Sakhalin Oil and Gas Industrial Park
Transcript
  • SakhalinOil and Gas

    Industrial Park

  • The project is supported by the Government of Sakhalin Oblast andSakhalin Energy

    2

  • 3

    Sakhalin oil and gas operators purchasing equipment, materials and services all over the world

    3

    SIP project will help to eliminate barriers for new vendors

    • Single infrastructure, energy sources,administrative, social and other services will beavailable for Residents

    • United warehousing complex and logistic centerwill allow to reduce transportation costs andtime

    Residents will be provided by all requiredinfrastructure in order to be able to focus ontheir service

    Operators work with international suppliersfrom all over the world

    All purchased materials and equipmentshould be in accordance with internationalstandards in HSE, integrity control andtechnological reliability

  • Benefits from the SIP project implementationCREATE new Russian procurement

    base for the oil and gas sector

    REDUCE risks and SHORTEN timeof equipment supplies in the contextof global changes in the market

    RAISE the level of cooperation efficiency between the vendors of oil

    and gas projects

    ENSURE accessibility of recourses and services

    ELIMINATE the dependenceon supplies of equipment andcomponents from abroad

    IMPROVE the local skill baseand CREATE new jobs andtraining centers

    REDUCE costs of repair andmaintenance works for oil and gasproject operators

    IMPROVE the process oftechnical control over oil andgas facilities

    ENSURE accelerated development of the Sakhalin Oblast’

    4

  • Provide production facilities with controlled price

    Exclude double costs and additional expenses

    Provide single infrastructure, power resources, social and administrative facilities, etc.

    Increase HSE compliance

    Manage vendor’s work activity on a single administered

    territory

    Attract small innovative and competitive companies

    Create warehouse complex and logistic center

    SIP characteristics

    5

  • Project realization suggests several legal mechanisms that allow SIPResidents to work under different Tax regimes:

    Tax regimes

    PSA (Production Sharing Agreement)

    TASED “Yuzhnaya”(territory of advanced social and economic development) 

    General tax regime

    6

  • Land plots status

    4.7 ha

    27.5 ha

    31.5 ha

    • Land owner: Land use department of Yuzhno‐Sakhalinsk

    • Land holder: MC SIP

    • Lease agreement was registered on 16.11.2018

    • Duration: till 29.10.2028

    • Land owner: AO Sovkhoz Yuzhno‐Sakhalinskiy

    • Land holder: MC SIP

    • Lease agreement was registered on 22.02.2019

    • Duration: till 30.11.2067

    • Land owner: АО Far East Development Corporation

    • Land holder: SIP‐TOR, LLC

    • Lease agreement was registered on 02.02.2019

    • Duration: till 16.03.2086

    1

    2

    3

    1

    2

    3

    Total area - 69,86 ha The following lease agreements have been signed for the Project implementation

    *Location: Yuzhno-Sakhalinsk, Novo Aleksandrovsk, 20 Vostochnaya st.

    7

    Stage 1

    Stage 2

  • Stage 1 (2020 – 2022) Maintenance and repair facilities for Sakhalin Energy

    8

    Current Status

    Launching stage II

    Archive

    Logistics center + Machinery maintenance shop

    Infrastructure

    Launching stage IMARF Facilities Stage I:

    Building 1

    Building 2

    Building 3

    Building 4

    Rotat. eqpt. repair(1978 sq.m.*)

    Valves repair (1392 sq.m.*)

    Drill. eqpt. repair(930 sq.m.*)

    Well control(516 sq.m.*)

    Electric department and laboratories (1676 sq.m.*)

    Motor Transport 

    Department(4975 sq.m.*)

    Diving eqpt.(1140 sq.m.*)

    Prefab.(780 sq.m.*)

    Building 5

    SEIC operational warehouse

    (3996 sq.m.*)

    InfrastructureInfrastructureArchive

    (1754 sq.m.*)

    Building 1

    Building 2

    Building 3

    Building 4

    Building 5

    Electrical equipment and instrumentation repairs

    Laboratories (electrical, calibration, corrosion and mechanical)

    Welding, turnery, painting works

    Air diving equipment storage and maintenance

    Blowup prevention services

    Drilling equipment repairs and maintenance

    Valves repairing, maintenance and calibration

    Rotating equipment repairs and maintenance

    Warehouse for SEIC Operational needs*  ‐ effective area (area of all indoor premises)

    Infrastructure

    Infrastructure

    Effective area : 12408 sqm*

    Effective area: 6729 sqm*

    Volume of investments not less than

    USD 45 mln

    +

    +

    1. To localize production capacities that Company require2. To reduce the time and costs due to simplified logistic scheme3. To adjust production capacities for Company needs and minimize risks in case of contractor replacement4. To eliminate barriers for new vendors5. To reduce direct costs of contractor activities to meet HSE requirements

    Construction of Sakhalin Energy MARF will allow:

  • Stage 2 (2022 – 2025) Facilities for third-parties and SIP Residents

    Mechanical workshop

    Engineering infrastructure facilities

    Medical center

    Heated warehouses

    Office

    Workshops

    Engineering center

    Archives

    Training center

    Hotel

    Data center

    Green zone

    Reserved facilities

    Liquified Nitrogen production and storage areaChemical warehouse

    Open area for storage and assembling worksWaste-storage area

    Administrative and recreation zone

    Hazardous area

    Warehouses and workshop facilities Open area

    Reserved facilities

    1

    2

    3

    4

    1234

    5

    6

    56

    7

    78899

    10

    10

    11

    1112

    12

    1314

    15

    13

    14 15

    15

    15

    total area of 65 ha available for construction works in 2020 localization of services not present on the islandVolume of investments not less than USD 230 mln. including infrastructure9

  • Localization of servicesUnited system of warehousing and materials storage– Chemical warehouse– Heated warehouse

    – Open and indoor warehouses– Core samples and logging tapes storage

    ARCHIVE DATA CENTER

    Engineering center Training center

    Laboratories– Chemical– Mycological

    – Fuel and lubricants – NDA

    – Low temperature tests

    Maintenance, calibration and inspection– Tools– Measurement instrumentation

    – Valves and power transmissions– Lifting devices and tools

    Drilling equipment and consumables

    Painting and sandblasting shop

    Welding shopPrefabrication shop

    – Electrical equipment and protection

    Manufacturing– Electrical and instrumentation panelboard– Fittings, flanges and seal connection

    – Transmissions and manual valves – Insulating and fireproof materials – Heating jackets and winterization equipment

    Liquified Nitrogen Plant

    Localization of other services

    PPE CENTER

    Carpenter workshop

    Certification center

    10