustement cost
variance
rep_adj_sv float reprogramming adjustement
schedule variance
rep_adj_budget float reprogramming adjustment
budget
unfilled_orders float unfilled orders
project_id int project id
wbs_obs int wbs/obs code element
oc_seq int outline code sequence number
add_replace smallint add_replace
Table: contract_perf_data Primary key: project_id
Field Name Type Description
evms_acc_date date EVMS acceptance date
System Guide for Safran Project 7.2
65
Contract_start_dat
e
date Contract Start Date
Contract_def_date Date Contract Definization date
lre_gate_date date Gate date, last revised estiamate
contract_qty float Contract quantity/deliverables
Contract_qty_r_d float contract quantity R&D
Project_id int (4) Project Id
contract_class int (4) contract classification
lre_option int EAC method (formula)
contractor_name varchar
(100)
Contractor name
contractor_addr varchar
(255)
Contractor Adress
contractor_city varchar
(255)
Contractor city
contractor_state varchar (50) Contractor state
contractor_zip varchar (20) Contractor zip code
contract_name varchar
(100)
contractor name
program_number varchar
(100)
program number/Id
client_name varchar
(100)
Client name
System Guide for Safran Project 7.2
66
client_addr varchar
(100)
Client name
client_city varchar
(255)
contractor city
client_state varchar (50) Client state
Client_zip varchar (20) Client zip code
Contract_no varchar (50) Contract number
contract_type varchar (20) Contract type
program_name varchar
(100)
Program name
program_phase varchar
(100)
Program name
wbs_code_field varchar (3) wbs code field (outline code)
obs_code_field varchar (3) Obs code field (outline code)
Table: contract_perf_periodic Primary key: project_id, cut_off_date
Field Name Type Description
cut_off_date date Cot off date
contrat_compl_dat
e
date Contract Completiond date
System Guide for Safran Project 7.2
67
Contreact_est_co
mpl_date
date estimated completion date
otb_ots_date date Over tareget date
conrep_subm_date date Contract Performance report
sbmission date
share_above float (8) Share above value
share_below float (8) Share below value
negotiated_cost float (8) negotiated cost
est_cost_unpriced float (8) estimated cost of authorized
unpriced work
target_profitt float (8) target fee dollars
target_profit_perc
entage
float (8) tagret fee percentage
tot_pay_received float (8) total payment received
gen_adm_eac float (8) Project indirects; G&A estimate at
completion
man_res_bac float (8) managment reserve budget at
completion
und_bud_bac float (8) Undistributed budget, budget at
completion
und_bud_eac float (8) undistributed budget,estimate at
completion
fund_limit float (8) fund limitations
System Guide for Safran Project 7.2
68
inv_amount_billed float (8) invoice ammounts billed
com_bac float (8) project indirects: Cost of money,
budget at completion
com_eac float (8) project indirects: Cost of money,
estimate at completion
gen_adm_bcws float (8) project indirects: general and
adminstritation: budgeted cost of
work scheduled
gen_adm_bcwp float (8) project indirects: general and
adminstritation: budgeted cost of
work performed
gen_adm_acwp float (8) project indirects: general and
adminstritation: actual cost of
work performed
gen_adm_bac float (8) project indirects: overhead; budget
at completion
overhead_acwp float (8) project indirects: overhead; actual
cost of work performed
overhead_bac float (8) project indirects: overhead; budget
at completion
overhead_eac float (8) project indirects: overhead,
estimate at completion
com_bcws float (8) project indirects: cost of money,
budgeted cost of work scheduled
com_bcwp float (8) project indirects: cost of money,
budgeted cost of work performed
System Guide for Safran Project 7.2
69
com_acwp float (8) project indirects: cost of money,
actual cost of work performed
mgm_est_best float (8) managment estimate of at cost at
completion best case
mgm_est_worst float (8) management estimate of cost at
completion worst case
mgm_est_likely float (8) managementt estimate of cost at
completion most likely case
con_budg_base float (8) contract budget base
overhead_bcws float (8) project indirects: overhead;
budgeted cost of work scheduled
overhead_bcwp float (8) project indirects: overhead;
budgeted cost of work performed
target_price float (8) target price
est_price float (8) estimated price
contract_ceiling float (8) contract ceiling
est_contr_ceiling float (8) estimated contr ceiling
tot_negotiated_ch
ange
float (8) cost of total negotiated changes
tot_allocated_budg float (8) total allocated budget (TAB)
project_id int (4) project id
conrep_name varchar
(255)
contractor representative name
System Guide for Safran Project 7.2
70
conrep_title varchar (50) contractor representative title
Table: cpr_oc_variances Primary key: net_id, wbs_obs, oc_seq, cut_off_date
Field Name Type Description
cut_off_date date cut off date
net_id int network id
wbs_obs int wbs/obs otline code
oc_seq int outline code seq
threshold_seq int threshold sequence number
cost_var_analysis long var (
32767)
narrative/description of cost
variance problem /impact analyses
cost_var_correct_
act
long var (
32767)
narrative/description of schedule
variance problem /impact analyses
sched_var_analysi
s
long var (
32767)
narrative/description of schedule
variance problem /impact analyses
sched_var_correct
_act
long var (
32767)
narrative/description of corrective
actions
var_flag varchar (10) variance flag/code
Table: cpr_omb300_milestones Primary key: net_id, an_seq, cut_off_date
System Guide for Safran Project 7.2
71
Field Name Type Description
cut off date date Cut off date
bes date Baseline early start
bef date Baseline early finish
acs date Actual Start
acf date Actual Finsih
planned_cost float (8) Planned Cost
current_progress float (8) Current progress
actual_cost float (8) Actual Cost
net_id int network Id
an_seq int Acticity Sequence number
dur varchar (50) activity duration
funding_agency varchar (50) funding
Table: cpr_omb300_narratives Primary key: net_id, cut_off_date
Field Name Type Description
cut off date date Cut off date
net_id int Network Id
System Guide for Safran Project 7.2
72
question_c long varchar
(32767)
Narrative OMB300 section C
question_d long varchar
(32767)
Narrative OMB300 section D
question_e long varchar
(32767)
Narrative OMB300 section E
question_f long varchar
(32767)
Narrative OMB300 section F
question_g long varchar
(32767)
Narrative OMB300 section G
System Guide for Safran Project 7.2
73
Table: cpr_thresholds Primary key: net_id, seq
Field Name Type Description
bac_min float (8) budget at complete range,
minimum value
bac_max float (8) budget at complet range,
maximum value
cv_per_neg float (8) cost variance, current period,
negative value
cv_per_pos float (8) cost variance, current period,
positive value
cv_per_pct_neg float (8) cost variance, current period
negative percentage
cv_per_pct_pos float (8) cost variance, current period
positive percentage
cv_at_compl_neg float (8) cost variance, at completion,
negative value
cv_at_compl_pos float (8) cost variance, at completion,
positive value
cv_at_compl_pct_
neg
float (8) cost variance, at completion,
negative percentage
cv_at_compl_pct_
pos
float (8) cost variance, at completion,
postive percentage
cv_cum_pct_neg float (8) cost variance, cumulative to date,
negative percentage
System Guide for Safran Project 7.2
74
cv_cum_pct_pos float (8) cost variance, cumulative to date,
positive percentage
sv_cum_neg float (8) schedule variance, cumulative to
date, negative value
sv_cum_pos float (8) schedule variance, cumulative to
date, positive value
sv_cum_pct_neg float (8) schedule variance, cumulative to
date, percentage negative value
sv_cum_pct_pos float (8) schedule variance, cumulative to
date, percentage positive
sv_per_neg float (8) schedule variance, current period,
negative value
sv_per_pos float (8) schedule variance, current
period,positive value
sv_per_pct_neg float (8) schedule variance, current period
negative percentage
sv_per_pct_pos float (8) schedule variance, current period
positive percentage
cv_cum_neg float (8) cost variance, cumulative to date,
negative value
cv_cum_pos float (8) cost variance, cumulative to date,
postitive value
net_id int network id
seq int sequence number
and_or int and/or threshold definition
System Guide for Safran Project 7.2
75
description varchar (100) Threshold description
Table: cpr_thresholds_periods Primary key: net_id, seq, cut_off_date
Field Name Type Description
cut_off_date date Cut off date
bac_min float (8) budget at complete range,
minimum value
bac_max float (8) budget at complet range,
maximum value
cv_per_neg float (8) cost variance, current period,
negative value
cv_per_pos float (8) cost variance, current period,
positive value
cv_per_pct_neg float (8) cost variance, current period
negative percentage
cv_per_pct_pos float (8) cost variance, current period
positive percentage
cv_at_compl_neg float (8) cost variance, at completion,
negative value
cv_at_compl_pos float (8) cost variance, at completion,
positive value
cv_at_compl_pct_
neg
float (8) cost variance, at completion,
negative percentage
System Guide for Safran Project 7.2
76
cv_at_compl_pct_
pos
float (8) cost variance, at completion,
postive percentage
cv_cum_pct_neg float (8) cost variance, cumulative to date,
negative percentage
cv_cum_pct_pos float (8) cost variance, cumulative to date,
positive percentage
sv_cum_neg float (8) schedule variance, cumulative to
date, negative value
sv_cum_pos float (8) schedule variance, cumulative to
date, positive value
sv_cum_pct_neg float (8) schedule variance, cumulative to
date, percentage negative value
sv_cum_pct_pos float (8) schedule variance, cumulative to
date, percentage positive
sv_per_neg float (8) schedule variance, current period,
negative value
sv_per_pos float (8) schedule variance, current
period,positive value
sv_per_pct_neg float (8) schedule variance, current period
negative percentage
sv_per_pct_pos float (8) schedule variance, current period
positive percentage
cv_cum_neg float (8) cost variance, cumulative to date,
negative value
cv_cum_pos float (8) cost variance, cumulative to date,
postitive value
System Guide for Safran Project 7.2
77
net_id int network id
seq int sequence number
and_or int and/or threshold definition
description varchar (100) Threshold description
Table: cross_plan_links Primary key: net_id, pan_seq, san_seq, ntypec
Field Name Type Description
split_target date split target date
net_id int network id
pan_seq int precedding activity sequence
number
san_seq int succeding activity sequence
number
ntypec int link type
lagc int lag for constraint
wpnc int calender number/ work pattern
number
lag_fmt int lag format
pan_db_netid int preceeding activity network -
database stored predecessor
System Guide for Safran Project 7.2
78
san_db_netid int succeeding activity network -
database stored predecessor
pan_save_type smallint Predecessor task save type : 1 = DB,
2 0 URL, 0 = File-path
san_save_type smallint Succcessor task save type : 1 = DB,
2 0 URL, 0 = File-path
pan_net varchar (200) preceeding activity network -
file/url stored predecessor
san_net varchar (200) succeeding activity network -
file/url stored predecessor
Table: detail_net_config Primary key: net_id
Field Name Type Description
net_id int Network ID
table_name varchar Table to link to (jobs table)
cal_id int Calendar set to be used for detail
items
resource_needed smallint Whether resources must be
present or not
symbolset int Symbolset to be used for detail
plan appl.
