www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
COVER SHEET
T1.0
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
GENERALT1.0 COVER SHEET
LANDSCAPEL1.0 OVERALL HARDSCAPE PLANL1.1 PARTIAL HARDSCAPE PLANL1.2 PARTIAL HARDSCAPE PLANL1.3 PARTIAL HARDSCAPE PLANL1.4 PARTIAL HARDSCAPE PLANL1.5 PARTIAL HARDSCAPE PLANL1.6 PARTIAL HARDSCAPE PLANL3.0 OVERALL PLANTING PLANL3.1 PARTIAL PLANTING PLANL3.2 PARTIAL PLANTING PLANL3.3 PARTIAL PLANTING PLANL3.4 PARTIAL PLANTING PLANL3.5 PARTIAL PLANTING PLANL3.6 PARTIAL PLANTING PLANL3.7 PARTIAL PLANTING PLAN
ARCHITECTURAL DEMOAD1.11 DEMOLITION SITE PLANAD4.21 DEMOLITION FLOOR PLANS & ELEVATIONS
ARCHITECTURALA1.10 SITE PLANA1.11 SITE PLAN - WESTA1.12 SITE PLAN - BACKYARD AND BGEA1.13 SITE PLAN - MAIN ENTRY - WESTA1.14 SITE PLAN - MAIN ENTRY - EASTA2.20 BGE FLOOR PLANA2.21 BGE ROOF PLANA2.30 BGE ELEVATIONSA2.40 BGE SECTIONS & INTERIOR ELEVATIONSA2.60 BGE DETAILSA2.90 BGE RENDERINGA3.10 BACKYARD/MACVEAGH COTTAGE - PLAN & ELEVATIONSA4.10 TRASH ENCLOSUREA5.10 MAIN ENTRY/ADMISSIONSA5.90 MAIN ENTRY PLAZA RENDERINGA6.10 MAIN ENTRY
LIGHTINGLT0.0 LIGHTING FIXTURE SCHEDULELT1.10 SITE PLAN - ALT1.11 SITE PLAN - BLT1.12 SITE PLAN - CLT2.20 BGE FLOOR PLAN - LIGHTINGLT2.21 BGE FLOOR PLAN - LIGHTING CALCLT2.30 BGE ELEVATIONS - LIGHTINGLT2.40 BGE SECTIONS - LIGHTINGLT3.0 BOLLARDSLT3.1 WALL-MOUNTED FIXTURESLT3.2 ENLARGED PLANSLT3.3 ENLARGED PLANS
SHEET INDEX
SLO
PE 1
.5H
:1V
(+/-)
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TBTB TB TB
TB
TB
TB
TB
TB
TB
TBTB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB TB
TB
DRIPLINE
DRIPLINE
DRIPLINE
DRIPLINE
TE: NO DRIPLINES SHOWN IN PARCEL TWO
NOTE: NO DRIPLINES SHOWN IN PARCEL TWO
S
S
xx
x
x
x
x
x
x
x
x
x
x
x
x
xx
x
x
x
x
x
x
x
x
x
x
x
x
WV
S
S
S
xx
x
x
x
x
x
x
x
x
x
x
x
x
xx
x
x
x
x
x
x
x
x
x
x
x
x
xx
x
S
S
S
S
WV
H
YD
GV
S
WV
WV
WVWV
S
M I S S I
O N C R E E K
PUESTA DEL SOL ROAD
PUES
TA D
EL S
OL R
OAD
(E) PARKING LOT
(E) PARKING LOTPARCEL BOUNDARY
D002
D001D001
D004
D027
D002
E24.
E1.
E9.
E16.
E15.
E2.
E21.
E3.
E10.
E4.
E5. E7.
E6.
E8.
E14.
E20.
E19.
E12.
E13.
E18.
E11.
E17.
D001
D041
AD4.212
D045
E22.
E23.
E24.
E25.D041
D041
D001
D001
D001
E26.
