Date post: | 08-Apr-2018 |
Category: |
Documents |
Upload: | traveller-spirit |
View: | 218 times |
Download: | 0 times |
of 8
8/6/2019 San Miguel Report
1/9
San Miguel CorporationReforestation
PartnershipAccomplishment Report 2010
Metropolitan Cebu Water District
Cor. Lapulapu & Magallanes Sts., Cebu City
Prepared By: Maria Dianne B. Rallon
Environment Division, 2010
8/6/2019 San Miguel Report
2/9
PROGRESS REPORT
A. TREE SEEDLING NURSERY PROGRAM
San Miguel Corporation has been supporting the growing of seedlings for the
needed requirement during tree plantings. The seedlings are grown in the two (2)
Central Nurseries of Jaclupan and Talamban and likewise in the 11 Community
Nurseries within the 11 Barangays of the Municipality of Liloan.
Activities:
i. Seedling Production
Jaclupan Central
Nursery
Talamban Central
Nursery
Liloan Community
Nurseries147,877 27,417 67,950
2. Species Produced
Central Nurseries Neem TreeJackfruitNarraMahogany
Liloan Community
Nurseries
Narra
MahoganyJackfruitCacaoMagtalisay
THE NURSERIES
1. Talamban Central Nursery located in the premises of the DFamily Park. This is
the humble home of our seedlings; this is the place where they see the first ray of lightand when fragile leaves start to shine and reaching out to that ray of light.
8/6/2019 San Miguel Report
3/9
2. The Jaclupan Central Nursery
This is the potting shed of the Talamban Central Nursery where the bagging is
conducted.(Photos by MDTRallon)Harry and Eddie are MCWDs caretakers doing planting and watering the seedlings.(Photos by MDTRallon)
8/6/2019 San Miguel Report
4/9
B. INTEGRATED WATERSHED MANAGEMENT PROGRAM
The integrated watershed management program takes care in the tree planting
activities from the site preparation, holing of the area for the seedlings and the
management of the seedlings once they are planted. Negotiations with land areas
potential for tree planting is part of the process of this particular program. Most of the
tree planting activities are done within the Central Cebu Protected Landscape which isbasically where the major critical watersheds are located very vital to Cebus economic
development. Initiatives are likewise very helpful to an escalating climate change
negative impacts.
SUMMARY OF TREE PLANTING ACTIVITIES
(Data provided by Jaime Cabural)
Reggie Mioza taking out the weeds surrounding the seedlings. The green thumb of
MCWDs caretaker can be seen in these leaves so green and healthy. (Photos by MDTRallon)
The little baby seedling under the suns spotlight after being germinated in the
seedbed will find the seedbags on the right their next home until they are nurtured ready for
them to taste life in the vast lands of the Central Cebu Protected Landscape and perform the
task expected of them to catch rainwater and to protect the soil from erosion.(Photos by MDTRallon)
8/6/2019 San Miguel Report
5/9
DATE TREEPLANTINGGROUP
WATERSHEDLOCATION
PLANTINGSITE
NO. OFSEEDLINGSPLANTED
NO. OFHECTARESPLANTED
July 31,
2010
Ginebra San
Miguel
Mananga Ayala
Heights,Pung-olSibugay
800
seedlings
1 hectare
August 21,2010
San MiguelCorporation Mananga
AyalaHeights,Pung-olSibugay
2000AssortedSeedlings
1.5 hectare
August28, 2010
San MiguelCorporation
Mananga AyalaHeights,Pung-ol,
Cebu
1500assortedseedlings
2 hectares
DATE TREEPLANTINGGROUP
WATERSHEDLOCATION
PLANTINGSITE
NO. OFSEEDLINGSPLANTED
NO. OFHECTARESPLANTED
Sept. 1, 2010 MBEAB Air
Force
Mananga Ayala
Heights,Pung-ol,
Cebu
600
seedlings(Mahogany)
.75 hectares
Sept. 4, 2010 San MiguelCorporation
Mananga AyalaHeights,Pung-ol,
Cebu
2000assortedseedlingsplanted
2 hectares
Sept. 11,2010
AbellanaNationalSchool
Mahiga CENTCOMArea
300Seedlings
(Mahogany)
.5 has
San Miguel
Corporation
Mananga Ayala
Heights,
2000
assortedseedlings
2 hectares
Sept. 17,2010
St.Alphonsus
CatholicSchool
Mananga Mt. Pung-ol,Cebu
200mahogany
planted
.25 hectaresestimatedplanted
Sept. 18,2010
Pardo DayHigh School
Mahiga CENTCOMRefo Site
300Mahogany
.75 hasplanted
8/6/2019 San Miguel Report
6/9
Seedlings
Sept. 18,2010
University ofCebu H.S.
