    SAVEAIR TECHNOLOGIESSAVEAIR TECHNOLOGIES

    PRIVATE LIMITEDPRIVATE LIMITED INCORPORATED IN YEAR 2005INCORPORATED IN YEAR 2005 DEVELOPED A STRONG CUSTOMER BASEDEVELOPED A STRONG CUSTOMER BASE

    EXPOSURE TO INTERNATIONALEXPOSURE TO INTERNATIONALCUSTOMERSCUSTOMERS

    CARRIED OUT NUMBER OF Automation &CARRIED OUT NUMBER OF Automation &

    Energy Saving ProjectsEnergy Saving Projects WELL VERSED IN LATEST Technologies &WELL VERSED IN LATEST Technologies &

    products for a wide range of Industriesproducts for a wide range of Industries

  • 8/3/2019 Save Air

    2/17

    VISIONVISION

    TO PROVIDETO PROVIDEAdvanced TechnologyAdvanced Technology

    AtAtAffordable costAffordable costbyby

    EstablishingEstablishingAA

    World Class customer centricWorld Class customer centricOrganizationOrganization

  • 8/3/2019 Save Air

    3/17

    MISSIONMISSION To SAVE All Important Resources SAVE A I RTo SAVE All Important Resources SAVE A I R To provide excellent Products & services in the field of CNC,PLC,To provide excellent Products & services in the field of CNC,PLC,

    DRIVES & ROBOTICSDRIVES & ROBOTICS To develop a CUSTOMER CENTRIC ORGANISATIONTo develop a CUSTOMER CENTRIC ORGANISATION To constantly update the resources to suit the ever changingTo constantly update the resources to suit the ever changing

    needs of the environmentneeds of the environment To be a leader in the field of CUSTOMISED AUTOMATIONTo be a leader in the field of CUSTOMISED AUTOMATION

    SOLUTIONSOLUTION To inculcate a culture of OPEN MINDED COMMUNICATION at allTo inculcate a culture of OPEN MINDED COMMUNICATION at all

    levels of organisationlevels of organisation

    To Constantly develop global networks based on WINTo Constantly develop global networks based on WIN--WINWINrelationshiprelationship To provide excellent products & services for All type of IndustriesTo provide excellent products & services for All type of Industries To provide consultancy in the field of System IntegrationTo provide consultancy in the field of System Integration To be a Leader in Power quality, Energy conservation TechniquesTo be a Leader in Power quality, Energy conservation Techniques

    & Energy management solutions& Energy management solutions

    To Provide professional training in CNC,PLC & Drives for EngineersTo Provide professional training in CNC,PLC & Drives for Engineers

  • 8/3/2019 Save Air

    4/17

    MAJOR PROJECTSMAJOR PROJECTS

    Installation of Robotic welding cell for Scooter chassis welding LineInstallation of Robotic welding cell for Scooter chassis welding Line--20052005 Installation of Fuel tank welding LineInstallation of Fuel tank welding Line--20052005 Revamping of Used Automatic welding cell & computerized Wheel TruthRevamping of Used Automatic welding cell & computerized Wheel Truth

    analyzer(2007)analyzer(2007) Energy Saving to the tune of 8000 units per day for Continuous Paper MillEnergy Saving to the tune of 8000 units per day for Continuous Paper Mill

    (2007(2007--08)08) Saving of Energy cost of Air conditioners inSaving of Energy cost of Air conditioners in

    Semiconductor plant(2009) SPELSemiconductor plant(2009) SPEL Tractor manufacturer(2009)TAFETractor manufacturer(2009)TAFE International Consulting group across India(2011) KPMGInternational Consulting group across India(2011) KPMG Major Publishing house in Chennai(2011) The HINDUMajor Publishing house in Chennai(2011) The HINDU

    NonNon--contact Sensor based Steam saving system for a starch polymercontact Sensor based Steam saving system for a starch polymerprocessing unit(2010)processing unit(2010) Turnkey Design & supply of Vehicle testing system for reputed truckTurnkey Design & supply of Vehicle testing system for reputed truck

    manufacturer(2011)manufacturer(2011) Rectification of ABB IRC5 robot 2011Rectification of ABB IRC5 robot 2011

  • 8/3/2019 Save Air

    5/17

    ROBOTIC WELDING CELL PROJECTROBOTIC WELDING CELL PROJECT

    9 AXIS ROBOT WITH DUAL MANIPULATOR9 AXIS ROBOT WITH DUAL MANIPULATORPROVIDED BY TECHNOROBOTS ITALYPROVIDED BY TECHNOROBOTS ITALY

