+ All Categories
Home > Documents > SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508...

SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508...

Date post: 14-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
19
www.saarch.com Principal Project Manager Drawn By Reviewed By Job No. Revisions: No. Date By c 2016 schacht | aslani architects tel (206) 443-3448, fax (206) 443-3471 901 Fifth Ave Seattle, WA 98164 Suite 2720 schacht aslani architects NOT FOR CONSTRUCTION SANTA BARBARA MUSEUM OF NATURAl HISTORY 1508 JANUARY 2016 DESIGN DEVELOPMENT COVER SHEET T1.0 2559 Puesta Del Sol Santa Barbara, CA WS CC AS GENERAL T1.0 COVER SHEET LANDSCAPE L1.0 OVERALL HARDSCAPE PLAN L1.1 PARTIAL HARDSCAPE PLAN L1.2 PARTIAL HARDSCAPE PLAN L1.3 PARTIAL HARDSCAPE PLAN L1.4 PARTIAL HARDSCAPE PLAN L1.5 PARTIAL HARDSCAPE PLAN L1.6 PARTIAL HARDSCAPE PLAN L3.0 OVERALL PLANTING PLAN L3.1 PARTIAL PLANTING PLAN L3.2 PARTIAL PLANTING PLAN L3.3 PARTIAL PLANTING PLAN L3.4 PARTIAL PLANTING PLAN L3.5 PARTIAL PLANTING PLAN L3.6 PARTIAL PLANTING PLAN L3.7 PARTIAL PLANTING PLAN ARCHITECTURAL DEMO AD1.11 DEMOLITION SITE PLAN AD4.21 DEMOLITION FLOOR PLANS & ELEVATIONS ARCHITECTURAL A1.10 SITE PLAN A1.11 SITE PLAN - WEST A1.12 SITE PLAN - BACKYARD AND BGE A1.13 SITE PLAN - MAIN ENTRY - WEST A1.14 SITE PLAN - MAIN ENTRY - EAST A2.20 BGE FLOOR PLAN A2.21 BGE ROOF PLAN A2.30 BGE ELEVATIONS A2.40 BGE SECTIONS & INTERIOR ELEVATIONS A2.60 BGE DETAILS A2.90 BGE RENDERING A3.10 BACKYARD/MACVEAGH COTTAGE - PLAN & ELEVATIONS A4.10 TRASH ENCLOSURE A5.10 MAIN ENTRY/ADMISSIONS A5.90 MAIN ENTRY PLAZA RENDERING A6.10 MAIN ENTRY LIGHTING LT0.0 LIGHTING FIXTURE SCHEDULE LT1.10 SITE PLAN - A LT1.11 SITE PLAN - B LT1.12 SITE PLAN - C LT2.20 BGE FLOOR PLAN - LIGHTING LT2.21 BGE FLOOR PLAN - LIGHTING CALC LT2.30 BGE ELEVATIONS - LIGHTING LT2.40 BGE SECTIONS - LIGHTING LT3.0 BOLLARDS LT3.1 WALL-MOUNTED FIXTURES LT3.2 ENLARGED PLANS LT3.3 ENLARGED PLANS SHEET INDEX
Transcript
Page 1: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

COVER SHEET

T1.0

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

GENERALT1.0 COVER SHEET

LANDSCAPEL1.0 OVERALL HARDSCAPE PLANL1.1 PARTIAL HARDSCAPE PLANL1.2 PARTIAL HARDSCAPE PLANL1.3 PARTIAL HARDSCAPE PLANL1.4 PARTIAL HARDSCAPE PLANL1.5 PARTIAL HARDSCAPE PLANL1.6 PARTIAL HARDSCAPE PLANL3.0 OVERALL PLANTING PLANL3.1 PARTIAL PLANTING PLANL3.2 PARTIAL PLANTING PLANL3.3 PARTIAL PLANTING PLANL3.4 PARTIAL PLANTING PLANL3.5 PARTIAL PLANTING PLANL3.6 PARTIAL PLANTING PLANL3.7 PARTIAL PLANTING PLAN

ARCHITECTURAL DEMOAD1.11 DEMOLITION SITE PLANAD4.21 DEMOLITION FLOOR PLANS & ELEVATIONS

ARCHITECTURALA1.10 SITE PLANA1.11 SITE PLAN - WESTA1.12 SITE PLAN - BACKYARD AND BGEA1.13 SITE PLAN - MAIN ENTRY - WESTA1.14 SITE PLAN - MAIN ENTRY - EASTA2.20 BGE FLOOR PLANA2.21 BGE ROOF PLANA2.30 BGE ELEVATIONSA2.40 BGE SECTIONS & INTERIOR ELEVATIONSA2.60 BGE DETAILSA2.90 BGE RENDERINGA3.10 BACKYARD/MACVEAGH COTTAGE - PLAN & ELEVATIONSA4.10 TRASH ENCLOSUREA5.10 MAIN ENTRY/ADMISSIONSA5.90 MAIN ENTRY PLAZA RENDERINGA6.10 MAIN ENTRY