Table: document_links renamed to sp_document_links Primary key:
System Guide for Safran Project 7.2
79
Field Name Type Description
seq int Sequence number - linked to
activity
net_id int Network Id number
label varchar(20) Link label
doc_path varchar(255) Full document path
Table: edit_hist_curtain Primary key:
Field Name Type Description
login_name varchar(200) login name /user (owner)
hist_name varchar(50) histogram name
start_date date hsitogram start date
start_date_str varchar(25) histogram start date input
until_date date histogram until date
until_date_str varchar(25) histogram until date input
bck_color integer background color
hatch integer hatch
hatch_color integer hatch color
System Guide for Safran Project 7.2
80
curtain_text varchar(50) text display
text_pos tinyint text position
repeat tinyint repeat every day
axis tinyint left or right axis
System Guide for Safran Project 7.2
81
Table: edit_hist_entries Primary key:
Field Name Type Description
login_name varhar (200) login user name - owner
View_name varchar(50) report name
entry_type tinyint entry type: 1=periodic, 2=
cumulative, 3=table
Entry_id tinyint id
graph_type tinyint histogram, profile, s_curve
data_field Small int main data field no.
from_date_str varchar( 25) from date, inpput
until_date_str varchar (25) until data, input
from_date datetime form date
until_date datetime until date
legend varchar2(50) legend
value_mpw_perce
nt
tinyint display value( value,manpower,
percent)
color integer bar coloor
hatch tinyint hatch style
hatch_color integer hatch color
System Guide for Safran Project 7.2
82
separation smallint % separation between bars
stack_fields integer stack field no
scope_field Integer scope field o ( hist 100%)
stack_field_level integer stack outline level
include_none tinyint stack: include non
plan_scope tinyint Scope definition from plan set
qty_type tinyint Scope definition from plan set
incl_orig tinyint Scope definition from plan set
incl_appr tinyint Scope definition from plan set
incl_est tinyint Scope definition from plan set
incl_int tinyint Scope definition from plan set
incl_sub tinyint Scope definition from plan set
table_stack_incl_s
um
tinyint sum lines in table when stacking
line_style tinyint line styles
line_thick tinyint line thickness
table_dec tinyint number of decimals in table
table_factor tinyint table display to show value
/(thousand/millions
hide_table_factor tinyint show table factor
System Guide for Safran Project 7.2
83
table_bold tinyint font details for table entries
table_italic tinyint font details for table entries
table_underline tinyint font details for table entries
table_font varchar2(50) font details for table entries
table_color integer font details for table entries
table_per_cum tinyint periodic cummulative link
table_link_id tinyint link towards curve/bar
graph_values tinyint show values n top of bar
lim_start_date date computed start date
lim_start_date_str varchar2(25) start date input
lim_finish_date date computed finish date
lim_finish_date_st
r
varchar2(25) finish date input
incl_dir_cost tinyint complex rate flag
inc_oh1 tinyint complex rate flag
inc_oh2 tinyint complex rate flag
inc_oh3 tinyint complex rate flag
inc_oh4 tinyint complex rate flag
incl_ga tinyint complex rate flag
System Guide for Safran Project 7.2
84
incl_com tinyint complex rate flag
start_cum integer start cumulative line/curve from
stack_legend int stack legend( Short, Description,
Short+ Description)
entry_name varchar(50) name of entry
stack_spread_line int group type for stacked line graph
and profile
fill_curve int Fill for line graphs and profiles
Table: edit_hist_grids primary key:
Field Name Type Description
login_name varhar (200) log in /user name - owner
View_name varchar(50) layout name
grid_date date date
grid_date_str varchar2(25) date input
grid_pos number(9) text position (%)
grid_text varchar2(25) text
grid_tickness number(9) line thickness
grid_line_style number(9) line style
System Guide for Safran Project 7.2
85
axis tinyint left or rigt axis
Table: edit_hist_groups Primary key:
Field Name Type Description
login_name varchar
(200)
login name - owner
hist_name varchar (50) histogram/report name
group_name long varchar
(32767)
stack value
color integer stack color
hatch integer stack hatch
hatch_color integer hatch color
entry_id integer link to histogram entry id
drawing_sequence integer sequence
entry_type tinyint entry type
System Guide for Safran Project 7.2
86
Table: edit_hist_views Primary key:
Field Name Type Description
login_name varhar (200) login name - owner
View_name varchar(50) histogran name
span tinyint span drop down selection
Span-from date from date
span_until date until date
span_from_str varchar(25) from date input
span_until_str varchar (25 until date input
numb_units tinyint interval ( number)
interval tinyint interval type from drop down
selection
date_format smallint date format selection
l_axis_descr varchar2(50) left axis defintion
l_axis_descr_rotate tinyint left axis defintion
l-axis_grid tinyint left axis defintion
l_axis_factor tinyint left axis defintion
l_axis_factor_txt tinyint left axis defintion
System Guide for Safran Project 7.2
87
l_axis_layout tinyint left axis defintion
l_axis_value_mpw tinyint left axis defintion
l_axis_max integer left axis defintion
l_axis_major_tics integer left axis defintion
l_axes_min integer left axis defintion
r_axis_descr varchar2(50) left axis defintion
r_axis_descr_rotate tinyint right axis defintion
r_axis_grid tinyint right axis defintion
r_axis_factor tinyint right axis defintion
r_axis_factor_txt tinyint right axis defintion
r_axis_layout tinyint right axis defintion
r_axis_value_percent tinyint right axis defintion
r_axis_max tinyint right axis defintion
r_axis_major_tics integer right axis defintion
r_axis_min integer right axis defintion
table_heading varchar2(50) table definition
table_grid tinyint table definition
table_visible tinyint table definition
System Guide for Safran Project 7.2
88
table_char_size double table definition
include_data tinyint table definition
title1 long varchar
(2000)
report title definitions
title2 varchar2(2000) report title definitions
title3 varchar2(2000) report title definitions
title4 varchar2(2000) report title definitions
title5 varchar2(2000) report title definitions
title6 varchar2(2000) report title definitions
title7 varchar2(2000) report title definitions
title8 varchar2(2000) report title definitions
title9 varchar2(2000) report title definitions
x_axis_tick_char_size double x-axis definition
x_axis_tick_rotate tinyint x-axis definition
table_rotate tinyint rotate table 90 degrees
l_axis_tick_dec tinyint number of decimals on left
axis thick
r_axis_tick_dec tinyint number of decimals on right
axis thick
x_axis_tick_font varchar(50) x-axis font definition
System Guide for Safran Project 7.2
89
x_axis_tick_bold tinyint x-axis font definition
x_axis_tick_italic tinyint x-axis font definition
x_axis_tick_underline tinyint x-axis font definition
x_axis_tick_color integer x-axis font definition
l_axis_tick_font varchar(50) left axis font definition
l_axis_tick_bold tinyint left axis font definition
l_axis_tick_italic tinyint left axis font definition
l_axis_tick_underline tinyint left axis font definition
l_axis_tick_char_size double left axis font definition
l_axis_tick_color integer left axis font definition
l_axis_desc_font varchar(50) left axis font definition
l_axis_descr_bold tinyint left axis font definition
l_axis_descr_italic tinyint left axis font definition
l_axis_descr_underli
ne
tinyint left axis font definition
l_axis_descr_char_siz
e
double left axis font definition
l_axis_descr_color integer left axis font definition
r_axis_tick_font varchar (50) right axis font definition
r_axis_tick_bold tinyint right axis font definition
System Guide for Safran Project 7.2
90
r_axis_tick_italic tinyint right axis font definition
r_axis_tick_underline tinyint right axis font definition
r_axis_tick_char_size double right axis font definition
r_axis_tick_color integer right axis font definition
r_axis_desc_font varchar(50) right axis font definition
r_axis_descr_bold tinyint right axis font definition
r_axis_descr_italic tinyint right axis font definition
r_axis_descr_underli
ne
tinyint right axis font definition
r_axis_descr_char_si
ze
double right axis font definition
r_axis_descr_color integer right axis font definition
table_title_font varchar(50) table title font definition
table_title_bold tinyint table title font definition
table_title_italic tinyint table title font definition
table_title_underline tinyint table title font definition
table_title_char_size double table title font definition
table_title_color integer table title font definition
table_head_font varchar(50) table header font definition
table_head_bold tinyint table header font definition
System Guide for Safran Project 7.2
91
table_head_italic tinyint table header font definition
table_head_underlin
e
tinyint table header font definition
table_head_char_siz
e
double table header font definition
table_head_color integer table header font definition
key_font varchar(50) legend font definition
key_bold tinyint legend font definition
keyitalic tinyint legend font definition
key_underline tinyint legend font definition
key_char_size double legend font definition
key_color integer legend font definition
footer1 long varchar footer text
footer2 long varchar footer text
footer3 longvarchar footer text
left_bitmap longvarchar logo in header area
right_bitmap longvarchar logo in header area
background_bitmap longvarchar backgroun picture
div_page_setup longvarchar other page setup
legend_text longvarchar legend
System Guide for Safran Project 7.2
92
filter_name varchar(50) filter name
filter_express longvarchar filter expression
page_field integer page on field
page_oc_level integer page on outline level if
page_field is of type outline
code
resource_filter longvarchar resource selection
filter_owner varchar (200) filter owner
Table: enterprise_codes Primary key: field_type, field_nr, code
Field Name Type Description
field_type char (1) field type
field_nr int field number
code int code
short varchar (50) short desc
description varchar
(255)
descroption
parent_sort int parent sort relationship
Table: enterprise_fields Primary key: field_type, field_nr
System Guide for Safran Project 7.2
93
Field Name Type Description
field_type char (1) field type
field_nr int field number
label varchar (50) field label
System Guide for Safran Project 7.2
94
Table: enterprise_values Primary key: field_type, field_nr, net_id
Field Name Type Description
field_type char (1) field type
field_nr int field number
net_id int Network Id
string_value float text/string values
numb_value float number values
int_value float integer
Table: external_ids Primary key:
Field Name Type Description
net_id int Network Id
seq int Sequence number
app char(3) External application - 3 letter
shortcode
ext_id_num Int Numerical external key
ext_id_txt varchar (50) Alpfanumerical external key
System Guide for Safran Project 7.2
96
Table: filter_group Primary key: CLUSTERED (fg_id)
Field Name Type Description
fg_id int filter group iud
fg_name varchar (25) filter group name
Table: filter_in_group Primary key: CLUSTERED (fg_id, fname, fuser, ftype)
Field Name Type Description
fg_id int filter group id
ftype int filter type
fname varchar (50) filter name
fuser varchar
(200)
user name
Table: filter_list Primary key: filter_name, owner, filtertype
Field Name Type Description
filter_name varchar Description
System Guide for Safran Project 7.2
97
owner varchar
(200)
Owner ( user ID)
filter text Expression
filtertype int Report or editor
System Guide for Safran Project 7.2
98
Table: forecast Primary key:
Field Name Type Description
net_id int Network ID
cut_off_date datetime Cut off date
seq int Resource sequence number
fc_prog_period float Forecast planned in period
fc_prog_cum float Forecast planned cumulative
fc_total_qty float Forecast total quantity
per_start datetime Start date for period
period_cost float Cost in period
Table: forecast_log Primary key: cut_off, net_id
Field Name Type Description
fc_date datetime Date forecast was run
cut_off datetime Cut off date
login_name varchar
(200)
User ID who performed forecast
net_id int Network ID
System Guide for Safran Project 7.2
99
fc_def varchar Scope, plan set
adj_rem_qty tinyint 1= Adjust remaining scope, 0 = Do
not
adj_rem_dur tinyint 1= Adjust remaining durations, 0 =
Do not
pf_qty_method tinyint Identifies method for adjusting
rem. scope
pf_dur_method tinyint Identifies method for adjusting
rem. dur.
