Dell|SAP project sizing information
where to get help If you need help understanding this form please email [email protected]
where to send this Once you have completed the form please email it to [email protected]
This form is designed to reflect SAP's Quick Sizer tool as of March 2006.
Version 4 (3/20/06)
The aim of this sizing form is to provide a structure for entry of the information required to size the required hardware for an SAP project. The form is based off SAP's Quick Sizer, as are most of the help texts - the text of these are reproduced from Quick Sizer with permission of SAP. No sizing calculations are generated as part of the form, SAP's Quick Sizer is used to generate the sizing in SAPS, their standarised load base. The form being provided as a convenience to enter the required input. SAP might make changes to their Quick Sizer tool that are not reflected in this form. SAP's service marketplace should be seen as the authoritive place for sizing information and notes.
Sizing the architecture for a SAP implementation is vital to the success of a SAP implementation. Sizing is an iterative process and should be revisited as you make discoveries through the phases of your implementation.
There are two types of sizing that can be performed - a User-Based Sizing or a Transactional-Based sizing. It is best to provide both user information as well as transactional information to get the most accurate sizing result.
A user-Based sizing is typical in the beginning of a project, with the mix and usage of modules and users. Although a user-based sizing can be reflective of what will be seen by production go-live, it is best to re-visit the sizing with any updated information to verify that the original planned architecture is still valid. Once transaction information and other particulars are discovered through the various phases of the implementation, the sizing should be checked to determine if any of these discoveries require any changes in the architecture design.
The sizing information requested in this document is based on the most current SAP sizing methodology. Customers that require a sizing for any other solution based on solutions not covered in this SAP Sizing Request Form should contact their Dell representative or send an email to [email protected] to get further information.
In areas such as BW's InfoCubes and ODS objects, where more object descriptor lines might be need than are provided, insert new lines in the appropriate section of the worksheet.
Version [email protected]
Project Information
Project information
Company
Address
Phoneemail
Phoneemail
Dell customer?Dell contact name
Start date - PRDStart date - Pilot
Landscapes
Unicode
Landscape Y/N %PRD DBProduction 100%QASDEVTRNSBX
Database Exisiting DB size
Operating system
Primary Contact name
SecondaryContact name
Version [email protected]
Project Information
Availability
BackupBackup windowBackup media
High availbility?
DR site?
Front End
Windows based GUIBrowser GUILAN WAN
CRMERPFinancialsHuman resourcesPLMSRMSCMNetweaver
Storage
Fibre based storageUse existing storage array?SCSI storageTape archive? TypeBackup to disk?Use snapshots or clones?
Acceptable downwindow (Hours)
Dell Inc.SAP sizing form
Version [email protected]
Existing QuickSizer?
Existing project in SAP's Quick Sizer
Customer numberProject name
If there is already a project entered in to SAP's Quick Sizer tool then those numbers do not have to be re-entered on this form.
Dell Inc.SAP sizing form
Version [email protected]
CRM
Customer Relationship Management
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
User Based sizing
Users of: Low Medium High Highest number of concurrently active usersActivity ManagementOppurtunity ManagementSales Transactions Service Transactions
Should be less than or equal to the total of the first four lines
Mobile#Users who synchronise/hour
Internet Browse Catalog Shop/Use basket#users in Internet Sales
Throughput - Standard sizing
Average #orders per year Number Line items %change %view Retention (months)Internet Sales 60Mobile sales & service 0Customer Orders 0Service Orders 0
Peak period orders Number Line items %change %view Retention (months) Start End HoursInternet Sales 0Mobile sales & service 0 0Customer Orders 0 0Service Orders 0
How many of these use the Interaction Center
Dell Inc.SAP sizing form
Version [email protected]
CRM
Throughput - Standard sizing (no line items)
Number %change %view Retention (months)ActivitiesCalls & EmailsOpportunities
Number %change %view Retention (months) Start End HoursActivities 0Calls & Emails 0Opportunities 0
%change The percentage of objects that will be changed during their retention period
%viewRetention For how many months the objects will remain in the databaseLow users Instigate SAP server activity every two minutesMedium users Instigate SAP server activity every thirty secondsHigh users Instigate SAP server activity every ten seconds
Interaction Center activity (per year)
Peak period Interaction Center activity
The percentage of objects that will be viewed during their retention period. If each object were viewed two times then that would be 200%
Comments:
Dell Inc.SAP sizing form
Version [email protected]
ERP - FI
Enterprise Resource Planning - Financials
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Concurrent Active Users
Low Medium HighCO usersFI users
Throughput - average