LIGHTINGLT0.0 LIGHTING FIXTURE SCHEDULELT1.10 SITE PLAN - ALT1.11 SITE PLAN - BLT1.12 SITE PLAN - CLT2.20 BGE FLOOR PLAN - LIGHTINGLT2.21 BGE FLOOR PLAN - LIGHTING CALCLT2.30 BGE ELEVATIONS - LIGHTINGLT2.40 BGE SECTIONS - LIGHTINGLT3.0 BOLLARDSLT3.1 WALL-MOUNTED FIXTURESLT3.2 ENLARGED PLANSLT3.3 ENLARGED PLANS

SHEET INDEX

Page 2: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

SLO

PE 1

.5H

:1V

(+/-)

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TBTB TB TB

TB

TB

TB

TB

TB

TB

TBTB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB TB

TB

DRIPLINE

DRIPLINE

DRIPLINE

DRIPLINE

TE: NO DRIPLINES SHOWN IN PARCEL TWO

NOTE: NO DRIPLINES SHOWN IN PARCEL TWO

S

S

xx

x

x

x

x

x

x

x

x

x

x

x

x

xx

x

x

x

x

x

x

x

x

x

x

x

x

WV

S

S

S

xx

x

x

x

x

x

x

x

x

x

x

x

x

xx

x

x

x

x

x

x

x

x

x

x

x

x

xx

x

S

S

S

S

WV

H

YD

GV

S

WV

WV

WVWV

S

M I S S I

O N C R E E K

PUESTA DEL SOL ROAD

PUES

TA D

EL S

OL R

OAD

(E) PARKING LOT

(E) PARKING LOTPARCEL BOUNDARY

D002

D001D001

D004

D027

D002

E24.

E1.

E9.

E16.

E15.

E2.

E21.

E3.

E10.

E4.

E5. E7.

E6.

E8.

E14.

E20.

E19.

E12.

E13.

E18.

E11.

E17.

D001

D041

AD4.212

D045

E22.

E23.

E24.

E25.D041

D041

D001

D001

D001

E26.

D042

D044

D046

D001

STRUCTURES REMOVED

STRUCTURES TO REMAIN

DEMO PLAN LEGEND

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

DEMOLITION SITEPLAN

AD1.11

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/32" = 1'-0"AD1.11

1 DEMOLITION SITE MASTER PLAN - ALL PHASES BUILDING/SITE KEY

EXISTING STRUCTURES:E1. FLEISCHMANN AUDITORIUME2. GOULD EXHIBIT HALLE3. ENTRY COURTYARDE4. CARTWRIGHT EXHIBIT HALLE5. MAMMAL EXHIBIT HALLE6. LIBRARYE7. BIRD HALLE8. MAXIMUS GALLERYE9. LURIA HALLE10. ADMINISTRATIONE11. MARINE/PALEONTOLOGY/GEOLOGY HALLE12. EDUCATION CENTERE13. FARRAND HALLE14. MACVEAGH HOUSE

STRUCTURES TO BE REPLACED:E24. BUTTERFLY PAVILION

D042 REMOVE (E) PLANTING ISLAND, BOULDERS AND LAMPPOST

D044 REMOVE AND REROUTE UNDERGROUND PIPED045 REMOVE (E) FENCED046 RELOCATE (E) DUMPSTERS

D001 REMOVE (E) ASPHALT, EXISTING STONE PAVERSYSTEM AND/OR CONC SIDEWALK AND CURB AND ALLASSOC.

D002 REMOVE (E) WALL AND ALL ASSOC. TO EXTENTSSHOWN

D004 SAWCUT AND REMOVE (E) HAZARD ESTATE WALL TOEXTENTS SHOWN. PRESERVE AND PROTECT EXISTINGSTONES

D027 DEMOLISH (E) DECK, STAIR & ALL ASSOCIATEDD041 REMOVE (E) STORAGE SHED

GENERAL NOTE: PRESERVE AND PROTECT TREES ADJACENT TO SCOPE OF WORK

KEYNOTES - DEMOLITION

EXISTING STRUCTURES CONT'D:E15. RAPTOR MEWSE16. MACVEAGH COTTAGEE17. PLANETARIUM & LIVING PLANETE18. COLLECTIONS & RESEARCH CENTERE19. OBSERVATORYE20. RESTROOMSE21. BRODER HALLE22. CARRIAGE HOUSEE23. STORAGE SHEDE26. PEDESTRIAN BRIDGE

EXISTING STRUCTURESTO BE REMOVED:E25. STORAGE SHEDS

N

Page 3: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

AD4.211

AD4.21

3

D027

NOTE: NO INTERIOR DEMOLITION PROPOSED.

