16
San Pedro Executive Director Report Waterfront Project l ecu e ec o epo Final EIR E i t lM tDi i i EnvironmentalManagement Di vision Port of Los Angeles Los Angeles Board of Harbor Commissioners Meeting September 29, 2009
Transcript
Page 1: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro 

Executive Director ReportWaterfront Projectl

ecu e ec o epoFinal EIR

E i t l M t Di i i  Environmental Management Division Port of Los Angeles

Los Angeles Board of Harbor Commissioners MeetingSeptember 29, 2009

Page 2: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIREnvironmental Review ProcessEnvironmental Review Process

Notice that an EIS/EIR will be Prepared Sept 2005Bridge to Breakwater

M t Pl

Notice that an EIS/EIR ill b P d

Public Comment Period & Three Public Meetings

Dec 2006

Master Plan Sept 200460 days

will be Prepared

Public Comment Period & Public Meeting

Draft EIS/EIR Prepared

ec 006

45 days

Public Comment Period & Public Meeting on

Draft EIS/EIR 77 days

Oct 2009

Final EIS/EIR Prepared

Board Hearing – Consideration of Certification of Final EIR &

P j t A l

Sept 29, 2009

2

Project Approval

Notice of Determination – Port

Page 3: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRProposed ProjectProposed Project

• Waterfront Promenade – 8 miles• New Harbors & 7th Street Pier – 6.8 acres• Open Spaces & Parks – 27 Acres (+ Existing =~ 46 Acres)• Transportation Infrastructure Improvement – Sampson Way, Red Car• New Development – Fireboat Museum Red Car Facility, OH Cruise Facilities• Redevelopment – Ports O’Call

3

Redevelopment Ports O Call• Relocated Development – Lane Victory, Catalina Exp, Jankovich• Adaptive Reuse – Warehouse 9 & 10• Removal of Existing Development – SP Railyard, Westways Tank Farm

Page 4: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRProposed Project ModificationsProposed Project Modifications

• Cruise Terminals• Inner Harbor Terminal Investment First!• Initially only one Outer Harbor Cruise• Initially only one Outer Harbor Cruise

Terminal at 45-47• Defer Inner Harbor Parking Structure until

needed; defer North Harbor Cut & use landscaped surface parking at Berth 87landscaped surface parking at Berth 87

• Examine parking structure design & replacement for baggage handling building

• Market Driven• Market Driven• Ultimate size of Ports O’ Call• Second Outer Harbor cruise berth

Pedestrian Crossings

• Pedestrian Access• Additional pedestrian access at 9th Street• Green roof, viewing areas & ped access on

POC parking structures; no roof parking

4• Ongoing Public Involvement

Page 5: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront EIR Project Alternatives – Major Features

Alternatives

ProposedReduced Dev

No Fed Action No Project

Feature Project 1 2 3 4 5 6

hOH Cruise Berth  2 Lg 1 Lg 1 Lg 1 Lay 1 Lay 1 Lay

IH Cruise Berth 1 Lg 1 Sm (1 Oc) 3 Sm 3 Sm Existing 

w/growth

Cruise Parking Str IH OH/IH ExistingCruise Parking Str IH OH/IH Existing

POC (sq. ft.) 375k 187k Existing

Harbor Blvd 2 Lanes 1 Lane 1 Lane 1 Lane ExistingHarbor Blvd. 2 Lanes 1 Lane 1 Lane 1 Lane Existing

Harbors All ‐‐ No North Harbor None None

Promenade (mi) 8 Behind M h

No In W t Existing

5

Promenade (mi) 8  Marsh Water Existing

Page 6: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRProposed Project ImpactsProposed Project Impacts

Less Than Significant• Marine Transportation & Navigation

Less Than Significant After Mitigation• Cultural• Groundwater & Soils• Hazards & Hazardous Materials

Unavoidable Significant Impacts

• Hazards & Hazardous Materials• Land Use & Planning• Utilities & Public Services

Unavoidable Significant Impacts• Aesthetics*• Air Quality* **• Biological Resources*• Geology*• Noise* **• Recreation* **• Ground Transportation* **

6

Ground Transportation • Water Quality, Sediments, & Oceanography*

*Cumulative Impacts**Environmental Justice Issues

Page 7: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRMitigation MeasuresMitigation Measures

Over 90 mitigation measures applied to Project construction and operation!j p

•Air Quality ------------------------------ 28• Clean Air Construction Guidelines• AMP: IH 80% 2013; OH 97% 2013;• LSF: 90% 40nm• VSR: 100% 2013