pf_qty float Factor for scope adjustments
pf_dur float Factor for duration adjustments
pf_qty_percent smallint Percentage for productivity factor
calculation, if scope shall be based
on this.
pf_dur_percent smallint Percentage for performance factor
calculation, if rem. dur. shall be
based on this.
adj_group varchar performace grooup by
fc_filter text forecats filter for partly forecast
pf_qty_max float max restriction om forecast qty
pf_dur_max float max restriction on forecast
duration
Table: globals Primary key:
System Guide for Safran Project 7.2
100
Field Name Type Description
gsid integer id
gctype char(1) global type (D,T,N)
gcnr tinyint number ( count by type)
label varchar (30) description/label
exp1 varchar (50) global expression
add1 smallint expression 1( part og date and text
expression position or +/-)
add2 smallint expression 2( part og date and text
expression length or value)
Table: globalset Primary key:
Field Name Type Description
gsid integer id
gsname varchar (30) name
owner varchar
(200)
owner ( created by)
Table: group_access Primary key: group_id, object_id, object_type
System Guide for Safran Project 7.2
101
Field Name Type Description
group_id int Group ID
object_id int Object ID
object_type char Object Type
access_level smallint Access level
Table: group_members Primary key: group_id, login_name
Field Name Type Description
group_id int Group ID
login_name varchar (200) user log in name
Table: historic_wpn Primary key: wpn, cal_id, net_id
Field Name Type Description
wpn int Calendar number
cal_id int Calendar ID
net_id int network ID
System Guide for Safran Project 7.2
102
Table: history_a Primary key: net_id, seq
Field Name Type Description
net_id number(9) Network id
seq number(9) internal Sequnce number
an varchar(50) activity Id/activity number
du number(9) duration
wpn number(9) calendar
esa date early start actual
ef date early finish
des varchar2(255) dsecription
r15 number(9) userfield - reference type
current_as date Current Actual Start
current_af date Current Actual Finish
current_progress float Current Progress
approved_vo_qty float Approved Variations Quantities
estimated_vo_qt
y
float Quantities for estimated Variation
orders
subcontr_vo_qty float Quantities for subcontracted
work/variations
System Guide for Safran Project 7.2
103
internal_vo_qty float Quantities for internal variations
base_planned_pr
og
float Baseline planned progress
bes date Baseline Early Start
bef date BAseline Early finish
ces date Current Early start
cef date Current Early Finish
csh float Baseline Scope ( configurable
summary)
rsh float Current Scope ( configurable
summary)
tsh float Total Scope ( configurable
summary)
current_frontline
_date
date frontline data against current plan
expended_qty float Actual Expended quantities
r1 number(9) userfield - reference type
r2 number(9) userfield - reference type
r3 number(9) userfield - reference type
r4 number(9) userfield - reference type
r5 number(9) userfield - reference type
System Guide for Safran Project 7.2
104
r6 number(9) userfield - reference type
r7 number(9) userfield - reference type
r8 number(9) userfield - reference type
r9 number(9) userfield - reference type
r10 number(9) userfield - reference type
r11 number(9) userfield - reference type
r12 number(9) userfield - reference type
r13 number(9) userfield - reference type
r14 number(9) userfield - reference type
r15 number(9) userfield - reference type
r16 number(9) userfield - reference type
r17 number(9) userfield - reference type
r18 number(9) userfield - reference type
r19 number(9) userfield - reference type
r20 number(9) userfield - reference type
r21 number(9) userfield - reference type
r22 number(9) userfield - reference type
r23 number(9) userfield - reference type
System Guide for Safran Project 7.2
105
r24 number(9) userfield - reference type
r25 number(9) userfield - reference type
r26 number(9) userfield - reference type
r27 number(9) userfield - reference type
r28 number(9) userfield - reference type
r29 number(9) userfield - reference type
r30 number(9) userfield - reference type
f1 varchar(255) userfield
f2 varchar(255) userfield
f3 varchar(255) userfield
f4 varchar(255) userfield
f5 varchar(255) userfield
f6 varchar2(50) userfield
f7 varchar2(50) userfield
f8 varchar2(50) userfield
f9 varchar2(50) userfield
f10 varchar2(50) userfield
f11 varchar2(50) userfield
System Guide for Safran Project 7.2
106
f12 varchar2(50) userfield
f13 varchar2(50) userfield
f14 varchar2(50) userfield
f15 varchar2(50) userfield
f16 varchar2(50) userfield
f17 varchar2(50) userfield
f18 varchar2(50) userfield
f19 varchar2(50) userfield
f20 varchar2(50) userfield
cancelled_date date cancelled date
Table: Host id Primary key: AppName, KeyType, Net_id, Seq, HostKey
Field Name Type Description
Id int id number
AppName varchar (100) Application name, currently fixed value SAP
KeyType int Optional index, by default 1
Net_id int Network id
Seq Int Sequence number
System Guide for Safran Project 7.2
107
HostKey Varchar (300) Key in host system (currently host key from
SAP)
SafranId int Resource sequence number
Table: ilap_exchange_config Primary key: id,
Foreign key: net_id, subnet_id, code_configuration_id
Field Name Type Description
Id Int Id for named ILAP Exchange Configuration
Owner Varchar (200) Owner of named ILAP Exchange
Configuration
Name Varchar(100) Display name for named ILAP Exchange
Configuration
Type Char(1) Exchange type, E=Export, I=Import
Filename Varchar(250) Full filepath for the ILAP Exchange
Configuration File (XML)
Net_id Int Network that named ILAP Exchange
Configuration applies to. Mappings are
against the User Field Set of this Network.
Subnet_id Int Sub-Network that named ILAP Exchange
Configuration applies to. Applies to Import
Code_configuration_id Int User Field Set that userfield-mappings are
against. Must be the same User Field Set
(of this Network) that was used when
mapped.
Filter_name_owner Varchar (250) Filter that is to be applied in the
exchange(export)
System Guide for Safran Project 7.2
108
Set_target_early_start Char(1) Set Target Start Early equal to Start Early
for start activities if filter is used (export)
Import_mode Char(1) Import mode: O=OverWrite, U=Update,
A=Append. Exports are set to dummy value
X.
Import_directely Char(1) Import directly without a need for a
manual Save after Read: N=Read and Save
in two steps, Y=Read and then Save directly
Table: ilap_network_configuration Primary key: net_id
Field Name Type Description
net_id int Network ID for the network in Safran
Project
Network_guid in A GUID-string representing the Safran
Project Data Installation for one Network.
