Date post: | 01-Dec-2015 |
Category: |
Documents |
Upload: | manoj-singh |
View: | 36 times |
Download: | 2 times |
Please Select from Dropdown list
Fill Data Manually
Note1 Please put notes at bottom of of table with indication in remarks column
1 LOT For writing 1 LOT please use custom format as shown in picture
Please write in numbers in manhour column. It wont take alphanumeric values
You can insert any number of rows for deliverables. But you cant delete rows
Don’t use any formula in cells. Its already been done for you
Please fill data in FEED and EI sheet
Main Heading must be in Bold with Font 12Sub Heading must be in Bold font 10Sub to Subheading in regular font of 10
Please don’t add any formulasDon’t Add or summarize any Heading by summation
Sheet "FEED" is for Manhours of Concept Endorsement and FEED Execution
Sheet "EI" for Engineered Items Procurement
List of Deliverables has been given in sheet "Deliverable List". This is for your reference and copy paste only
Incase of any problem please contact [email protected]
document.xlsx FEED Page4 of 88
Client / Proj Here TCO/DSP/PEN/ Ref No Here
CLIENT/PROJECT Proposal Ref Number
FEED / Detailed Design Rev 0CTR Title Revision
Instrumentation Please Select Descipline Sunday, May 12, 2013
DISCIPLINE Date:GEOFF RADFORD Saturday, June 1, 2013Resp. Person Activity start
GEOFF RADFORD Saturday, November 30, 2013
CTR Originator Activity Finish
26
Concept endorsement No of Weeks
CTR Scope Definition
CTR Information Requirements
Item Ref S.No. Deliverable
Lead Engineer Lead Designer TOTAL HOURSRemarks
E N E N E N E N E N E N E N E N E N E N E N TOTAL
CE 1 1 Conceptual Design Data Assessment 1 LOT 0 0.00 0.00 0.00
CE 1 a Review of Technical Documentation received from Company 35.00 0.00 0.00 0.00
CE 1 b Review list of applicable Codes and Standards 5.00 0.00 0.00 0.00
CE 5 2 Instrumentation and Control Systems Design Philosophy 0 0.00 0.00 0.00
CE 5 a Overall instrument architecture 1 5.00 5.00 0.00 5.00
CE 5 b Control and Safety System Design Philosophy 1 4.00 4.00 0.00 4.00
CE 5 c Instrument Design Philosophy 1 3.00 3.00 0.00 3.00
CE 5 d Control and Safety System Philosophy 1 3.00 3.00 0.00 3.00
CE 5 e Control and Safety System Architecture 1 1.00 1.00 0.00 1.00
CE 5 f Control and Safety Functions 1 1.00 1.00 0.00 1.00
CE 5 g Shutdown and Logic Philosophy 1 1.00 1.00 0.00 1.00
CE 5 h Package Philosophy 0.00 0.00 0.00
CE 5 i) absc 1.00
CE 5 ii) jdjdjd 2.00
CE 5 iii) fefref 1.00
CE 5 i UPS 0.00 0.00 0.00
CE 6 3 Site survey (Lump sum cost shall including travel & accomodation) 1 165 5.00 80.00 80.00 165.00 0.00 165.00
CE 7 4 Additional activities not covered by ADS 1 LOT 60 50.00 10.00 60.00 0.00 60.00 Note 1
FD 7 a Preliminary Instrumentation and Control Systems 0 0.00 0.00 0.00Note 2
FD 6 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
FD 2 Utilities Design 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
Quantityof
Deliverables or
Activities
Normative Hours for
One Deliverable or Activity
PrincipalEngineer
SeniorEngineer Engineer
JuniorEngineer
PrincipalDesigner
SeniorDesigner Designer
JuniorDesigner
document.xlsx FEED Page5 of 88
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
document.xlsx FEED Page6 of 88
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
CE 1 Conceptual Design Data Assessment 0 0.00 0.00 0.00
document.xlsx FEED Page7 of 88
TOTAL MANHOURS FOR CTR 10 225 117.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 243.00 0.00 243.00
document.xlsx EI Page8 of 88
Client / Proj Here TCO/DSP/PEN/ Ref No Here
CLIENT/PROJECT Proposal Ref Number
FEED / Detailed Design Rev 0CTR Title Revision
civil / Structural Please Select Descipline Sunday, May 12, 2013
DISCIPLINE Date:Saturday, June 1, 2013
Resp. Person Activity start
Saturday, November 30, 2013CTR Originator Activity Finish
26
Concept endorsement No of Weeks
CTR Scope Definition
CTR Information Requirements
Item Ref S.No. Deliverable Activities
Lead Engineer Lead Designer TOTAL HOURS
E N E N E N E N E N E N E N E N E N E N E N TOTAL
EI 02 H2S polishing package 1 1.00 0.00 0.00 0.00
EI 02 H2S polishing package 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
Quantityof
Deliverables or
Activities
Normative Hours for
One Deliverable or Activity
PrincipalEngineer
SeniorEngineer Engineer
JuniorEngineer
PrincipalDesigner
SeniorDesigner Designer
JuniorDesigner
Reply to technical queries
Documentation for contract/order
award
document.xlsx EI Page9 of 88
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
EI 02 H2S polishing package Requisitions 0 0.00 0.00 0.00
document.xlsx EI Page10 of 88
TOTAL MANHOURS FOR CTR 0 1 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
document.xlsx EI Page11 of 88
Remarks
Note 1
Note 2
Note 3
Note 4
Note 5
Note 6
Note 7
Note 8
Note 9
Note 10
Note 11
document.xlsx EI Page12 of 88
document.xlsx EI Page13 of 88
Code Defination
Conceptual Endorsement
CE 1 Conceptual Design Data Assessment
CE 2 Conceptual Process Review and Optimisation
CE 3 Process Design Philosophy
CE 4 Electrical Design Philosophy
CE 5 Instrumentation and Control Systems Design Philosophy
CE 6 Site survey (Lump sum cost shall including travel & accomodation)
CE 7 Additional activities not covered by ADS
CE 8 Project Management
CE 9 Project services
FD 1 Process Design
FD 2 Utilities Design
FD 3 Preliminary Machinaries Design
FD 4 Package Philosophy and Duties
FD 5 Preliminary Mechanical Design
FD 6 Preliminary Electrical Design
FD 7 Preliminary Instrumentation and Control Systems
FD 8 Safety Systems Design
FD 9 Plants General Arrangement
FD 10 Piping design
FD 11 Civil works & structures design
FD 12 Buildings Architectural Design
FD13 Initial HAZOP & SIL review
FD 14 Additional activities not covered by ADS
FD 15 Project Management
FD 16 Project services
FE 1 Extended Process design
FE 2 Utilities Extended Process Design
FE 3 Piping Design
FE 4 Machinery Design - General Specifications
FE 5 Machinery Design - Process and Utility Pumps
FE 6 Machinery Design - Compressors
FE 7 Machinery Design - Diesel Engines
FE 8 Mechanical Design - Pressure Vessels, Columns and Traps
FE 9 Mechanical Design - Heat Exchangers
FE 10 Mechanical Design - Tanks
FE 11 Mechanical Design - Flares
FE 12 Mechanical Design - Miscellaneous Equipment
FE 13 Instrumentation Design - Metering System
FE 14 Instrumentation Design - Power supply
FE 15 Instrumentation Design - Control System and Safety System
FE 16 Instrumentation Design - Control Rooms Arrangement and General layout
FE 17 Instrumentation Design - Field Instrumentation and Instrument Requirements
FE 18 Instrumentation Design -Instrumentation and Automation Interface design
FE 19 Instrumentation Design - F & G and Emergency Shutdown System
FE 20 Instrumentation Design - Reliability and Safety Integrity Level Requirements
FE 21 Instrumentation Design - Field Instrumentation
FE 22 Instrumentation Design - Instrumentation and Control Systems
FE 23 Instrumentation Design - Telecommunication & IT Systems Design
FE 24 Electrical Design - Electrical Distribution
FE 25 Electrical Design - Electrical Load Demand
FE 26 Electrical Design - Electrical Design Calculations and Studies
FE 27 Electrical Design - Electrical Equipment Sizing
FE 28 Electrical Design - General Electrical Layouts
FE 29 Electrical Design - Specifications for Electrical Switchboards
FE 30 Electrical Design - Specifications for Emergency Generators
FE 31 Electrical Design - Specifications for Transformers and Neutral Earthing Resistors
FE 32 Civil and structural design - Technical Specifications for Civil Works and Structures