D014

D014

WC (E)

STOR (E)

MACVEAGH COTTAGE (E)

REFER TO CIVIL & LANDSCAPE DRAWINGS FOR ALL SITEIMPROVEMENT SCOPEREFER TO SHTS C-1 AND C-2 FOR RAMP AND SLOPEDWALKWAY SLOPES AND CROSS-SLOPES

GENERAL NOTES

(E) WALL OR STRUCTURE TO REMAIN

(E) WALL TO BE REMOVED

? DEMO KEYNOTE#

DEMO FLOOR PLAN LEGEND

(E) WINDOW/DOOR TO BE REMOVEDINCLUDING HARDWARE, THRESHOLD, CASING& TRIM COMPLETE

(E) AREA TO BE DEMOLISHED

1 - LOWER LEVELEL 297' - 9"

D014

D027

D027

1 - LOWER LEVELEL 297' - 9"

D014

D027

(E) CONSTRUCTION TO BE REMOVED

? DEMO KEYNOTE#

DEMO ELEVATION / SECTION LEGEND

(E) AREA TO BE DEMOLISHED

(E) WINDOW TO BE REMOVED

(E) DOOR TO BE REMOVED

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

DEMOLITION FLOORPLANS &

ELEVATIONS

AD4.21

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"AD4.212 DEMOLITION - MAIN LEVEL PLAN - WEST - MACVEAGH COTTAGE - PHASE 1

1/4" = 1'-0"AD4.211 DEMOLITION ELEVATION - MACVEAGH COTTAGE EAST - PHASE 1

1/4" = 1'-0"AD4.213 DEMOLITION ELEVATION - MACVEAGH COTTAGE NORTH - PHASE 1

D014 REMOVE (E) DOOR AND FRAMED027 DEMOLISH (E) DECK, STAIR & ALL

ASSOCIATED

KEYNOTES - DEMOLITION

Page 4: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

WV

WV

WVWV

LOPE

1.5

H:1

V (+

/-)

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TBTB TB TB

TB

TB

TB

TB

TB

TB

TBTB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB TB

TB

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

WV

WVWV

SLO

PE 1

.5H

:1V

(+/ -)

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB TB

TB TBTB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TBTB TB TB

TB

TB

TB

TB

TB

TB

TBTB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB TB

TB

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

M I S S I

O N

C R E E K

PARCEL BOUNDARY

B.

E1.

E9.

E16.

E15.

E2.

E21.

50' SETBACK25' SETBACK

TOP OF BANK

E3.

E10.

E4.

E5. E7.

E6.

E8.

E14.

E22.

E19.

E12.

E13.

E18.

E11.

E17.

HC

C.

D.

E.

A4.104

F.

E23.

WF

WF

RELOCATE (E)LIGHT POST

E26.

E24.

E PARKING ENTRY

E PARKING EXIT

E ADA PARKING

PHASE 1BPHASE 1A

PHASE 1BPHASE 1A

G.

A.

EASEMENTSEWER

PUESTA DEL SOL RIGHT-OF-WAY IMPROVEMENTS

A1.121

A1.131

(N) ASPHALTPAVING WHEREPLANTERREMOVED

A1.141

APN 023-250-010APN 023-250-009APN 023-250-056

4.95 ACRES

APN 023-250-0390.63 ACRES

APN 023-272-003APN 023-272-004

9.85 ACRES

PARCEL BOUNDARY(TYPICAL)

MUSEUM CAMPUS

TB TBTB

WF

SITE PLAN LEGENDNEW LANDSCAPE

PERMEABLE PAVERS

FLAGSTONE

BOARDWALK

ENGINEERED WOOD FIBER

SITE MATERIALS

1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.

SITE PLAN GENERAL NOTES

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

SITE PLAN

A1.10

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/32" = 1'-0"A1.101 SITE PLAN

PARCEL BOUNDARY

CREEK SETBACK

PARCEL SETBACK

PROPOSED REPLACEMENTSTRUCTURES:B. BUTTERFLY GARDEN EXHIBIT

PRIMARY SITE FEATURES:A. MAIN ENTRY PLAZAC. ACTIVITY AREA/ WOODLAND GARDEND. FORT BUILDING AREAE. BACKYARDF. TRASH ENCLOSUREG. BIOSWALE OVERLOOK

EXISTING STRUCTURES TO REMAIN:E16. MACVEAGH COTTAGEE17. PLANETARIUM & LIVING PLANETE18. COLLECTIONS & RESEARCH CENTERE19. OBSERVATORYE21. BRODER HALLE22. RESTROOMSE23. STORAGE SHEDE24. CARRIAGE HOUSEE26. PEDESTRIAN BRIDGE