Table: impact_log Primary key: net_id, set_nr
Field Name Type Description
net_id int network id
set_nr in alternative schedule set
impact name varchar
(100)
name for the alternative schedule
set
activate tinyint active flag
System Guide for Safran Project 7.2
109
Table: install_config Primary key: def_id
Field Name Type Description
def_id int Shall be 1.
login_type char Default (N) or extended security (E)
def_group varchar Default group for new users
def_cal integer Calendars et for network defaults
def_pro integer Profile set for network defaults
def_res integer Resource set for network defaults
def_sym integer Symbols set for network defaults
def_ufc integer User field set for network defaults
def_glo integer global set for netwok defaults
def_rat integer rate set for network defaults
System Guide for Safran Project 7.2
110
Table: level_config Primary key: result_net_id
Field Name Type Description
result_net_id int Result network ID
result_net_name varchar resukt network name
source_net_id int Source Network ID
group_field1 varchar Group field 1
group_field2 varchar Group field 2
group_field3 varchar Group field 3
group_field4 varchar Group field 4
auto_update smallint Flag for automatic update of level
generated network during status
updates/baseline updates.
sum_dates smallint Flag for summary of dates
sum_qtys smallint Flag for summary of quantities
sum_prog smallint Flag for summary of progress on
baseline, current or Total qty
plan_profile smallint not in use
gen_date datetime Date for generating level etwork
sum_descr int flag forupdate of long descriptions
System Guide for Safran Project 7.2
111
filter_name varchar2(50) filter name
filter varchar2(320
0)
filter expression
System Guide for Safran Project 7.2
112
Table: map_external_fields Primary key: map_id, sp_field_type, sp_field_nr
Field Name Type Description
map_id int mapping Id
sp_field_type char (1) Safran field type
sp_field_nr int Safran field no.
ext_field_label varchar (40) field description, external system
ext_field_use smallint flagg used to determine of field is
to be transferred
ext_field_nr int field no in external system
ext_infotype varchar (10) information type, external system
Status_method Integer Progressing method
Status_method_o
ption
Integer Option on how to deal with
Remaining Duration
Status_method_in
tv
integer Which cutoff to synchronize the
Timenow.
Table: mp_master Primary key: mp_id
Field Name Type Description
System Guide for Safran Project 7.2
113
mp_id int Multi project ID
mp_name varchar Multi project name
mp_description varchar Description
mp_resourceset int Resource set ID
mp_codeset int User fields ID
ava_method int Method for availability calculation
mp_profileset int Profile set ID
mp_symbolset int Symbol set ID
mp_title varchar Title
mp_client varchar Client
mp_company varchar Company
logo1 varchar Logo reference
logo2 varchar Logo reference
freetext1 varchar User description
freetext2 varchar User description
freetext3 varchar User description
freetext4 varchar User description
owner varchar (200) Owner ( user Id)
System Guide for Safran Project 7.2
114
sch_opt tinyint Scheduling options
sch_max_delay int maximum delay on scheduling
sch_overload_lim int Scheduling overlaod limit
sch_overload_opt tinyint Scheduling overload option
sch_filter text schedule filter expression
sch_sort text schedule sort/order list
System Guide for Safran Project 7.2
115
Table: mp_member Primary key: mp_id, net_id
Field Name Type Description
mp_id int Multi project ID
net_id int Network ID
net_no int network internal seq number
Table: msp_net_index Primary key:
Field Name Type Description
msp_db varchar (20) database name ( used for Safran
for the Microsoft Project Platform)
msp_proj_id varchar (50) Msp project id (used for Safran for
the Microsoft Project Platform)
msp_server varchar (25) Server (used for Safran for the
Microsoft Project Platform)
msp_src varchar (255) msp source and path ( used for
Safran for the Microsoft Project
Platform)
msp_user varchar (200) user name ( used for Safran for the
Microsoft Project Platform)
safran_netid integer safran net_id ( used for Safran for
the Microsoft Project Platform)
System Guide for Safran Project 7.2
116
trans_setup varchar (100) options setup ( used for Safran for
the Microsoft Project Platform)
System Guide for Safran Project 7.2
117
Table: msp_ufield_mapping Primary key: uf_map_uid, safran_field_no
Field Name Type Description
uf_map_uid int internal index
msp_field_no int MS Project userdefined field code
msp_is_enterprise int Is userdefined field entreprise or
not : 1 = enterprise, 0 = ordinary
userfield
safran_field_no varchar (10) safran user field. i.e.R1,F1,..etc
Table: msp_web_reports Primary key:
Field Name Type Description
proj_id varchar (50) project id
rep_name varchar (50) report name
rep_category Integer report category or type
proj_type integer project type; single og network
group
modified_date datetime modified
created_by varchar (200) created by
System Guide for Safran Project 7.2
118
description varchar (255) description
Table: msp_web_reports_images Primary key:
Field Name Type Description
proj_id varchar (50) id
rep_name varchar (50) report name
rep_category Integer report category or type
proj_type integer project type; single og network
group
file_type varchar (10) jpg or pdf
page_no integer report page number
rep_blob long binary page content
Table: net_calc_master Primary key: netcalc_id
Field Name Type Description
netcalc_id int ID of ruleset
netcalc_name varchar Name of ruleset
System Guide for Safran Project 7.2
119
owner varchar Owner (user name) of ruleset
Table: net_calcs Primary key: netcalc_id, rule_name
Field Name Type Description
netcalc_id int Ruleset ID
rule_name varchar Name of rule
result_field varchar Column (field) to be updated
condition varchar Possible future use
formula varchar Rule to be executed
Table: networks Primary key: net_id
Field Name Type Description
net_id int Network ID
name varchar
(200)
Network name
description varchar
(200)
network description
ana_date datetime last analysed date
System Guide for Safran Project 7.2
120
ana_tnow datetime Time Now for last analysis
user_id int Owner User ID
na_date datetime Analysis invalidated date
user_name varchar
(200)
Owner user name
cal_id int Calendar ID
profileset int Profile Set ID
codeset int Codeset/User Field set ID
ana_off smallint Flag for analysis capability
project_id int Project ID
derived_from int Source network if network is a
summary network
stretch tinyint Stretch yes/no
longest_path tinyint Longest path yes/no
float_opt tinyint Float calculation options
dependencies tinyint Dependencies options
progress tinyint Progress options
save_ana_flag tinyint Flag for automatic saving of
analysis results
sch_opt tinyint Scheduling options
System Guide for Safran Project 7.2
121
sch_max_delay int Max delay on scheduling
sch_overload_lim int Scheduling oveload limit
sch_overload_opt tinyint Scheduling overload options
calc_id int Rule set ID
save_resource_flag int Flag which tells if resource
analysis results shall be saved to
the database
lock_scope int Flag for preventing updates to
scope
auto_sum_scope int Flag for auto sum of qty from
resources tothe activity fields
tsh, rsh and csh
resource_set int Resource set related to the
network
symbol_set int Symbol set related to the
network
os_scope tinyint determines the scope for the On
schedule activities to be
calculated against.
disable_split_targets tinyint Disable/enable Flag for Split
targets
sch_filter text schedule filter expression
sch_sort varchar schedule sort/order list
gsid integer global set
System Guide for Safran Project 7.2
122
prog_handling_meth
od
smallint set mark for progress drop
during import
rate_type tinyint rate tape ( simple /complex
rates)
rate_set integer rate set for complex rates
is_template integer Project template
Status_method Integer Progressing method
Status_method_opti
on
Integer Option on how to deal with
Remaining Duration
Status_method_intv integer Which cutoff to synchronize the
Timenow.
Table: outline_codes Primary key: config_id, oc_field, seq
Field Name Type Description
config_id numeric(8) codeset id
oc_field numeric(8) Outline Code (1-30)
seq numeric(8) act. sequence number
parent_seq numeric8 seq of outline parent
short varchar2(10
0)
outline code short description
System Guide for Safran Project 7.2
123
description varchar2(25
5)
outline code description
Sort_field Integer Sorting field
Table : pa_config Primary key: seq
Field Name Type Description
seq int Unique ID
user_name varchar (200) Login name of user who saved this
save_name varchar Name
source_table varchar Aggregate from table
group_col1 varchar Group by column 1
group_col2 varchar Group by column 2
group_col3 varchar Group by column 3
group_col4 varchar Group by column 4
link_tabs text Join (link) definitions
start_date datetime Start of aggregation
end_date datetime End of aggregation
interval int Together with intv_type, length of
periods
System Guide for Safran Project 7.2
124
intv_type int 1 = year, 2 = quarter...6 = days
calendar int Calendar set to be used
wpn varchar (Default) Calendar to be used
profileset int Profileset to be used
profile varchar (Default) profile to use
sum_fields text Definition of sources (column,
from, until...)
target_defs text Definition of target (name etc.)
save_table varchar Name of table to save to
save_overwrite int If last results should be overwritten
save_columns text Name of columns if save
subtit varchar Report Config.
header2 varchar Report Config.
header3 varchar Report Config.
footer_left varchar Report Config.
footer_mid varchar Report Config.
footer_right varchar Report Config.
extra_data varchar Report Config.
main_title varchar Report Config.
System Guide for Safran Project 7.2
125
right_header1 varchar Report Config.
right_header2 varchar Report Config.
left_header1 varchar Report Config.
left_header2 varchar Report Config.
graph_start_date datetime Report Config.
graph_end_date datetime Report Config.
graph_date_forma
t
int Report Config.
graph_l_axis_desc
r
varchar Report Config.
graph_l_axis_grid int Report Config.
graph_l_axis_auto int Report Config.
graph_l_axis_max int Report Config.
graph_l_axis_majo
r
int Report Config.
graph_r_axis_desc
r
varchar Report Config.
graph_r_axis_grid int Report Config.
graph_r_axis_auto int Report Config.
graph_r_axis_max int Report Config.
System Guide for Safran Project 7.2
126
graph_r_axis_maj
or
int Report Config.
table_entries text Report Config.
period_entries text Report Config.
cum_entries text Report Config.