    CAPABLE OF PRODUCING 10CAPABLE OF PRODUCING 10

    FRAME/HOUR(AGAINST 3 PER HOUR MANUALLY)FRAME/HOUR(AGAINST 3 PER HOUR MANUALLY) IMPROVES CONSISTANCY OF WELDINGIMPROVES CONSISTANCY OF WELDING DEPLOYED WEAVING IN A VERY EFFECTIVEDEPLOYED WEAVING IN A VERY EFFECTIVE

    MANNER TO IMPROVE WELDING QUALITY OFMANNER TO IMPROVE WELDING QUALITY OFMAIN FRAMEMAIN FRAME

    PROJECT WAS COMPLETED IN 90 DAYSPROJECT WAS COMPLETED IN 90 DAYSDURATIONDURATION

    POKAPOKA--YOKE FOR MISSSING OF PARTS/WELDSYOKE FOR MISSSING OF PARTS/WELDSUSING APPROPRIATE SENSORS ON THEUSING APPROPRIATE SENSORS ON THE

    FIXTUREFIXTURE

  • 8/3/2019 Save Air

    6/17

    AUTOMOTIVE FUEL TANK LINEAUTOMOTIVE FUEL TANK LINE

    THIS WAS A NEW BUSINESS DEVELOPMENTTHIS WAS A NEW BUSINESS DEVELOPMENT ALL 4 WELDING MACHINES WERE USED ONESALL 4 WELDING MACHINES WERE USED ONES

    AND WERE REVAMPED WITH MODERNAND WERE REVAMPED WITH MODERNCONTROLS TO THE REQUIREMENT SAVINGCONTROLS TO THE REQUIREMENT SAVING1MILLION USD1MILLION USD

    TANK LEAK TESTING EQUIPMENT WAS DESIGNEDTANK LEAK TESTING EQUIPMENT WAS DESIGNED

    AND ASSEMBLED INAND ASSEMBLED IN--HOUSE TO SAVE CAPITALHOUSE TO SAVE CAPITAL THE LINE WAS MADE READY IN 45 DAYS TIME ASTHE LINE WAS MADE READY IN 45 DAYS TIME ASPER CUSTOMER REQUIREMENTPER CUSTOMER REQUIREMENT

  • 8/3/2019 Save Air

    7/17

    REVAMPING OF WHEEL TRUTHREVAMPING OF WHEEL TRUTH

    ANALYSER & FLASH BUTT WELDINGANALYSER & FLASH BUTT WELDING THE EQUIPMENT WAS UNUSED DUE TOTHE EQUIPMENT WAS UNUSED DUE TO

    FAILURE OF DATA ACQUSITION CARDFAILURE OF DATA ACQUSITION CARD

    REPLACED THE DAQ AND TESTED THE SAMEREPLACED THE DAQ AND TESTED THE SAMEWITH NEW SET OF MEASUREMENT ROLLERSWITH NEW SET OF MEASUREMENT ROLLERSAND SOFTWAREAND SOFTWARE

    SAVINGS 50K USDSAVINGS 50K USD

    FLASH BUTTWELDING WELD FAILURE RATEFLASH BUTTWELDING WELD FAILURE RATEREDUCED FROM 45% TO 3% by upgrading theREDUCED FROM 45% TO 3% by upgrading theweld controller and process controlweld controller and process control

  • 8/3/2019 Save Air

    8/17

    CARTA MISR Paper MillsCARTA MISR Paper Mills--CAIROCAIRO--EGYPTEGYPT

    SPECIFIC ENERGY CONSUMPTION CARTA MISR-PLANT 1

    328

    58.9 62.7 67.6 65.1 71.874.2 83.4 83.8 72.5 82.5

    367327

    350378

    418

    489

    578

    504

    564

    3

    4

    0

    0

    0

    3

    2

    7

    9

    63

    5

    0

    6

    0

    2

    8

    0

    4

    9

    2

    8

    0

    6

    7

    2

    9

    21

    1

    2

    9

    2

    9

    4

    3

    66

    8

    2

    26

    1

    4

    1

    2

    7

    0

    9

    0

    0

    100

    200

    300

    400

    500

    600

    700

    Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08

    MONTH & YEAR

    Energyp

    erton

    20000

    22000

    24000

    26000

    28000

    30000

    32000

    34000

    36000

    38000

    D

    aily

    averageEnergy

    con

    sum

    ption

    Average energy per ton Daily average production Daily average energy consumption

    DAILY PRODUCTION in ton/DAY

    DAILY ENERGY CONSUMPTION

    SPECIFIC ENERGY

  • 8/3/2019 Save Air

    9/17

    Project Completed for KPMG INDIA-FEB -2010

    let us save energy if feasible

    KPMG OfficeKPMG Office

    LocationLocation

    NumberofNumberofAirAir

    conditionerconditioner

    ss

    TotalTotal

    InvestmentInvestment

    In Rs.In Rs.

    ExpectedExpectedannual energyannual energy

    saving insaving in

    Kw/HrKw/Hr

    ExpectedExpectedannualannual

    costcost

    savingsaving

    Rs.Rs.

    ReductionReductionof Co2of Co2

    emissionemission

    Tons perTons perannumannum

    Pay backPay back

    periodperiod

    ChennaiChennai 1313 9665096650 56,60256,602 3,99,0503,99,05042.542.5

    84Days84Days

    HyderabadHyderabad 1515 1,02,7501,02,750 29,24529,245 2,06,1812,06,181 2222 171 Days171 Days

    PunePune

    BundgardenBundgarden1313 89,05089,050 29,92629,926 2,10,9832,10,983 22.522.5 144Days144Days

    Pune2Pune2(Kasarwadi(Kasarwadi

    3434 2,32,9002,32,900 62,49262,492 4,40,5744,40,574 4747 180Days180Days

    The entire project was completed during second & third week of Feb 2010

    The post Installation savings was established

  • 8/3/2019 Save Air

    10/17

    CURRENT PROJECTSCURRENT PROJECTS

    Vehicle Test rig using Modern PLC technologyVehicle Test rig using Modern PLC technologyfor a Leading vehicle manufacturerfor a Leading vehicle manufacturer

    PLC control panel with Vision system forPLC control panel with Vision system for

    Special Purpose MachinesSpecial Purpose Machines Continual Energy saving project for popularContinual Energy saving project for popularresort group in India( 7.7 lakh per annum asresort group in India( 7.7 lakh per annum ason date)on date)

    Energy saving project for a vehicleEnergy saving project for a vehiclemanufacturermanufacturer

    Revamping of 3 no Used CNC Machine ToolsRevamping of 3 no Used CNC Machine Tools

    for various customersfor various customers

  • 8/3/2019 Save Air

    11/17

    REMOTE COMMUNICATION USINGREMOTE COMMUNICATION USING

    STEEL ROPE AS MEDIUMSTEEL ROPE AS MEDIUM This was done for a Chennai client as an R&DThis was done for a Chennai client as an R&D

    initiativeinitiative

    Appropriate Modem and PLCs were configured andAppropriate Modem and PLCs were configured andPrototype was prepared and fully testedPrototype was prepared and fully tested

    Presently Pilot lot is being prepared for smallPresently Pilot lot is being prepared for smallvolumevolume

    The system has 200Mbps data transfer rateThe system has 200Mbps data transfer ratecapability and we are the only Indian company tocapability and we are the only Indian company toprovide this technologyprovide this technology

    This system has helped our customer to compete inThis system has helped our customer to compete inpar with other International suppliers with theirpar with other International suppliers with their

    proprietary technologyproprietary technology

  • 8/3/2019 Save Air

    12/17

    Integration of Special PurposeIntegration of Special Purpose

    Machine with Vision systemMachine with Vision system Project for a major Auto Ancillary at Padi, ChennaiProject for a major Auto Ancillary at Padi, Chennai Its a 3 stage Metal forming SPMIts a 3 stage Metal forming SPM The component orientation feed back is provided by theThe component orientation feed back is provided by the

    Vision system to the PLCVision system to the PLC

    An HMI us used for visualizing and controlling theAn HMI us used for visualizing and controlling theprocessprocess

    An additional display is provided for exclusiveAn additional display is provided for exclusive

    monitoring of the camera and component positioningmonitoring of the camera and component positioning The PLC control Orients the component using HydraulicThe PLC control Orients the component using Hydraulic

    servo and controls the other stage processesservo and controls the other stage processes

    This helps the customer to save cost on manpower andThis helps the customer to save cost on manpower andis first VISION system for the customeris first VISION system for the customer

  • 8/3/2019 Save Air

    13/17

    VEHICLE TEST RIGVEHICLE TEST RIG This was specifically designed for a leading VehicleThis was specifically designed for a leading Vehicle

    manufacturermanufacturer Latest PLC technology was deployed with greatLatest PLC technology was deployed with great

    amount of flexibility to easily accommodate harnessamount of flexibility to easily accommodate harnessdesign changesdesign changes

    The Test rig is capable of testing the completeThe Test rig is capable of testing the completewiring harness of a vehicle in few minutes timewiring harness of a vehicle in few minutes timewithout disturbing the wiring.without disturbing the wiring.

    The User friendly interface gives clear feed back toThe User friendly interface gives clear feed back tothe operator and involves him fully in the testingthe operator and involves him fully in the testingprocessprocess

    A supervisory control panel provides advancedA supervisory control panel provides advancedfunctionality meant for expert usagefunctionality meant for expert usage

  • 8/3/2019 Save Air

    14/17

    Project completed for CLUB Mahindra

    let us save energy if feasible

    Name of theName of the

    ResortResortLocationLocation

    NumberofNumberof

    AirAir

    conditioneconditione

    rsrs

    TotalTotal

    InvestmentInvestment

    In Rs.In Rs.

    ExpectedExpected

    annual energyannual energy

    saving insaving in

    Kw/HrKw/Hr

    ExpectedExpected

    annualannual

    costcost

    savingsaving

    ReductiReduction ofon of

    Co2Co2

    emissioemission Tonsn Tons

    perper

    annumannum

    Pay backPay back

    periodperiod

    Zest big beachZest big beachResortResort

    PondicherrPondicherryy

    2828 1,98,0161,98,016 5565055650 2,09,2442,09,244 41.841.8 288Days288Dayscompletedcompleted

    Mahindra BackMahindra Back

    waterRetreatwaterRetreatAshtamudiAshtamudi 4040 2,96,0002,96,000 5917059170 5,62,1115,62,111 44.444.4

    216Days216Days

    completedcompleted

    KumbalgarhKumbalgarh

    Resort,Resort, RajasthanRajasthan 108108 7,99,2007,99,200 1,67,7541,67,754 9,22,6479,22,647 125.82125.82 316Day316Day

    CorporateCorporate

    officeoffice ChennaiChennai 3535 2,47,5202,47,520 5353053530 3,10,4733,10,473 40.1540.15271 Days271 Days

    inprogressinprogress

  • 8/3/2019 Save Air

    15/17

    ORGANISATION STRUCTUREORGANISATION STRUCTURE

    BUSINESS HEAD

    DESIGN MANAGER HEAD MANUFACTURING HEAD SERVICES

    MANUFACTURING ENGINEERSSERVICE ENGINEERSDESIGN ENGINEERS

    Technician Electrical

    Technician Mechanical

    Draftsmen Operators/fabricators

  • 8/3/2019 Save Air

    16/17

    MAJOR SUPPLY PARTNERSMAJOR SUPPLY PARTNERS

    BRANDNER ENGINEERINGBRANDNER ENGINEERING--GERMANYGERMANY EXOR INDIA LTDEXOR INDIA LTD

    RENU ELECTRONICSRENU ELECTRONICS SYSSYS--BASE KOREABASE KOREAABBABB--SWEDENSWEDEN

    TEKNO ROBOTSTEKNO ROBOTS--ITALYITALY .. MANY MORE.. MANY MORE

  • 8/3/2019 Save Air

    17/17

    PARTIAL Client list

    SPEL Semiconductors ,Maraimalai nagar CARTA MISR Paper Mills,Egypt Motherson Automotive Ltd,chennai TAFE,sembiam, Chennai TAFE Gears, Kelambakkam,chennai BSIL, Pondicherry KPMG-INDIA INPAC-Delta Packaging co,Chennai PRIMO Automations,Chennai

    Bimetal Bearings,Thoraipakkam. Necco tools Vinay Automotives Mercury Precision Gears, Club Mahindra, Chennai Zest Beach Resort ,Pondicherry Mahindra Back water Retreat,Ashtamudi Bharat Starch Industries Limited,,Pondy Rane Engine valves,chennai

    RANGER Cotton mills, GopichettyPalayam RR Donnelly Publishing India Ltd,Chennai Leland Deer Ltd The HINDU WIPRO INFRSTRUCTURE LIMITED Modern Machine Works FORD INDIA-Maraimalai Nagar Rane Engine Valves-Chennai Hi-Tek Machines


Recommended