FE 33 Civil and structural design - Civil Design for Early Civil Works
FE 34 Civil and structural design - Foundation Design
FE 35 Civil and structural design - Structural Design
FE 36 Civil and structural design - Technical Buildings Architectural Design
FE 37 Civil and structural design - Layouts and Arrangements
FE 38 Construction Specifications
FE 39 Layout Design
FE 40 Safety Systems Design
FE 41 Final HAZOP & SIL review
FE 42 Incorporation HAZOP & SIL findings
FE 43 Issue of Close out report
FE 44 Additional activities not covered by ADS
FE 45 Project Management
FE 46 Project services
EI 01 Booster & inlet compressors
EI 02 H2S polishing package
EI 03 Modification to gas plant & LPG pumps module
EI 04 Oil pre treatment facilities
EI 05 Water injection pumps
EI 06 Water injection pumping system
EI 07 Initial filtration & deaeration unit
EI 08 Produced water treatment
EI 09 Foam system for new storage tanks
EI 10 Oil circulation & transfer pumps
EI 11 SWIS pumping system
EI 12 Additional hot water heaters & pumps
EI 13 Electric distribution system for DGU area
EI 14 Electric distribution systems for South plant
EI 15 Water and foam fire fighting package
EI 16 Project Management
EI 17 Project services
Deliverable TableTable 4.2 :
CE 1
Input123
Scope
11
34
12345
6789
Deliverable12
Table 4.3 :
CE 2
Input12
Scope
123
456
Deliverable 1
Table 4.4 :
CE 3
Input
12345
Scope
12345678
Deliverable 1
Table 4.5 :
CE 4
Input
1234
Scope
123
45
Deliverable
123
4
Table 4.6 :
CE 5
Input
12345
123
Scope 456789
10Deliverable 1
Table 4.7 :
CE 6 12
Input 345
Scope
12345
Deliverable 1
Table 5.1 :Activity Description List
FD 112
Input 3
1
Scope 23456789
10
11
12131412
Deliverable 3456789
1011
1213141516
Table 5.3 :Activity Description List
FD 212
Input 34
12
Scope 34
56789
1011121
2Deliverable 3
456789
101112131415
Table 5.4 :Activity Description List
FD 312
Input 3
45
12
Scope 34
56
712
Deliverable 3
Table 5.5 :Activity Description List
FD 412
Input 34567
12
Scope 34
51
Deliverable 23
Table 5.6 :Activity Description List
FD 51
2Input 3
45
12
Scope 345
612
Deliverable 3
Table 5.7 :Activity Description List
FD 612
Input 345
1Scope 2
34
561
Deliverable 2
Table 5.8 :Activity Description List
FD 7
12
Input 345
1
2
Scope 34
512
Deliverable 3456
Table 5.9 :Activity Description List
FD 812
Input 345
12
Scope 3
4512
Deliverable 345
Table 5.10 :Activity Description List
FD 912
Input 345
1
Scope 2
12
Deliverable
Table 5.11 :Activity Description List
FD 1012
Input 345678
Scope
1
2
1Deliverable 2
Table 5.12 :Activity Description List
FD 1112
Input 345678
12
Scope 3
4
Deliverable 1
Table 5.13 :Activity Description List
FD 1212
Input 3456789
12
Scope 3
4
561
2Deliverable 3
45
Table 6.3 :ACTIVITY DESCRIPTION SHEET
EIP 1
Input12
Scope
12345
Deliverable 1
Table 6.4 :
EIP 2
Input12
Scope12345
Deliverable 1
Table 6.5 :
EIP 3Input 1
Scope
1
2
Deliverable 1
Table 6.6 :
EIP 4Input 1
Scope
1
2
345
Deliverable12
Table 7.2 :
FE 1
Input
1234
Scope
12
3456
7
Scope
8
9
10
11
Deliverable
123456789
101112
13141516
17
Table 7.3 :
FE 2
Input
1234
Scope
123
456
789
Deliverable
1
23456789
1011121314
Table 7.4 :
FE 3
Input
123456789
10
Scope
123456
Deliverable
1234
Table 7.5 :
FE 4
Input
Scope
Deliverable
Table 7.6 :
FE 5
Input
123456
Scope
1
234567
12345
Deliverable
12345
Table 7.7 :
FE 6
Input
123456
Scope
1
23456
78912345
Deliverable
12345
Table 7.8 :
FE 7
Input
1234
Input
56
Scope
12345612345
Deliverable
12345
Table 7.9 :
FE 8
Input
123456
Scope
123456
12345
Deliverable
1
Deliverable
23456
Table 7.10 :
FE 9
Input
123456
Scope
123
45612345
Deliverable
12345
6
Table 7.11 :
FE 10
Input
123456
Scope
1
2345123
45
Deliverable
123456
Table 7.12 :Activity Description List
FE 1112
Input 3456
12
Scope 34
512
Deliverable 34
567
Table 7.13 :Activity Description List
FE1212
Input 3456
Scope 1
2
34
5
Deliverable
Table 7.14 :Activity Description List
FE1312
Input 3456
7
Scope 1
21
Deliverable 2
Table 7.15 :Activity Description List
FE 1412
Input 34567
Scope1
1Deliverable 2
Table 7.16 :Activity Description List
FE151234
Input 567
Scope1
2
12
Deliverable 345
Table 7.17 :Activity Description List
FE 1612
Input 345
Scope1
12
Deliverable 3
4
Table 7.18 :Activity Description List
FE 1712
Input 34567
Scope1
12
Deliverable 34
567
Table 7.19 :Activity Description List
FE 1812
Input 34567
Scope1
2Deliverable 1
Table 7.20 :Activity Description List
FE 1912
Input 345678
Scope
121
Deliverable 23
Table 7.21 :Activity Description List
FE2012
Input 34567
Scope1
2Deliverable 1
Table 7.22 :Activity Description List
FE2112
Input 34567
Scope1
12
Deliverable 34
Table 7.23 :Activity Description List
FE221
2Input 3
4567
1
Scope 234
Deliverable1
Table 7.24 :Activity Description List
FE2312
Input 345
1Scope 2
3
4Deliverable 1
Table 7.25 :Activity Description List
FE24
Input
1Scope
12
34567
Deliverable
Table 7.26 :Activity Description List
FE25
Input
Scope1
2
Deliverable
Table 7.27 :Activity Description List
FE26
Input
1Scope
2
Deliverable
Table 7.28 :Activity Description List
FE27
Input
1Scope
23
Deliverable
Table 7.29 :Activity Description List
FE28
Input
1
Scope 2
Deliverable
Table 7.30 :Activity Description List
FE29
Input
Scope
Deliverable
Table 7.31 :Activity Description List
FE30
Input
Scope
Deliverable
Table 7.32 :Activity Description List
FE 3112
Input 3456
12
Scope 345
Deliverable 1
Table 7.33 :Activity Description List
FE 3212
Input 345
678
12
Scope 34
5
6
78
912
Deliverable 345
6789
Table 7.34 :Activity Description List
FE 3312
Input 3456
12
Scope 345
6712
Deliverable 3456
Table 7.35 :Activity Description List
FE 3412
Input 3456789
1
2Scope 3
45
1Deliverable 2
3
Table 7.36 :Activity Description List
FE 3512
Input 3456
789
12
Scope 345671
Deliverable 23
Table 7.37 :Activity Description List
FE 3612
Input 3456789
12
Scope 3
4
561
2Deliverable 3
4
5
Table 7.38 :Activity Description List
FE 3712
Input 3456789
10
12
Scope 3456789
1012
Deliverable 345678
Table 7.39 :Activity Description List
FE 3812
Input 345
Scope
Deliverable 1
Table 7.40 :Activity Description List
FE 3912
Input 3456789
10
Scope 1212
Deliverable 34
Table 7.41 :Activity Description List
FE 4012
Input 34
12
Scope 3
4512
Deliverable 34567
CE1 Conceptual Design Data AssessmentACTIVITY DESCRIPTION SHEET
Conceptual Design Data Assessment - Contract Technical Documentation - Company Basis of Design (BoD) - Environmental data
The following activities are foreseen: Review of the Technical Documentation received from Company
Review of the BoD for consistency and completeness
list of interfaces outlet streams conditions inlet streams conditions battery limits battery limit conditions voltage and frequency for electrical power available utility data requirements for uniform and consistent equipment design philosophy for contol. relief and blowdown. Telecomm. Interfaces - Design Premises report for the plant process and systems - Functional and Interface specification for the plants
CE2 Conceptual Process Review and OptimisationACTIVITY DESCRIPTION SHEET
Conceptual Process Review and Optimisation - Contract Technical Documentation - BoD Review proposed process configuration vis a vis with products specifications Clearly identify areas to be modified or further optimised
Preparation of Process Block Diagramm and PFD's Prepare Utility Flow Diagrams ( UFD's) Prepare ESD and blow-down philosophy - Concept Endorsement Reports
Definition of the data and information to be used by the Contractor as basis for the basic engineering design relevant to the process and systems
Review list of applicable Codes and Standards identifying/confirming those to be adpoted for the design of proposed facilities