Table: pa_config_filters Primary key:
Field Name Type Description
pa_id int ID of saved configuration
filter_type int Filter type
filter text Filter
Table: path_details Primary key:
Field Name Type Description
path_id int Path sequence number
constraint_act int sequence number for activity
included in the path
System Guide for Safran Project 7.2
127
Table: period_plan_r Primary key: net_id, cut_off_date, seq, per_start
Field Name Type Description
net_id int Network ID
cut_off_date datetime Cutt off date, Period finish
per_start datetime Period start date
seq int resource internal sequence
number in resources
an_seq int Activity Internal Sequence number
res_seq int Resource internal sequence
number in resource_defs
pl_earned_early float Planned earned early
pl_earned_late float Planned earned late
pl_c_earned_early float planned earned cost early
pl_c_earned_late float planned earned cost late
pl_prog_cum_earl
y
float planned progress cumulative early
pl_prog_cum_late float planned progress cumulative late
wpn int Calendar
System Guide for Safran Project 7.2
128
Table: period_status_a Primary key: net_id, cut_off_date, seq
Field name Type Description
net_id int Network ID
cut_off_date datetime Cut off date, period finish date
seq int Internal sequence number for
activity
per_start datetime Period start date
current_as datetime Current Actual start
current_af datetime Current Actual Finsih
current_progress float Current progress cumulative
(Volume)
current_pc float Current progress cumulative (Time)
tf integer total float
ff integer free float
cesa datetime current early start analyzed
ces datetime current early start
cef datetime currentr early finish
cls datetime current late start
clf datetime current late finish
System Guide for Safran Project 7.2
129
du integer duration
wpn integer calendar
Rsh Float Current Scope
Tsh Float Total Scope
Cpc Float Calculated % Complete
Base_planned_pro
g
Float Baseline planned progress
Esa Datetime Early Start Actual
Es Datetime Early Start
Ef Datetime Early Finish
Resa Datetime Revised plan early start actual
Res Datetime Revised plan early start
Ref Datetime Revised plan early finish
Rls Datetime Revised plan late start
Rlf Datetime Revised plan late finish
Curr_frontline_dat
e
Datetime Frontline date against current plan
Table: period_status_r Primary key: net_id, cut_off_date, seq
Field Name Type Description
System Guide for Safran Project 7.2
130
net_id int Network ID
per_start datetime Period start date
cut_off_date datetime Cut off date, Period finish date
seq int Resource internal sequence
number in resources
an_seq int Activity internal sequence number
res_seq int resource internal sequence
number in resource_defs
qty float Quantity
dur int Duration
lagr int Lag on resources (relative to
activity)
type smallint Resource type
profile int Profile ID
vo_seq int Variation order sequence number
(if record is a variation order line)
current_progress float Current progress cumulative
(volume)
expended_qty_cu
m
float Actual expended quantity
cumulative
jobpack_est_qty float Jobpack estimated quantity
qty1 float Quantity (second)
System Guide for Safran Project 7.2
131
csh_flag smallint Flag for inclusion in csh on activity
level
rsh_flag smallint Flag for inclusion in rsh on activity
level
tsh_flag smallint Flag for inclusion in tsh on activity
level
wpn int Calendar
earned_job_qty float Earned at job level (in combination
with job card system, or Safran
details)
cost float Cost quantity
cost1 float Contract cost quantity
cost_actual float Actual Expended cost
period_earn float earned qty in last period
period_earn1 float earned qty1 in last period
period_ecost float earned cost in last period
period_ecost1 float earned cost1 in last period
period_exp float expended qty in last period
period_exc float expended cost in last period
Table: Periodic_rates Primary key: rate_set, rate_seq, seq
System Guide for Safran Project 7.2
132
Field Name Type Description
input_date date rate from date
rate float rate
rate_set int rate set
rate_seq int rate sequence number
seq int sequece number
Table: Perm_renumbering Primary key:
Field Name Type Description
net_id int network id
field_integer int stores field number used
next_seq int stores next count for sequence
text_value varchar (50) stores user added text used in
permanent renumbering
Table: Planner_subprojects Primary key: mp_an_seq,mp_net_id
Field Name Type Description
System Guide for Safran Project 7.2
133
mp_an_seq int master project activity sequence
number
mp_net_id int master project network id
db_netid int database network id
file_name varchar (200) safran planner file name
path_name varchar (200) safran planner file path
url varchar (200) safran planner url adress
project_name varchar (200) project name
System Guide for Safran Project 7.2
134
Table: Prj_comments Primary key: pr_project_id, prj_id
Field Name Type Description
prj_id number(9) key
prj_project_id number(9) project
prj_comment varchar2(2000
)
comments
Table: Prj_docs Primary key:
Field Name Type Description
prj_id number(9) key
prj_project_id number(9) project
description varchar2(50) description
prj_docname carchar2(255) documnet path/name
Table: Prj_labels Primary key: prj_project_id, field_nr
Field Name Type Description
System Guide for Safran Project 7.2
135
prj_project_id number(9) project
field_nr number(9) userfield no
label varchar2(20) user field label
rcol number(9) connected reference field
auto_upd number(1) yes/no update Reference field
Table: Prj_pers Primary key: prj_pid
Field Name Type Description
prj_pid number(9) key - person id
prj_sign char(3) signature
prj_name varchar2(255) name
Table: Prj_types Primary key: prj_type
Field Name Type Description
prj_type varchar2(10) code
prj_typedes varchar2(255) description
System Guide for Safran Project 7.2
136
Table: Prj_wbs Primary key: prj_wbs_project, prj_wbsid
Field Name Type Description
prj_wbs_project number(9) project
prj_wbsid number(9) key
prj_wbscode varchar2(16) code
prj_wbs_desc varchar2(255) description
System Guide for Safran Project 7.2
137
Table: profile_intv Primary key: profile_id, profileset_id, value_x
Field Name Type Description
profile_id int Profile ID
profileset_id int Profile set ID
value_x int X-axis value
value_y int Y-axis value
Table: profiles Primary key: profile_id, profileset_id
Field Name Type Description
profile_id int Profile ID
name varchar Profile name
profileset_id int Profile set ID
Table: profileset Primary key: profileset_id
Field Name Type Description
profileset_id int Profileset ID
System Guide for Safran Project 7.2
138
name varchar Name/description
owner varchar (200) Owner user name
System Guide for Safran Project 7.2
139
Table: project_config Primary key: project_id
Field Name Type Description
project_id int Unique project ID
project_name varchar project name
project_title varchar Project Title ( for report titles)
main_network int Project Main network
project_start datetime Project start date
project_end datetime Project end date
project_client varchar project client name (for report
titles)
logo_bmp varchar path to company og project logo
(for reports)
client_bmp varchar Path to client logo (for reports)
owner varchar (200) Owners user ID
cut_off_dow smallint Specifies day of week to be used
for cut-offs
contractor varchar Contractor
freetext1 varchar User field - project text entry (for
reports)
System Guide for Safran Project 7.2
140
freetext2 varchar User field - project text entry (for
reports)
freetext3 varchar User field - project text entry (for
reports)
freetext4 varchar User field - project text entry (for
reports)
mr_def_field varchar(4) Possible future use
mr_def_value integer Possible future use
ub_def_field varchar(4) Possible future use
ub_def_value integer Possible future use
Hour_cutoffs Varchar
(100)
Time for cutoffs
Table: project_members Primary key: project_id, login_name
Field Name Type Description
login_name varchar (200) log in name / user ID
project_id integer Filter project id
Table: pt_act_bitmaps Primary key:
System Guide for Safran Project 7.2
141
Field Name Type Description
net_id int network id
an_seq int activity sequence number
bitmap varchar path and fine name for bitmab
bitmap_date datetime date
date_field int number for datefield if positioned
against a Safran Project datefield
align int row alignment, above, center,
below
scale int % scale relative to row height
System Guide for Safran Project 7.2
142
Table: pt_act_bitmaps_visible Primary key:
Field Name Type Description
net_id int network ID
view_name varchar (50) layout name
login_name varchar (200) login name /user Id
an_seq int activity seq number
bitmap varchar full path and bitmap file name
bitmap_date datetime date
date_field int number for datefield if positioned
against a Safran Project datefield
Table: pt_act_grids Primary key:
Field Name Type Description
net_id number(9) network ID
an_seq number(9) activity sequence number
grid_date number(9) selected activity date
grid_pos number(9) text position relative to top- (%)
System Guide for Safran Project 7.2
143
grid_text() varchar2(25) text on grid date
grid_thickness number(9) line tihickness
grid_line_style number(9) line style
Table: pt_act_grids_visible Primary key:
Field Name Type Description
net_id number(9) network ID
an_seq number(9) activity sequence number
view_name varchar2(25) layout name
login_name varchar (200) login name/user Id
grid_date number(9) grid date
Table: pt_fonts Primary key:
Field Name Type Description
login_name varchar (200) log in name / user ID
view_name varchar(50) layout name
System Guide for Safran Project 7.2
144
row_id int values that together with row type
identifies font definitions
row_type varchar activity,s=summary, F=filtered
row_text varchar header/label display text
font_color int font color
font_name varchar font
font_size int font size
font_bold tinyint flag, bold
font_italic tinyint flag, italic
font_underline tinyint flag, underline
filter text filter expression
active tinyint active filter for layout( value =1,0)
font_bck_color numeric(8) back ground color
init_expl_collapse tinyint Layout group/summary appearance
sum_dates tinyint Layout group/summary appearance
sum_numbers tinyint Layout group/summary appearance
frontline_visible tinyint Layout group/summary appearance
final_line_style smallint Layout group/summary appearance
final_line_thick integer Layout group/summary appearance
System Guide for Safran Project 7.2
145
sum_span tinyint summary/group bar appearance,
all or as filtered ( 0,1)
filter_name varchar(50) Filtername
filter_owner varchar(200) Filter Owner
sum_refs tinyint Controls if Reference fields are to
be displayed at group level or not
Table:pt_links_draw_level Primary key:
Field Name Type Description
login_name varchar (200) user log_in name
view_name varchar (50 Barchart Editor Layout name
net_id Iiteger Network ID number
pan_seq integer predecessor seq
san_seq integer successor seq
typec integer link type
pan_net integer network for pan
san_net integer network for san
draw_pan integer draw level for pan
draw_san integer draw level for san
System Guide for Safran Project 7.2
146
Table: ptavle_collapsed_groups Primary key
Field Name Type Description
login_name varchar
(200))
user log_in name
view_name varchar2(25) Barchart Editor Layout name
net_id number(9) Network ID number
expression varchar2(9) What is collapsed (coded)
Table: ptavle_curtain Primary key:
Field Name Type Description
net_id numeric(8) Network ID
start_date date start date of curtain
start_date_str varchar2(25) start date <system fields>
until_date date end date of curtain
until_date_str varchar2(25) end date <system fields>
bck_color numeric(8) bacground color for shading
hatch numeric(8) shading type
System Guide for Safran Project 7.2
147
hatch_color numeric(8) color of hatch/shading
Table: ptavle_curtain_visible Primary key:
Field Name Type Description
net_id numeric(8) Network ID
view_name varchar(50) Barchart editor Layout name
login_name varchar
(200)
user ID/Login
start_date date start date for curtain shading
start_date_str varchar2(25) start date <system fields>
until_date date end date for curtain shading
until_date_str varchar2(25) end date <system fields>
Table: ptavle_grids Primary key:
Field Name Type Description
net_id int Network ID
grid_date datetime Grid date, Dateline
System Guide for Safran Project 7.2
148
grid_pos int Text position (0-100%) from top of
page
grid_text varchar Text/ dateline description
grid_color int Color
grid_thickness int Line thickness
grid_line_style int Line style
grid_date_str varchar2(25) grid type, if one of set types
Table: ptavle_grids_visible Primary key:
Field Name Type Description
net_id int Network ID
view_name varchar (50) Barchart editor Layout name
grid_date datetime Links to ptavle_grids
login_name varchar
(200)
user ID/Login
grid_date_str varchar2(25) grid type, if one of set types
Table: ptavle_page_breaks Primary key:
System Guide for Safran Project 7.2
149
Field Name Type Description
login_name varchar(200) user ID/Login
view_name varchar(50) Barchart editor Layout name
net_id number(9) network id
Expression varchar2(25
5)
expression
System Guide for Safran Project 7.2
150
Table: qty_config Primary key: project_id, field_name
Field Name Type Description
field_name varchar Field name (csh, rsh, tsh)
field_label varchar label for field
formula varchar Summary formula
baseline_update smallint Flag for update during baseline
status_update smallint Flag for update during status
upfdate
project_id int Project ID
weight_factor smallint Flag for use as weight factor during
updates
Table: rap_act Primary key:
Field Name Type Description
user_id int User ID
seq int Activity Sequence number
net_id int Network ID
System Guide for Safran Project 7.2
151
Table: rap_act2 Primary key: user_id, seq
Field Name Type Description
user_id int User Id
seq int Activity sequence number
net_id int Network ID
page varchar Value of page column (or
sectioning col.)