Element #objects Items %change %view RetentionCO-PA-BILCO-PA-FICO-PA-SLSCOEC-PCAFIN-BAC
Throughput - peak
Element #objects Items %change %view Retention Start End HoursCO-PA-BIL 0CO-PA-FI 0CO-PA-SLS 0CO 0EC-PCA 0FIN-BAC 0
Dell Inc.SAP sizing form
Version [email protected]
ERP - FI
Throughput - background jobs
Element #objects Start End HoursCO-OM 0CO-OM-RATE 0CO-OM-SETT 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
ERP - HCM
Enterprise Resource Planning - Human Capital Management
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Concurrent Active Users
Low Medium HighPA usersPD users
Throughput - payroll
Element #objects Start End HoursHCM-PT 0HCM-PY 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
ERP - Logistics
Enterprise Resource Planning - Logistics Execution
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Concurrent Active Users
Low Medium HighLE users
Throughput - average
Element #objects Items %change %view RetentionLE-WMLE-SHP
Throughput - peak
Element #objects Items %change %view Start End HoursLE-WM 0LE-SHP 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
ERP - Product Dev Exec
Enterprise Resource Planning - Product Development and Execution
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Concurrent Active Users
Low Medium HighALM usersMM usersPP usersPS usersQM users
Throughput - average
Element #objects Items %change %view RetentionALM-PMMM-IMMM-PURPP-CONFPP-REMPP-SFCQM-IM
Throughput - peak
Element #objects Items %change %view Start End HoursALM-PM 0MM-IM 0MM-PUR 0PP-CONF 0PP-REM 0PP-SFC 0QM-IM 0
Throughput - Project System
Element #objects WBS Networks Activities %change %view Retention Start End HoursPS - annual 0PS - peak 0
Dell Inc.SAP sizing form
Version [email protected]
ERP - Product Dev Exec
Throughput - Material Requirements Planning
Element Planned orders Reorder %LTS Start End HoursMRP RUN 0
Dell Inc. 2006
Comp/BOM
Non-reorder
PLhorizon
BOM changes
%Depend-encies
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
ERP - Sales Service
Enterprise Resource Planning - Sales & Service
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Concurrent Active Users
Low Medium HighCS usersSD users
Throughput - average
Element #objects Items %change %view RetentionCS-AGSD-CUSTSD-BILSD-POSSD-SLS
Throughput - peak
Element #objects Items %change %view Start End HoursCS-AG 0SD-CUST 0SD-BIL 0SD-POS 0SD-SLS 0
Throughput - ICM Case processing
Element Commcases RemC Retention Start End HoursICM Case - annual 0ICM Case - peak 0
Throughput - ICM Document Posting
Element Documents RemD Retention Start End HoursICM Doc - annual 0ICM Doc - peak 0
Dell Inc.SAP sizing form
Version 4 [email protected]
ERP - Sales Service
Throughput - ICM Settlement
Element Settlement Items CommContr Start End HoursICM Set - annual 0ICM Set - peak 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
ERP - Corporate services
Enterprise Resource Planning - Corporate Services
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Throughput - Standard sizing
Element #objects Items %change %view Retention Start End HoursTV-RECEIPT (annual) 0TV-RECEIPT (peak) 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
SCM - Demand Planning
Supply Chain Management - Demand Planning
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
APO - Planning area sizing
Element Char/Com Key fig. Periods Compression Time Comp. periods Planning versionsTimeseries 3 1
APO - Planning run sizing
Element Char/Com Time Start End HoursDemand Planning Batch run 0
APO - Additional users (peak)
Element #users Start End HoursDP Users 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
SCM - Supply Product Planning
Supply Chain Management - Supply & Product Planning
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
APO - Master Data
Element Location products ResourcesMaster Data
APO - Warehouse Stocks
Element ObjectsStock
APO - Planned Orders
Element Objects Comps Operations Activities Alternate ParellelPlanned Orders
APO - Sales & Purchase Orders
Element Objects Sub-objectsForecast OrdersPurchase OrdersSalese OrdersTransfer Orders
APO - Planning run sizing (peak)
Element #SKUs Time buckets Start End HoursSNP Heuristic Planning run 0
Dell Inc.SAP sizing form
Version [email protected]
SCM - Supply Product Planning
APO - Additional users (peak)
Element #users Start End HoursPP Users 0SNP Users 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
SCM - Order Fullfillment
Supply Chain Management - Order fulfillment
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
APO - Location Products (peak)
Element Location products Start End HoursATP-MD 0
APO - Available to Promise checks
Element Requests Start End HoursATP-CP 0ATP-Rule 0ATP-Simple 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
SCM - Inventory hub
Supply Chain Management - Inventory Hub
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
APO - Location Products (peak)
Element Location products Start End HoursICH-MD 0
APO - Message processing with period
Element Messages Products Periods RetentionICH-DSICH-PROACT
APO - Message processing with period (peak)
Element Messages Products Periods Start End HoursICH-DS 0ICH-PROACT 0
APO - Message processing
Element Messages Products Periods RetentionICH-ASNICH-GR
APO - Message processing (peak)
Element Messages Products Periods Start End HoursICH-ASN 0ICH-GR 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