Preparation of the Design Premises Reports relevant to the process plants and systems to be used as basis for the FEED Design activities
Preparation of the preliminary Functional & Interface Specification for the Plants. The information contained in these preliminary specifications shall essentially be the data supplied by Company. This data shall include. But not necessarily be limited to:
Complete conceptual optimisation of the systems in order to slect a flexible and cost effective configuration for the design of facilities.
CE3 Process Design PhilosophyACTIVITY DESCRIPTION SHEET
Process Design Philosophy - Technical Contract Documentation - Design Premises Report - Process & Utility Requirements - BoD - Functional & Interface Specification for the plant
In the Process Design Philosophy the following items shall be identified:feed conditionscapacities major items of equipment process and utility control operating requirements process and utility balances process flow diagrams utility flow diagrams - Process Design Philosophy
CE4 Electrical Design PhilosophyACTIVITY DESCRIPTION SHEETElectrical Design Philosophy
- Technical Contract Documentation - Design Premises Report - Process & Utility requirements - Functional & Interface Specification for the plants
the review of the proposed systems ( if any ) the definition of technical data and plant design requirements the development of fit for purpose distribution systems configuration
the preparation of the hazard area classification general specification distribution systems philosophy general one line diagrams
preliminary Electrical Load Lists for the various operating conditions and Load Summary hazardous area classification specification
Prepare the Process Design Philosophy, which define the basis for the eventual design of the process and each utility system,
Development of design philosophy and architecture of the electrical distribution systems of the plants.The following activities are foreseen:
the preliminary definition of the load demand for the various operating conditions ( i.e. design, emergency, start-up, etc. )
CE5 Instrumentation and Control System Design PhilosophyACTIVITY DESCRIPTION SHEET
Instrumentation and Control System Design Philosophy - Technical Contract Documentation - Design Premises Report - Process & Utility Requirements - Functional & Interface Specification for the plants - PFD's and UFD's
Overall instrument architecture of the plant Contol and safety system design philosophy Instrument design philosophy Control and safety system philosophy Control and safety system architecture SCADA(if required) requirement, architecture and design philosophy Control and safety functions Shutdown and logic philosophy Package philosophy UPS - Project instrumentation and control system philosophy
CE5 Site SurveyACTIVITY DESCRIPTION SHEET
Site Survey - Technical Contract Documentation - Design Premises Report - Process & Utility Requirements - Functional & Interface Specification for the plants - PFD's and UFD'sExecution of a site survey to:get aquainted with the Dunga Facilities familiarize with operating conditions and operationasl critera Identify and review tie in points Collect additional inforation and data needed for FEED activities any other activity, identified by the contractor, needed for FEED activities - Survey report
FD1 Process DesignActivity Description List
Process DesignDesign Premises Report for the plant processConceptual design reviewFunctional and Interface specification for the plants
Development of the instrumentation and control system philosophy of the plants. The following activities are foreseen.
Perform process simulations
Review and freeze sparing and stand by philosophyPreparation of Process Block Diagram and PFD'sSizing of main process equipmentPreparation of the major equipment process data sheetsAssesment of ESD and blow-down philosophyAssesment of instrumentation and control requirements and philosophyPreliminary HAZOP & SIL performanceMaterial selection for main process equipment and lines
Release source identification for hazardous area classificationPreparation of functional specifications for process units.Process Block DiagramsPlant Process ReportsSparing and standd by PhilosophyMaterial Selection Report and MFD'sPFD'sP&ID'sMain Equipment listLong Lead Items list and process data sheetsMain equipment and machinery process data sheetsProcess Utility Consumption and Electrical Load listFunctional specifications of process units
ESD, Relief and Blowdown Philosophy (co-ordinated with utilities)Preliminary instrument listSpecialist design input reports (e.g. for special/licensed technology)Narrative reports covering optemisation studies/analyses
FD2 Utilities DesignActivity Description List
The process design shall comprise the review of the proposed process, the execution of all the required optimisation and the development of the FEED activities for the identified process systems of the plants inclusive of normal operations (including expected daily and seasonal variations over field life) and alternative operations (including start-up, controlled emergency shut-downs, operating requirements requirements). The following activities are foreseen.
Prepare H&MB for the entire plant process, taking into account the requirements imposed by the export lines
Defenition of the input data for sizing of the major process utilities, including electrical power, steam, condensate, boiler feel water, fuel, cooling water, process water, plant air, etc.
Preliminary identification of effluent streams produced by plants process and their associated utilities
Instrumentation and control requirement (input to instr. & control philosophy and architecture)
Utilities designTechnical Contract documentationDesign Premises reportProcess Utility Consumption ListFunctional & Interface Specification for the plant
Review, develop and optimise utility systemsDefinition of the input data for sizing the main process utility systemsReview and freeze sparing and stand by philosophyPrepare utility Block Diagrams
Prepare Utility Flow Diagrams (UFD's)material Selection for main equipment and special service linessizing of all major utility equipmentPreparation of utility main equipment listPreparation of process data sheets for all the main utility equipment Preparation of process functional specifications for main utility systemsIdentification of additional effluent treatment facilities requiredUtility Block Diagrams
utility consumption for utility systemaUtility Electrical Load listConsumption SummarySparing and stand-by Philosophy (co-ordinated with process systems)Material Selection Report and MFD'sUtility Flow Diagrams (UFD's)P&ID's Main Equipment ListLong Lead Items list data sheetsMain Utility Equipment data sheetsInstrument and control requirements and philosophy (co-ordinated with process)ESD, Blowdown and Relief Philosophy (co-ordinated by process)Narrative reports coveing optimisation studies/analyses
FD3 Preliminary Machineries DesignActivity Description List
Package Machinery DesignTechnical Contract documentationDesign Premises reportProcess & utility requirements
The process design shall comprise the review of the proposed systems, the execution of all the required optimisation and the development of the basic engineering activities for all utility systems of the plant.The activity will include:
Preare Consumption summary for the entire plant, taking into account the requirement of main utility systems (i.e. blow-down system, cooling water system, ect.
