Engineering &Operations Committee MeetingMay 23, 2013
Jerry Reed
Raised Dam
2
Spillway
3
4
Downstream Step Repair
Upstream Liner Installation
5
Low Level Outlet Gate Structure
Low Level Outlet Pipe
Existing Dam
Cofferdam
Bedrock
Target EL 594
EL 625
Future RCC Dam
Active Reservoir
Flood Buffer
6
Low Level Outlet Gate Structure
7
Outlet Tower
8
9
Outlet Tower Gates
10
Fish Screen
11
Lower Level Outlet108-inch Diameter Pipe
City 66-inchDiameter Pipe
EmergencyDischarge
Outlet WorksWater Authority
90-inchDiameter Pipe
Plunger and Gate Valve Installation
12
Picture of BFV flying in from Crane, update on Monday
13
108-inch Diameter Butterfly Valve Installation
108-inch Diameter Butterfly Valve
14
Contractor’s Baseline Schedule
Start-up Testing
Decommission Exist OW
108” Valve Actuator Delay
Schedule Update
NO
VEM
BER
2013
FIN
ISH
15
(Construction Contract Duration)
Complete Outlet Works
7 Months
Commence Reservoir Fill
CONTRACTORS BASELINE SCHEDULE
RESE
RVO
IR F
ILL
TO E
L.64
0FA
LL 2
014
-20
17
Award Package 5 Marina Construction -Summer of 2013
Complete Filling to Height of Existing Dam
Award Package 4 Bypass Pipeline Construction -Summer of 2014
Begin Filling to Full Height of Raised Dam
Upcoming Activities
16