+ All Categories
Home > Documents > sample work

sample work

Date post: 09-Feb-2017
Category:
Upload: ghasem-zolfaghari
View: 15 times
Download: 0 times
Share this document with a friend
30
1 Dish washer machine reverse engineering. We have redesigned a washing machine to add the suggested improvements -
Transcript
Page 1: sample work

1

Dish washer machine reverse engineering. We have redesigned a

washing machine to add the suggested improvements

-

Page 2: sample work

2

Kinder garden designed with PU paneling

Page 3: sample work

3

Page 4: sample work

4

MULTIPLE FLOOR CONTAINER BUILDING

Page 5: sample work

5

Page 6: sample work

6

CONTAINER MOTEL: The relocatable container house has been designed to facilitate temporary jobs staff for better

protection towards environmental hazards and comfortable stay

Page 7: sample work

7

Building extension Fully metal structure has been designed and all necessary drawing for manufacturing has been

developed

Page 8: sample work

8

4 seasonal container sized restaurant Fully retractable and of the grid for temporary restaurants in Australia.

Page 9: sample work

9

Heat press machine

Page 10: sample work

10

ARDUINO SMART SERVER To control server room devises and monitor temperature and humidity for inside and outside of the server rooms, It is also

fire alarm system.

Page 11: sample work

11

CLAW GAME

Page 12: sample work

12

Page 13: sample work

13

Page 14: sample work

14

RFID customer attendance. With C# language programmed the application to reward restaurant customers

for their visits

Page 15: sample work

15

Vibro sieve design and test with different motor types, bearings and designs.

Page 16: sample work

16

Air shower electronic brain for clean rooms

Page 17: sample work

17

Conveyer Oven temperature sensor:

We have designed temperature recording system for conveyer systems to understand conveyer oven temperature profile for regulation and correction.

Solidworks temperature study:

Page 18: sample work

18

Final design tested and the temperature profile in below collected

Page 19: sample work

19

Page 20: sample work

20

Bone density incensement vibrator machine. Designed for elderly people and it gives exact vibration frequency to reduce the mussel stress and increase bone density

Page 21: sample work

21

Corn harvesting machine modification: tractor has been re designed

and the new function is added

Page 22: sample work

22

Page 23: sample work

23

Oil palm tree cutter

Page 24: sample work

24

PC case integrated with cooling (fanless)

Complete details: igg.me/at/ulfberht

Page 25: sample work

25

My Website (designed by myself)

Page 26: sample work

26

Page 27: sample work

27

MSM factory ventilation (To analyze and propose cost saving measures for our factory)

We have spent RM 72000 in November 2015 for electricity, we have changed all our air conditioner units in January 2015, Our machinery breaks down quiet more frequently, the workers are getting more tired and thus reducing their mental and working ability. Now is the time to ask ourselves why?

As the weather gets hotter the equipment’s uses more power. It will result in high heat output, less precision, lowers the component life, tired workers and lowers the factory quality.

In below we have compared the electricity usage of MSMM with the increase of sunshine on the factory.

Electricity bill for the previous months (Unit RM)

1 Jun 96K

2 July 90K

3 Aug 100K

4 Sep 90K

5 Oct 67K

6 Nov 72K

0

50000

100000

150000

0 1 2 3 4 5 6 7

Electricity bill for the previous months (Unit RM)

Page 28: sample work

28

OUR REQUEST:

We urge finance department for funding on the installation of ventilation system proposed in this proposal.

For replacing the air inside the factory once per hour we need minimum 10 units of 16” wind turbine ventilation with the 800 cfm capacity to be installed. 5unit in each section of the factory with equal spacing. This will cost total of RM 5949 including one year warranty and installation.

We need additional 10 units of 24” ventilation fan (similar exhaust fan used in MCI). 6 for intake and 2 for exhaust and 2 for circulation. It will cost total of RM4240. We will install with MSM staff and the total power consumption for this project is less than RM 500/ month.

We are in need of RM10500 fund (included wiring and installation)

Expected outcome of this project:

5% less electricity cost, 30% less accumulated heat, 30% less pollution, less machine maintenance and downtime, High worker satisfaction and safety, more accurate parts. Workers working condition and health will directly influence the outcome of his projects.

TECHNICAL DATA

Ventilation capacity of each turbine is 800cfm = 1360 𝑚𝑚3

ℎ we have 10 units therefore total

ventilation capacity is 10 unit * 1360𝑚𝑚3

ℎ = 13600𝑚𝑚

3

ℎ.

Page 29: sample work

29

The total air inside the building is 14000 m3. We can see that we will be able to replace the factory air once per hour only with the turbine ventilation.

Each of the fans has air flow of 15000 𝑚𝑚3

ℎ and we have 3 exhaust fans therefore we will have

total of 46000 𝑚𝑚3

ℎ vacuumed air to outside. This means that the fans will have the capability of

replacing the factory air 3 times per hour.

Factory simulation before fan installation

Page 30: sample work

30

Factory simulation after installation


Recommended