SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
BP Naik, Project Manager , ERPS Mohanty, AGM(Systems)
BUILDING INTEGRATED PROCESSES FOR EFFICIENT MANUFACTURING
Case Study at National Aluminium Company Limited
8/2/2019 SAP_NALCO
2/49
IBM System x
AGENDA
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Project & Change Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
3/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
4/49
IBM System x
NATIONAL ALUMINIUM COMPANY LTD
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
I N C O R P O R A T E D I N 1 9 8 1 .
A N A V A R A T N A P S U .
A P R E M I E R T R A D I N G H O U S E .
L A R G E S T I N T E G R A T E D A L U M I N A - A L U M I N I U M C O M P L E X I N A S I A .
O N E A M O N G T H E L O W E S T C O S T P R O D U C E R S .
E X P O R T T O O V E R 3 0 C O U N T R I E S .
I S O 9 0 0 2 & I S O 1 4 0 0 1 C E R T I F I E D U N I T S .
A L L T H E P R O D U C T I O N U N I T S A N D C O R P O R A T E O F F I C E S A 8 0 0 0 C E R T I F I E D .
1 S T C O M P A N Y I N T H E C O U N T R Y W I T H L O N D O N M E T A L E X C H A N G E
R E G I S T R A T I O N S I N C E 1 9 8 9 . P R O F I T M A K I N G P S U S I N C E I N C E P T I O N
T U R N O V E R O F I N R 6 3 7 0 C R O R E , P A T O F I N R 1 0 6 9 C R O R E D U R I N G 2 0 1 1
H U M A N R E S O U R C E 7 4 0 0 S T R O N G
ABOUT NALCO
8/2/2019 SAP_NALCO
5/49
LOCATIONS
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
New DelhiJaipur
Silvasa
Mumbai
Bhiwandi
Bangalore Chennai
Visakhapatnam
Damanjodi
Bhubaneswar
Angul
Kolkata
Registered Office
Regional Offices
Production Centres
Ports
Bauxite Mines
Stockyards
FaridabadBaddi, HP
8/2/2019 SAP_NALCO
6/49
MARKET REACH
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
7/49
MANUFACTURING PLANTS
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8 T H L A R G E S T B A U X I T E D E P O S I T I N T H E W O R L D .
L O W E N E R G Y C O N S U M P T I O N .
4 8 L A K H T P Y C A P A C I T Y - B E I N G E X P A N D E D T O 6 3 L A K H T P Y .
M E C H A N I Z E D M I N E S W I T H H I G H P R O D U C T I V I T Y .
T R A N S P O R T T H R O U G H S I N G L E L I N E M U L T I - C U R V E C A B L E B E L T ( 1 4 . 6 K M ) .
1 0 0 % C A P A C I T Y U T I L I Z A T I O N .
Bauxite Mine
8/2/2019 SAP_NALCO
8/49
MANUFACTURING PLANTS
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
1 5 . 7 5 L A K H T P Y C A P A C I T Y - B E I N G E X P A N D E D T O 2 1 L A K H T P Y .
A M O N G T H E L O W E S T C O S T P R O D U C E R S .
S P L . H Y D R A T E S , S P L . A L U M I N A A N D Z E O L I T E A D D E D .
C O - G E N E R A T I O N P O W E R O F 5 5 . 5 M W F R O M P R O C E S S S T E A M B E I N G E X P A N D E D T O 7 4 M W . 1 0 0 % C A P A C I T Y U T I L I Z A T I O N .
U P - G R A D A T I O N O F 4 T H S T R E A M T O I N C R E A S E C A P A C I T Y T O 2 2 . 7 5 L A K H T P Y .
Alumina Refinery
8/2/2019 SAP_NALCO
9/49
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
M O D E R N T E C H N O L O G Y F R O M A P , F R A N C E .
C A P A C I T Y E X P A N D E D F R O M 3 . 4 5 L A K H T P Y T O 4 . 6 L A K H T P Y
I N T E G R A T E D A N O D E M A K I N G , A L U M I N I U M C A S T I N G A N D R O L L I N G .
