Date post: | 02-Jan-2016 |
Category: |
Documents |
Upload: | preston-parsons |
View: | 214 times |
Download: | 0 times |
SC13
API SC13 Drilling Completion and Fracturing Fluids
Jan 26, 2011Fort Worth, TX
Paul Scott, Chair
Johnna Smith, Secretary
David Ekas Vice-Chair
SC13
Agenda
Housekeeping (SC Charge, Roll Call, etc)Previous Meeting Minutes – ApprovalUpcoming MeetingsSC13 API Reporting and SupportNew Work ItemsTask Group UpdatesOld BusinessNew BusinessAdjourn
SC13
SC13 Charge & Intro
Develop and Maintain Specifications and Recommended Practices for Drilling, Completion, Fracturing Fluids, Fluids Processing Equipment and related subjects
Incoming Secretary Johnna Smith
Del Son
SC13
API Email Lists & Roll Call
Comment on API Email List
Circulate SC13 Roster for Updates
Sign-in sheet
Roll Call
SC13
API Resolution of Appreciation
Dr Judy Guy-Caffey
Presented by David Miller API
Many thanks!
SC13
Welcome new members
Andrez Diaz, BP GOMMatthew Malwitz, Grinding & SizingLeon Martinez, Global Wire ClothToby McClain, Fann InstrumentsHugo Osorio, Equion - Energy (ex-BP Colombia Company)Victoria Xiaoping Qiu, Shell International Exploration and ProductionTom Remy, Global Wire ClothPhil Schwarz, OFI Testing EquipmentJennifer Shafer, TETRA TechnologiesNeil TrotterOthers?
Thanks to everyone for attending and participating
SC13
SC13 Meeting Minutes
Review & Approve Previous 2 Meeting Minutes – emailed recently
Posted on API website with all TG WG presentations & documents
Review Previous Meeting Action Items:All significant items accomplished continued or unresolved items will be carried forward
SC13
Next API SC13 Meetings
2011 Summer – June 27- July 1, San Francisco, CA
2012 Winter – January 23-27, Fort Worth, TX
2012 Summer – June 11-15, Westminster, CO
SC13
SC13
SC13 Home Page
API Website: Standards – Committee Info - CSOEM – SC13
Sign-in: Email address & 1st time Username: FirstnameLastname or “Forgot Password”
SC13
Committee DocumentsCommon Documents
Each TG has a page where they can store and share information
SC13
SC13 Meeting Minutes
SC13
SC13 Rosters and Mailing Lists
SC13
API Support & Staff
Need to use the API Website more!!!!!
Shail Ghaey, Standards [email protected]
Roland Goodman, Manager - Upstream [email protected]
David Miller, Director - [email protected]
SC13
TG2 Publications: StarkSummary Report
See TG reports for status of all SC13 documents
RP13B-2 is close to go to ISO FDIS Feb 2011
SC13
• WG1: Oil Mud Chemical Analysis• Hibernation
• WG2: HPHT Direct Indicating Viscometers • Sent back to WG to address TG comments
• WG3: Particle Size Distribution Testing of OBM / SBM• Held one meeting and has developed a work
plan for future action
• SR3: Measurement of NAF Internal Phase Activity Modifiers• To be addressed by Paul Scott
TG3 OBM Report To SC13: Pless
SC13
TG3 OBM Particle Plugging Test Revision for Inclusion in RP13B-2
• Meeting with TG4/WG2, Ceramic PPT Procedure Re-Write
• New procedure will be applicable to RP13B-1, RP13B-2 and 13I
• WG2 to submit procedure to TG4 for approval
• Following approval of draft in TG4, draft procedure to be distributed to TG3 members for review / approval
SC13
Background: Increased emphasis on environmental aspects of drilling fluids is driving fluid companies toward non-chloride internal phase activity modifiers for non-aqueous fluids
•Introduced at the 2010 winter meetings
•SR3 submitted by Brent Estes to the Task Group at the 2010 summer meetings
•Tabled by Task Group for further refinement
TG3 OBM Measurement of NAF Internal Phase Activity Modifiers
SC13
Actions assigned for consideration prior to winter standardization conference:
• Limit scope of materials to be addressed
• Inclusion of methodology for solids calculations into SR3 document / WG Charge
TG3 OBM Measurement of NAF Internal Phase Activity Modifiers
SC13
Interested parties met on 12/7/2010 to draft a response to the Task Group:•Activity modifiers to be considered
• Formates• Nitrates• Acetates• Glycol / Glycerols
• Agreed to include methodology for utilizing activity measurements to calculate corrected solids.
TG3 OBM Measurement of NAF Internal Phase Activity Modifiers
SC13
Proposed Work Group Charge:
Develop procedure(s) for measurement of non-chloride activity modifiers in non-aqueous fluids and methodology to use those measurements in corrected solids calculations.