1" = 160'-0"A1.10

2 PARCEL KEY PLAN

N

EXISTING STRUCTURES TO REMAIN:E1. FLEISCHMANN AUDITORIUME2. GOULD EXHIBIT HALLE3. ENTRY COURTYARDE4. CARTWRIGHT EXHIBIT HALLE5. MAMMAL EXHIBIT HALLE6. LIBRARYE7. BIRD HALLE8. MAXIMUS GALLERYE9. LURIA HALLE10. ADMINISTRATIONE11. MARINE/PALEONTOLOGY/GEOLOGY HALLE12. EDUCATION CENTERE13. FARRAND HALLE14. MACVEAGH HOUSEE15. RAPTOR MEWS

TOP OF BANK

WATER FOUNTAIN

BUILDING SETBACK

BUILDING/SITE KEY

Page 5: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

TB

TB

TB

TB TB

TB TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TBTB TB TB

TB

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

WV

WVWV

SLO

PE 1

.5H

:1V

(+/ -)

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB TB

TB TBTB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TBTB TB TB

TB

TB

TB

TB

TB

TB

TBTB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB

TB TB

TB

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

SANTA BARBARA CITY LIMITS (APPROXIMATE LOCATION)

PARCEL BOUNDARYE16.

E15.50' SETBACK25' SETBACKTOP OF BANK

E14.

HC

E.

A4.104

A3.101

F.

RELOCATE (E)LIGHT POST

REFER TO SHEET A1.11 FORSITE INFORMATION TO THE EAST

MATC

HLIN

E

WESTERN RESIDENCE

G.

NEW LANDSCAPE

PERMEABLE PAVERS

FLAGSTONE

BOARDWALK

ENGINEERED WOOD FIBER

SITE MATERIALS

TB TBTB

WF

SITE PLAN LEGEND

APN 023-250-010APN 023-250-009APN 023-250-056

4.95 ACRES

APN 023-250-0390.63 ACRES

APN 023-272-003APN 023-272-004

9.85 ACRES

PARCEL BOUNDARY(TYPICAL)

MUSEUM CAMPUS

1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.

SITE PLAN GENERAL NOTES

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

SITE PLAN - WEST

A1.11

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/32" = 1'-0"A1.111 SITE PLAN

PARCEL BOUNDARY

CREEK SETBACK

PARCEL SETBACK

N

TOP OF BANK

WATER FOUNTAIN

1" = 160'-0"A1.112 PARCEL KEY PLAN

BUILDING SETBACK

Page 6: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

TB

TBTB

TB

TB

A3.101

A2.201

050

051052

053

054

951TYP

951TYP

951TYP TYP

951TYP

1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.

SITE PLAN GENERAL NOTESNEW LANDSCAPE

PERMEABLE PAVERS

FLAGSTONE

BOARDWALK

ENGINEERED WOOD FIBER

SITE MATERIALS

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

SITE PLAN -BACKYARD AND BGE

A1.12

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

3/32" = 1'-0"A1.121 BACKYARD AND BGE SITE PLAN

050 RAPTOR MEWS

051 MACVEAGH COTTAGE

052 ACTIVITY AREA/WOODLAND GARDEN

053 BACKYARD

054 BUTTERFLY GARDEN EXHIBIT

951 SITE LIGHT FIXTURE, REFERENCE LIGHTINGDRAWINGS

KEYNOTES

Page 7: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

A5.101

MAIN ENTRY PLAZA, SEE LANDSCAPE DRAWINGS FORMORE INFORMATION ON PAVING AND PLAZA DETAILS

BOARDWALK TO MAIN ENTRY, SEELANDSCAPE DRAWINGS FOR MOREINFORMATION

GOULD HALL(E)

ADMISSIONS(E)

MARINE/PALEONTOLOGY/GEOLOGYHALL (E)

LURIA (E)

MINERAL &GEM (E)

COURTYARD(E)

FLEISCHMANN AUDITORIUM(E)

MENS RM(E)

WOMENS RM(E)

FLEISCHMANN ANNEX(E)

951TYP

1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.

SITE PLAN GENERAL NOTESNEW LANDSCAPE

PERMEABLE PAVERS

FLAGSTONE

BOARDWALK

ENGINEERED WOOD FIBER

SITE MATERIALS

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

SITE PLAN - MAINENTRY - WEST

A1.13

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/8" = 1'-0"A1.131 MAIN ENTRY - WEST SITE PLAN

951 SITE LIGHT FIXTURE, REFERENCE LIGHTINGDRAWINGS

KEYNOTES

Page 8: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

GIFT SHOP MAMMALHALL (E)

IT OFFICE (E)

MAXIMUSOFFICES (E)

MAXIMUSCOLLECTIONS

(E)

OFFICE (E)

CARTWRIGHT(E)

STOR (E)

COURTYARD(E)

(E)ARCHIVES &

COLLECTIONS(E)

COURTYARD(E)

LIBRARY (E)

BIRD HALL(E)

PUESTA DEL SOL

951TYP

A6.101

1. SEE CIVIL AND LANDSCAPE DRAWINGS FOR SITE IMPROVEMENTSCOPE INCLUDING BUT NOT LIMITED TO GRADING/DRAINAGE,HARDSCAPE, LANDSCAPE, AND PLANTING.