I N G O T S , B I L L E T S , W I R E R O D S , S O W S & S T R I P C O I L S .
5 0 , 0 0 0 M T C A P A C I T Y R O L L E D P R O D U C T S U N I T .
T E E I N G O T C A S T I N G F A C I L I T Y O F 6 0 , 0 0 0 M T P Y
H Y P E R D E N S E P H A S E S Y S T E M ( H D P S ) F O R A L U M I N A F E E D I N G .
MANUFACTURING PLANTS
Aluminium Smelter
8/2/2019 SAP_NALCO
10/49
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
C A P A C I T Y E X P A N D E D F R O M 9 6 0 M W T O 1 2 0 0 M W
L O W C O S T O P E R A T I O N .
H I G H P L A N T L O A D F A C T O R .
A D V A N C E D E L E C T R O S T A T I C P R E C I P I T A T O R ( 9 9 . 9 % E F F I C I E N C Y ) T O C O N T R O L P O L L U T I O N .
Z E R O D I S C H A R G E O F E F F L U E N T S .
H I C H C O N C E N T R A T E S L U R R Y D I S P O S A L ( H C S D ) S Y S T E M F O R A S H D I S P O S A L .
MANUFACTURING PLANTS
Thermal Power Plant
8/2/2019 SAP_NALCO
11/49
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
V I Z A G :
C A P A C I T Y T O H A N D L E S H I P S U P T O 3 5 , 0 0 0 D W T .
M E C H A N I Z E D M O B I L E S H I P L O A D E R . M E C H A N I Z E D S T O R A G E F A C I L I T I Y .
E X P O R T O F A L U M I N A A N D I M P O R T O F C A U S T I C S O D A .
O T H E R S :
E X P O R T O F A L U M I N I U M T H R O U G H K O L K A T A & P A R A D I P P O R T S .
Port Facility
PORT FACILITY
8/2/2019 SAP_NALCO
12/49
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
PRODUCTS
8/2/2019 SAP_NALCO
13/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
14/49
IBM System x
BUSINESS CHALLENGES - ENVIRONMENT
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
COMPETITION FROM MULTINATIONAL COMPANIES IN DOMESTIC MKTHEAVY LOAD ON RAILWAYS/PORT DUE TO HIGH INDUSTRIALISATION IN REGIONINCREASE IN PRICE OF PRINCIPAL INPUTSMARKETS CONSTRAINED TO REGIONS CLOSE TO INDIA TRANSPORTATION COSTS
LACK OF INTEGRATION BETWEEN PROCESSESLACK OF UNIFORMITY ACROSS UNITSPERSON-CENTRIC PROCESSESLACK OF PROCESS METRICSLIMITED CONTROLS PROCESS INEFFICIENCY DUE TO NON-VALUE-ADDED COMPONENTS
SOME MARKET CHALLENGES
SOME PROCESS CHALLENGES
8/2/2019 SAP_NALCO
15/49
IBM System x
BUSINESS CHALLENGES -TECHNOLOGY
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
HIGHLY CUSTOMISED PACKAGESNON-UNIFORM PLATFORMS : SYBASE ,APT, POWERBUILDER,FOX,CRYSTALREPORTDISPARATE SYSTEMS UNDER DISTRIBUTED CONTROLNO VERSION CONTROL
LIMITED SOFTWARE ENGINEERING / MANAGEMENT CONCEPTSHIGHER APPLICATION MAINTENANCE EFFORTTHREAT OF OBSOLESCENCE /IRRELEVANCE SYBASE, POWERBUILDERNON-STANDARD IT HARDWARE/INFRASTRUCTURE
8/2/2019 SAP_NALCO
16/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Future Directions
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
17/49
IBM System x
SAP LANDSCAPE
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
IBM P550 Series
IBM SystemSTORAGE
DS4700
SRM 5
SCM-APO
DEVELOPMENT,QUALITY,SOLMAN
ECC 6 PROD
BI
EP
IBM System X 3650
IBM BLADE JS21
IDES
IBM P550 Series
IBM P550 Series IBM P550 Series
IBM P550 Series
IBM P510 Series
APPLICATIONSERVER
500USERS
8/2/2019 SAP_NALCO
18/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