Department
Mahiga CENTCOMArea
400Seedlings
(Mahogany)
1.5 has
Sept.21 &
28,2010
San Miguel
Corporation
Kotkot River
Basin
Sitio
Tawasan,Sirao
1,500
Seedlings
2 hectares
DATE TREEPLANTINGGROUP
WATERSHEDLOCATION
PLANTINGSITE
NO. OFSEEDLINGSPLANTED
NO. OFHECTARESPLANTED
Sept. 25, 2010 Pardo NightHigh School
Mahiga CENTCOMRefo Site
500Seedlings
(Mahogany)
Sept. 25, 2010 University of
Cebu H.S.Department
Mahiga CENTCOMR
efo Site
400
Seedlings(Mahogany)
2 has.
October 9,2010
San MiguelCorporation
Butuanon SitioCantipla,
Brgy.Talamban
4,000assortedseedlingsplanted
4 hectaresestimated
areaplanted
October 16,2010
ABS CBN Mananga Gov.Leyson Lot Owner
300mahogany
planted
.25 hectaresplanted
Oct. 16, 23,30, 2010
St. AlphonsusCatholic
School
Mananga Mt. Pung-ol(Replanting)
750 AssotedSeedlings
October 23,2010
San CarlosLaw Studentsand Professor
CENTCOMarea
replanting
100mahogany
planted
Nov. 6, 2010 PardoNational High
School
Mahiga CENTCOMArea
600 AcaciaAure
(replanting)
Nov. 6 & 13,2010
St. AlphonsusCatholicSchool
Mananga Mt. Pung-ol(Replanting)
500 assortedseedlingsplanted
.5 hectares
Summary of the Liloan Tree Plantings(Data provided by Anne Sevilla)
TREE PLANTINGGROUP
PLANTING SITE NO. ofSEEDLINGSPLANTED
NO. of HECTARESPLANTED
ABS CBN, UCStudents, CTU, MOR
Mrs. Senen Ouano Lot Owner
1000 mahoganyseedlings
2 hectares areaplanted
8/6/2019 San Miguel Report
7/9
Radio Station, MORListeners, LaConsolacion College,Liloan PoliceCebu Womens Club
c/o Atty. CynthiaBarrit
Atty. Cecilio Seno
Lot Owner
500 seedlings 1 hectare area
planted
Philippine DrugEnforcement Agency
Edelberta Baja Lot Owner
700 seedlings ofassorted fruit trees
1 hectare areaplanted
Lataban Barangayofficials and LiloanNursery caretakers
Lataban 400 seedlings ofJackfruit andMahogany
Barangay Road
Mormons Mr. Tundag LotOwner
500 seedlings ofJackfruit andMahogany
.5 hectares areaplanted
TREE PLANTING PHOTO-DOCUMENTATION
University of Cebu Tree PlantingActivity
8/6/2019 San Miguel Report
8/9
(Photos by Anne Sevilla & Duchess Salcedo)
PLAN 2011
I. Seedling Nursery Improvement
II. Acquisition of Tools for the Two (2) Central Seedling Nurseries
III. Initial Implementation of Indigenous Seedlings Growing Program
IV. Assisted Seedling Collection Activities
V. Continuing Liloan Caretakers Meetiing
ACKNOWLEDGEMENTS
i. San Miguel Corporation
ii. The Local Government of the Municipality of Liloan, Province of Cebu
iii. ABS-CBN Regional Television Network
iv. The Barangay Officials of the Cebu City and Liloan BLGUs
8/6/2019 San Miguel Report
9/9
"Someone's sitting in the shade today because
someone planted a tree a long time ago."
- Warren Buffett