D042
D044
D046
D001
STRUCTURES REMOVED
STRUCTURES TO REMAIN
DEMO PLAN LEGEND
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
DEMOLITION SITEPLAN
AD1.11
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/32" = 1'-0"AD1.11
1 DEMOLITION SITE MASTER PLAN - ALL PHASES BUILDING/SITE KEY
EXISTING STRUCTURES:E1. FLEISCHMANN AUDITORIUME2. GOULD EXHIBIT HALLE3. ENTRY COURTYARDE4. CARTWRIGHT EXHIBIT HALLE5. MAMMAL EXHIBIT HALLE6. LIBRARYE7. BIRD HALLE8. MAXIMUS GALLERYE9. LURIA HALLE10. ADMINISTRATIONE11. MARINE/PALEONTOLOGY/GEOLOGY HALLE12. EDUCATION CENTERE13. FARRAND HALLE14. MACVEAGH HOUSE
STRUCTURES TO BE REPLACED:E24. BUTTERFLY PAVILION
D042 REMOVE (E) PLANTING ISLAND, BOULDERS AND LAMPPOST
D044 REMOVE AND REROUTE UNDERGROUND PIPED045 REMOVE (E) FENCED046 RELOCATE (E) DUMPSTERS
D001 REMOVE (E) ASPHALT, EXISTING STONE PAVERSYSTEM AND/OR CONC SIDEWALK AND CURB AND ALLASSOC.
D002 REMOVE (E) WALL AND ALL ASSOC. TO EXTENTSSHOWN
D004 SAWCUT AND REMOVE (E) HAZARD ESTATE WALL TOEXTENTS SHOWN. PRESERVE AND PROTECT EXISTINGSTONES
D027 DEMOLISH (E) DECK, STAIR & ALL ASSOCIATEDD041 REMOVE (E) STORAGE SHED
GENERAL NOTE: PRESERVE AND PROTECT TREES ADJACENT TO SCOPE OF WORK
KEYNOTES - DEMOLITION
EXISTING STRUCTURES CONT'D:E15. RAPTOR MEWSE16. MACVEAGH COTTAGEE17. PLANETARIUM & LIVING PLANETE18. COLLECTIONS & RESEARCH CENTERE19. OBSERVATORYE20. RESTROOMSE21. BRODER HALLE22. CARRIAGE HOUSEE23. STORAGE SHEDE26. PEDESTRIAN BRIDGE
EXISTING STRUCTURESTO BE REMOVED:E25. STORAGE SHEDS
N
AD4.211
AD4.21
3
D027
NOTE: NO INTERIOR DEMOLITION PROPOSED.
D014
D014
WC (E)
STOR (E)
MACVEAGH COTTAGE (E)
REFER TO CIVIL & LANDSCAPE DRAWINGS FOR ALL SITEIMPROVEMENT SCOPEREFER TO SHTS C-1 AND C-2 FOR RAMP AND SLOPEDWALKWAY SLOPES AND CROSS-SLOPES
GENERAL NOTES
(E) WALL OR STRUCTURE TO REMAIN
(E) WALL TO BE REMOVED
? DEMO KEYNOTE#
DEMO FLOOR PLAN LEGEND
(E) WINDOW/DOOR TO BE REMOVEDINCLUDING HARDWARE, THRESHOLD, CASING& TRIM COMPLETE
(E) AREA TO BE DEMOLISHED
1 - LOWER LEVELEL 297' - 9"
D014
D027
D027
1 - LOWER LEVELEL 297' - 9"
D014
D027
(E) CONSTRUCTION TO BE REMOVED
? DEMO KEYNOTE#
DEMO ELEVATION / SECTION LEGEND
(E) AREA TO BE DEMOLISHED
(E) WINDOW TO BE REMOVED
(E) DOOR TO BE REMOVED
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
DEMOLITION FLOORPLANS &
ELEVATIONS
AD4.21
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"AD4.212 DEMOLITION - MAIN LEVEL PLAN - WEST - MACVEAGH COTTAGE - PHASE 1
1/4" = 1'-0"AD4.211 DEMOLITION ELEVATION - MACVEAGH COTTAGE EAST - PHASE 1
1/4" = 1'-0"AD4.213 DEMOLITION ELEVATION - MACVEAGH COTTAGE NORTH - PHASE 1
D014 REMOVE (E) DOOR AND FRAMED027 DEMOLISH (E) DECK, STAIR & ALL
ASSOCIATED
KEYNOTES - DEMOLITION
WV
WV
WVWV
LOPE
1.5
H:1
V (+
/-)
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TBTB TB TB
TB
TB
TB
TB
TB
TB
TBTB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB TB
TB
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
WV
WVWV
SLO
PE 1
.5H
:1V
(+/ -)
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB TB
TB TBTB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TBTB TB TB
TB
TB
TB
TB
TB
TB
TBTB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB TB
TB
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
M I S S I
O N
C R E E K
PARCEL BOUNDARY
B.
