SaT5G Progress and Main Achievements Reporting Period 2: 01/07/2018 28/02/2020 SaT5G Period Review Online meeting April 29 th 2020
Transcript
Page 1: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G Progress and Main Achievements

Reporting Period 2: 01/07/2018 – 28/02/2020

SaT5G Period Review

Online meeting – April 29th 2020

Page 2: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G 2

Agenda

Welcome & introductions

Management update

WP4 update

WP6 update

WP3 update

WP2 update

WP5 update and Demonstration video

AoB

Page 3: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

<Section Title>

WP1 PROJECT MANAGEMENT

UPDATE

Vinaya Raghavan– AVA

3

Page 4: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

Contributing to the 5GPPP use case “Broadband access everywhere”, SaT5G will foster the implementation of solutions enabling the “plug and play” integration of satellite communications in 5G networks

Hence, SaT5G project researched the key technology enablers and validated use-cases by demonstration in live 5G testbeds

SaT5G project outcomes will contribute in enabling the satellite industry to join the European initiative in the deployment of a competitive and ubiquitous 5G network globally

4

SaT5G Objectives

WP1 – Project Management

Page 5: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G 5

SaT5G Consortium

WP1 – Project Management

16 partners

10 countries

3 5G testbeds

Page 6: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G 6

SaT5G Concept

Research the key technology enablers for

the integration of satellite in 5G

Contribute to standardisation of satcom as

an intrinsic element of 5G

5G and Satellite Research

Ca

chin

g &

mu

ltic

ast

fo

r O

pti

mis

ed

Co

nte

nt

& N

FV d

istr

ibu

tio

n

Mu

lti-

link

an

d H

ete

roge

ne

ou

s T

ran

spo

rt

Inte

gra

ted

Ne

two

rk M

an

age

me

nt

an

d O

rch

est

rati

on

Ext

en

din

g 5

G S

ecu

rity

to

Sa

telli

tes

Imp

lem

en

tin

g 5

G S

DN

an

d N

FV

in S

ate

llite

Ne

two

rks

Standardisation

Ha

rmo

nis

ati

on

of

Satc

om

wit

h 5

G

Co

ntr

ol &

Use

r P

lan

es

Validation & Demos

Business & Operations

Sat5G [“Plug and Play” Satellite in 5G]

Build compelling business cases and

commercial models

Build on current 5G research and contribute

to the 5GPPP Working Groups

Validate and demonstrate solution in live

testbeds

WP1 – Project Management

Page 7: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G 7

Work packages

WP1 – Project Management

WP2Scenarios for Satellite Integration in

5G

WP3Integrated Network Architecture Design

WP4WP4 “Research to

Prototype Development”

WP1Project Management

WP

6D

isse

min

atio

n, S

tan

dar

ds

and

Exp

loit

atio

n

WP5WP5 “Validation and Demonstration”

EC

5Gppp

Page 8: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

WP Main Outputs and Interdependencies

8

Work Breakdown

WP1: Overall project management and technical coordination

WP2

• Definition of SaT5G use cases, scenarios and business models

• Techno-economic analysis

WP3

• Reference architecture for satcom integration into 5G

• Scenario specific architectures

• Identification of issues for further research

WP4:

• Research of technical enablers

• Development and validation of prototypes for the project live demos

WP5:

• Design, planning and execution of the live demos using the 5G testbeds

• Analysis of demo results and recommendations

WP6:

• Roadmapping for the exploitation of the SaT5G solution

• Coordination of dissemination, standardisation and exploitation activities

EC, 5GPP, 3GPP/ETSI & other Standardisation Bodies, Wider Research Community, Industry Stakeholders

WP2 Scenarios for Satellite Integration in 5G

WP3 Integrated Network

Architecture Design

WP4 Research to Prototype

Development

WP5 Validation and Demonstration

WP1 Project Management

Three Existing 5G Testbeds

Consortium Active in

3GPP and ETSI

Inputs from H2020, ESA, National Projects and 5GPPP

Phase 1 Projects

WP6 Dissemination, Standards and Exploitation

Continuous Advisory Board Oversight & Recommendations

WP1 – Project Management

Page 9: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

All six research pillars concluded

Techno-economic analysis completed

EuCNC 2019: Successful demonstrations of 5G over satellite in Valencia, Spain

Exceeded beyond expectations in dissemination, exploitation and standardisation realm

5G core network integration into live GEO satellite network and tested on 5GIC testbed

Demonstrated for the first time - over-the-air 5G backhauling using MEO satellite constellation (MEO Booster and Gilat’s modem)

5G NR over satellite links was demonstrated on UOULU testbed

An industry-briefing event held in the 5G Innovation Centre at the University of Surrey, United Kingdom