Utility system report discription (normal and alternative operations) including, as appropriate simulations and calculations
Functional & Interface Specification for the plantsMachinery process data-sheets
the review of the proposed systems (if any)the definition of technical data and plant design requirementsthe definition of type, number, and charachteristics of the required machinerymachinery preliminery sizing (weights and dimensions)
preparation of main equipment list
identification , for lay-out purposes, of the expected location and size of main equipmentMachinery preliminary sizing (weights and dimensions)Main equipment listPreliminary plot plans and lay-outs
FD4 Package Philosophy & DutiesActivity Description List
Package Philosophy and DutiesTechnical Contract documentationDesign Premises reportProcess & utility requirementsElectrical requirements instrumentation and control requirementsGeneral safety requirementsfunctional & interface Specification for the plants
the review of the proposed systemsthe definition of technical data and plant design requirementsthe definition of the package units philosophypreparation of main equipment list
identification for lay-out purposes, of the expected location and size of main equipmentplant package philosophy main equipment listpreliminary plot plans and lay-outs
FD5 Preliminary Mechanical DesignActivity Description List
Preliminary Mechanical DesignTechnical Contract documentation
The design shall comprise the development of the engineering activities for the main machinery (e.g. compressors, pumps, act.) of the plants. The following activities are foreseen:
identification of the minimum requirements including Codes and Standarts for skidmounted equipment
The Design shall comprise the development of the engineering activities for th main packages of the planys. The following activities are foreseen:
Design Premises reportProcess & utility requirementsFunctional & interface Specification for the plants
the review of the proposed systems (if any)the definition of technical data and plant design requiremen
definition of type, number and characteries of the required machanical equipmentmain equipment preliminary sizing ( weights and dimensions).main equipmet list and weight report
identification for lay-out purposes of the expected location and size of main equipment main equipment preliminary sizing (weights and dimensions)main equipment listpreliminary plot plans and lay-outs
FD6 Preliminary Electrical DesignActivity Description List
Preliminary Electrical DesignTechnical Control DocumentationDesign Premises Report Process & Utility RequirementsFunctional & Interface Specification for the plantsElectrical philosophy
The review of the proposed systems (if any)The definition of technical data and plant and OHL design requirementsThe identification of all the main electrical equipment and systemsMain equipment preliminary sizing (weights and dimensions)
Preparation of main equipment list and weight reportMain equipment listPlot plans and lay-outs
FD7 Preliminary instrument and Control DesignActivity Description ListPreliminary instrument and Control Design
The design shall comprise the development of the engineering activities for the main mechanical equipment (I.e. vessels, exchangers, columns, ect.) of the Plants. The following activities are foreseen:
The design shall comprise the development of the engineering activities for the electrical generation and distribution systems of the plants. The following activities are foreseen:
Identification for lay-out purposes, of the expected location and size of main electrical equipment (i.e. generators and switchgear/electrical rooms, OHL & substation)
Technical Contract documentationDesign Premises reportProcess & utility requirementsFunctional & interface Specification for the plantsPFD's, P&ID's and UFD's
the definition of the technical data and designrequirements
the review of proposed system and design philosophies provided by Company (if any)
preparation of fit for proposed systems and design architecture of the control systemsidentification of SCADA requirements, architecture and design philosophy
Identification of lay-out purposes of the expected location and size of control room (s)Control SystemArchitetectureInstrumentaion and control philosophySCADA requirements, architecture and design philosophyPreliminary location and size of control room(s)main equipment listpreliminary plot plans and lay-outs
FD8 Safety Systems DesignActivity Description List
Safety Systems DesignTechnical Contract documentationDesign basis & PhilosphyFunctional & interface Specificationgeneral Safety Criteria and Reports
Definition of the Plant Fire Risk Areas
Identification of the Fire Hazardous Maps for Fireproofing requirementsFire and Gas Detection SpecificationFirefightning System SpecificationEscape routets, safe havens, ect. General arrangementsSafety Systems Plot Plan (firefightning system)Fire Hazardous Area Maps
The design shall comprise the development of the engineering activities for the instrumentation and control systems of the plants. The following activities are foreseen:
The safety systems design shall comprise the development of the engineering activities for the definition of the safety systems inside the planets.The fiollowingactivities are foreseen:
definition of evacuation /detection criteria for the Fire and Gas Detection System of the plant alarms and personnel safety requirements
Definition of the plant firefightning requirements including fire protection design basis and system descriptions
Preparation of safety System Plot Plans showing the preliminary locations of the firefightning systems
FD9 Plants General ArrangementActivity Description List
Plants General ArrangementTechnical Contract documentationDesign Premises reportProcess & utility requirementsEnvironmental DataFunctional & interface Specification
prepare Plant layout arramgement and piping philosophy
Outline dimensioned lay-outsPreliminary plot plans
FD10 Preliminary Piping DesignActivity Description List
Piping DesignTechnical Contract documentationdesign BasisPiping design philosophyFunctional & interface SpecificationGeneral Safety CriteriaPFD's and UFD'sProcess and Utility P&ID'sCorrosion requirements
Development of the engineering activities to prepare the layout general project specifications for plants
Prepare for the proposed systems an outline dimensioned lay-out and preliminary plot plans of the plant areas
The development of the front-end engineering activities to prepare the piping and layout general project s[pecifications for the plantsthe following activities are foreseen:
definition of project dedign- piping project specifications (pipr, valve and fittings)-piping material general specification- piping design and fabrication-plant lay-out design
Project general specifications for piping and plant lay-out designStandard piping classes
FD11 Preliminary Civil Works & Structural DesignActivity Description List
Civil Works & Structural DesignTechnical Contract documentationDesign Basis nd PhilosophiesFunctional & interface SpecificationSite SurvayGeneral Safety CriteriaPlot PlansControl Room LayoutElectrical Equipment Arrangement Drawings
Review general safety RequirementsReview of design requirements for civil works and structures
Project General Design Specifications for civil works and structures
FD12 Preliminary Buildings Architectural DesignActivity Description List
Buildings Architectural DesignTechnical Contract documentationDesign Basis nd PhilosophiesFunctional & interface SpecificationProject general specificationProject Technical specificationGeneral Safety CriteriaPlot PlanControl Room LayoutElectrical Equipment Arrangement Drawings
acording to external coating insulation and protection requirements, prepare:-planting and coating specifications- piping protection specifications- piping insulation specifications
Development of front-end engineering design activities to prepare the general project specifications for the civil works and technical building.The activities will include:
Definition of design criteria for civil, structures, air conditioning/ventilation with reference to codes, standards and project specification
Preparation of General Design Specifications (including list of applicable Codes and Standards) for civil works and structures
Development of the architectural design related to technical buildingsThe activities will include:
define the required technical buildingsprepare architectural general specification
identifying the required furarchitectural general design specification
technical spesification for fishing materialschedule of finishingpreliminary furniture list and relevant technical specifications
EIP1Requisitions for Engineered ItemsACTIVITY DESCRIPTION SHEET
Requisitions for Engineered Items - FEED Design activities - ITT Packages
technical description data-sheets drawings inspection data-sheets documentation requirements (from vendors)
- Technical Requisition for the Long Lead Item ITT Package
EIP2 Cost estimate for engineered itemsACTIVITY DESCRIPTION SHEET
Cost estimate for engineered items - FEED Design activities - ITT Packages
itemized equipment and tagged item cost bulks cost cost engineering & management cost indirect cost packing, shipping and freight cost
elaborate of functional and destributive plot plans of buildings with location and dimentions
prepare architectural design drawings for all technical buildings including plans, elevations, facade and details (scale 1:100,1:20)
describe the finishing material and prepare schedule and technical specification of fishing materials
architectural design drawings for all technical buildings including plans, elevations, façade, and details (scale 1:100, 1:20)
Prepare technical section of inquiry packages, reflecting the number and type of equipment for identified Engineered Items including:
Asssemble Requests for Quotation (RFGs) for direct use by Company to obtain cost, delivery and technical information. Company will provide the commercial section and the list of Company's preferred manufacturers.