E1.
E9.
E16.
E15.
E2.
E21.
50' SETBACK25' SETBACK
TOP OF BANK
E3.
E10.
E4.
E5. E7.
E6.
E8.
E14.
E22.
E19.
E12.
E13.
E18.
E11.
E17.
HC
C.
D.
E.
A4.104
F.
E23.
WF
WF
RELOCATE (E)LIGHT POST
E26.
E24.
E PARKING ENTRY
E PARKING EXIT
E ADA PARKING
PHASE 1BPHASE 1A
PHASE 1BPHASE 1A
G.
A.
EASEMENTSEWER
PUESTA DEL SOL RIGHT-OF-WAY IMPROVEMENTS
A1.121
A1.131
(N) ASPHALTPAVING WHEREPLANTERREMOVED
A1.141
APN 023-250-010APN 023-250-009APN 023-250-056
4.95 ACRES
APN 023-250-0390.63 ACRES
APN 023-272-003APN 023-272-004
9.85 ACRES
PARCEL BOUNDARY(TYPICAL)
MUSEUM CAMPUS
TB TBTB
WF
SITE PLAN LEGENDNEW LANDSCAPE
PERMEABLE PAVERS
FLAGSTONE
BOARDWALK
ENGINEERED WOOD FIBER
SITE MATERIALS
1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.
SITE PLAN GENERAL NOTES
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
SITE PLAN
A1.10
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/32" = 1'-0"A1.101 SITE PLAN
PARCEL BOUNDARY
CREEK SETBACK
PARCEL SETBACK
PROPOSED REPLACEMENTSTRUCTURES:B. BUTTERFLY GARDEN EXHIBIT
PRIMARY SITE FEATURES:A. MAIN ENTRY PLAZAC. ACTIVITY AREA/ WOODLAND GARDEND. FORT BUILDING AREAE. BACKYARDF. TRASH ENCLOSUREG. BIOSWALE OVERLOOK
EXISTING STRUCTURES TO REMAIN:E16. MACVEAGH COTTAGEE17. PLANETARIUM & LIVING PLANETE18. COLLECTIONS & RESEARCH CENTERE19. OBSERVATORYE21. BRODER HALLE22. RESTROOMSE23. STORAGE SHEDE24. CARRIAGE HOUSEE26. PEDESTRIAN BRIDGE
1" = 160'-0"A1.10
2 PARCEL KEY PLAN
N
EXISTING STRUCTURES TO REMAIN:E1. FLEISCHMANN AUDITORIUME2. GOULD EXHIBIT HALLE3. ENTRY COURTYARDE4. CARTWRIGHT EXHIBIT HALLE5. MAMMAL EXHIBIT HALLE6. LIBRARYE7. BIRD HALLE8. MAXIMUS GALLERYE9. LURIA HALLE10. ADMINISTRATIONE11. MARINE/PALEONTOLOGY/GEOLOGY HALLE12. EDUCATION CENTERE13. FARRAND HALLE14. MACVEAGH HOUSEE15. RAPTOR MEWS
TOP OF BANK
WATER FOUNTAIN
BUILDING SETBACK
BUILDING/SITE KEY
TB
TB
TB
TB TB
TB TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TBTB TB TB
TB
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
WV
WVWV
SLO
PE 1
.5H
:1V
(+/ -)
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB TB
TB TBTB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TBTB TB TB
TB
TB
TB
TB
TB
TB
TBTB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB TB
TB
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)
PARCEL BOUNDARYE16.
E15.50' SETBACK25' SETBACKTOP OF BANK
E14.
HC
E.
A4.104
A3.101
F.
RELOCATE (E)LIGHT POST
REFER TO SHEET A1.11 FORSITE INFORMATION TO THE EAST
MATC
HLIN
E
WESTERN RESIDENCE
G.
NEW LANDSCAPE
PERMEABLE PAVERS
FLAGSTONE
BOARDWALK
ENGINEERED WOOD FIBER
SITE MATERIALS
TB TBTB
WF
SITE PLAN LEGEND
APN 023-250-010APN 023-250-009APN 023-250-056
4.95 ACRES
APN 023-250-0390.63 ACRES
APN 023-272-003APN 023-272-004
9.85 ACRES
PARCEL BOUNDARY(TYPICAL)
MUSEUM CAMPUS
1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.