stack varchar Value of stack column (or
sectioning col. 2)
group1 varchar Internal use
group2 varchar Internal use
date1 datetime Internal use
date2 datetime Internal use
float1 float Internal use
Table: rap_act3 Primary key: user_id, page, stack
Field name Type Description
user_id int User ID
System Guide for Safran Project 7.2
152
page varchar Value of page column (or
sectioning col.)
stack varchar Value of stack column (or
sectioning col.)
wpn int Calendar
System Guide for Safran Project 7.2
153
Table: rap_act_psr Primary key:
Field Name Type Description
user_id numeric(8) User Id
net_id numeric(8) Network ID
seq numeric(8) Activity sequence number
group1 varchar2(50) group values
group2 varchar2(50) group values
group3 varchar2(50) group values
group4 varchar2(50) group values
group5 varchar2(50) group values
group6 varchar2(50) group values
Table: rap_agg_fields Primary key: seq, user_id
Field Name Type Description
seq int resource record ID
user_id int login_name
res_name char name of resource
System Guide for Safran Project 7.2
154
page_value char Value of page column (or
sectioning col.)
res_seq int ID of resource
System Guide for Safran Project 7.2
155
Table: rap_oc Primary key: seq, user_id
Field Name Type Description
user_id integer process id
group_field integer outline code no (O<n>
oc_seq integer unique key for outline code
group_value integer group value key
codeset integer codeset config_id
Table: rap_resources Primary key:
Field Name Type Description
user_id int User ID
seq int Resource sequence number
Table Rap_rfield_values Primary key: user_id, rfield_nr, code
Field Name Type Description
user_id int User ID
System Guide for Safran Project 7.2
156
rfield_nr int Reference field value
code int Internal code value
short varchar Short description
description varchar Description
Table Rate_records Primary key: rate_set, seq
Field Name Type Description
rate_seq int rate set
seq int sequence number
short varchar (50) short name
description varchar 200 description
Table Rate_set Primary key: id
Field Name Type Description
id int rate set id
name varchar (50) name
owner varchar (200) login id of rate set owner
System Guide for Safran Project 7.2
157
dir_alias varchar (25) direct rate alias
oh1_alias varchar (25) overhead rate1 alias
oh2_alias varchar (25) overhead rate2 alias
oh3_alias varchar (25) overhead rate3 alias
oh4_alias varchar (25) overhead rate4 alias
ga_alias varchar (25) general and administration rate
alias
com_alias varchar (25) cost of money rate alias
System Guide for Safran Project 7.2
158
Table: rep_config Primary key:
Field Name Type Description
rep_id int Report ID
rep_name varchar report name
user_name varchar (200) user name
save_name varchar (50) Name used during save
filter text Filter string
subtit varchar Report subtitle
header2 varchar Report header/subtitle 2
header3 varchar Report header/subtitle 3
footer_left varchar Left footer for report
footer_mid varchar Centre footer for report
footer_right varchar Right footer for report
sort_list varchar report sort list/ sort order
start_date datetime Start date
end_date datetime End date
extra_data varchar Other config. parameters
System Guide for Safran Project 7.2
159
window_name varchar Window name
main_title varchar Main title
remarks varchar Report comment
right_header1 varchar Right subtitle 1
right_header2 varchar Right subtitle2
left_header1 varchar Left subtitle 1
left_header2 varchar left subtitle 2
net_id int network ID
cflag int Report on cost?
logo_bmp varchar Path to logo
clogo_bmp varchar Path to logo
Table: rep_config_data Primary key: rep_id, line_no
Field Name Type Description
rep_id int Report ID
line_no int Line number
data_line varchar Line parameters
System Guide for Safran Project 7.2
160
Table: rep_config_fields Primary key: rep_id, field_name
Field Name Type Description
rep_id int Report ID
field_name varchar Field name
field_size int Field /column width
field_header varchar Field/column header
field_nr int Field number (order)
field_type char Field Type
field_label varchar Field label
field2 varchar Field (second column entry)
header2 varchar Field header ( second column
entry)
label2 varchar Field label ( second column entry)
bcgcolor int background color
Table:rep_config_group_prop Primary key: rep_id, groupname
Field Name Type Description
System Guide for Safran Project 7.2
161
rep_id int Report ID
group_name varchar(255) Display value for group
color int Bar / line color
style int Bar / line hatch / style
line_no numeric(8) Line number
Table: rep_config_resources Primary key:
Field Name Type Description
rep_id int Report ID
res_seq int Resource sequence number
res_type tinyint Resource type (1=qty, 2= Cost)
res_sort smallint Sort field
Table: rep_groups Primary key: group_id
Field Name Type Description
group_id int Report Group ID
group_name varchar Description
System Guide for Safran Project 7.2
162
swa_flag integer Safran Web Access flag
Table: rep_in_group Primary key:
Field Name Type Description
group_id int Report group ID
rep_id int Report ID
Table: rep_in_package Primary key: package_id, rep_id
Field Name Type Description
package_id int Report package ID
rep_id int Report ID
sortnr int Report sort order
System Guide for Safran Project 7.2
163
Table: rep_package Primary key: package_id
Field Name Type Description
package_id int Report package ID
package_name varchar Report package name
created_by varchar (200) User Name
autorun smallint Flag for autorun (possible future )
interval smallint Interval for autorun (possible
future )
last_run_date datetime Last run date (possible future )
next_run_date datetime next run date (possible future )
remarks varchar Comments
start_date datetime Start of common report span (If
selected)
end_date datetime End of common report span (If
selected)
date_option int 1=Report dates, 2=Common dates,
3=Relative dates
st_offs int If relatve dates, number of
days/weeks after set date to start
report span
System Guide for Safran Project 7.2
164
end_offs int If relative dates, number of
days/weeks after set date to end
report span
offs_type int If relative dates, whether
st/end_offs should be counted in
days or weeks
offs_date_type int If relative dates, offset date for
calculation of start/end: Today, last
baseline etc.
filter text filter for future use
save_type tinyint save type (use save name or
standard)
to_where tinyint output
file_type tinyint psr or pdf file type
filter_option tinyint filter option for future use
path_name varchar(255) save path
def_name varchar(16) standard name
filter_name varchar(30) filter name for future use
filter_opt2 tinyint filter option check
ref_field_iteration varchar (4) reference field for package
repetition
one_pdf tinyint flag for creation of one combined
pdf file
Swa_folder varchar (255) SWA folder path
System Guide for Safran Project 7.2
165
Table: rep_package_filters Primary key: package_id
Field Name Type Description
package_id int report_package_id
filter_name varchar (50) filter_name
filter_owner varcghar
(200)
filter owner
System Guide for Safran Project 7.2
166
Table: resourc_avail Primary key:
Field Name Type Description
net_id int Network ID
res_seq int Resource sequence number
avail_from datetime Availability from date
avail_until datetime Availability until date
avail_qty float Quantity available
avail_type int Availability type
wpn int Calendar
Table: resource_def Primary key: seq, net_id
Field Name Type Description
seq int Unique resource sequence number
name varchar (100) Resource code/name
descr varchar Resource description
net_id int Relation to Resource set
res_type tinyint Resource type (1=qty,2=cost)
System Guide for Safran Project 7.2
167
cost_rate float Unit cost rate for resource type=1
parent int used for hierarchical structure
System Guide for Safran Project 7.2
168
Table: resource_rates Primary key: id
Field Name Type Description
net_id int Network Id
res_seq int resource sequence number
account int cost account
budget_rate int budget rate account
forecast rate int forecats rate record
expended_rate int actual/expended rate record
Table: resource_set Primary key: id
Field Name Type Description
id int Unique resource set sequence
number
name varchar Resource set name
owner varchar (200) Owner, user Id
Table: resources Primary key: seq, net_id
System Guide for Safran Project 7.2
169
Field Name Type Description
seq int Unique sequence number
an_seq int Activity sequence number
res_seq int Resource sequence number
qty float Quantity
dur int Resource duration
lagr int Lag (relative to Activity start)
type smallint Resource type
profile int Resource Profile ID
vo_seq int Variation order sequence number
current_progress float Current progress (Volume)
actual_qty float Actual expended qty
jobpack_est_qty float Jobpack estimated quantity
wpn int Calendar
qty1 float Quantity
csh_flag smallint Flag for inclusion in Csh
rsh_flag smallint Flag for inclusion in Rsh
tsh_flag smallint Flag for inclusion in Tsh
System Guide for Safran Project 7.2
170
net_id int Network ID
earned_job_qty float Earned against job (from jobcard
system, Safran details etc.)
