+ All Categories
Home > Documents > Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes...

Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes...

Date post: 30-Mar-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
26
Scanned by CamScanner
Transcript
Page 1: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Scanned by CamScanner

Page 2: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Minutes of 46th SOAP Meeting held on 29.10.2018. Page 1

SSLLDDCC

MMIINNUUTTEESS OOFF 4466tthh

MMEEEETTIINNGG OOFF SSOOAAPP

HHEELLDD OONN 2299..1100..22001188

Page 3: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Minutes of 46th SOAP Meeting held on 29.10.2018. Page 2

Minutes of 46th meeting of Sub Committee for Operation and Protection

(SOAP) held at SLDC, Raipur on 29.10.2018.

The 46th meeting of Chhattisgarh State Operation and Protection Sub

Committee of SGCC was held on 29th October 2018 at SLDC Conference Hall.

The list of participants is enclosed in Annexure-I.

Shri. A. K. Shrivastava, CE (SLDC) welcomed all the participants of 46th SOAP meeting.

Item no. 1 Review of system operation during the month of September-

2018:

Presentation and the performance of Thermal Stations and

Transmission System by SLDC, is enclosed in Annexure-II.

Sub Committee noted.

Item no. 2 State Energy Account (SEA) Data:

The data regarding State Energy Account for the month of

September-2018 was submitted to this office on 25.10.2018 by

O/o ED (Revenue) CSPDCL and representatives from O/o ED (S/s:

O&M) CSPTCL, Raipur submitted the data on 26.10.2018.

It was reminded to the representatives from O/o ED (S/s:

O&M) CSPTCL, Raipur to incorporate consumption of

transformers charged in August-2018 at new sub-stations i.e. 132

KV Rajpur, 132 KV Kansabel , 132 KV Wadrafnagar , 132 KV

Nagri, which was not included in the earlier data. This was

already intimated Vide T.O. letter no. 1323 dated 16.10.2018 as

the calculated transmission loss for the month of August-2018 is

on higher side.

Page 4: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Minutes of 46th SOAP Meeting held on 29.10.2018. Page 3

Item no. 3 Outage planning for the month of December-2018 & January-

2019:

Outage planning of Transmission feeders, Power transformers for

the month December-2018 & January-2019, submitted by O/o ED

(S/s: O&M) CSPTCL Raipur is enclosed in Annexure III. Sub Committee agreed and noted.

Item no.4. Status of FGMO { Free Governor Mode Operation } in

thermal units as on 28.09.2018:

The decision of OCCM held on 23.09.2018 was apprised to the

head of generating stations that state generators has also

contribute to the relief through Primary frequency response.

Primary frequency response below 40% will be reported to CERC

for penal action. The status RGMO of of both Marwa TPS is

showing out. Representative of ED(O&M:Gen) CSPGCL has

been requested to get the same in service.

Item no.5. Details of new transmission lines, transformer or any other

transmission elements to be charged in December-2018 &

January-2019:

The representative from O/o CE (S/s: O&M) CSPTCL has

intimated the following list of new substation and transformers

likely to be charged in November-2018 & December-2018.

S.

No

Name of

S/stn

Details of equipments &

lines to be commissioned Remark

1 220 KV S/s

Bhatapara 40 MVA Transformer-II

Expected to be

charged in

December 2018

2 132 KV S/S 132/33 KV 40 MVA Xmer-

II, Make: ECE

Expected to be

charged in

Page 5: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Minutes of 46th SOAP Meeting held on 29.10.2018. Page 4

R

e

Representative from O/o ED (S/s: O&M) Raipur, CSPTCL was

requested to provide single line diagram of newly charged sub-

stations along with feeder names at 33 KV end also. Further it

was also requested to arrange telemetry of these new stations

already commissioned in past months, as early as possible. In

case of any delay in commissioning of RTU, the data from other

end sub-station may be provided so that the newly commissioned

S/s may be monitored effectively.

Sub Committee noted.

Item no. 6 Details for Installation of capacitors to be furnished to WRPC:

The status of Installation of capacitors of Raipur and Bilaspur

circle for September-2018 was furnished during the meeting by

the representatives from O/o ED (S/s:O&M) Raipur, CSPTCL.

Item no. 7 LGBR Preparation for the Year 2019-20 in Western Region:

It was requested to the representatives from O/o CE

(RA&PM),CSPDCL to submit the data regarding LGBR at the

earliest so that the LGBR report can be prepared and sent to

WRPC .

The data only from O/o CE (RA&PM), CSPDCL is still

awaited. The correspondence Vide T.O. letter no. 955 dated

14.08.2018, 1159 dated 25.08.2018 and 1330 dated 16.10.2018

has already been done with O/o CE (RA&PM), CSPDCL.

Representative of O/o CE (RA&PM), CSPDCL has committed to

send it within few days.

Kurud (Augmentation from 20

MVA Xmer to 40 MVA

Xmer)

November 2018

3 132 KV S/S

Kawardha 40 MVA Transformer-II

Expected to be

charged in

January 2018

Page 6: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Minutes of 46th SOAP Meeting held on 29.10.2018. Page 5

Item No. 8. Black Start mock drill Exercise.

It was decided in the meeting to conduct the Black Start mock

drill Exercise at Hasdeo Bango HPS on 25th November 2018

(Sunday).

It was also decided to carry out the mock drill through

220/132KV Churi S/s through any of the following route:

i) 132 KV Hasdeo Bango HPS -132 KV Churi S/s -132 KV

Jamnipali S/s -132 KV Korba east

ii) 132 KV Hasdeo Bango HPS -220/132 KV ICT at Churi,

220KV Korba east-220/132 KV ICT-132 KV Korba east

A meeting will be held on 13th November 2018 (Monday)

at 1200Hrs to discuss the Mock drill preparedness and route

plan among all the officials of CSPGCL O/o CE(S/s:O&M)CSPTCL

Bilaspur and CSPDCL Korba.

Representative of Korba West has intimated that during

mock drill communication with Bango HPS is very difficult and

requested for one more VOIP phone at Bango from EITC.

Item No. 9. High Voltage in Marwa, Raita and Korba West S/s:

The representatives from CSPGCL were apprised about high

voltage in Marwa, Korba West and Raita S/s and were requested

to take appropriate measures like absorbing MVAR at Generation

stations to control high voltage as the matter is being discussed

frequently in OCC meetings.

Item No. 10. Telemetry status:

The non availability of real time telemetry of the

substations to SLDC SCADA was displayed & requested for earlier

solution. Since the issues are pending since long time as such it

was decided to call a meeting in November first week after

seeking date from MD CSPTCL.

The telemetry status is enclosed in Annexure IV.

Page 7: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Minutes of 46th SOAP Meeting held on 29.10.2018. Page 6

Item No. 11. Raigarh(PG)-Budipadar charging status:

As intimated by EE(Communication) Bilaspur, The

carrier panel at Budhipadar end has been commissioned and

contract for foundation and structure for Wave Trap and CVT is

being issued.

Representative of Korba West has intimated that in both 220 KV

Korba West-Churri lines has no carrier protection presently. It

was also reported that the exchange in Churri S/s is burnt twice

recently in July2018.

Date & Venue of next meeting:

The 47th SOAP meeting is proposed to be held on 28th November

2018 (Wednesday) at SLDC Raipur. The time of meeting will be

from 12:00 hrs sharp.

*******

Page 8: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Annexure-I

S.No. Participants Designation Office Name Mobile No E-mail ID

1 Shri.J.S.Netam ED O/o ED(O&M), CSPDCL 9826837766 [email protected]

2 Shri.A.K.Shrivastava CE O/o CE(SLDC), CSPTCL 9827177466 [email protected]

3 Shri.J.R.Patel Addl. CE O/o ED(Revenue), CSPDCL 9425212795 [email protected]

4 Smt. Sharda Sonwani Addl. CE O/o CE(SLDC), CSPTCL [email protected] ,

[email protected]

5 Shri.J.K.Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]

6 Shri.V.K.Nimja SE SE(O&M) HBHPS Machadoli, CSPGCL 9406440565 [email protected]

7 Shri.Y.K.Rao SE O/o CE(SLDC), CSPTCL 9826518820 [email protected]

8 Shri.G.K.Mandavi SE O/o CE(SLDC), CSPTCL 8225962747 [email protected]

9 Shri.Ajay Sharma SE O/o CE (RA&PM) CSPDCL 9893193646 [email protected]

10 Shri.H.P.Sharma EE (E.M)KTPS,Korba East,CSPGCL 9425539703 [email protected]

11 Shri.R.Arvind EE O/o SE(ET&C),KWB,CSPGCL9452224086 ,

[email protected]

12 Shri.Sanjay Choudhary EE O/o SE(Backup SLDC), CSPTCL 9340197611 [email protected],

13 Shri.Shashank Dhabre EE O/o ED(O&M:), GCC,CSPGCL 9329296556 [email protected]

14 Shri.M.S.Singh EE O/o EE(Communication & Telemetry)Dn Bhilai,

[email protected]

15 Shri.J.L.Uranve EEO/o EE(Communication &

Telemetry)Dn,Bilaspur,CSPTCL9752074311

[email protected] ,

[email protected]

List of participants attended the 46th SOAP (Sub-committee of Operation & Protection) Meeting.

Minutes of 46th SOAP Meeting held on 29.10.2018.

Page 9: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Annexure-I

S.No. Participants Designation Office Name Mobile No E-mail ID

List of participants attended the 46th SOAP (Sub-committee of Operation & Protection) Meeting.

16Shri.Suchendra Kumar

UikeEE O/o CE(SLDC), CSPTCL 9685554777 [email protected]

17 Smt. Veena Narang EE O/o CE(S/s:O&M), CSPTCL 9713990560 [email protected]

18 Shri.S.Surya Prakash AE O/o CE(SLDC), CSPTCL 9329012913 [email protected]

19 Shri.G.P.Singh AE O/o CE(SLDC), CSPTCL [email protected] ,

[email protected]

20 Shri.K.K.Bajaj AE O/o ED(O&M:Gen),CSPGCL 9424228869 [email protected]

21 Shri.Sourabh Pandey AE O/o CE(S/s:O&M), CSPTCL [email protected] ,

[email protected]

22 Ms. Namita Vibha Lakra AE O/o CE(SLDC), CSPTCL 8435002692 [email protected]

23 Shri.K.K.Shrivastava AE O/o CE(RA&PM), CSPDCL 9425586694 [email protected]

24 Shri.Prem Kumar Jaiswal AE O/o CE(SLDC), CSPTCL 8982611767 [email protected]

Minutes of 46th SOAP Meeting held on 29.10.2018.

Page 10: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

1

STATE LOAD DISPATCH CENTRE

RAIPUR CHHATTISGARH

46thSOAP MEETING

29.10.2018

1.1 PERFORMANCE OF STATE GENERATING STATIONS

THERMAL & HYDEL GENERATING STATIONS :

Generation (in MU)PLANT AVAILABILITY FACTOR

PAF (in %)

PLANT LOAD FACTOR

PLF (in %)

Generator Capacity SEP-18Prog. from

Apr-18

Annual

Target as

per CSERC

norms

SEP-18Prog.

from

Apr-18

Annual

Target as

per CSERC

norms

SEP-18Prog.

from

Apr-18

Annual

Target

as per

CSERC

norms

KTPS440 MW

{2X50 +

2X120}123.23 888.85 1537.38 49.05 58.20

60%- PH2

70%- PH350.34 47.78 66.76

DSPM500 MW

{2X250}340.08 1986.81 3723.00 97.33 96.91 85.00 94.46 90.47 85.00

HTPS 840 MW

{4X210}472.64 2819.92 5472.94 80.48 79.60 74.38 78.15 76.44 74.38

KWB

Extn

500 MW

{1X500}330.58 1941.73 3723.00 91.88 89.67 85.00 91.82 88.42 85.00

MARWA

1000

MW

{2X500}612.19 3571.42 7446.00 84.64 80.99 85.00 85.02 81.31 85.00

THERMAL3180

MW1878.73 11208.73 21902.32 --- --- --- 82.05 78.19 80.00

BANGO

HPS

120 MW

{3X40} 74.02 145.568 --- --- --- --- --- --- ---

Page 11: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

2

1.2 PERFORMANCE OF STATE GENERATING STATIONS

Generating

Station Capacity

Auxiliary Consumption (in %)

No. of Forced Outage

SEP-18Progressive

from Apr-18

Annual Target as

per CSERC norms

SEP-18Tube

LeakageProgressive from Apr-18

KTPS440 MW {2X50 + 2X120}

13.27 13.27 11.25 6 1 57

DSPM500 MW {2X250}

7.96 8.06 9.00 1 1 11

HTPS840 MW {4X210} 9.49 9.53 9.70 4 4 29

KWB Extn.

500 MW {1X500} 5.21 4.76 5.25 5 0 8

MARWA1000 MW {2X500} 5.27 5.50 5.25 2 1 24

THERMAL 3180 MW 7.33 7.46 --- 18 7 129

BANGO120 MW {3X40} 0.10 0.290 --- --- --- ---

1.3 Frequency ParticularsFrequency status during AUG-18, SEP-18 & SEP-17 (As per WRLDC)

Other Frequency parameters during the month of SEP - 2018.

Frequency Range AUG-18 SEP-18 SEP-17

IEGC band % of time % of time % of time

Between 49.90 & 50.05 Hz

80.44 88.22 78.50

< 49.90 Hz 8.93 13.21 11.77

> 50.05 Hz 10.63 6.57 9.73

Frequency Status Frequency {Hz}

Time { h:mm:ss}

Date

Average Freq. 49.97 -- --

Max Instantaneous Freq.

50.20 13:03 22.09.2018

Min Instantaneous Freq.

49.57 18:23 24.09.2018

Page 12: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

3

1.4 Demand Pattern.

AUGUST-18 SEPTEMBER-18 SEPTEMBER-17% Change

compared to previous year

Max. Demand Met

4186 MW05.08.2018

19:15

4468 MW27.09.2018

18:30

4093 MW26-09-2017

18:309%

Max. Unrestricted

Demand at the time of Max. Demand Met

4190 MW 4485 MW 4139 MW 8%

Min. Demand Met

2404MW27.08.2018

12:30

2234 MW21.09.2018

09:30

2460 MW20-09-2017

14:00-9%

Max. Unrestricted

Demand

4190 MW05.08.2018

19:15

4640 MW15.09.2018

19:15

4318 MW26-09-2017

18:457%

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100

4200

4300

4400

4500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MW

Date

Daily Max Demand met in the month of Aug-18,Sep-18 & Sep-17. MAX 4468 MW on 27.09.2018 at 18:30 hrs.

Average increase of 9 % compared to last year

SEP-

2018SEP-

2017AUG-

2018

4186 MW on

05.08.18 at

19:15 Hrs.

4468 MW on

27.09.18 at

18:30 Hrs4093 MW on

26.09.17 at

18:30 Hrs

Page 13: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

4

2100

2300

2500

2700

2900

3100

3300

3500

3700

3900

4100

4300

4500

MW

Date

Daywise Min and Max Demand met in the month of Sep-18, [ Difference : Max 1469 MW on 21.09.18 & Min 450 MW on 16.09.18 ]

450 MW

1469 MW

Demand drop due to rainy

day & Vishwakarma

jayanti

3300

3500

3700

3900

4100

4300

4500

4700

MW

Date

Daywise Maximum Resrticted Vs Unrestricted Demand in the month of Sep-18,

UNRESTRICTED

DEMAND

RESTRICTED

DEMAND

Page 14: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

5

3625

3482

3619

3743

354434863470

3544

3704

3898

40344125

42314205

4365

419241144128

42114159

37033728

3874

40844176

4118

4468440843704389

1700

1800

1900

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100

4200

4300

4400

4500

4600

4700

01/S

ep

02/S

ep

03/S

ep

04/S

ep

05/S

ep

06/S

ep

07/S

ep

08/S

ep

09/S

ep

10/S

ep

11/S

ep

12/S

ep

13/S

ep

14/S

ep

15/S

ep

16/S

ep

17/S

ep

18/S

ep

19/S

ep

20/S

ep

21/S

ep

22/S

ep

23/S

ep

24/S

ep

25/S

ep

26/S

ep

27/S

ep

28/S

ep

29/S

ep

30/S

ep

MAX. DEMAND MET PATTERN 2016 Vs 2017 Vs 2018 For the Month of September

FY 2016 - 17 FY 2017 - 18 FY 2018-19 Linear ( FY 2016 - 17)

MW %

CSPGCL Thermal (Ex Bus)

2524 56%

CSPGCL Hydel 119 3%

CPP/IPP's (STOA+PPA) Injection + Inter state STOA

53 1%

Other Injection 45 1%

CS Share including BSP share in NSPCL

1143 26%

Net Import / Export 610 14%

OD(+) / UD(-) -26 -0.59%

Demand Met (MW) 4468

Availability during Monthly Peak Demand Met: (4468 MW on 27-09-2018 at 18:30 hrs)

Page 15: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

6

CSPGCL Thermal 252456%

CSPGCL Hydel1193%

CPP/IPP's (STOA+PPA) Injection + Inter state

STOA531%

Other Injection451%

CS Share including BSP share in NSPCL

114326%

Net Import(+) / Export (-)

61014%

OD(+) / UD(-) -26

-0.59%

Availability at the time of monthly peak demand.4468 MW on 27.09.18 at 18:30 Hrs.

Total Import at the time of Max Demand

Met94574%

Total Export at the time of Max Demand

Met-335-26%

Import & Export at the time of Monthly Peak Demand.4468 MW on 27.09.18 at 18:30 Hrs.

Page 16: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

7

1.5 LOAD SHEDDING

Load Shedding during September-2018:

Load Shedding Duration (in HH:MM)

Equivalent Load Relief

(in MU/Day)

Max Load Shedding

Done.

In Groups Feeders55:18:00 0.16

586 MW on 29.09.2018 at

19:00 Hrs

In Industrial feeders 108:07:00 0.28

TOTAL 163:25:00 0.44

Power Cuts / Load shedding : CHHATTISGARH ( SEPTEMBER : 2018 )

Date

Hour 1st

2nd

3rd

4th

5th

6th

7th

8th

9th

10th

11th

12th

13th

14th

15th

16th

17th

18th

19th

20th

21st

22nd

23rd

24th

25th

26th

27th

28th

29th

30th

1:00 0 0 0 0 0 0 0 0 0 0 0 0 0 326 38 0 0 0 56 0 0 0 0 0 0 45 0 0 245 116

2:00 0 0 0 0 0 0 0 0 0 0 0 0 0 177 38 0 0 0 56 0 0 0 0 0 0 45 0 0 129 187

3:00 0 0 0 0 0 0 0 0 0 0 0 0 0 177 38 0 0 0 56 0 0 0 0 0 0 45 0 0 129 216

4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38 0 0 0 56 0 0 0 0 0 0 45 0 0 0 143

5:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38 0 0 0 56 0 0 0 0 0 74 45 0 0 0 143

6:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 0 0 0 0 0 73 91 0 0 236 112

7:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

8:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66 0 0 0 0

9:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 101

11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 221

12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 173

13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 296

15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 172

Page 17: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

8

Power Cuts / Load shedding : CHHATTISGARH ( SEPTEMBER : 2018 )

Date

Hour1s

t

2nd

3rd

4th

5th

6th

7th

8th

9th

10th

11th

12th

13th

14th

15th

16th

17th

18th

19th

20th

21st

22nd

23rd

24th

25th

26th

27th

28th

29th

30th

16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 172

17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 116 0 0 65 110

18:00 0 0 0 0 0 0 0 0 0 0 0 0 60 38 0 0 0 0 240 0 0 0 0 0 0 143 0 0 54 0

19:00 0 0 0 0 0 0 0 0 192 34 0 0 60 500 0 0 0 0 296 0 0 0 0 0 0 521 0 0 586 0

20:00 0 0 0 0 0 0 0 0 28 34 0 0 248 500 0 0 0 261 49 0 0 0 0 0 0 521 0 0 54 0

21:00 0 0 0 0 0 0 0 0 0 0 0 0 248 500 0 0 0 56 49 0 0 0 0 0 45 408 0 0 54 0

22:00 0 0 0 0 0 0 0 0 0 0 0 0 60 321 0 0 0 56 49 0 0 0 0 0 45 0 0 0 149 0

23:00 0 0 0 0 0 0 0 0 0 0 0 0 60 321 0 0 0 56 339 0 0 0 0 0 45 0 0 0 307 0

24:00 0 0 0 0 0 0 0 0 0 0 0 0 60 214 0 0 0 56 0 0 0 0 0 0 45 0 0 266 212 0

AVG

(MW)0 0 0 0 0 0 0 0 9 3 0 0 33 128 8 0 0 20 57 0 0 0 0 0 14 87 0 11 92 90

MAX

(MW)0 0 0 0 0 0 0 0 192 34 0 0 248 500 38 0 0 261 339 0 0 0 0 0 74 521 0 266 586 296

MIN

(MW)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1.6 - SOLAR POWER INJECTION (At 132 KV)

M/s Acme [30 MW]

M/s Azure [3X10 MW]

M/s Parampujya[2X50 MW]

Total

APR-18 MU 4.33 4.25 20.10 28.68

MAY-18 MU 4.49 4.23 21.17 29.90

JUN-18 MU 4.01 3.72 18.51 26.25

JUL-18 MU 2.40 2.68 13.57 18.65

AUG-18 MU 2.43 2.31 11.98 16.72

SEP-18 MU 3.37 3.79 18.15 25.31

Page 18: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

9

Addition of new grid elements during September-2018.

S.No

NAME OF SUB STATION

NAME OF CHARGED EQUIPMENTS & LINES

DATE TIME REMARKS

1132 KV S/s Pakhanjur

[New S/stn]

1). 132 KV Bhanupratappur-Pakhanjur Ckt.

14-Sep-18

17:23First time charged.

2). 132 KV Main Bus. 18:17First time charged.

3). 40 MVA Transformer . 19:24First time charged.

2400 KV S/s Jagdalpur

315 MVA, 400/220 KV ICT - II

19-Sep-18

First time charged.

Bay - 407 17:02First time charged.

Bay - 408 17:06First time charged.

3220 KV S/s Gendpur

(Kawardha)

160 MVA Transformer No. II (From 220 KV side only)

24-Sep-18 17:40First time charged.

4 132 KV S/s Saja 40 MVA Transformer No. II 26-Sep-18 18:00First time charged.

1.7 - TRANSMISSION LOSS

Performance of CSPTCL : Transmission Loss(%) as per data provided by O/o of CSPGCL, CSPTCL & CSPDCL.

2018-19 2017-18% Change

compared to previous year

APR 3.16% 3.33% -5%

MAY 3.13% 2.88% 9%

JUN 3.00% 2.89% 4%

JUL 3.13% 2.87% 9%

Page 19: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

10

Percentage Status of Compliances of Backing Down Instruction issued by SLDC to Generating Stations of CSPGCL :

1.8 - BDI Compliance

MonthTotal no of BDI issued

by SLDC

Compliance % by Generators/Generating Stations

Total Non Compliance

< 25% 25 to 50% 50 to 90% > 90%

SEP-18 79 1 2 14 44 18

MonthTotal

(In Mus)

Backing Down by Generators/Generating Stations. (In Mus)

((

KTPS HTPS KWB Extn MTPP DSPM

SEP-18 27.58 0.52 16.03 1.33 0.00 9.70

G G

Bango 132 KV Bus

Korba East 132 KV Bus

Manendragarh Bishrampur

Near-Bus

Far-Bus

Jamnipali 132 KV Bus

Bus - II

Bus - I

Bus Coupler

Bus Coupler

Gewra132 KV

Champa

Station Transformer

3x40 MW

U#3U#1 U#2

ISLANDED SUB-SYSTEM

40 MVA

40MVA Mopka Renki

G

Korba East 220 KV Bus (4x50+2x120 MW)

NETWORK FOR EXTENDING START UP POWER FROM BANGO HYDEL STATION TO THERMAL STATIONS OF CSPGCL

Churi 132 KV

Churi 220 KV

DSPMTPS 220 KV Bus (2x250 MW)

Korba West 220 KV Bus (4x210+500 MW)

160 MVA

132 KV

220 KV

MTTP 220 KV Bus (2x500 MW)

220KV BANARI

160MVA ICT-2

160MVA ICT-1

Churi Khurd

132 KV40 MVA

Page 20: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

30/10/2018

11

Bango 132 KV Bus

Korba East 132 KV

Far-Bus

Jamnipali 132 KV Bus

Bus - II

U#3

ISLANDED SUB-SYSTEM

40 MVA Tr.1 132/33 KV

NCDC Manikpur

BALCO 5 MVA

33/11 KV

5 MVA 33/11 KV

ITI Colony Korba-II

33 KV

160MVA ICT-1

G

The real time telemetry of following substations is still not available toSLDC.