SITE PLAN GENERAL NOTES
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
SITE PLAN - WEST
A1.11
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/32" = 1'-0"A1.111 SITE PLAN
PARCEL BOUNDARY
CREEK SETBACK
PARCEL SETBACK
N
TOP OF BANK
WATER FOUNTAIN
1" = 160'-0"A1.112 PARCEL KEY PLAN
BUILDING SETBACK
TB
TBTB
TB
TB
A3.101
A2.201
050
051052
053
054
951TYP
951TYP
951TYP TYP
951TYP
1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.
SITE PLAN GENERAL NOTESNEW LANDSCAPE
PERMEABLE PAVERS
FLAGSTONE
BOARDWALK
ENGINEERED WOOD FIBER
SITE MATERIALS
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
SITE PLAN -BACKYARD AND BGE
A1.12
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
3/32" = 1'-0"A1.121 BACKYARD AND BGE SITE PLAN
050 RAPTOR MEWS
051 MACVEAGH COTTAGE
052 ACTIVITY AREA/WOODLAND GARDEN
053 BACKYARD
054 BUTTERFLY GARDEN EXHIBIT
951 SITE LIGHT FIXTURE, REFERENCE LIGHTINGDRAWINGS
KEYNOTES
A5.101
MAIN ENTRY PLAZA, SEE LANDSCAPE DRAWINGS FORMORE INFORMATION ON PAVING AND PLAZA DETAILS
BOARDWALK TO MAIN ENTRY, SEELANDSCAPE DRAWINGS FOR MOREINFORMATION
GOULD HALL(E)
ADMISSIONS(E)
MARINE/PALEONTOLOGY/GEOLOGYHALL (E)
LURIA (E)
MINERAL &GEM (E)
COURTYARD(E)
FLEISCHMANN AUDITORIUM(E)
MENS RM(E)
WOMENS RM(E)
FLEISCHMANN ANNEX(E)
951TYP
1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.
SITE PLAN GENERAL NOTESNEW LANDSCAPE
PERMEABLE PAVERS
FLAGSTONE
BOARDWALK
ENGINEERED WOOD FIBER
SITE MATERIALS
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
SITE PLAN - MAINENTRY - WEST
A1.13
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/8" = 1'-0"A1.131 MAIN ENTRY - WEST SITE PLAN
951 SITE LIGHT FIXTURE, REFERENCE LIGHTINGDRAWINGS
KEYNOTES
GIFT SHOP MAMMALHALL (E)
IT OFFICE (E)
MAXIMUSOFFICES (E)
MAXIMUSCOLLECTIONS
(E)
OFFICE (E)
CARTWRIGHT(E)
STOR (E)
COURTYARD(E)
(E)ARCHIVES &
COLLECTIONS(E)
COURTYARD(E)
LIBRARY (E)
BIRD HALL(E)
PUESTA DEL SOL
951TYP
A6.101
1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.
SITE PLAN GENERAL NOTESNEW LANDSCAPE
PERMEABLE PAVERS
FLAGSTONE
BOARDWALK
ENGINEERED WOOD FIBER
SITE MATERIALS
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
SITE PLAN - MAINENTRY - EAST
A1.14
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/8" = 1'-0"A1.141 MAIN LEVEL PLAN - EAST - PHASE 1
951 SITE LIGHT FIXTURE, REFERENCE LIGHTINGDRAWINGS
KEYNOTES
A2.30
4
1 2 3 4 5 6 7 8 9 10
B
A
11 12 13 14
A2.30
1
S
S
1A2.40
6' - 0" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 0"
A2.303
A2.30 2
2A2.40
25 FT CREEK SETBACK
50 FT
CREEK S
ETBAC
K
LILY POND, REF TO LANDSCAPEDRAWINGS FOR MORE INFO
SEWER EASEMENT
BUTTERFLY GARDEN EXHIBIT
VESTIBULE VESTIBULE
A2.40 3
5
4
A2.40
8
6
7
9A2.40
10A2.40
34' -
0"
0' - 4
"15
' - 3
1/2"
11' - 7 3/8"
EQEQ
EQ EQ
14' - 1 1/2"
11' -
6 3/
4"
0' - 4
"
EQEQ
EQ EQ
951TYP
TYP951
1211
(E) WALL OR STRUCTURE TO REMAIN
WALL
FLOOR PLAN LEGEND
(E) WINDOW/DOOR TO BE REMAIN
WINDOW/DOOR
NEW LANDSCAPE
PERMEABLE PAVERS
FLAGSTONE
BOARDWALK
ENGINEERED WOOD FIBER
SITE MATERIALS
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
BGE FLOOR PLAN
A2.20