Prepare a cost estimate for each engineered item package covering the define scope of work. The cost estimate shall be a level 3 with and accuracy of not less than -15% +20%. The estimate shall have the following breakdown:
- Cost estimate report
EIP3 Reply to technical queriesACTIVITY DESCRIPTION SHEET
Reply to technical queries - Bidders queries
Prepare replies to bidders queries coming from bidders during the tendering process
- Reply to technical queries
EIP4 Documentation for contract/order awardACTIVITY DESCRIPTION SHEET
Documentation for contract/order award - Bidders documentation
Assist Company in commercial evaluations,if requestedUpgrade enquiry specifications to purchase specificationsPrepare purchase requisitions ain a form prescribed by Company - technical evaluation report - Documentation for contract award
FE1 Extended Process DesignACTIVITY DESCRIPTION SHEET
Extended Process deesignContract Technical DocumentationFEED Definition Design DocumentsProcess Design PhilosphyDesign Basis
The following activities are foreseen:Sizing of all process equipment and main process pipeworkPreparation of process general specificationsPreparation of the tagged equipment process data sheetsBlow-down calculationsUpdate/complete of process P&ID's
HAZOP performance
Provide additional engineering work ar required to provide clear replies and input to bidders
Participate in any technical bid evaluation necessary for clarification or equalisation of proposal
Prepare technical evaluation of proposals and recommend which meet the technical requisites for inclusion in the commercial evaluation
The process design shall comprise the development of the front-end engineering activities for the process systems of the plants
Update/complete, according to engineering development,equipment list,material selection,MFD's,utility consumption's,electrical load lists
Definition of the input data to allow sizing of the major control valves,ESDV's and PSV's
Release source identification for hazardous area classificationDefinition of procedures for pre-commissioning and commissioningProcess P&ID'sEquipment List,MFD's,Utility consumption's,Electrical load listsGeneral Specifications for process equipmentSpecifications for tagged or ingineered itemsEquipment and Machinery Process Data Sheets for all tagged itemsMiscellaneous Equipment process data sheetsProcess Data Sheets for control valves,flow orifices and relief valvesProcess Data Sheets for InstrumentsPackage Systems Duty SpecificationsBlow-down Calculation reportsBlowdown Relief Rates and Blowdown Summary
Shutdown Logic Block Diagram and list of alarms and trip settingProcess line list (process data)Proceduresfor pre-commissioning and commissioning
Design calcualtion documents
FE2 Utilities Extended Process DesignACTIVITY DESCRIPTION SHEET
Utilities Extended Process DesignContract Technical DocumentationFEED Definition Design DocumentsProcess Design PhilosophyDesign BasisDelelopment of the front-end engineering activities for the utility systems of the plants.These activity will include:Preparation of process P&ID's for each utility systemSizing of all utility equipment and related pipeworkFlare radiation stury and gas dispersion analysis
Preparation of process general specificationsPreparation of process specifications for tagged or engineered itemsPreparation of all utility tagged equipment process data sheetsPreparation of the utility packages duty specificationsdentification of the utility equipment commissioning guidelines
Identification of all effluent streams produced and its associated process and utility systems,and definition of their flow rate and composition
List of effluent streams (tabulating liquid and gaseous effluents requiring further treatment before disposal)
Process Safeguarding Flow Scheme PSFS (simplified flow scheme with the indication of all SDV's and BDV's)
Update/complete,according to engineering development,equipment list,material selection,MFD's,utility consumption's,utility electrical load lists,consumption summary
P&ID's (process level only)
Utility equipment & Machinery Process Data SheetsProcess Data sheets for main utility control valves,flow orifices and relief valvesProcess data sheets for main instrumentationUtility package duty specificationsBlowdown relief rates and Blowdown Summary Flare radiation and gas despersion reportShutdown Logic Block Diagram and list of alarms and trip settingUtility line list (process) data)Procedures for pre-commissioning and commissioningGeneral specifications for utility equipmentSpecifications for tagged or engineered itemsDesign calculation documents
FE3 Piping DesignACTIVITY DESCRIPTION SHEET
Piping DesignFEED Definition Design DocumentsDesign BasisPiping design philosophyFunctional & Interface SpecificationGeneral Safety CriteriaPFDs and UFDsProcess and Utility P&ID'sEquipment & Machinery Process Data SheetsPackage Units Process Duty SpecificationsPreliminary Electrical Equipment Arrangement Drawings
The following activities are foreseen:Piping material estimateDefinition of critical piping material,as far as delivery time is concernedMechanisation of the process P&ID
Preparation af data sheets and specifications for tagged or engineered items (piping)Data-sheets and specifications for tagged or engineered items (piping)Equipment Lists (piping)Preliminary Piping material take-offStandard piping classes
FE4 Machinery Design - General SpecificationsACTIVITY DESCRIPTION SHEET
Equipment List,MFD's,Utility consumption's,Utility Electrical load lists.Consumption Summary
Development of the front-end engineering design activities for the piping systems of the plants.
Machinery Design - General SpecificationsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaMachinery Process Data SheetsPlot Plans
The following activities are foreseen:
General specification for skid mounted equipmentGeneral specification for equipment noise limitsGeneral specification for packaged equipmentWorkshop minimum requirement specification
FE5 Machinery Design - Process & Utility PumpsACTIVITY DESCRIPTION SHEET
Machinery Design - Process and Utility PumpsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaMachinery Process Data SheetsPlot Plans
The following activities are foreseen:Definition of type,number and characteristics of the required machineryPumps preliminary sizing ( weights and dimensions)Identification of the minimum requirements for skid mounted pumpsSelcetion of mechanical seals
technical descriptiondata-sheetsdrawingsinspection data-sheetsdocumentation requirements ( from vendors)
Development of the front-end engineering design activities to prepare general design specifications for the machinery (e.g. compressors,pumps, ets) of the plant.
Preparation of machinery General Design Specifications (including list of applicable Codes and Standards)
Definination of noise control criteria and preparation of general specification for noise control, and requirements for noise studies to be carried-out during detail design phase
Machinery General Design Specifications for each type of machinery (e.g. compressors,pumps,etc.)
Development of the front-end engineering design activities for the process and utility pumps of the plant.
Preparation of Technical Specifications for tagged or engineered process and utility pumps including:
Technical Specifications for tagged or engineered pumpsData sheets for tagged or engineered pumpsEquipment List (machinery)Pumps design documentationInput for Layouts and plot plans
FE6 Machinery Design - CompressorsACTIVITY DESCRIPTION SHEET
Machinery Design - CompressorsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaMachinery Process Data SheetsPlot Plans
The following activities are foreseen:Definition of type,number and characteristics of the reguired machineryCompressors preliminary sizing (weights and dimensions)Identification of the minimum requirements for skid mounted compressorsIdentification of requirements for workshops definition
Preparation of data sheetsPreparation of Technical Specifications for compressors including:technical descriptiondata-sheetsdrawingsinspection data-sheetsdocumentation requirements (from vendors)Technical Specifications for compressorsData sheetsEquipment List (machinery)Compressors design documentationInput for layouts and plot plans
FE7 Machinery Design - Diesel EnginesACTIVITY DESCRIPTION SHEET
Machinery Design - Diesel EnginesFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety Criteria
Development of the front-end engineering design activities for the compressors of the plants.