SITE PLAN GENERAL NOTESNEW LANDSCAPE

PERMEABLE PAVERS

FLAGSTONE

BOARDWALK

ENGINEERED WOOD FIBER

SITE MATERIALS

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

SITE PLAN - MAINENTRY - EAST

A1.14

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/8" = 1'-0"A1.141 MAIN LEVEL PLAN - EAST - PHASE 1

951 SITE LIGHT FIXTURE, REFERENCE LIGHTINGDRAWINGS

KEYNOTES

Page 9: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

A2.30

4

1 2 3 4 5 6 7 8 9 10

B

A

11 12 13 14

A2.30

1

S

S

1A2.40

6' - 0" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 8" 6' - 0"

A2.303

A2.30 2

2A2.40

25 FT CREEK SETBACK

50 FT

CREEK S

ETBAC

K

LILY POND, REF TO LANDSCAPEDRAWINGS FOR MORE INFO

SEWER EASEMENT

BUTTERFLY GARDEN EXHIBIT

VESTIBULE VESTIBULE

A2.40 3

5

4

A2.40

8

6

7

9A2.40

10A2.40

34' -

0"

0' - 4

"15

' - 3

1/2"

11' - 7 3/8"

EQEQ

EQ EQ

14' - 1 1/2"

11' -

6 3/

4"

0' - 4

"

EQEQ

EQ EQ

951TYP

TYP951

1211

(E) WALL OR STRUCTURE TO REMAIN

WALL

FLOOR PLAN LEGEND

(E) WINDOW/DOOR TO BE REMAIN

WINDOW/DOOR

NEW LANDSCAPE

PERMEABLE PAVERS

FLAGSTONE

BOARDWALK

ENGINEERED WOOD FIBER

SITE MATERIALS

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

BGE FLOOR PLAN

A2.20

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"A2.201 BUTTERFLY GARDEN EXHIBIT - PLAN

951 SITE LIGHT FIXTURE, REFERENCE LIGHTING DRAWINGS

KEYNOTES

Page 10: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

A2.30

4

A2.30

1

1A2.40

A2.303

A2.30 2

2A2.40

STAINLESS STEEL MESH OVER HSS FRAME

SANDSTONE COPING

STAINLESS STEEL MESH ON HSS STEEL RIB STRUCTURE

HISTORIC LIGHT FIXTURE (TYP), REFERENCE LIGHTING DRAWINGS

1211

CONCRETE

STAINLESS STEEL MESH

STUCCO

SANDSTONE VENEER

EXTERIOR MATERIAL LEGEND

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

BGE ROOF PLAN

A2.21

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"A2.211 BUTTERFLY GARDEN EXHIBIT - ROOF PLAN

Page 11: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

TERRACE LEVELEL 310' - 0"

T.O. BUTTERFLY PAVILIONEL 325' - 4"

B

A

reference landscapedrawings for ornamentaliron infill

3x3 HSS, painted

bollard light fixture (typ),reference lighting drawings

historic light fixture (typ),reference lighting drawings

TERRACE LEVELEL 310' - 0"

T.O. BUTTERFLY PAVILIONEL 325' - 4"

B

A

reference landscapedrawings for ornamentaliron infill

3x3 HSS, painted

2' - 2

"

bollard light fixture (typ),reference lighting drawings

historic light fixture (typ),reference lighting drawings

TERRACE LEVELEL 310' - 0"

T.O. BUTTERFLY PAVILIONEL 325' - 4"

1 2 3 4 5 6 7 8 9 10 11 12 13 14

reference landscapedrawings forornamental iron infill

reference landscapedrawings for ornamentaliron infill

sandstone veneer oncmu backup wall (typ)

stainless steelmesh

stained concrete curb

steel ribs, painted (typ)

15' -

4"

steel pipe, 3" O.D.

bollard light fixture (typ), reference lighting drawings

historic light fixture (typ),reference lighting drawings

? KEYNOTE#

SECTION & ELEVATION LEGENDCONCRETE

STAINLESS STEEL MESH

STUCCO

SANDSTONE VENEER

EXTERIOR MATERIAL LEGEND

TERRACE LEVELEL 310' - 0"

T.O. BUTTERFLY PAVILIONEL 325' - 4"

1234567891011121314

sandstoneveneer on cmubackup wall (typ)

stucco

steel pipe, 3" O.D.

15' -

1 1/

2"

16' -

9 1/

4"

7' - 7

1/4

"

5' - 1

1 1/

2"

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

BGE ELEVATIONS

A2.30

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"A2.30

3 BUTTERFLY GARDEN EXHIBIT - EAST ELEVATION 1/4" = 1'-0"A2.30

2 BUTTERFLY GARDEN EXHIBIT - WEST ELEVATION

1/4" = 1'-0"A2.30

1 BUTTERFLY GARDEN EXHIBIT SOUTH ELEVATION

1/4" = 1'-0"A2.30

4 BUTTERFLY GARDEN EXHIBIT - NORTH ELEVATION

Page 12: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

TERRACE LEVELEL 310' - 0"

T.O. BUTTERFLY PAVILIONEL 325' - 4"

1 2 3 4 5 6 7 8 9 10 11 12 13 14

sandstone veneer onCMU backup wall

2A2.40

2X1 HSS frame supporting stainlesssteel mesh and shade cloth

air curtain mounted above butterflyexhibit enclosure enty/exit

vestibule

ornamental iron infill & gates, seelandscape for more information

stucco on cmu wall

9A2.40

10A2.40

lateral support:steel pipe, 3" O.D.

vestibule

BGE W. VEST.EL 308' - 3"

TERRACE LEVELEL 310' - 0"

T.O. BUTTERFLY PAVILIONEL 325' - 4"

B

A

15' -

4" steel ribs:5x5HSS typ, painted

curb:stained concrete

stainless steel mesh:mesh: 16x16 per inchopening size: 0.0440 inchoverall thickness: 0.036 inchwire diameter: 0.18" wire

sandstone wall:sandstone veneer on CMU

34' - 0"

coping:2" sandstone

lateral support:steel pipe, 3" O.D.

stucco finish on CMU

A2.602

gates:stainless steel mesh coverat interior vestibule gates

lighting:downlights, reference lighting drawings

lighting:bollard light fixture, reference lighting drawings

EQ EQ

EQ EQ

EQ EQ

EQEQ

TERRACE LEVELEL 310' - 0"

T.O. BUTTERFLY PAVILIONEL 325' - 4"

A

6' - 0

"

STEEL PLATE O/STAINLESS STEEL MESH O/5" X 5" TUBE STEEL STRUCTURAL RIB

1/8" FINISH STUCCO O/3/8" BASE STUCCO O/10" FULLY-GROUTED CMU BLOCK

2" SANDSTONE VENEER O/1/2" MORTAR SETTING BED O/1/2" MORTAR SCRATCH COAT O/10" FULLY-GROUTED CMU BLOCK

MORTAR JOINTS FLUSH

1"A2.60

3

T.O. BUTTERFLY PAVILIONEL 325' - 4"

A

1/8" FINISH STUCCO O/3/8" BASE STUCCO O/10" FULLY-GROUTED CMU BLOCK

MORTAR JOINTS FLUSH

STEEL RIB AND MESHASSEMBLY BEYOND

2" SANDSTONE VENEER O/1/2" MORTAR SETTING BED O/1/2" MORTAR SCRATCH COAT O/10" FULLY-GROUTED CMU BLOCK

1"SS MESH O/ SHADE CLOTHO/ 2x1 HSS SUPPORTTRELLIS

A2.604

BGE W. VEST.EL 308' - 3"

10' -

10"

CONCRETE

STAINLESS STEEL MESH

STUCCO

SANDSTONE VENEER

EXTERIOR MATERIAL LEGEND

EQ EQ

EQ EQ

EQ EQ

603

EQ EQ

EQ EQ EQ EQ

603

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

BGE SECTIONS &INTERIOR

ELEVATIONS

A2.40

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"A2.401 BUTTERFLY GARDEN EXHIBIT - EAST-WEST SECTION

1/4" = 1'-0"A2.402 BUTTERFLY GARDEN EXHIBIT - NORTH-SOUTH SECTION

1/4" = 1'-0"A2.403 BGE - WEST VESTIBULE - EAST

1/4" = 1'-0"A2.40

4 BGE - WEST VESTIBULE - NORTH 1/4" = 1'-0"A2.40

5 BGE - WEST VESTIBULE - SOUTH

1/4" = 1'-0"A2.406 BGE - EAST VESTIBULE - WEST

1/4" = 1'-0"A2.40

7 BGE - EAST VESTIBULE - NORTH 1/4" = 1'-0"A2.40

8 BGE - EAST VESTIBULE - SOUTH

1/2" = 1'-0"A2.40

9 BGE WALL SECTION @ NORTH WALL 1/2" = 1'-0"A2.40

10 BGE WALL SECTION @ VESTIBULE WALL

603 LIGHT FIXTURE (TYP), REFERENCE LIGHTINGDRAWINGS

KEYNOTES

1/4" = 1'-0"A2.4011 BGE - EAST VESTIBULE - EAST

1/4" = 1'-0"A2.4012 BGE - WEST VESTIBULE - WEST

Page 13: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

TERRACE LEVELEL 310' - 0"

B

permeable pavers see landscape drawingsconcrete curb (stained) and footing

painted steel plate

5x5 HSS steel ribs, painted

painted steel bent plate

stainless steel mesh

counter-sunk screws

VARI

ES

1' - 0"

mesh seam location

stainless steel mesh

5x5c3/8HSS rib, painted

steel plate (3"x3/8")netting "clamp bar"