19/49
IBM System x
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
INVENTORY
MANAGEMENT
RECEIVE,STORE AND
ISSUE
GOODS
PORTCLEARING
ANDDESPATCH
OSRDCLAIMS &
INSURANCE
PROCUREMATERIAL
RAISEAND
APPROVEINDENT
INDIRECTTAXES
PROCESSES ENABLED THROUGH SAP
Materials Management
8/2/2019 SAP_NALCO
20/49
IBM System x
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
CUSTOMERMASTER
MAINTENANCE
PRICINGMEASURE
CSI
HANDLESALE
ORDERDESPATCH
HANDLECUSTOMER
COMPLAINTS
DEVELOPMOU
PROCESSES ENABLED THROUGH SAP
Sales & Distribution
8/2/2019 SAP_NALCO
21/49
IBM System x
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
GL, JournalsAnd
Consolidation
Inter-UnitReconciliation
PayablesManagement
Receivables
Management
BG / LC
Monitoring
CostingFixed
Assets
EMDMonitoring
Tax
Compliance
Cash & BankPayment
PROCESSES ENABLED THROUGH SAP
Finance & Controlling
8/2/2019 SAP_NALCO
22/49
IBM System x
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
MONTHLYPRODUCTION
PLAN
QUALITYMANAGEMENT
PRODUCTIONREPORTING
PRODUCTIONEXECUTION
PRODUCTIONREVIEW ON
MONTHLY BASIS
PROCESSES ENABLED THROUGH SAP
Production Planning & Quality Management
8/2/2019 SAP_NALCO
23/49
IBM System x
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
PROMOTIONAND
TRANSFER
PERSONNELADMINISTRATION
RECRUITMENT
TRAININGAND
DEVELOPMENT
PROCESSES ENABLED THROUGH SAP
HCM
EMPLOYEEMASTER
MAINTENANCE
8/2/2019 SAP_NALCO
24/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
25/49
IBM System x
ERP PROJECT HIGHLIGHTS
Comprehensive implementation ERP, Hardware & DC Implementation in 27 months (ASAP Methodology)
Phased implementation MM-FI-CO, PP-SD, HR
Simultaneously at Corporate Office, Plants, Regional Offices
PWC as End-To-End consultant Wipro as Implementing Agency
500 licensed users
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
26/49
IBM System x
Steering committee headed by CMD
Combination of full-time and part-time core team 16 FT , 10 PT
Phased roll-out - MM - FI CO in Feb 2010 , PP-SD in Oct 2010 with3 period closures in between
Phasing of Golive Critical and GoLive Non-Critical developments
Golive non-critical developments parked till stabilisation.
Parallel run for Feb and Mar 2010 (Legacy & ERP) but all accountfigures from ERP
Support of internal IT team in development of reports
Optimisation of AS IS study and Integration Testing
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
PROJECT MANAGEMENT HIGHLIGHTS
Actual Period Closure
8/2/2019 SAP_NALCO
27/49
IBM System x
Period Closure chasing actual month ends. Initial lag of 3 month. Reduced to zero wef Oct2010. Cutover Stock was matched as on 31/1/2010 and MM rolled out on 23/02/2010
Cutover FI trial balance as on 31/1/2010 taken in phased manner Bank Balances/ FA/Vendor Bal/Customer Bal/ Expenses GL till 31/3/10
Production plan and confirmation done on monthly basis till Sep 2010 Sales data uploaded to SAP at product level thru BDC till Sep 2010
Cutover finished products with Lab analysis at Bundle/Coil level loaded as on 30/9/2010.
Daily confirmation of production with Lab analysis started from 1-10-2010.