Technical-economic analysis and selction of seals type (dry gas seals vfs.oil seals) for main gas compressors
Machinery Process Data SheetsPlot Plans
The following activities are foreseen:Definition of type,number and characteristics of the required machineryTurbines preliminary,sizing (weights and dimensions)Identification of the minimum requirements for skid mounted diesel enginesIdenification of requirements for workshops definitionPreparation of data sheetsPreparation of Technical Specifications for diesel engines including:technical descriptiondata-sheetsdrawingsinspection data-sheetsdocumentation requirements (from vendors)Technical Specifications for diesel enginesDqata sheetsEquipment List (machinery)Diesel engines design documentationInput for layuts and plot plans
FE8 Mechanical Design - Pressure Vessels,Columns & TrapsACTIVITY DESCRIPTION SHEET
Mechanical Design - Pressure Vessels,Columns and TrapsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaEquipment Process Data SheetsPlot Palns
The following activities are foreseen:Preparation of general specification for pressure vessels,columns and trapsDefinition of type,number and characteristics of the required equipmentTechnical/economic evaluation of the minimum thicknessEquipment sizing (weights and dimensions)Preparation of data sheets
Preparation of Technical Specifications for pressure vessels,columns and traps,including:technical descriptiondata-sheetsdrawingsinspection data-sheetsdocumentation requirements (from vendors)General specifications for pressure vessels,columns and traps
Development of the front-end engineering design activities for the diesel engines of the plant.
Development of the front-end engineering design activities for the pressure vessels,columns and traps of the plants.
Technical Specifications for pressure vessels,columns and trapsData sheets for pressure vessels,columns and trapsEquipment List (mechanical)Input for layouts and plot plansPressure vessels,columns and traps mechanical design documentation
FE9 Mechanical Design - Heat ExchangersACTIVITY DESCRIPTION SHEET
Mechanical Design - Heat ExchangersFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaEquipment Process Data SheetsPlot Palns
The following activities are foreseen:Preparation of general specifications for heat exchangersDefinition of type,number and characteristics of the required heat exchangers
Equipment sizing (weights and dimensions|)Preparation of data sheetsPreparation of Technical Specifications for heat exchangers including:technical descriptiondata-sheetsdrawingsinspection data-sheetsdocumentation requirements (from vendors)General specifications for heat exchangersTechnical Specifications for heat exchangersData sheets for heat exchangersEquipment List (mechanical)Input for layouts and plot plansHeat exchangers mechanical design documentation
FE9 Mechanical Design - TanksACTIVITY DESCRIPTION SHEET
Mechanical Design - TanksFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaEquipment Process Data SheetsPlot Palns
Development of the front-end engineering design activities for heat exchangers of the plants.
Perform technical/economic evaluation to define the TEMA configuration (AES,CFU, etc.) to improve operability and maintainability
Development of the front-end engineering design activities for tanks of the plants.The following activities are foreseen:
Definition of type,number and characteristics of the required tanksEquipment sizing (weights and dimensions)Preparation of data sheetsPreparation of Technical Specifications for tanks including:technical descriptiondata-sheetsdrawingsinspection data-sheetsdocumentation requirements (from vendors)General specifications for tanksTechnical Specifications for tanksData sheets for tanksEquipment List (mechanical)Input for layouts and plot plansTanks mechanical design documentation
FE11 Mechanical Design-FlaresActivity Description List
Mechanical Design-FlaresFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaEquipment Process data sheetsPlot pLan
Preparation of general specifications of the required flaresFlare tip noise studyEquipment sizing (weights and demensions)Preparation of data sheets
General specifications for flarestechnical Specifications for flaresdata sheets for flaresEquipment List (mechanical)
Preparation of general specifications for tanks (floating roof,fixed roof,spheres,sumps,etc)
Development of the front-end engineering design activities for flares of the plants.The following activities are foreseen:
Preparation of technical Specifications for flares including:- technichal discription- data sheets- drawings- inspection data-sheets- documentation requirements (from vendors)
Input forlayout and plot plansFlares mechanical design documentationFlare tip noise study reports
FE12 Mechanical Design - Miscellaneous EquipmentActivity Description List
Mechanical Design - Miscellaneous EquipmentFEED Definition Design DocumentsDesign Basis & PhilosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaEquipment Process Data SheetsPlot Plans
Preparation of general specifications for miscellaneous mechanical equipment
Equipment sizing (weights and dimensions)Preparation of data sheets
- technical description - data-sheets - drawings - inspection data-sheets - documentation requirements (from vendors) - General specifications for miscellaneous mechanical equipment
- Data sheets for tagged or engineered miscellaneous mechanical equipment - Equipment list (mechanical) -Input for layouts and plot plans - Mechanical design documentation
FE13 Instrumentation Design -Metering SystemActivity Description ListInstrumentation Design - Metering System
FEED Definition Design DocumentsDesign Basis & PhilosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block Diagram
Development of the front-end engineering design activities for the miscellaneous mechanical equipment of the plantsThe following activities are foreseen:
Definition of type, number and characteristics of the required miscellaneous mechanical equipment
Preparation of Technical Specifications for tagged or engineered miscellaneous mechanical equipment including:
- Technical specifications for tagged or engineered miscellaneous mechanical equipment
Instrumentation and Control System Philosophy
Mechanisation of the P&ID - System specifications - Input to the equipment list and weight report
FE14 Instrumentation Design - Power SupplyActivity Description List
Instrumentation Design-Power SupplyFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
System specificationsSystem Block Diagrams
FE15 Instrumentation Design - Control & Safety SystemsActivity Description List
Instrumentation Design - Control & Safety SystemsFEED Definition Design DocumentsConceptual Design & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
Mechanisation of the P&ID
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Definition of the philosophy, architecture and technical requirements of the metering system
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Definition of the philosophy, architecture and technical requirements of the instrumentation power supply
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Definition of the philosophy, architecture and technical requirements of the plants control system
Overall system block diagramSystem specificationsControl and safety system architectureInput to the equipment list and weight reportI/O summary list
FE16 Instrumentation Design - Control Room Arrangement &General LayoutActivity Description List
FE16 Instrumentation Design - Control Room Arrangement &General LayoutFEED Definition Design DocumentsDesign Basis & philosophiesGeneral Safety CriteriaInstrumentation and Control System Specification Instrumentation and Control System Philosophy
Control room (s) and panel layoutDistributed control room(s) in the plant layout Main instrument cable routing layout
Telecomm/public address layout and intercom system Instruments data sheets and list
FE17 Instrumentation Design - Field Instrumentation & Instrument RequirementsActivity Description List
Instrumentation Design-Field Instrumentation & Instrument RequirementsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
Field instrumentation general specification Instruments data sheets and listInstruments installation criteria specification Instruments interconnection criteria specification
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Study and definition of the instrumentation and control room(s) arrangements (Layout, equipment sizes, cable ducts, etc)
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Definition of the philosophy, architecture and technical requirements of the field instrumentation and instrument requirements for package units
Input to the equipment list and weight reportInstrument package specification and intallation Instrumentation earthing principle specification/layout
FE18 Instrumentation Design - Instrumentation & Automation Interface DesignActivity Description List
Instrumentation Design-Instrumentation & Automation Interface DesignFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
Mechanisation of the P&IDInstrument, electrical and automation interface documentation
FE19 Instrumentation Design-F&G & ESD SystemActivity Description List
Instrumentation Design - F&G & Emergency Shutdown SystemFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaSafety System DesignProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
Definition of the philosophy and technical requirements of the metering systemMechanisation of the P&IDSystem specificationsSystem Block DiagramsMechanised P&ID
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Definition of the philosophy and technical requirements of the instrumentation, electrical systems and package interfaces
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
FE20 Instrumentation Design-Reliability and Safety Integrity Level RequirementsActivity Description List
Instrumentation Design-Reliability and Safety Integrity Level RequirementsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