A

STUCCO FINISH

METAL LATH

10" FULLY-GROUTED CMU BLOCK

STEEL ANGLE

STEEL PRESSURE PLATE

SLOPED SANDSTONE COPING

SLOPED MORTAR BED

1/2" MORTAR SCRATCH COAT

1/2" MORTAR SETTING BED

2" SANDSTONE VENEER

STAINLESS STEEL MESH

WATERPROOFING

HSS RIB, BEYOND

A

STAINLESS STEEL MESH, BEYOND

HSS RIB, BEYOND

STUCCO FINISH

METAL LATH

STAINLESS STEEL MESH O/ SHADE CLOTH

2x1 HSS SUPPORT TRELLIS2" SANDSTONE VENEER

1/2" MORTAR SETTING BED

1/2" MORTAR SCRATCH COAT

WATERPROOFING

SLOPED SANDSTONE COPING

SLOPED MORTAR BED

8" FULLY-GROUTED CMU BLOCK

0' - 1"

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

BGE DETAILS

A2.60

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1 1/2" = 1'-0"A2.60

2 CONCRETE CURB DETAIL

6" = 1'-0"A2.60

1 NETTING TO FRAME CONNECTION - AXONOMETRIC

3" = 1'-0"A2.603 T.O. NORTH WALL @ BGE

3" = 1'-0"A2.604 T.O. VESTIBULE WALL, TYP.

Page 14: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

BGE RENDERING

A2.90

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

BUTTERFLY GARDEN EXHIBIT - LOOKING EAST

Page 15: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

(E) WALL OR STRUCTURE TO REMAIN

WALL

FLOOR PLAN LEGEND

(E) WINDOW/DOOR TO BE REMAIN

WINDOW/DOOR

? KEYNOTE#

SECTION & ELEVATION LEGEND

WC (E)

SUPPORT &STORAGE

298' - 0"

298' - 0"

NOTE: PROVIDE FIRE SPRINKLERS THROUGHOUT. NO ADDITIONALPROPOSED INTERIOR IMPROVEMENTS AT MACVEAGH COTTAGE

1.0

1.1

CLUBHOUSE/WOODLAND

CENTER

STOR (E)

1.1

SEE SHEET L1.2 FOR INFORMATIONON DECK AND RAIL

DOOR FIXED IN PLACE

NOTE: MACVEAGH COTTAGE TO BE PAINTEDTHE FOLLOWING:CALIFORNIA PAINTS - 20TH CENTURY COLORS1900-1920, ARTS & CRAFTS/ CRAFTMENCOLLECTIONHOUSE: CLAM SHELLTRIM: WHITE TO MATCH EXISTING

MACVEAGH COTTAGE STORAGEDOOR STYLE TO MATCH EXISTING

2' - 6"

6' - 9

"

2' - 1

"2'

- 8"

MV COTTAGE LEVEL298' - 0"

1.0

SEE SHEET L1.2 FOR INFORMATIONON DECK AND RAILING

NOTE: MACVEAGH COTTAGE TO BE PAINTEDTHE FOLLOWING:CALIFORNIA PAINTS - 20TH CENTURY COLORS1900-1920, ARTS & CRAFTS/ CRAFTMENCOLLECTIONHOUSE: CLAM SHELLTRIM: WHITE TO MATCH EXISTING

MACVEAGH COTTAGE MAIN ENTRYDOOR STYLE TO MATCH EXISTING

6' - 6

"

3' - 0"

2' - 5

"2'

- 1"

602

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

BACKYARD/MACVEAGHCOTTAGE - PLAN &

ELEVATIONS

A3.10

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"A3.10

1 MACVEAGH COTTAGE - ENLARGED FLOOR PLAN 1/4" = 1'-0"A3.10

2 MACVEAGH COTTAGE - NORTH ELEVATION

1/4" = 1'-0"A3.103 MACVEAGH COTTAGE - EAST ELEVATION

602 HISTORIC LIGHT FIXTURE (TYP), REFERENCELIGHTING DRAWINGS

KEYNOTES

Page 16: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

8' - 6" 2' - 0"

0' - 6

"

7' - 6

"

STUCCO CLAD CMU WALLS, TYP

0' - 6

"0'

- 9"

WOOD GATE ON STEEL FRAME, PAINT DARK BROWN

EQEQ

28' - 0"

2' - 3

"2'

- 3"

1' - 6"

6' - 9

"

7' - 6

"

0' - 3

"7'

- 0"

WOOD GATE ON STEEL FRAME,PAINT DARK BROWN

A4.10

1

A4.103

A4.10 2

31' - 6"

3' - 6" 28' - 0" 2' - 0"

8' - 6

"2'

- 0"

10' -

6"

3' - 0"

3' - 0

"

PARKING LOT

NEW ADA PARKING STALL

951TYP

NEW LANDSCAPE

PERMEABLE PAVERS

FLAGSTONE

BOARDWALK

ENGINEERED WOOD FIBER

SITE MATERIALS

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

TRASH ENCLOSURE

A4.10

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"A4.103 TRASH ENCLOSURE - EAST ELEVATION

1/4" = 1'-0"A4.10

1 TRASH ENCLOSURE - NORTH ELEVATION

1/4" = 1'-0"A4.102 TRASH ENCLOSURE WEST ELEVATION

1/8" = 1'-0"A4.10

4 MAIN LEVEL PLAN - WEST - TRASH

951 SITE LIGHT FIXTURE, REFERENCE LIGHTING DRAWINGS

KEYNOTES

Page 17: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

(E) WALL OR STRUCTURE TO REMAIN

WALL

FLOOR PLAN LEGEND

(E) WINDOW/DOOR TO BE REMAIN

WINDOW/DOOR

REFER TO CIVIL & LANDSCAPE DRAWINGS FOR ALL SITEIMPROVEMENT SCOPEREFER TO SHTS C-1 AND C-2 FOR RAMP AND SLOPEDWALKWAY SLOPES AND CROSS-SLOPES

GENERAL NOTES

A5.10

2

ADMISSIONS(E)

HALL (E)

DATA (E)VESTIBULE

(E)

GOULD HALL(E)

MINERAL &GEM (E)

COURTYARD(E)

EGRESS HARDWARE, FINISHEDTO MATCH (E) IRON, SEERENDER & REFERENCE IMAGE

PERFORATED STEELKICKPLATE, FINISHED TOMATCH (E) IRON, SEE RENDER

EXAMPLE PANIC HARDWARE,DARK BRONZE, FINISHED TOMATCH (E) IRON

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

MAINENTRY/ADMISSIONS

A5.10

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1" = 80'-0"

KEY PLAN N

1/4" = 1'-0"A5.101 ADMISSIONS & GOULD HALL RAMP - ENLARGED PLAN

1/4" = 1'-0"A5.102 MAIN PLAZA GATE - NORTH ELEVATION

12" = 1'-0"A5.103 MAIN PLAZA GATE - RENDER

12" = 1'-0"A5.104 MAIN PLAZA GATE - EGRESS HARDWARE - REFERENCE IMAGE

Page 18: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

MAIN ENTRY PLAZARENDERING

A5.90

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

MAIN ENTRY PLAZA - LOOKING SOUTHEAST

Page 19: SANTA BARBARA MUSEUM OF NATURAl HISTORY€¦ · santa barbara museum of natural history 1508 january 2016 design development site plan a1.10 2559 puesta del sol santa barbara, ca

A6.10

2

GIFT SHOP GIFT SHOP(E)

ADMISSIONS(E)

COURTYARD(E)

HALL (E)

(E) GATE USED INPLACE, MODIFIED TOACCOMMODATEEGRESS WIDTH ANDHARDWARE

REFER TO CIVIL & LANDSCAPE DRAWINGS FOR ALL SITEIMPROVEMENT SCOPEREFER TO SHTS C-1 AND C-2 FOR RAMP AND SLOPEDWALKWAY SLOPES AND CROSS-SLOPES

GENERAL NOTES(E) WALL OR STRUCTURE TO REMAIN

WALL

FLOOR PLAN LEGEND

(E) WINDOW/DOOR TO BE REMAIN

WINDOW/DOOR

(E) HISTORIC GATE LEAFS,COMBINED INTO ONE

PERFORATED STEEL KICKPLATE,FINISHED TO MATCH (E) IRON

EGRESS HARDWARE, FINISHED TO MATCH(E) IRON, SEE REFERENCE IMAGE

EXAMPLE PANIC HARDWARE,DARK BRONZE, FINISHED TOMATCH (E) IRON

www.saarch.com

PrincipalProject Manager

Drawn ByReviewed By

Job No.

Revisions:No. Date By

c 2016 schacht | aslani architects

tel (206) 443-3448, fax (206) 443-3471

901 Fifth Ave

Seattle, WA 98164Suite 2720

schacht aslani architects

NOT FORCONSTRUCTION

SAN

TA B

ARBA

RA M

USE

UM

OF

NAT

URA

l HIS

TORY

1508

JANUARY 2016

DESIGNDEVELOPMENT

MAIN ENTRY

A6.10

2559

Pue

sta

Del S

olSa

nta

Barb

ara,

CA

WSCCAS

1/4" = 1'-0"A6.10

1 MAIN ENTRY - ENLARGED PLAN

1/2" = 1'-0"A6.102 MAIN ENTRY GATE - NORTH ELEVATION

N 1" = 80'-0"

KEY PLAN

12" = 1'-0"A6.103 MAIN ENTRY GATE - EGRESS HARDWARE - REFERENCE IMAGE


Recommended