Workshop on 5G Satellite-Terrestrial Integration for Aircraft Connectivity at Zodiac Inflight, Wessling, Germany

Main achievements during Period 2

9

Overview of Main Achievements

WP1 – Project Management

Page 10: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

Contributed to 5GPPP Working Groups(Pre-Stand, Architecture, Software Networks, Vision & Societal Challenges, Trials WGs)

10

Working with 5GPPP and other Projects

WP1 – Project Management

5G-PPP WGCoordinating

partnerLeader details Participating partners

Pre-Standardization TAS Nicolas Chuberre ADS, SES, TNO

5G Architecture ADS Boris Tiomela Jou AVA, TAS, iDirect, SES

SDN / NFV I2CATPouria Sayyad

KhodashenasADS, i2CAT

Vision and Societal Challenges

AVA Simon Watts SES

Trials AVA Omar Iqbal SES, UoS, UOULU, ZII, TNO

Technical Board TAS / UoS Michael Fitch AVASteering Board AVA Simon Watts N/A

Collaborated with 5G-VINNI, 5GESSENCE, 5Genesis and SATis5 projects

Page 11: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

Status of Project Deliverables

11

Project Management Update (1/4)

WP1 – Project Management

Deliverable nameDisseminationlevel

Planned Date

Actual Date

D1.6 Report on Project cumulative expenditureConfidential 31/01/2020 07/02/2020

D2.2 Business, Operational and Technical Requirements for Satellite eMBBPublic 27/09/2019 07/102020

D2.3 Business Modelling and Techno-economic Analysis of Satellite eMBBPublic 20/02/2020 02/03/2020

D3.1 Integrated SaT5G General Network Architecture Public 30/11/2019 11/12/2019

D3.2 Integrated SaT5G Detail Network Architecture Public 31/07/2018 17/12/2018

D3.3 Integral End-to-End Service Delivery ArchitecturePublic 31/07/2018 19/12/2018

D3.4 Satellite and 3GPP NextGen Reference InterfacePublic 31/07/2018 31/08/2018

D4.1 Virtualization of Satcom Components – Analysis, Design and Proof of ConceptsPublic 31/12/2019 21/12/2019

D4.2 Integrated Network Management – Analysis, Design and Proof of Concepts Public 31/08/2019 18/09/2019

D4.3 Multi-link and Heterogeneous Transport – Analysis, Design and Proof of Concepts Public 31/12/2019 06/01/2020

D4.4 Satcom & 5G Control/User Plane Harmonization – Mid- and Long-Term Approach

Public 31/12/2019 21/12/2019

D4.5 5G Security Mechanisms Extended to Satellite LinksPublic 31/12/2019 21/12/2019

D4.6 Caching and Multicast – Analysis, Design and Proof of Concepts Public 31/12/2019 21/12/2019

Page 12: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

We have experienced delays in the submission of deliverables mainly due to:

• Greater effort than originally envisaged was required for some tasks;

• Numerous tasks are running in parallel so prioritisation of resources was necessary to avoid

major impact on project schedule and testbed demonstrations;

Status of Project Deliverables

12

Project Management Update (2/4)

WP1 – Project Management

Deliverable nameDissemination level

Planned Date

Actual Date

D5.2 Testbed Data Centre Equipment Installed, Connected and Functionally Tested and Validated Public 30/11/2019 17/03/2020

D5.2/5.3 Demonstration of Fixed and Home Backhaul Scenarios Including Caching & Multicast Public 30/11/2019 17/03/2020

D5.2/5.4 Demonstration of Mobile Backhaul Scenario Including Caching & Multicast Public 31/01/2020 09/03/2020

D5.2/5.5 Validation of 5G Control and User Plane Harmonization Public 30/11/2019 13/03/2020

D5.6 Results and Recommendations from SaT5G Demonstrations and Validations Public 29/02/2020 17/03/2020

D6.1 Roadmap for Satellite into 5G Public 30/11/2019 31/01/2020

D6.3 Standardisation Activity Report Public 30/11/2019 02/12/2019

D6.5 Dissemination Activity Report Public 30/11/2019 02/12/2019

D6.6 Exploitation Plan Public 31/05/2018 02/09/2018

D6.7 Exploitation Activity Report Public 30/11/2019 02/12/2019

Page 13: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

Status of Project Milestones

13

Project Management Update (3/4)

WP1 – Project Management

In terms of milestones, the project has successfully completed all the rest of the milestones:

MS3 Critical design review, which is related to the deliverable D3.1, which focuses on the definition of the Reference integrated satellite-terrestrial network architecture, which was completed as an interim version in August 2018.

MS4 Validation readiness review was completed by June 2019 along with framework for research pillars put in place

MS5 Demo readiness review, was completed in September 2019 which made sure the individual testbeds were ready for demonstrations.