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"A2.201 BUTTERFLY GARDEN EXHIBIT - PLAN
951 SITE LIGHT FIXTURE, REFERENCE LIGHTING DRAWINGS
KEYNOTES
A2.30
4
A2.30
1
1A2.40
A2.303
A2.30 2
2A2.40
STAINLESS STEEL MESH OVER HSS FRAME
SANDSTONE COPING
STAINLESS STEEL MESH ON HSS STEEL RIB STRUCTURE
HISTORIC LIGHT FIXTURE (TYP), REFERENCE LIGHTING DRAWINGS
1211
CONCRETE
STAINLESS STEEL MESH
STUCCO
SANDSTONE VENEER
EXTERIOR MATERIAL LEGEND
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
BGE ROOF PLAN
A2.21
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"A2.211 BUTTERFLY GARDEN EXHIBIT - ROOF PLAN
TERRACE LEVELEL 310' - 0"
T.O. BUTTERFLY PAVILIONEL 325' - 4"
B
A
reference landscapedrawings for ornamentaliron infill
3x3 HSS, painted
bollard light fixture (typ),reference lighting drawings
historic light fixture (typ),reference lighting drawings
TERRACE LEVELEL 310' - 0"
T.O. BUTTERFLY PAVILIONEL 325' - 4"
B
A
reference landscapedrawings for ornamentaliron infill
3x3 HSS, painted
2' - 2
"
bollard light fixture (typ),reference lighting drawings
historic light fixture (typ),reference lighting drawings
TERRACE LEVELEL 310' - 0"
T.O. BUTTERFLY PAVILIONEL 325' - 4"
1 2 3 4 5 6 7 8 9 10 11 12 13 14
reference landscapedrawings forornamental iron infill
reference landscapedrawings for ornamentaliron infill
sandstone veneer oncmu backup wall (typ)
stainless steelmesh
stained concrete curb
steel ribs, painted (typ)
15' -
4"
steel pipe, 3" O.D.
bollard light fixture (typ), reference lighting drawings
historic light fixture (typ),reference lighting drawings
? KEYNOTE#
SECTION & ELEVATION LEGENDCONCRETE
STAINLESS STEEL MESH
STUCCO
SANDSTONE VENEER
EXTERIOR MATERIAL LEGEND
TERRACE LEVELEL 310' - 0"
T.O. BUTTERFLY PAVILIONEL 325' - 4"
1234567891011121314
sandstoneveneer on cmubackup wall (typ)
stucco
steel pipe, 3" O.D.
15' -
1 1/
2"
16' -
9 1/
4"
7' - 7
1/4
"
5' - 1
1 1/
2"
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
BGE ELEVATIONS
A2.30
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"A2.30
3 BUTTERFLY GARDEN EXHIBIT - EAST ELEVATION 1/4" = 1'-0"A2.30
2 BUTTERFLY GARDEN EXHIBIT - WEST ELEVATION
1/4" = 1'-0"A2.30
1 BUTTERFLY GARDEN EXHIBIT SOUTH ELEVATION
1/4" = 1'-0"A2.30
4 BUTTERFLY GARDEN EXHIBIT - NORTH ELEVATION
TERRACE LEVELEL 310' - 0"
T.O. BUTTERFLY PAVILIONEL 325' - 4"
1 2 3 4 5 6 7 8 9 10 11 12 13 14
sandstone veneer onCMU backup wall
2A2.40
2X1 HSS frame supporting stainlesssteel mesh and shade cloth
air curtain mounted above butterflyexhibit enclosure enty/exit
vestibule
ornamental iron infill & gates, seelandscape for more information
stucco on cmu wall
9A2.40
10A2.40
lateral support:steel pipe, 3" O.D.
vestibule
BGE W. VEST.EL 308' - 3"
TERRACE LEVELEL 310' - 0"
T.O. BUTTERFLY PAVILIONEL 325' - 4"
B
A
15' -
4" steel ribs:5x5HSS typ, painted
curb:stained concrete
stainless steel mesh:mesh: 16x16 per inchopening size: 0.0440 inchoverall thickness: 0.036 inchwire diameter: 0.18" wire
sandstone wall:sandstone veneer on CMU
34' - 0"
coping:2" sandstone
lateral support:steel pipe, 3" O.D.