Minimal disruption of despatch for 4-5 days.
SD golive on 9/10/2010
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
PROJECT MANAGEMENT HIGHLIGHTS
Actual Period Closure
8/2/2019 SAP_NALCO
28/49
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
CHANGE MANAGEMENT HIGHLIGHTS
1. Level 1 Training to Core Team
1. End User Needs Assessment2. Level 2 Training to Core Team3. End User Training and Documentation Strategy Analysis4. Business Process Familiarisation Workshops5. Top management stakeholder analysis
1. Level 3 Training to Core Team2. Development of End User Training and Documentation Content3. Involvement of key users during Integration Testing
1. Key User training (100)
2. Onsite End User Training (600)3. Business Process Validation Workshops ( Senior & Top Management)
31. Launch by Senior Management2. Hand-holding Support3. Buy in of Auditors
CO
MMUNIC
ATION
TO
VARIOUS
LE
VELS
IN
VOL
VEMENT
OF
ST
AKEHOL
DERS
PROJECT PREPARATION
BUSINESS BLUEPRINT
REALISATION
FINAL PREPARATION
GOLIVE AND SUPPORT
8/2/2019 SAP_NALCO
29/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
30/49
IBM System x
Centralised customer master with strict control overcustomer definition
Complete transparency across units wrt all customertransactions and complaints
Real time consolidated view of customer account acrossunits
Automatic MOU rating and discount processing
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
ERP BENEFITS IN SALES AND DISTRIBUTION
8/2/2019 SAP_NALCO
31/49
IBM System x
ERP BENEFITS IN PROCUREMENT
Streamlined and standardised processes across units
Enhanced transparency enabling better coordination among units
Centralised vendor master with strict control over definition,
minimising possibilities of incomplete or duplicate vendor definition Automatic check on procurement of non-moving items
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
32/49
IBM System x
Centralised item and vendor master with strict controlover item definition minimising possibilities of duplicateitem/vendor codes
Visibility of stock across units thereby reducing need foremergency procurement of common items
On-line accounting for all material transactions
Better tracking of Procure-to-pay cycle
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
ERP BENEFITS IN INVENTORY MANAGEMENT
8/2/2019 SAP_NALCO
33/49
IBM System x
Streamlined and standardised processes across all unitswith single Chart of Accounts
Real time visibility of transaction/account balances across allunits
Reduction in process cycle time for bank reconciliation,
consolidation of unit accounts Elimination of quarterly inter-unit advise reconciliation at
Corporate Office Online availability of vendor account at individual unit level
as well as company level Unit wise and company wise fixed asset register
System generated cost sheet with variance analysis System generated export documentation, export license
tracking, excise register maintenance and statutory reporting
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
ERP BENEFITS IN FINANCE & CONTROLLING
8/2/2019 SAP_NALCO
34/49
IBM System x
Scientific planning and production reporting
Parameterised Quality recording and reporting
Tight integration with Controlling Disciplined raw material consumption reporting
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
ERP BENEFITS IN PRODUCTION PLANNING
8/2/2019 SAP_NALCO
35/49
IBM System x
Next practice ready
Host of available technologies built around ERP
Ready availability of knowledge, skills, user groups
Single technology platform Segregation of Development / Quality / Production
Enhanced security with Roles & Authorisation controls
Tier III Data Centre with Centralised BMS, EMS, Backup
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
ERP BENEFITS IN INFORMATION TECHNOLOGY
8/2/2019 SAP_NALCO
36/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
37/49
VALUE ADDITION IN ERP
Some Examples
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
MOU SYSTEM FOR MARKETING :AGREEMENT BY NALCO TO PROVIDE AND CUSTOMER TO BUYPRIORITY IN DISPATCHADDITIONAL DISPATCHTATKAL (OVERRIDING ) DISPATCH UPTO 10% OF MONTHLY MOUCUSTOMER REWARD SCHEME : MONTHLY / QUARTERLY / ANNUAL
CUSTOMER SATISFACTION MANAGEMENTCOLLECTION OF FEEDBACK FROM VALID CUSTOMERS
FEEDBACK CAPTUREANALYSIS OF RESPONSE
ANALYSIS REPORTS IN MATERIALS MANAGEMENT
PRICED STORES LEDGERPO STATUSMATERIAL PIPELINEPURCHASE ORDER LEAD TIME
8/2/2019 SAP_NALCO
38/49
Annual Activity.