SCM - ECC integration
Supply Chain Management - ECC integration
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
`APO - Orders replicated to/from ECC
Element Objects line items Start End HoursPI-PROD 0PI-SALES 0PI-PURCH 0PI-STOCK 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
SRM
Supplier Relationship Management
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Concurrent Active Users
Low Medium HighCTRCT usersPLAN usersCLASSIC usersSourcing usersService users
Throughput - average
Element #objects Items %change %view RetentionSRM-CNTRCTSRM-PLANCLASSICEXTENDEDSRM-SERVIC
Throughput - peak
Element #objects Items %change %view Start End HoursSRM-CNTRCT 0SRM-PLAN 0CLASSIC 0EXTENDED 0SRM-SERVIC 0
Dell Inc.SAP sizing form
Version [email protected]
SRM
Throughput - Strategic Sourcing
Element Bid invit items %change %view Retention Start End HoursSourcing - annual 0Sourcing - peak 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
IS - Insurance
Industry solutions - Insurance
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Throughput Based sizing
Element Number Items %change %view Retention (months)Account statements 60DunningsInsurance invoices
Element Number Items Start End HoursAccount statements 0Dunnings 0Insurance invoices 0
Throughput - Subledger
Element Postings BP items GL items (posting) Payments GL items (payments) Retention
UTIL-MD-01
Throughput - no line items
Element Number %change %view Retention (months)Broker report items 60CD-PL payment lotsPAY-EXE payment plan execPAY-TRANS PAY-RUN
Element Number Start End HoursBroker report items 0CD-PL payment lots 0PAY-EXE payment plan exec 0PAY-TRANS 0PAY-RUN 0
Dell Inc.SAP sizing form
Version 4 [email protected]
IS - Insurance
Throughput - Background Processes
Element Objects Start End HoursACC-BAL 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
IS - Utilities
Industry solutions - utilities
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Throughput - Master Data (mandatory)
Element Billing Budget Partial Partial line Consumption Info Contracts Taxes Contr acct Meters Retention
UTIL-MD-01
Throughput - Master Data (optional)
Element Business Partners Overdue notices Deposits Customer Contacts Retention
UTIL-MD-02
Throughput - Background Processes
Element Business Partners Days Start End HoursUTIL-BP 0
Throughput Based sizing
Average #orders per year Number Retention (months)Customer overviews 60Customer ContactsMove InMove Out
Peak period orders Number Start End HoursInternet Sales 0Mobile sales & service 0 0Customer Orders 0 0Service Orders 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
Enterprise Portals
Enterprise Portals
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
`Active Users - Enterprise Portal
Element Conc users Think time Java iV URL iV %KMCESS 1INT 211 3PCC 3PRT
Active Users - Enterprise Portal Logon
Max logons per hour
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
Business Intelligence
Business Intelligence
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Throughput - User groups of SEM-BPS
Element Users steps change max - onestep max - data Start End HoursSEM-BPS1 6 30000 60000 200000 0SEM-BPS2 0 12 15000 30000 100000 0SEM-BPS3 0 30 5000 10000 25000 0
Throughput - Query & User distribution
Element Users %Reporting %OLAP %Data explorationBW-INFO 80 20BW-EXEC 0 50 50BW-POWER 0 100
Throughput - Data upload to BW server
Element Objects Parallel upload Start End HoursUpload 0 0
Throughput - Definition of Infocubes
Element Dimension Key Fig Initial Load Periodic load PeriodsInfocube 0 0IC-APO 8 23 0IC-CO 8 34 0IC-CRM 12 27 0IC-FI 6 43 0IC-HR 10 11 0IC-MM 11 13 0IC-PP 8 78 0IC-PS 2 3 0IC-SD 11 27 0IC-SEM 13 68 0
Dell Inc.SAP sizing form
Version [email protected]
Business Intelligence
Throughput - Definition of ODS objects
Element Numeric Text Initial Load Periodic load PeriodsODS 0 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
Exchange Infrastructure
Exchange Infrastructure
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Initial Throughput Based sizing
Peak period messages Avg size Number Async/Sync %BPM Start End HoursXI messages asynchronous 0
Advanced Throughput Based sizing
Peak period messages Avg size Number Async/Sync Routing Mapping Ack Pattern %BPM In Out Start EndXI messages asynchronous Mapping tool
Throughput Based sizing - Non Central Adapter Engine
Peak period messages Avg size Number Async/Sync Ack In Out Start EndXI messages asynchronous
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version 4 [email protected]
Application server
Application server
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
Concurrent Active Users
Low Medium HighBC usersBWP users
Throughput - annual, without line items
Element #objects %change %view RetentionBC - PRINT
Throughput - peak, without line items
Element #objects %change %view Start End HoursBC-PRINT 0
Throughput - annual, Businessworkplace
Element #objects items ExtRecp IntRecp %change %view RetentionBWP
Throughput - peak, Business workplace
Element #objects items ExtRecp IntRecp %change %view Start End HoursBWP 0
Dell Inc. 2006
Comments:
Dell Inc.SAP sizing form
Version [email protected]
TREX
Standalone NW engines
Start Stop HoursAverage workday 8 17 9 Workdays per year 250Peak hours 10 12 2
`
TREX
Element searches Start End HoursTREX 0
Total Size of documents to be searched (GB)
Dell Inc. 2006
Comments: