SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT Draft Environmental Impact Report (EIR)/Environmental Assessment (EA) and Section 4(f) Evaluation Public Scoping Meeting
Transcript
Page 1: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT

Draft Environmental Impact Report (EIR)/Environmental Assessment (EA) and Section 4(f) Evaluation

Public Scoping Meeting

Page 2: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

AGENDA

Project Overview and Alternatives

CEQA Overview

EIR Process

Resource Areas to be Studied

Page 3: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

PURPOSE OF PROJECT

Replace Structurally Deficient and Functional

Obsolete Vehicular Bridge

Design Bridge for Vehicular/Seismic Loading

Improve Public Safety

Page 4: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

PROJECT SITE

CAROUSSEL PARK

Page 5: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

ALTERNATIVES

Alternative 1: One Bridge One 58’ Wide Bridge With All Travel Modes (vehicles, bicycles and pedestrians) Temporary vehicular bridge at Moss Avenue during construction for vehicular access Temporary pedestrian bridge connecting Ocean Avenue to the Pier at the north or south

side of the existing bridge.

Alternative 2: One Bridge One 58’ Wide Bridge With All Travel Modes (vehicles, bicycles and pedestrians) Temporary vehicular ramp at 1550 Parking Lot during construction for vehicular access Temporary pedestrian bridge connecting Ocean Avenue to the Pier at the north or south

side of the existing bridge.

Alternative 3: Two Bridges One – 34’ Wide Bridge for mainly Pedestrian and Bicycle, with emergency vehicle/ limited

access at the existing location, including a path in compliance with Americans with Disabilities Act (ADA)

One New Permanent Bridge at Moss Avenue for main vehicle access to the Pier and Parking Temporary pedestrian bridge connecting Ocean Avenue to the Pier at the north or south

side of the existing bridge.

Page 6: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

ALTERNATIVE 1

Moss Ave Temp Bridge

Page 7: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

ALTERNATIVE 2

Page 8: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

ALTERNATIVE 3

Page 9: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

NOP Filing Date: December 11, 2014 CEQA LEAD AGENCY: City of SANTA MONICA NEPA LEAD AGENCY: CALTRANS

PURPOSE OF NOTICE OF PREPARATION • Announce that an EIR/EA has been initiated • Describe the proposed project • Provide information on known or likely environmental effects of the project • Start Scoping Process

PURPOSE OF SCOPING PERIOD • Obtain agency and public input on scope and content of the EIR/EA • Identify range of actions, alternatives, mitigation measures, and significant

effects to be analyzed in the EIR/EA

• Identify potential issues early in the environmental review process

ENVIRONMENTAL PROCESS

Page 10: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

CITY & CALTRANS REVIEWS

CITY & CALTRANS REVIEWS

THE ENVIRONMENTAL IMPACT REPORT (EIR)/ ENVIRONMENTAL ASSESSMENT (EA) & SECTION 4(f) PROCESS

PREPARE& CIRCULATE

PREPARE & CIRCULATE

Page 11: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

• Aesthetics / Visual • Air Quality • Construction Impacts • Cultural Resources • Economic and Social Impacts • Geology / Soils • Greenhouse Gas Emissions • Neighborhood Effects • Community Impacts • Hydrology / Water Quality • Land Use / Planning • Hazards and Hazardous Materials • Noise

• Public Services • Recreation • Paleontology • Transportation, Traffic and Circulation • Utilities / Service Systems • Mandatory Findings of Significance • Section 4(f) Evaluation • Energy • Biological Environment • Cumulative Impacts • Growth

Page 12: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

ONLINE INFORMATION

www.smgov.net/smpierbridge www.smconstructs.org/smpierbridge

www.Facebook.com/SMConstructs

Twitter: www.twitter.com/SMConstructs

Page 13: SANTA MONICA PIER BRIDGE REPLACEMENT PROJECT · by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street,

Deadline for comments in writing, by 5:30 p.m. on February 2, 2015

Selim Eren, P.E., Civil Engineer City of Santa Monica

Civil Engineering Division 1437 4th Street, Suite 300, Santa Monica, CA 90401

e-mail: [email protected]