MS6 Final internal review and MS7 Project Completion are the closure activities, which is envisaged to be completed before end of May 2020 as delays have been noticed due to Covid-19 pandemic crisis.

Page 14: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

WP Deviation Justification Potential implications

WP4.

4

Studies concentrate on

the long-term approach “5G

over satellite link”.

It is better to concentrate limited

efforts on the more relevant approach

- Going straight forward to the best

solution from market perspective,

- Leveraging on-going telecom

standard and challenge vendors to

design a satellite friendly waveform.

Hybrid “5G and DVB”

will not be analysed

But the “Mid term”

approach has been done

in the SaT5G delivery,

“D3.4; Satellite and 3GPP

NextGen Reference

Interface,” 2018 and the

ETSI TR 103 611

“Seamless integration

of satellite and/or HAPS

(High Altitude Platform

Station) systems into 5G

and related architecture

options”.

WP4.

5

Developed Set of Security

Functions was not produced.

Investigation in this work package

showed that there was no need to

develop a new set of security

functions.

No implications.

Deviations from plan

14

Project Management Update (4/4)

WP1 – Project Management

Page 15: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

• TNO moved funds to Travel from Personal costs to support 3GPPP meetings(2 PMs reduced)

• Avanti moved funds from Travel and Equipment to personnel costs (3.3 PMs added)

• Funds transfer from BT and TAS to UoS was completed in January 2019

• Change of Technical manager, budget transfer and extension of project were executed via two amendments that was submitted and completed.

15

Budget and Amendments

WP1 – Project Management

Person Months: 718.8 total + 1.3 PMs, was added as part of the amendment

Important to Note:

• External financial audits are in progress

• Final claims – to be submitted in coming weeks

Page 16: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

Period 2 PM deviation table for work packages:

Period 2 Costs:

• Total cost deviation(effort and other direct cost): 18% from projections

Project Level Spending

16

Financial Reporting (1/2)

WP Deviation Justification

1 26% Extension of the project resulted in more management effort

2 52%More WP2 activities were completed in and also extension period kept

WP2 alive after November with more activities.

3 38% More effort was required for some of the partners in this WP

4 22%Research pillar activities were carried out till up to November and

write-ups were done during the extension period.

5 28%

More WP5 activities were done during the extension period. Extra

effort was put into EuCNC 2019 live demonstrations

6 10%EuCNC 2019 booth arrangement etc. and other dissemination

activities for this conference created an overspent for some partners.

WP1 – Project Management

Page 17: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

There is an overspent overall in Effortcost due to project extension.

PMs in Period 2:

• Planned: 418.6 PMs

• Achieved : 528.2 PMs

• Deviation: +26%

Effort Cost in Period 2:

• Planned cost: € 4,025,205

• Achieved cost: € 4,863,486

• Deviation: +21%

(BT did not report the planned PMs or plannedeffort cost)

Spending per Partner: Effort

17

Financial Reporting (2/2)

WP1 – Project Management

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

Effo

rt in

PM

s

Planned

€ -

€ 50

€ 100

€ 150

€ 200

€ 250

€ 300

€ 350

€ 400 Ef

fort

Co

st (

in €

k)

Planned

Page 18: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G

Underspends in other direct costs inPeriod 1 was compensated inperiod2 as majority of the cost arearound the testbeds and demoswhich was active in full swing inPeriod 2.

Other direct Cost in Period 2:

• Planned cost: € 654,543

• Achieved cost: € 659,989

• Deviation: +1%

(BT did not report the planned cost)

Spending per Partner – Other direct costs

18

Financial Reporting (2/2)

WP1 – Project Management

€ -

€ 10

€ 20

€ 30

€ 40

€ 50

€ 60

€ 70

€ 80

€ 90

€ 100

€ 110

Oth

er

Dir

ect

Co

st (

in €

k)

Planned

Achieved

Page 19: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

SaT5G - Satellite And Terrestrial network for 5G 19

Key Risks (program)

Risk Mitigation strategy Status

The mobile test-bed might not be live with O3b

satellites integration completed on time.

Extra time was needed to pursue and complete

the MEO over-the-air demo (High-Fly - as it is

using real satellites). The O3b beam availability

was secured for SaT5G ZII testbed measurements

and demonstration activities for December 2019

period. However, the team also, in parallel, had a

second setup with Low-Fly (as this is an

emulation), emulating the GEO satellite option

and using the already established IPsec tunnel (L3

VPN) between ZII (Munich) and Gilat offices (Tel

Aviv).

Closed

Page 20: SaT5G Progress and Main Achievements Reporting Period 2: …€¦ · and play” integration of satellite communications in 5G networks Hence, ... TAS, iDirect, SES SDN / NFV I2CAT

Thank you for your attention