TG3 OBM Measurement of NAF Internal Phase Activity Modifiers
SC13
New Work Items
Motion and vote on TG3 OBM Measurement of NAF Internal Phase Activity Modifiers
SC13
TG4 WBM & Lab Testing: BreedenSummary Report
WG1 Drill Solids Simulation continues, WG2 PPT procedure re-write near completion, Ad hoc Filter cake compressibility – potential university interest, Ad hoc PSD Laser diffraction continues as Ad hoc, Presentation David Derwin Superior Graphite on different in RP13I abrasion test procedure blades – no new WG. Will liaise with supplier Fann
SC13
TG5 Summary Report: Robinson
WG1 SCE calculations has new chair Neil Trotter should now make progress looking for new technology,
WG2, Stocks: Educational Marketing group nearing recommendation for screen designation monogram or certification program
SC13
TG6 Summary Report: Javora
TG6: Testing Heavy Brines, Javora
SC13
SC13 TG-6 Testing of Heavy Brines
• Quorum was established• June 2010 Meeting Minutes Approved• Buffer, Corrosion, and Future Project Work Groups completed their tasks• Return Permeability, Displacement, Hydrate, Scale and Emulsion Technology Work Groups conducting/initiating business• API CRA Testing Program – Update given• Total Comments - ISO 13503-3 revisions
SC13
TG7 Rheology & HydraulicsSummary Report
TG in hibernation previous chair Bern retiredRP13D has numerous errors:Zamora has submitted errors and technical issuesZamora wants to reactivate TG and minor revision of RP13D to include additional items like effect of rotationWill discuss with Zamora
SC13
TG-8, Drilling Fluid MaterialsAction Items 01/26/11Action Items 01/26/11
1)1)Review wording of Starch and Guar tests with Review wording of Starch and Guar tests with TG08WG02, vote and forward to TG08TG08WG02, vote and forward to TG08
2)2)Re-run SEBC tests with new sample of Starch in Re-run SEBC tests with new sample of Starch in round robin repeatround robin repeat
3)3)Recommend hibernation for TG08WG04 (API RP13K) Recommend hibernation for TG08WG04 (API RP13K) after voting comments are resolved (Passed)after voting comments are resolved (Passed)
4)4)Contact Saleh Al-Ammari for clarification on data Contact Saleh Al-Ammari for clarification on data presented to SC13, determine status of proposed WG presented to SC13, determine status of proposed WG and solicit members as appropriate (Establish WG)and solicit members as appropriate (Establish WG)
SC13 – Drilling Completion and Fracturing Fluids
SC13
TG9 Frac Fluids: Mahmoud Asadi TG9 Frac Fluids: Mahmoud Asadi Active DocumentsActive Documents
ISO 13503-1 (API 13M-1) ISO 13503-1 (API 13M-1) Procedure for measuring Procedure for measuring viscous properties of completion fluidsviscous properties of completion fluids
5-year revision is under review by ISO/API5-year revision is under review by ISO/API
ISO 13503-6 (API 13M-6) ISO 13503-6 (API 13M-6) Procedure for measuring Procedure for measuring leakoff of completion fluids under dynamic conditionsleakoff of completion fluids under dynamic conditions
Final comments from the reviewers are under review by the Final comments from the reviewers are under review by the committee members committee members
SC13
TG9 Frac Fluids: Mahmoud Asadi TG9 Frac Fluids: Mahmoud Asadi WGs & DocumentsWGs & Documents
ISO 13503-X (API 13M-X) Formation damage (regain ISO 13503-X (API 13M-X) Formation damage (regain permeability)permeability)
First draft will be submitted to ISO/API in Jan 2012First draft will be submitted to ISO/API in Jan 2012
ISO 13503-XX (API 13M-XX) EmulsionISO 13503-XX (API 13M-XX) Emulsion
Kick-off meeting was held in 2010Kick-off meeting was held in 2010
ISO 13503-XXX (API 13M-XXX) FrictionISO 13503-XXX (API 13M-XXX) Friction
First draft will be submitted in Jan 2012First draft will be submitted in Jan 2012
SC13
WG on Business Practices, PolnaszekWG on Business Practices, PolnaszekSummary Report Summary Report
Proposed new TG and equipment for long term Proposed new TG and equipment for long term storage of technical data – wait to develop storage of technical data – wait to develop SR3 and SC13 vote on new TGSR3 and SC13 vote on new TG
Other work on RP and flowchart will continueOther work on RP and flowchart will continue
SC13
Transfer of Proppant TG from Transfer of Proppant TG from SC19 to SC13SC19 to SC13
CSOEM will most likely transfer of TG on CSOEM will most likely transfer of TG on Proppants from SC19 to SC13, Glenn Proppants from SC19 to SC13, Glenn Penny ChairPenny Chair
SC13
Comments on this meeting
Comments on this meetingGood attendance
Simultaneous meetings did not work and will try not to do it again
Having true work group meetings was good and will be continued
First row TG/WG seating did not work
Will stay with Tuesday Wednesday schedule
SC13
Closing Comments
My agenda as Chair:1. Do things faster with same quality of work
2. Less is more – publication bloat reduction
3. Change:a) Embrace modern work processes
b) Accept new technologies: API website, eWorking
c) Encourage new and younger member participation
4. Social – Contact Jarad Hammar
Thanks for Volunteering!
Feel free to contact me
SC13
Are we finished?
OLD BUSINESS
NEW BUSINESS
ADJOURN