• Greenhouse Gas -------------------- 15• Biology 6• Biology ---------------------------------- 6• Cultural Resources ----------------- 4• Geology -------------------------------- 2• Groundwater & Soils --------------- 2• Hazards & Risks --------------------- 1• Land Use ------------------------------- 1• Ground Transportation ------------ 26• Noise ------------------------------------- 2 AMP Mobile

7

• Noise ------------------------------------- 2• Utilities & Public Service ---------- 6• Recreation ------------------------------ 7

AMP - Mobile

Page 8: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRAreas of ControversyAreas of Controversy

• Outer Harbor Cruise Facilities• Sustainable Waterfront Plan Consideration• Synergy with Downtown San Pedro• Downtown Waterfront Red Car Line• Parking Structures on the waterfront

A ll t G C diti f A l• Appellant Group Conditions of Approval

8

Page 9: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRAreas of Controversy: Outer Harbor Cruise TerminalAreas of Controversy: Outer Harbor Cruise Terminal

Issues Raised:

• Recreational boat access to marina• Recreational use of bay• Create an aesthetic impact• Passenger Shuttle bus trips from Inner Harbor• Passenger Shuttle bus trips from Inner Harbor• Develop B. 45-47 (west side) vs B. 49-50 first (east side)• Adequate market demand• Relocation of Inner Harbor Cruise Business to Outer Harbor• Cruise Passenger Synergy with Downtown San Pedro• Consideration of Inner Harbor Main Channel Wharf Work

9

Page 10: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

Inner Harbor Cruise TerminalThree Princess Vessels

10

Page 11: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRAreas of Controversy: Inner Harbor Cruise TerminalAreas of Controversy: Inner Harbor Cruise Terminal

Ship encroaches into the Fire Stationinto the Fire Station to avoid angle point

Na igation ships back do n cargo ships• Navigation – ships back down; cargo ships

• Capacity - size and number

• Costs – wharf and no phasingCosts wharf and no phasing

• Existing Operations - maintaining

• Attracting and Maintaining Market Share

11

Page 12: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront ProjectWaterfront Access

Seamless Study

12

Page 13: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront EIROverriding Considerations

• Enhances Maritime Uses• Creates Jobs

• Construction - 14,301 (7,416 Direct)• Operation 5 607 Cruise = 2 400 new jobs• Operation - 5,607 Cruise = 2,400 new jobs

• Provides Tax Revenue• Construction - $95.4 Million• Operation - $30.3 Million

• Increases Non-vehicular Access to Water• Promotes Sustainability• Creates New Open Space

13

• Reduces Cruise Terminal Air Emissions

Page 14: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront EIRStaff Recommendations

• Certify the Environmental Impact Report

• Adopt the Final Findings of Fact and Statement of Overriding ConsiderationsStatement of Overriding Considerations

• Adopt the Final Mitigation Monitoring and Reporting ProgramReporting Program

• Approve the Proposed Project with Staff Recommendations

• Direct the incorporation of mitigation measures into construction specifications and leases

14

and leases

Page 15: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront EIRLetters Received Since Final EIR Published

• U.S. Senator Dana Rohrabacher – Support

• CA Senator Rodrick Wright – Support

• CA Senator Jenny Oropeza – Support

• CA Senator Alan Lowenthal – Support

• CA Assemblymember Warren Furutani – Support

CA A bl b B i L th l S t• CA Assemblymember Bonnie Lowenthal – Support

• LA Councilman Tom LaBonge – Support

• Gabrieleno Band of Mission Indians – Cultural monitoring

• Gambol Industries – Fueling dock at Berth 240• Gambol Industries – Fueling dock at Berth 240

• LA Economic Development Corp. – Support

• Harbor Assoc. Industry & Commerce – Support

• Nat. Assoc. Women Business Owners – Supportat ssoc o e us ess O e s Suppo t

• Coastal Conservancy – Support

• Coastwalk California – Support, concerns about OH Cruise Terminal

15

• San Pedro Youth Coalition – Support

• San Pedro Chamber of Commerce - Resolution Support

Page 16: San Pedro Waterfront Executive Director Report ecu e ec o epo … · 2018-04-17 · San Pedro Waterfront Final EIR Proposed Project • Waterfront Promenade – 8 miles • New Harbors

San Pedro Waterfront Final EIRSan Pedro Waterfront Final EIRHealth RiskHealth RiskHealth RiskHealth Risk

Residential Cancer Risk

+10

1


Recommended