Mechanisation of the P&IDReliability and safety integrity level requirement specification
FE21 Instrumentation Design - Field InstrumentationActivity Description List
Instrumentation Design-Field InstrumentationFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
Definition of the technical requirements of the field indtrumentation - Field indtrumentation general specification - Instruments data sheets and listControl valves specification and data sheetsSafety valves specification and data sheetsFlow mesurement specification and data sheetsCalculation sheets
FE22 Instrumentation Design - Instrumentation & Control SystemActivity Description List
Instrumentation Design - Instrumentation & Control SystemFEED Definition Design Documents
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Definition of the philosophy, architecture and technical requirements of the Safety integrity level
Development of the basic and front-end engineering activities for the instrumentation and control systemsThe following activities are foreseen:
Design Basis & philosophiesFunctional & Interface SpecificationsGeneral Safety CriteriaProcess P&IDsShut-down logic Block DiagramInstrumentation and Control System Philosophy
The definition of technical data and design requirements
Preparation of fit for purpose architecture of the control systemsDefinition of SCADA requirements, architecrure and design philosophy
Project Instrumentation and control system philosophy and architecture specification
FE23 Instrumentation Design - Instrumentation - Telecomm & IT Systems DesignActivity Description List
Instrumentation Design-Instrumentation-Telecommunication & IT Systems DesignFEED Definition Design DocumentsProject Telecomm System Philosophy and ArchitectureDesign Basis & philosophyFunctional & Interface SpecificationGeneral Safety CriteriaDevelopment of the front-end engineering activities for:
The telephone and field communication facilitiesThe IT system network facilitiesThe following activities are foreseen:Preparation of specifications and data sheets for main systemsSpecifications and data sheets for main systems
FE24 Electrical system - Electrical DistributionActivity Description List
Electrical design-Electrical Distribution - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot Plans
The basic design shall comprise the development of the conceptual activities for the instrumentation and control systems of the plants. The following activities are foreseen:
The review of the proposed systems and design philosophies provided by Company (if any)
The overall telecommunication, telephone and IT systems to connect all the Project areas according to the general project requirements
- Electrical Philosophy and Design Criteria
Prepare, according to the updated electrical load lists and electrical philosophy: - General one line diagrams - Protective relaying one line diagram
Prepare general electrical project specifications including but not limited to:
electrical substationselectrical emergency generatorsOHLelectrical motors
- General one line diagrams - protective relaying one line diagrams - main and emergency generators control and monitoring block diagrams - General electrical Project specifications - Project Specification for electrical system design
FE25 Electrical System - Electrical Load DemandActivity Description List
Electrical Design-Electrical Load Demand - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria
Development of the front-end engineering design activities to define the electrical distribution system configuration and design criteria to be adopted during detail design for the plants. The following activities are included:
The diagram shall have all the information's (metering, relays, equipment characterstic, etc) to permit the detail engineering contractor to understand and complete them when the information will be available from vendors:
Electrical report describing for each plant, the whole elctrical system, indicating the detailed philosophy, load balance, equipment characterestic, etc.
Prepare the electrical system design criteria specification describing requirements for electrical system detail design
Development of the front-end engineering activities for the electrical systems of the plant to define the electrical load demand. The following activities are included:
Definition of the load demand for the various operating conditions (i.e. design, emergency, start-up, etc.) collecting data form various including process, utilities, safety, lighting, miscellaneous users, support facilities and infrastructures
- Electrical load lists and load summary - Electrical load balances
FE26 Electrical System-Electrical Design Calculation & StudiesActivity Description List
Electrical Design-Electrical Design Calculation & Studies - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria
Electrical systems studies design calculation documents including: - preliminary short circuit calculation and stability study - preliminary selectivity study - main cables voltage drops calculations - preliminary lighting study - preliminary earthing system calculations - miscellaneous studies and analysesHazardous area classification report - preliminary short circuit calculation and stability study - preliminary selectivity study - main cables voltage drops calculations report - preliminary lighting study - preliminary earthing system calculations report
- miscellaneous studies and analyses to support load analyses and equipment sizing - Hazardous area classification report
FE27 Electrical System-Electrical Equipment SizingActivity Description List
Electrical Design-Electrical Equipment Sizing - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists
the load balance will be done according to the load list keeping into considertaion the load factor, diversity factor, powers losses,contingency, etc.
Development of the front-end engineering design activities for the electrical systems of the plant including:
- Plot plans - Electrical phylosophy and design criteria
Definition of all the main electrical items, including but not limited to: - Battery, battery charger, DC Power supply and UPS - Emergency Power Generation System - Power distribution systems including OHL - Transformers (power, auxilary, ighting) - Electrical system protective devices - Emergency and Stand-by Systems - Electric motors - Main controlcentres - Electrical control desk - PLC architecture, power management and load shedding - Cathodic protection - Cables ladder/trayIdentification of electrical requirements for package unitsPreparation of data-sheets for tagged or engineered items - Electrical equipment sizing - Data sheets for tagged or engineered items (electrical) - Equipment list (electrical) - Electrical requirements for package units - Input for layouts and plot plans
FE28 Electrical System-General Electrical LayoutActivity Description ListElectrical Design-General Electrical Layouts
- FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria
Development of the front-end engineering design activities for sizing the electrical systems of the plant. The following activities are foreseen:
Development of the front-end engineering design activities to define the general layout of the electrical substation and main systems of the plant. The following activities are included
according to type and size of electrical equipment determine the size of electrical switchgear rooms and produce layouts showing main equipmenr location and arrangement including special requirements to integrate other services and allow easy maintenance:
produce general layouts for motive power, lighting and earthing with the relevant electrical distribution layout for all installations
- Switchgera rooms layout - Central control room layout - Transformer room - Turbogenerator lay-out - Emergency generator layout - Electrical equipment layout - Flood light tower layout - Cable ladder/tray layout - Hazardous area classification layout
FE29 Electrical System-Specification for Electrical SwitchboardsActivity Description List
Electrical Design-Specifications for Electrical Switchboards - FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria
- technical description - data-sheets - drawings - inspection data-sheets - documentation requirements (from vendors) - Technical specifications for MV switchboards - Technical specifications for LV switchboards - Technical specifications for main LV Lighting / auxiliary panel boards - Technical specifications for electrical control panels
- Technical specifications for PLC architecture, power management and load shedding - Power factor correction panel boards (if necessary) - Battery, battery charger panel boards - AC UPS panel boards - Cathodic protection panels - Protection panel boards
FE30 Electrical System-Specification for Emergency GeneratorsActivity Description List
Electrical Design-Specification for Emergency Generators
Development of the front-end engineering design activities to prepare the technical specifications for the tagged or engineered switchboards of the plants including:
- FEED Definition Design Documents - Design Basis & philosophy - Functional & Interface Specification - General Safety Criteria - Process P&IDs - Electrical Load Lists - Plot plans - Electrical phylosophy and design criteria
- technical description - data-sheets - drawings - inspection data-sheets - documentation requirements (from vendors) - Emergency generator/s technical specifications
FE31 Electrical System-Specifications for TransformersActivity Description List
Electrical System-Specifications for Transformers and Neutral Eathing ResistorsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaProcess P&ID'sElectrical Philosophy and Design Criteria
technical descriptiondata-sheetsdrawings inspection data-sheetsdocumentation requirements (from vendors)Technical specifications
Civil&Structural Design-Technical Specifications for Civil Works and StructuresActivity Description List
Civil&Structural Design-Technical Specifications for Civil Works and StructuresFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaPlot Plans