stucco finish on CMU
A2.602
gates:stainless steel mesh coverat interior vestibule gates
lighting:downlights, reference lighting drawings
lighting:bollard light fixture, reference lighting drawings
EQ EQ
EQ EQ
EQ EQ
EQEQ
TERRACE LEVELEL 310' - 0"
T.O. BUTTERFLY PAVILIONEL 325' - 4"
A
6' - 0
"
STEEL PLATE O/STAINLESS STEEL MESH O/5" X 5" TUBE STEEL STRUCTURAL RIB
1/8" FINISH STUCCO O/3/8" BASE STUCCO O/10" FULLY-GROUTED CMU BLOCK
2" SANDSTONE VENEER O/1/2" MORTAR SETTING BED O/1/2" MORTAR SCRATCH COAT O/10" FULLY-GROUTED CMU BLOCK
MORTAR JOINTS FLUSH
1"A2.60
3
T.O. BUTTERFLY PAVILIONEL 325' - 4"
A
1/8" FINISH STUCCO O/3/8" BASE STUCCO O/10" FULLY-GROUTED CMU BLOCK
MORTAR JOINTS FLUSH
STEEL RIB AND MESHASSEMBLY BEYOND
2" SANDSTONE VENEER O/1/2" MORTAR SETTING BED O/1/2" MORTAR SCRATCH COAT O/10" FULLY-GROUTED CMU BLOCK
1"SS MESH O/ SHADE CLOTHO/ 2x1 HSS SUPPORTTRELLIS
A2.604
BGE W. VEST.EL 308' - 3"
10' -
10"
CONCRETE
STAINLESS STEEL MESH
STUCCO
SANDSTONE VENEER
EXTERIOR MATERIAL LEGEND
EQ EQ
EQ EQ
EQ EQ
603
EQ EQ
EQ EQ EQ EQ
603
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
BGE SECTIONS &INTERIOR
ELEVATIONS
A2.40
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"A2.401 BUTTERFLY GARDEN EXHIBIT - EAST-WEST SECTION
1/4" = 1'-0"A2.402 BUTTERFLY GARDEN EXHIBIT - NORTH-SOUTH SECTION
1/4" = 1'-0"A2.403 BGE - WEST VESTIBULE - EAST
1/4" = 1'-0"A2.40
4 BGE - WEST VESTIBULE - NORTH 1/4" = 1'-0"A2.40
5 BGE - WEST VESTIBULE - SOUTH
1/4" = 1'-0"A2.406 BGE - EAST VESTIBULE - WEST
1/4" = 1'-0"A2.40
7 BGE - EAST VESTIBULE - NORTH 1/4" = 1'-0"A2.40
8 BGE - EAST VESTIBULE - SOUTH
1/2" = 1'-0"A2.40
9 BGE WALL SECTION @ NORTH WALL 1/2" = 1'-0"A2.40
10 BGE WALL SECTION @ VESTIBULE WALL
603 LIGHT FIXTURE (TYP), REFERENCE LIGHTINGDRAWINGS
KEYNOTES
1/4" = 1'-0"A2.4011 BGE - EAST VESTIBULE - EAST
1/4" = 1'-0"A2.4012 BGE - WEST VESTIBULE - WEST
TERRACE LEVELEL 310' - 0"
B
permeable pavers see landscape drawingsconcrete curb (stained) and footing
painted steel plate
5x5 HSS steel ribs, painted
painted steel bent plate
stainless steel mesh
counter-sunk screws
VARI
ES
1' - 0"
mesh seam location
stainless steel mesh
5x5c3/8HSS rib, painted
steel plate (3"x3/8")netting "clamp bar"
A
STUCCO FINISH
METAL LATH
10" FULLY-GROUTED CMU BLOCK
STEEL ANGLE
STEEL PRESSURE PLATE
SLOPED SANDSTONE COPING
SLOPED MORTAR BED
1/2" MORTAR SCRATCH COAT
1/2" MORTAR SETTING BED
2" SANDSTONE VENEER
STAINLESS STEEL MESH
WATERPROOFING
HSS RIB, BEYOND
A
STAINLESS STEEL MESH, BEYOND
HSS RIB, BEYOND
STUCCO FINISH
METAL LATH
STAINLESS STEEL MESH O/ SHADE CLOTH
2x1 HSS SUPPORT TRELLIS2" SANDSTONE VENEER
1/2" MORTAR SETTING BED
1/2" MORTAR SCRATCH COAT
WATERPROOFING
SLOPED SANDSTONE COPING
SLOPED MORTAR BED
8" FULLY-GROUTED CMU BLOCK
0' - 1"
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
BGE DETAILS
A2.60
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1 1/2" = 1'-0"A2.60
2 CONCRETE CURB DETAIL
6" = 1'-0"A2.60
1 NETTING TO FRAME CONNECTION - AXONOMETRIC
3" = 1'-0"A2.603 T.O. NORTH WALL @ BGE
3" = 1'-0"A2.604 T.O. VESTIBULE WALL, TYP.
