+ All Categories
Home > Documents > SAP Plant Maintenance (PM) Process Innovation and … · Process Innovation and Related Winshuttle...

SAP Plant Maintenance (PM) Process Innovation and … · Process Innovation and Related Winshuttle...

Date post: 21-Apr-2018
Category:
Upload: buibao
View: 219 times
Download: 3 times
Share this document with a friend
13
SAP Plant Maintenance (PM) Process Innovation and Related Winshuttle Best Practices Brandi Czerniewski, ConocoPhillips
Transcript

SAP Plant Maintenance (PM)

Process Innovation and

Related Winshuttle

Best Practices

Brandi Czerniewski,

ConocoPhillips

About ConocoPhillips

• Integrated Energy Company

– Exploration & Production

– Refining, Marketing, Supply &

Transportation

– Natural Gas Gathering,

Processing & Marketing

– Chemicals & Plastics

• 29,600 Employees in more

than 30 countries

About Brandi Czerniewski

• Hired in May 2006 as Analyst on TMT

Technology Integration Project

• SAP PM Analyst: August 2007 – March 2009

• SAP PS Analyst: March 2009 – 2011

• SAP Repositioning Effort – 2011 - Present

• Lead COP Bartlesville Women’s Network

ConocoPhillips SAP Implementation

0

10

20

30

40

50

60

70

80

90

100

To

tal S

AP

Syste

ms .

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

SAP System Growth - ConocoPhillips

ERP BI SRM GTS

Portal SCM LiveCache PI

MDM Optimizer GW Solution Mgr External Supplier Portal

External Supplier SCM Internal and External SLD External Web App Server

• Single SAP instance worldwide

• Global implementation: Bartlesville. Europe/Middle East/Africa, Asia Pacific regions

ConocoPhillips WinShuttle Implementation

• CENTRAL 10.1 – License Management

– Reporting

– Template Storage

– Policies and Roles

• TRANSACTION 10.1 – 3 North America

– 1 Europe/Middle East/Africa

– 1 Asia Pacific

• RUNNER Users (62) – Downstream

– Upstream

– Corporate Staffs

Supporting Processes

• License Approval

• Template Approval

– New

– Changes

• Template Testing

• Template Design & Storage

Process Flow

Gate

keeper

TR

NA

SA

CT

ION

SA

P S

upp

ort

Busin

ess

Review

Request

Initiate

Request

Technical

Evaluation Possible?

Stop

No

Review

Request

Yes

Rejected

Create/Modify

Template

Test

Template

Test

Template

Continue

Stop

Approved

Publish &

Document

ConocoPhillips WinShuttle Statistics

• Loads run on 14 environments

• Used on 125 transactions

• 3,041,227 records uploaded (since 1/2011)

• Saved 52,684 hours (since 1/2011)

• PM Records Total: 1,697,859

Mid-Continent Business Unit Cleanup

• 12 Sites over Lower 48

• 50 K – 100 K records per site

• Defined order for 10 – 15 templates

Example 1

Example 2

MCBU (Continued)

CENTRAL Best Practices

• Role of Workflow

• Lessons Learned

• Training

– RUNNER

– TRANSACTION

Exploring New Areas

• Projects

– Security Cleanup

– MM Tolerance Reset

– SAP Repositioning

• Configuration

– Company Code Setup

– SD Table Maintenance

Questions?


Recommended