Maintained on Type of MoU. Source of all activity related to MoU
Customer MOU Management
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
39/49
Customer MOU Management
Report for each type of MoU Scheme Annual, 1Qtr, 2Qtr & 3Qtr.
Report for Each scheme has Qtr-Wise Report and Full-period Report. Each Report has data break-up by MoU Qty, Monthly Eligibility, QuarterlyEligibility, Monthly Lifting & MoU Discount Eligibility Status.Report scheduled for update 1:00AM every day.
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
40/49
Legacy ERPMultiple Database Smelter, Corporate,Stockyards
Unified Database
Batch Process (data transfer to Corp) at end ofmonth confirmation from Finance and Despatch.
Real-Time activity ends on close ofworking day.
Re-conciliation of Transferred data Real-Time activity ends on close of working day.
MoU processing & Report generation MoU processing, Report generation, CreditNote, Account Posting is completed in oneinstance.
Regional Offices print and generate mailwhen printing the credit notes fordisbursement to customer.
Checking of Report
Transfer Discounts to Respective Regional Officesfor making Accounting entries relevant to theirregion.
Generation of Voucher, Posting & Transfer to FAS.
Credit Note Disbursement and mails
Time Line: Appx. 5-6 days. Time Line: 1 day. Max 2 days.
Customer MOU Management
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
41/49
Customer Satisfaction Index System
Selection of Customerbased on defined
Criteria
Mail Communication
along with Feedbackform to Customer
Capturing Feedbackfrom Customer
Customer-wiseProduct-wise
CSI report
Sales District-wise Analysi s
Product-wiseAnalysis
Sales Table
ZSDCSIWEGT(weight-age
table)
ZSDCSICF(Customerfeedback)
ZSDCSIVAL(CSI Value)
Can be run at each Regional Office at end of period. Feedback can be entered at each Regional Office.
Analyses can be generated across the company.
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
42/49
Customer Satisfaction Index System
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
43/49
Priced Stores Ledger
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
PART-A
PART-B
PART-C
ANALYSIS REPORTS IN MATERIALS MANAGEMENT
8/2/2019 SAP_NALCO
44/49
PO STATUS
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
PART-A
PART-B
ANALYSIS REPORTS IN MATERIALS MANAGEMENT
8/2/2019 SAP_NALCO
45/49
Material Pipeline Details
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
PART-A
PART-B
ANALYSIS REPORTS IN MATERIALS MANAGEMENT
8/2/2019 SAP_NALCO
46/49
Purchase Order Lead Time
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
As compared to June-Dec 2010, there has been an improvement in PO Lead Timefrom 80 days to 47 days during Jan-June 2011
ANALYSIS REPORTS IN MATERIALS MANAGEMENT
8/2/2019 SAP_NALCO
47/49
IBM System x
CONTENTS
About NALCO
Business Challenges : Environment , Technology
SAP Landscape Processes enabled through SAP
Change & Project Management Highlights
Key Business Benefits
Value Additions in ERP
Way Forward
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
8/2/2019 SAP_NALCO
48/49
IBM System x
WAY FORWARD
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011
IMPLEMENTATION OF SRM 7
IMPLEMENTATION OF DISASTER RECOVERY SITE
IMPLEMENTATION OF DMS
SHOP FLOOR INTEGRATION
IMPLEMENTATION OF PLANT MAINTENANCE
8/2/2019 SAP_NALCO
49/49
SAP WORLD TOUR 2011, NEW DELHI, 26 TH AUGUST 2011