Development of the front-end engineering design activities to prepare the electrical section of technical specifications for emergency generators of the plants including:
Develop the front-end engineering design activities to prepare the technical specifications for the tagged or engineered transformers and neutral eathing resistors of the plants including:
Project General SpecificationControl Room layoutElectrical Equipment Arrangement Drawings
Prepare project technical specifications for structuresPrepare project technical specifications for foundationsPrepare project technical specifications for technical buildingsPrepare project technical specifications for HVAC
Study the crossing with roads and prepare the relevant specification
Project technical specification for structuresProject technical specification for foundationsProject technical specification for technical buildings and relevant facilitiesProject technical specification for HVACProject technical specification for ducting for cables, pipes, drainage, ect, crossing
Project technical specification for road crossingProject technical specification for protection materialSchedule of protection material & protected areas
FE33 Civil & Structural Design for Early Civil WorksActivity Description List
Civil & Structural Design - Civil Design for Early Civil WorksDesign premisesFEED Definition Design DocumentsSite SurveysGeneral Safety CriteriaDesign Basis & philosophiesArchitectural design
prepare general design specifications for civil worksidentify the water distribution systemidentifying the preliminary sizing the sewerage collectiong systemidentifying the site preparation worksidentifying the fire fightning system
Develop the front-end engineering design activities to prepare the technical specifications for civil and technical buildings.The activities will include:
Prepare project technical specifications of ducting for cables, pipes, drainage, ect, and crossing
Study the impact of high/low temperature (freezing) on supporting structures and foundations
Prepare project technical specifications for special supporting structures (exposed to high/low temperature)
Prepare a schedule of protection material defining the area to be protected and the psecification of the protection material
Project technical specification for special support structures (exposed to high/low temperature)
Develop the front-end engineering design activities for the civil works related to Ealry Civil Works.The following activities are foreseen:
identifying the moisture and heat barrierdiscription of building materialgeneral design specifications for civil workssite preparation requirements and technical specificationpreliminary water system design and technical specificationcivil work material technical specificationpreliminary bil of quantitybuilding material specification
FE34 Civil & Structural Design - Foundation DesignActivity Description List
Civil & Structural Design - Foundation DesignFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaProject General SpecificationProject technical SpecificationPlot PlansTechnical Building Architectural DesignElectrical Equipment Arrangement Drawings
Identify the design systems for technical buildingsstudy the trackd foundations requirements and specificationssizin the foundations member and the ring beams
preliminary foundation design for technical buildingspreliminary foundation design for tanks
FE35 Civil & Structural Design-Structural DesignActivity Description ListCivil & Structural Design-Structural Design
FEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaProject General SpecificationProject technical Specification
Develop the front-end engineering design activities related to preliminary design of foundations for main equipment, process towers, pipe racks, supporting structure, technical buildings, tanks foundations and ect.The activities will include:
Preliminary sizing of foundation of the major equipment, process towers, pipe racks and supporting structure
Study the impact of foundation design on the relevant distances in-between equipment in the plant lay-out design (no overlap of foundation is permitted)
preliminary foundation design for the major equipment, process towers, Pipe racks and supporting structure
Plot PlansTechnical Building Architectural DesignElectrical Equipment Arrangement Drawings
Identifying the location, size and number of pipe racks and supproting structureDesign the configuration of the pipe racks and supporting structurePreliminary defining the structural members sections and sizesPreliminary sizing the supporting structuresPreliminary defining of water intake structureIdentifying the structural systems for technical buildingsPreliminary analysis of the structural systems and calculating member sizepreliminary pipe racks degignpreliminary supporting structures designspreliminary structural design of technical buildings
FE36 Civil&Structural Design-Technical Buildings archtectural DesingActivity Description List
Civil&Structural Design-Technical Buildings archtectural DesingFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaProject General SpecificationProject Technical SpecificationPlot PlansControl room LayoutElectrical Equipment Arrangement Drawings
define the required technical buildingsprepare architectural general design specificaion
indentifying the required furniture and prepare the relevant technical specificationsarchitectural general design specification
technical specifications for finishing materialschedule of finishing
Develop the front-end engineering design activities related to preliminary design of piperacks, supporting structures, technical buildings structures, tanks, cranes and other.The activities will include:
Development of the architectural front-end engineering design activities related to technical buildings.The activities will include:
elaboration of functional and distributive plot plans of buildings with location and dimentions
prepare architectural design drawings for all technical buildings including plans, elevations,façade and details (scale1:100, 1:20)
describe the finishing material and prepare schedule and technical specification of finishing material
architectural design drawings for all technical buildings including plans, elevations, facade and details (scale 1:100, 1:20)
preliminary furniture list and relevant technical specifications
FE37 Civil&Structural Design-Layout & ArrangementsActivity Description List
Civil and Structural Design-Layout and ArrangementsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaTechnical Buildings Archtectural DesignProject General SpecificationProject Technical SpecificationPlot PlansControl room LayoutElectrical Equipment Arrangement Drawings
Review the requirements for safety and utility systemsstudy the drinage of the areaStudy the sewerage systemStudy the water use and identify the network, required storage and treatmentStudy and identify the water intake building and structureStudy and ducts requirements for running cables and servicesStudy the crossing with roadsIdentify the required paved area, roads and walk waysIdentify safety wallsIdentify the civil work for all technical buildingsPreliminary design of drinage systemPreliminary design of sewerage systemPreliminary design of water networkPreliminary design of water intake buildingPreliminary design of major ducts and crossingsPlot plan showing all paved areaPreliminary design of wallsPreliminary design of civil works for technical building
FE38 Construction SpecificationsActivity Description List
Construction SpecificationsFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety CriteriaFacility design data
Development of front-end engineering design activities to finalise the layouts and general arrangements for the civil works and technical buildings.The activities will include:
Construction specifications
FE39 Layout DesignActivity Description List
Layout DesignFEED Definition Design DocumentsDesing BasisPiping design philosphyFunctional & Interface SpecificationGeneral Safety CriteriaPFD's and UFD'sProcess and Utility P&ID'sEquipment & Machinery Process Data SheetsPackage Units Process Duty SpecificationsPreliminary Electrical Equipment Arrangement Drawings
Design of general and unit plot plansPrepare major (6" and larger) piping lay-outsgeneral Plot PlanUnit Plot PlanEquipment Arrangement and locationMajor (6" and larger) piping layouts
FE40 Safety System DesignActivity Description List
Safety System DesignFEED Definition Design DocumentsDesign Basis & philosophiesFunctional & Interface SpecificationGeneral Safety Criteria and reports
Prepare construction specifications covering the applicable crafts, descipline or categories of work at each location, and include specification of general items such as quality assurance/control, safety, hygiene, sp. Securyty, clean up, meterial handling, protection and presentation of materials and equipment during storage, liftinh, ect.
Development of the pront-end engineering activities for the layput design of the plants.The following activities are foreseen:
The safety systems shall comprise the development of the basic and front-end engineering activities for the definition of the safety systems inside the plants.The following activities are foreseen:
Definition of the Plant Fire Risk Area
Identification of the Fire Hazardous Maps for fireproofing requirementsFire and Gas Detection SpecificationFirefightning Sysytem SpecificationSpecifications for main firefightning equipmentData Sheets for main firefightning equipmentEscape route, safe haven, ect, generaql arrangementSafety Systems Plot Plans (firefightning system)Fire Hazardous Area Maps
Definition of elevation/detection criteria for the Fire and Gas Detection System, of the plant alarms and personnel safety requirements
Definition of the plant Firefightning requirements including fire protection design basis and system describtions
Preparation of Safety System Plot Plans showing the locations of the firefightning systems