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
BGE RENDERING
A2.90
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
BUTTERFLY GARDEN EXHIBIT - LOOKING EAST
(E) WALL OR STRUCTURE TO REMAIN
WALL
FLOOR PLAN LEGEND
(E) WINDOW/DOOR TO BE REMAIN
WINDOW/DOOR
? KEYNOTE#
SECTION & ELEVATION LEGEND
WC (E)
SUPPORT &STORAGE
298' - 0"
298' - 0"
NOTE: PROVIDE FIRE SPRINKLERS THROUGHOUT. NO ADDITIONALPROPOSED INTERIOR IMPROVEMENTS AT MACVEAGH COTTAGE
1.0
1.1
CLUBHOUSE/WOODLAND
CENTER
STOR (E)
1.1
SEE SHEET L1.2 FOR INFORMATIONON DECK AND RAIL
DOOR FIXED IN PLACE
NOTE: MACVEAGH COTTAGE TO BE PAINTEDTHE FOLLOWING:CALIFORNIA PAINTS - 20TH CENTURY COLORS1900-1920, ARTS & CRAFTS/ CRAFTMENCOLLECTIONHOUSE: CLAM SHELLTRIM: WHITE TO MATCH EXISTING
MACVEAGH COTTAGE STORAGEDOOR STYLE TO MATCH EXISTING
2' - 6"
6' - 9
"
2' - 1
"2'
- 8"
MV COTTAGE LEVEL298' - 0"
1.0
SEE SHEET L1.2 FOR INFORMATIONON DECK AND RAILING
NOTE: MACVEAGH COTTAGE TO BE PAINTEDTHE FOLLOWING:CALIFORNIA PAINTS - 20TH CENTURY COLORS1900-1920, ARTS & CRAFTS/ CRAFTMENCOLLECTIONHOUSE: CLAM SHELLTRIM: WHITE TO MATCH EXISTING
MACVEAGH COTTAGE MAIN ENTRYDOOR STYLE TO MATCH EXISTING
6' - 6
"
3' - 0"
2' - 5
"2'
- 1"
602
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
BACKYARD/MACVEAGHCOTTAGE - PLAN &
ELEVATIONS
A3.10
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"A3.10
1 MACVEAGH COTTAGE - ENLARGED FLOOR PLAN 1/4" = 1'-0"A3.10
2 MACVEAGH COTTAGE - NORTH ELEVATION
1/4" = 1'-0"A3.103 MACVEAGH COTTAGE - EAST ELEVATION
602 HISTORIC LIGHT FIXTURE (TYP), REFERENCELIGHTING DRAWINGS
KEYNOTES
8' - 6" 2' - 0"
0' - 6
"
7' - 6
"
STUCCO CLAD CMU WALLS, TYP
0' - 6
"0'
- 9"
WOOD GATE ON STEEL FRAME, PAINT DARK BROWN
EQEQ
28' - 0"
2' - 3
"2'
- 3"
1' - 6"
6' - 9
"
7' - 6
"
0' - 3
"7'
- 0"
WOOD GATE ON STEEL FRAME,PAINT DARK BROWN
A4.10
1
A4.103
A4.10 2
31' - 6"
3' - 6" 28' - 0" 2' - 0"
8' - 6
"2'
- 0"
10' -
6"
3' - 0"
3' - 0
"
PARKING LOT
NEW ADA PARKING STALL
951TYP
NEW LANDSCAPE
PERMEABLE PAVERS
FLAGSTONE
BOARDWALK
ENGINEERED WOOD FIBER
SITE MATERIALS
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
TRASH ENCLOSURE
A4.10
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"A4.103 TRASH ENCLOSURE - EAST ELEVATION
1/4" = 1'-0"A4.10
1 TRASH ENCLOSURE - NORTH ELEVATION
1/4" = 1'-0"A4.102 TRASH ENCLOSURE WEST ELEVATION
1/8" = 1'-0"A4.10
4 MAIN LEVEL PLAN - WEST - TRASH