esar datetime Early start for resource
efr datetime Early finish for resource
lsr datetime Late start for resource
lfr datetime Late finsih for resource
cost float Cost quantity
cost1 float Contract cost quantity
cost_rate float Cost rate for resource
cost_actual float Actual expended cost quantity
pl_prog_cum_earl
y
float Planned progress early cumulative
fcqty float Forecast quantity
fclag float Forecast lag
fcdur float Forecast duration
ext_seq number(8) for S4MsP compatibility
Table: revision_dibb Primary key: seq, cut_off, net_id
System Guide for Safran Project 7.2
171
Field Name Type Description
seq int ID of resource record
an_seq int ID of activity
res_seq int ID of resource type
net_id int ID of network
cut_off datetime Cut off date
pl_earned_early float Earned scope - planned earned
early, last revision (or baseline)
pl_earned_late float Earned scope - planned earned
late, last revision (or baseline)
pl_c_earned_early float Earned cost - planned earned early,
last revision (or baseline)
pl_c_earned_late float Earned cost - planned earned early,
last revision (or baseline)
Table: sap_activities Primary key: seq, net_id
Field Name Type Description
Seq Integer Sequence number
Net_id Integer Project id
System Guide for Safran Project 7.2
172
Sap_crud Tinyint
Sap_netw Bigint
Table: sequence_log Primary key: table_name
Field Name Type Description
table_name varchar Table name
next_id int Next available sequence number
Table: sp_document_links Primary key:
Field Name Type Description
seq int Sequence number - linked to
activity
net_id int Network Id number
label varchar(20) Link label
doc_path varchar(255) Full document path
System Guide for Safran Project 7.2
173
Table: standard_bar_texts Primary key:
Field Name Type Description
symbol_set int Link to symbol set
style_id int Link to symbol
text_pos tinyint Text position configuration
text_prefix varchar Prefix field or text
text_suffix varchar Suffix field or text
text_field int Text field
text_align tinyint Alignment parameter
text_bold tinyint Text Bold
text_italic tinyint Text Italic
text_underline tinyint Text Underline
text_color int Text Color
text_size int Text size
text_size_factor float Internal use
text_font varchar Font Name
text_numb_dec int number of decinals
System Guide for Safran Project 7.2
174
text_thous_sep int use thousand separator
text_date_format int text date format
text_other_format int text formatting
Table: standard_bars Primary key:
Field Name Type Description
style_id int Symbol Id
symbol_set int Symbol set
name varchar Name
include_on tinyint All/filtered/none
date_field_from smallint From date
date_field_until smallint Until date
start_symbol varchar Start symbol
main_bar smallint Bar visible, style
finish_symbol varchar End symbol
bar_color int Color
bar_hatch int Hatch
bar_hatch_color int Hatch Color
System Guide for Safran Project 7.2
175
ypos tinyint y-postion (0-100%)
bar_height tinyint Bar height (0-100%)
progress_bar tinyint Progress bar parameter
text_field smallint Not in use
text_align_vert tinyint Not in use
text_align_horz tinyint Not in use
text_relative_to tinyint Not in use
text_font varchar Not in use
text_color int Not in use
text_bold tinyint Not in use
text_italic tinyint Not in use
text_underline tinyint Not in use
text_size int Not in use
filter text Filter
draw_order int Bar/symbol draw order
delay_units int Delay config for bars
delay_use_wpn tinyint Calendar
bar_frame_color int Bar frame color
System Guide for Safran Project 7.2
176
text_size_factor float Not in use
text_prefix varchar Not in use
text_suffix varchar Not in use
line_num tinyint Bar drawn on line
necked_bar numeric(1) flag for necked bar
necked_limit numeric(8) limit for necking
bar_frame_style integer line style for bar frame
filter_name varchar(50) Filter name
filter_owner varchar(200) Filter owner
Table: standard_bars_dev Primary key:
Field Name Type Description
object_id int Object Id
net_id int Network ID
an_seq int Activity Sequence number
start_symbol varchar Start symbol
main_bar smallint Bar visible, bar style
finish_symbol varchar End symbol
System Guide for Safran Project 7.2
177
bar_color int Color
bar_hatch int Hatch
bar_hatch_color int Hatch color
ypos tinyint Y position (0-100%)
bar_height tinyint Bar height (0-100%)
progress_bar tinyint Progress bar configuration
bar_frame_color int Color of bar frame
style_id int Symbol Id
line_num smallint line, -2, -1, 0, 1, 2
symbol_set int symbol set Id
necked_bar numeric(1) flag for necked type bar
necked_limit numeric(8) limit for necking
bare_frame_style int bare frame line style
Table: std_bars_view_config Primary key:
Field Name Type Description
style_id int Symbol Id
symbol_set int Symbol set
System Guide for Safran Project 7.2
178
view_name varchar(50) View name
login_name varchar
(200)
Login name / User ID
bar_visible smallint Bar Visible flag
legend_visible smallint Legend visible flag
visible_summary smallint Not in use
visible_summary1 smallint Visible flag for summary 1
visible_summary2 smallint Visible flag for summary 2
visible_summary3 smallint Visible flag for summary 3
visible_summary4 smallint Visible flag for summary 4
visible_summary5 smallint Visible flag for summary 5
visible_summary6 smallint Visible flag for summary 6
visible_summary7 smallint Visible flag
visible_summary8 smallint Visible flag
visible_summary9 smallint Visible flag
visible_summary1
0
smallint Visible flag
visible_summary1
1
smallint Visible flag
visible_summary1
2
smallint Visible flag
System Guide for Safran Project 7.2
179
visible_summary1
3
smallint Visible flag
visible_summary1
4
smallint Visible flag
visible_summary1
5
smallint Visible flag
visible_summary1
6
smallint Visible flag
visible_summary1
7
smallint Visible flag
visible_summary1
8
smallint Visible flag
visible_summary1
9
smallint Visible flag
visible_summary2
0
smallint Visible flag
visible_summary2
1
smallint Visible flag
visible_summary2
2
smallint Visible flag
visible_summary2
3
smallint Visible flag
visible_summary2
4
smallint Visible flag
visible_summary2
5
smallint Visible flag
System Guide for Safran Project 7.2
180
bar_summary1 smallint Bar summary type flag (detailed,
summary)
bar_summary2 smallint Bar summary type flag (detailed or
summary)
bar_summary3 smallint Bar summary type flag (detailed or
summary)
bar_summary4 smallint Bar summary type flag (detailed or
summary)
bar_summary5 smallint Bar summary type flag (detailed or
summary)
bar_summary6 smallint Bar summary type flag (detailed or
summary)
bar_summary7 smallint Bar summary type flag (detailed or
summary)
bar_summary8 smallint Bar summary type flag (detailed or
summary)
bar_summary9 smallint Bar summary type flag (detailed or
summary)
bar_summary10 smallint Bar summary type flag (detailed or
summary)
bar_summary11 smallint Bar summary type flag (detailed or
summary)
bar_summary12 smallint Bar summary type flag (detailed or
summary)
bar_summary13 smallint Bar summary type flag (detailed or
summary)
System Guide for Safran Project 7.2
181
bar_summary14 smallint Bar summary type flag (detailed or
summary)
bar_summary15 smallint Bar summary type flag (detailed or
summary)
bar_summary16 smallint Bar summary type flag (detailed or
summary)
bar_summary17 smallint Bar summary type flag (detailed or
summary)
bar_summary18 smallint Bar summary type flag (detailed or
summary)
bar_summary19 smallint Bar summary type flag (detailed or
summary)
bar_summary20 smallint Bar summary type flag (detailed or
summary)
bar_summary21 smallint Bar summary type flag (detailed or
summary)
bar_summary22 smallint Bar summary type flag (detailed or
summary)
bar_summary23 smallint Bar summary type flag (detailed or
summary)
bar_summary24 smallint Bar summary type flag (detailed or
summary)
bar_summary25 smallint Bar summary type flag (detailed or
summary)
net_id integer network id
System Guide for Safran Project 7.2
183
Table: sub_project Primary key: prj_project_id, prj_id
Field Name Type Description
prj_id number(9) key
prj_code varchar2(20) sub project code (id)
prj_des varchar2(25
5)
description
prj_alias char(8) alternative id
prj_sflag char(1) Future use
prj_vo number(8) Future use
prj_type varchar2(10) sub project type
prj_reg date registered date
prj_ark date archived date
prj_kunde varchar2(30) customer rep.
prj_aop varchar2(30) company rep.