951 SITE LIGHT FIXTURE, REFERENCE LIGHTING DRAWINGS
KEYNOTES
(E) WALL OR STRUCTURE TO REMAIN
WALL
FLOOR PLAN LEGEND
(E) WINDOW/DOOR TO BE REMAIN
WINDOW/DOOR
REFER TO CIVIL & LANDSCAPE DRAWINGS FOR ALL SITEIMPROVEMENT SCOPEREFER TO SHTS C-1 AND C-2 FOR RAMP AND SLOPEDWALKWAY SLOPES AND CROSS-SLOPES
GENERAL NOTES
A5.10
2
ADMISSIONS(E)
HALL (E)
DATA (E)VESTIBULE
(E)
GOULD HALL(E)
MINERAL &GEM (E)
COURTYARD(E)
EGRESS HARDWARE, FINISHEDTO MATCH (E) IRON, SEERENDER & REFERENCE IMAGE
PERFORATED STEELKICKPLATE, FINISHED TOMATCH (E) IRON, SEE RENDER
EXAMPLE PANIC HARDWARE,DARK BRONZE, FINISHED TOMATCH (E) IRON
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
MAINENTRY/ADMISSIONS
A5.10
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1" = 80'-0"
KEY PLAN N
1/4" = 1'-0"A5.101 ADMISSIONS & GOULD HALL RAMP - ENLARGED PLAN
1/4" = 1'-0"A5.102 MAIN PLAZA GATE - NORTH ELEVATION
12" = 1'-0"A5.103 MAIN PLAZA GATE - RENDER
12" = 1'-0"A5.104 MAIN PLAZA GATE - EGRESS HARDWARE - REFERENCE IMAGE
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
MAIN ENTRY PLAZARENDERING
A5.90
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
MAIN ENTRY PLAZA - LOOKING SOUTHEAST
A6.10
2
GIFT SHOP GIFT SHOP(E)
ADMISSIONS(E)
COURTYARD(E)
HALL (E)
(E) GATE USED INPLACE, MODIFIED TOACCOMMODATEEGRESS WIDTH ANDHARDWARE
REFER TO CIVIL & LANDSCAPE DRAWINGS FOR ALL SITEIMPROVEMENT SCOPEREFER TO SHTS C-1 AND C-2 FOR RAMP AND SLOPEDWALKWAY SLOPES AND CROSS-SLOPES
GENERAL NOTES(E) WALL OR STRUCTURE TO REMAIN
WALL
FLOOR PLAN LEGEND
(E) WINDOW/DOOR TO BE REMAIN
WINDOW/DOOR
(E) HISTORIC GATE LEAFS,COMBINED INTO ONE
PERFORATED STEEL KICKPLATE,FINISHED TO MATCH (E) IRON
EGRESS HARDWARE, FINISHED TO MATCH(E) IRON, SEE REFERENCE IMAGE
EXAMPLE PANIC HARDWARE,DARK BRONZE, FINISHED TOMATCH (E) IRON
www.saarch.com
PrincipalProject Manager
Drawn ByReviewed By
Job No.
Revisions:No. Date By
c 2016 schacht | aslani architects
tel (206) 443-3448, fax (206) 443-3471
901 Fifth Ave
Seattle, WA 98164Suite 2720
schacht aslani architects
NOT FORCONSTRUCTION
SAN
TA B
ARBA
RA M
USE
UM
OF
NAT
URA
l HIS
TORY
1508
JANUARY 2016
DESIGNDEVELOPMENT
MAIN ENTRY
A6.10
2559
Pue
sta
Del S
olSa
nta
Barb
ara,
CA
WSCCAS
1/4" = 1'-0"A6.10
1 MAIN ENTRY - ENLARGED PLAN
1/2" = 1'-0"A6.102 MAIN ENTRY GATE - NORTH ELEVATION
N 1" = 80'-0"
KEY PLAN
12" = 1'-0"A6.103 MAIN ENTRY GATE - EGRESS HARDWARE - REFERENCE IMAGE