prj_f1 varchar2(30) user field
prj_f2 varchar2(30) user field
prj_f3 varchar2(30) user field
prj_f4 varchar2(30) user field
System Guide for Safran Project 7.2
184
prj_project_id number(9) project
prj_intern_nr char(6) Future Use
prj_f5 varchar2(30) user field
prj_f6 varchar2(30) user field
prj_f7 varchar2(30) user field
prj_f8 varchar2(30) user field
prj_f9 varchar2(30) user field
prj_f10 varchar2(25
5)
user field
prj_f11 varchar2(50) user field
prj_f12 varchar2(50) user field
prj_f13 varchar2(50) user field
prj_f14 varchar2(50) user field
prj_f15 varchar2(50) user field
prj_f16 varchar2(50) user field
prj_utm date date
prj_wbsid number(9) wbs
prj_baseline (date) baseline rund date
System Guide for Safran Project 7.2
185
Table: subnet_access Primary key: subnet_id, login_name
Field Name Type Description
subnet_id int Subnet ID
login_name varchar (200) User Login name
access_level tinyint Avess level
log_level tinyint Log level
System Guide for Safran Project 7.2
186
Table: subnet_temp Primary key: subnet_id, login_name
Field Name Type Description
login_name varchar (200) User Login name
seq_orig integer Orginal sequence
seq integer Sequence number
Table: subnets Primary key: subnet_id
Field Name Type Description
subnet_id int Subnet ID
net_id int Network ID
name varchar
(100)
Subnet name
description varchar
(100)
Subnet description
last_changed datetime Last changed date
user_id int User ID
na_flagg tinyint Flag for not avaialable
System Guide for Safran Project 7.2
187
user_name varchar
(200)
User log in name
Table: subpro_pers_selection Primary key:
Field Name Type Description
person varchar2(10) name
sign char(3) signatur
Table: symb_inherit_draw_order Primary key: style_id, symbol_set
Field Name Type Description
style_id int ID
symbol_set int symbol set id
draw_order Int symbol draw order/priority number
Table: symbol_set Primary key: id
Field Name Type Description
System Guide for Safran Project 7.2
188
id int Symbol set ID
name varchar Name
owner varchar
(200)
Owner, user name
inherit_symbolset int id of symbol set to inherit symbols
from
Table: user_access Primary key: login_name, object_id, object_type
Field Name Type Description
login_name varchar
(200)
User log in name
object_id int Object Id
object_type char Object type
access_level smallint Access level
Table: user_group Primary key: group_id
Field Name Type Description
group_id int User group ID
name varchar user log in name
System Guide for Safran Project 7.2
189
Table: user_locking Primary key:
Field Name Type Description
login_name varchar
(200)
User log in name
object_id int Object ID
object_type char Object Type
access_level smallint Access level
process_id int Database process ID
locked_time datetime Lock applied time
window varchar Window name
Table: userfield_formulas Primary key: config_id
Field Name Type Description
config_id int User fields set id
field type varchar (2) Field Type
field_nr integer Field number
row_nr integer Rrow number in formula
System Guide for Safran Project 7.2
190
condition tinyint Include (All,Where, Then where,
Remaining)
expresion varchar(255) Formula
use_wpn integer Flag for use of calendar in
computation
wpn integer Calendar
dur_fmt integer Duration format
filter_name varchar(100) Filter applied by name
filter_owner varchar(100) Owner of applied filter
filter_express varchar(2000
)
User defined filter expression
remarks varchar(50) Row formula remarks
Table: userfield_config Primary key: field_nr, field_type, config_id
Field Name Type Description
field_nr int Field number
field_type char (1) Field Type
select_stmnt varchar (255) Select statement
valid_stmnt varchar (255) Validation statement
System Guide for Safran Project 7.2
191
label varchar(40) Field label
newflag smallint Possible future
editflag smallint Flag for allowing direct input or
DDLB
config_id int Codeset ID
Use_codeset integer link to userfield set
oc_levels integer outline levels
summary_opt tinyint summary option/defintion
summary_function tinyint function
activity_opt tinyint activity option/definition
formula varchar (255) userfield formula for computed
value
formula_filter long varchar
(255)
filter for computed values
display tinyint
formula_use_wpn tinyint use calendar checkmark
formula_wpn smallint selected calendar
formula_dur_form
at
smallint format for duration
use_field_nr int link to userfield nr
System Guide for Safran Project 7.2
192
save_to_db number(2) keep information is you need to
store calculated values to the
database
Table: users Primary key: login_name
Field Name Type Description
login_name varchar (200) User login name
full_name varchar user full name
Table: version Primary key: version_id
Field Name Type Description
version_id int Version ID
version_number varchar Version number
version_name varchar version name
version_date datetime version date
version_comment varchar Version comments
Table: vo_reg Primary key:
System Guide for Safran Project 7.2
193
Field Name Type Description
seq int Unique sequence number
vo_no varchar (50) Variation order number
cli_vo varchar (50) Client variation order number
revision varchar (4) Variation order revision code
description varchar
(255)
Description
responsible varchar (16) Responsible person
issue_date datetime Issue date
ok_date datetime Approved date
baseline_id int Included in baseline
remarks varchar
(255)
comments
vo_type char (1) Variation order type
net_id int network ID
Table: weekref Primary key: project_id, week_end
Field Name Type Description
project_id int Project ID
System Guide for Safran Project 7.2
194
week_start datetime Week start ( day of week)
week_end datetime Week end (day of week9
week_number int Week number
project_week smallint Project week number (counting
from 1)
biweek_cutoff_fla
g
smallint Flag for Biweekly cut off
month_cutoff_flag smallint Flag for monthly cut off
prog_input_starte
d
smallint Flag for progress input
status_run smallint Flag for status run
status_approved smallint Flag for status approved date
actual_period_star
t
datetime Actual start date for status run
activity_history smallint Activity history flag
revision_cut tinyint Whether a revision has been set,
and type.
Table: window_defaults Primary key: login_name, net_id, window_name, field_name
Field Name Type Description
login_name varchar (200) User log in
System Guide for Safran Project 7.2
195
net_id int Network ID
window_name varchar Name of window
field_name varchar Name of field in window
value text Configuration value
Table: windows Primary key: window_id
Field Name Type Description
window_id int Window ID
name varchar Window name
help_id int Obsolete
default_access smallint Default access level
remarks text Window comments
Table: wpn_def Primary key: cal_id, wpn
Field Name Type Description
hours float Work hours per day
System Guide for Safran Project 7.2
196
description varchar
(100)
Description
cal_id int Calendar ID
wpn int Calendar number
System Guide for Safran Project 7.2
197
Table: wpn_rest Primary key:
Field Name Type Description
cal_id int Calendar ID
wpn int Calendar number
rest_from datetime Rest from date/time
rest_until datetime Rest until date/time
day_of_week tinyint Rest day of Week (1 until 7)
rest_from_hrs smallint Rest from hours
rest_until_hrs smallint Rest until hours
seq int Unique sequence number
rest_from_min smallint Rest from minute
rest_until_min smallint Rest until minute
System Guide for Safran Project 7.2
198
The Data Model This section provides details on the various tables used by Safran Project and how these tables relate
to each other.
Throughout this section more and more complexity will be added to the structures
The Network The central part of Safran Project is the network. The network, in its simplest form, contains activities
(task) and links (constraints).
Adding Resources to the model Associated with the Activities are the resource requirements, the resources required to complete the
work. The Resource definition table defines available resource types.
System Guide for Safran Project 7.2
199
Adding Variation Orders to the model Your resource requirement may be part of your original scope of work or may, as in many instances
be associated with project Variation Orders.
System Guide for Safran Project 7.2
200
Starting from the Project View The network is always associated with, and is the essential part in a Project definition.
System Guide for Safran Project 7.2
201
Adding the Scope of Work and the week reference tables to the model The Project contains a scope of work and a quantity summary definition. Your Project is also linked to
a Week reference table that defines your weekly, bi-weekly and monthly cut-off dates for reporting
and statusing.
Adding Calendar definitions to the model For time calculation you will associate your network with a Calendar Set. Calendar sets contain an
unlimited number of Calendars, which defines working time, time-of, holidays and rest periods.
System Guide for Safran Project 7.2
202
Profile set and Resource Profiles The network may be associated with a resource profile set. The Profile set contains workload profiles
made up of interval definitions.
Resources, Resource definitions The network is also associated with a resource set, having a set of resource type definitions and
availabilities.
System Guide for Safran Project 7.2
204
Rate sets and rates Associated with the network is a rate set and rate records that holds your complex rate definitions.
Userfield definitions and codes. The network is connected to a set of userfield definitions, and codes belonging to those definitions.
System Guide for Safran Project 7.2
205
Field calculations/Rules You may assign activity field calculations for your Network.
Globals You may define globals and associate the global set with your network.
Sub-projects The Network may be divided into sub-projects.
System Guide for Safran Project 7.2
206
Project Groups Networks may be part of one or more project groups.
System Guide for Safran Project 7.2
207
Contract Performance data and Government Reporting The government Reporting and Contract performance module support formal contract performance
reporting such as the CRP1-5 report formats, the OMB 300 and NASA 533M formats and contains a
variance and threshold analysis feature. Status and updating.
System Guide for Safran Project 7.2
208
Status and Updating Two processes are available for updating and Statusing:
Baseline
Status Update
You run an initial baseline at the beginning of your project, and thereafter when it is required to reset
your performance measurement target.
Baseline At every baseline -run, a new entry is added to the baseline log and a copy of activities and
constraints are stored. A set of plan value adjustments is saved to the Baseline_dibb table.
System Guide for Safran Project 7.2
209
Status Update Normally you will run the Status Update process once a week to track project progress and collate
actual expenditure.
At every run the week reference table is updated and progress data is copied from activities and
resources.
System Guide for Safran Project 7.2
210
Revision During a plan revision, the definition of the revision is stored in the weekref table. Plan adjustments
are stored in revision_dibb.
System Guide for Safran Project 7.2
211
Forecast During a forecast, the definition is saved in forecast_log, and calculated value are saved in
forecast_data.
System Guide for Safran Project 7.2
212
Access Control Access to objects can be controlled at user or group level. The highest access level is accepted. Access
can be set on objects or on windows. On Objects the default is no access, Windows are by default
fully accessible. Safran Project access control is an addition to the database access control.
Users and Groups Users are registered in Safran Project and added to groups from the system administration module.
User access Two tables hold the access granted for the user and the group.
System Guide for Safran Project 7.2
213
Objects Access can be granted for Projects, Networks, Network Groups, Subnetworks, calendars, userfield
sets, profile sets, symbol sets, rule sets, rate sets and windows.
System Guide for Safran Project 7.2
214
Reports All report definitions may be saved for later use. Saved report definitions may be used in report
packages, to be run together as a batch job. You may also run reports saved by other users. Report
Definitions may be allocated to report groups, to allow selection from reports set up for a specific
project. You may include a barchart editor layout as a report in a package.
Report definition The report definition is stored in the rep_config table, and selected columns, resources and line/bars
definitions and more are stored in corresponding tables.
System Guide for Safran Project 7.2
215
Report Packages. any saved report specifications may be used in Report Package definitions. The report packages
enable you to run a series of reports in one go. In addition, you may add Barchart Editor layouts to
report packages.
Report Groups Reports may be grouped together to make selection easier, and to structure the usage of standard
report specifications per Project, Department, Team etc.
System Guide for Safran Project 7.2
217
Summarized models Finally, we will give you the Safran Project data model broken down to 6 areas. The Network, Project,
Access, The Barchart Editor layout and views, Reporting and Activity and History.
The Network model