SL. No.

Name of S/S

1 220 KV S/S Vishrampur

2 220 KV S/S Kawardha

3 220 KV S/S Borjhara

4220 KV S/S Kuthrel

(Dharsiwa)

5 132 KV S/S Mana

6 132 KV S/S Sector-A Urla

7 132kV S/S Balrampur

8 132kV S/S Pratappur

9 132kV S/S Sukma

10 132kV S/S Takhatpur

11 132kV S/S Kondatarai

12 132kV S/S Dabhra

SL. No. Name of S/S

13 132kV S/S Mohla

14 132kV S/S Basna

15 132kV S/S Bhakhara

16 132kV S/S Sheorinarayan

17 132kV S/S Lormi

18 132kV S/S Batoli

19 132kV S/S Kansabel

20 132kV S/S Rajpur

21 132kV S/S Wadrafnagar

22 132kV S/S Nagri

23 132kV S/S Pakhanjur

Page 21: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

ANNEXURE III

Date Time Date Time

Routine Maintenance

1 400400 KV Bus-II at 400 KV S/s

Khedamara.14.12.2018 7:00 14.12.2018 18:00 Daily

Conductor rewinding work in various 400 KV baysCSPTCL ---

2 400400 KV Transfer Bus (Bay No. 6) at 400 KV Switchyard at HTPS,

Korba West.

05.12.2018 8:30 05.12.2018 18:00 Daily(1) Cleaning and tightness of clamps of bus and line

isolator, CT's & CVT's and breaker.Cleaning of insulator of CT's & CVT's ,isolator and breaker.

CSPTCL ---

3 220220 KV Marwa-Banari Feeder No.

1 (Bay No. 209) at 400 KV switchyard Marwa.

6.12.2018 8:30 07.12.2018 17:30 Continuous

1. Annual Testing of Relays, CT, Circuit Breaker and

CVT. 2. Cleaning and Terminal tightness of CT JB, Breaker Mar. Box., and control & relay panel. 3.

General Checking, Cleaning & lubrication of operating mechanism of Circuit Breaker &

Isolators.

CSPTCL ---

4 220220 KV Marwa-Banari Feeder No.

2 (Bay No. 208) at 400 KV switchyard Marwa.

13.12.2018 8:30 14.12.2018 17:30 Continuous

1. Annual Testing of Relays, CT, Circuit Breaker and CVT. 2. Cleaning and Terminal tightness of CT JB, Breaker Mar. Box., and control & relay panel. 3.

General Checking, Cleaning & lubrication of operating mechanism of Circuit Breaker &

Isolators.

CSPTCL ---

5 220220 KV Transfer Bus Coupler (Bay

No. 204) at 400 KV switchyard Marwa.

20.12.2018 8:30 21.12.2018 17:30 Continuous

1. Annual Testing of Relays, CT, Circuit Breaker and CVT. 2. Cleaning and Terminal tightness of CT JB, Breaker Mar. Box., and control & relay panel. 3.

General Checking, Cleaning & lubrication of operating mechanism of Circuit Breaker &

Isolators.

CSPTCL ---

6 220220 KV PGCIL Ckt-I at 220 KV S/s

Raigarh04.12.2018 8:00 04.12.2018 17:00 Daily For preventive maintenance CSPTCL ---

7 220220 KV PGCIL Ckt-II at 220 KV S/s

Raigarh05.12.2018. 8:00 05.12.2018. 17:00 Daily For preventive maintenance CSPTCL ---

8 220220 KV PGCIL Ckt-III at 220 KV

S/s Raigarh07.12.2018 8:00 07.12.2018 17:00 Daily For preventive maintenance CSPTCL ---

B ICT

1 400 315 MVA ICT bank-I at 400 KV S/s Khedamara.

03.12.2018 9:00 04.12.2018 17:00 Continuous Annual Maintenance Programme. CSPTCL ---

2 400 315 MVA ICT bank-III at 400 KV S/s Khedamara.

06.12.2018 9:00 07.12.2018 17:00 Continuous Annual Maintenance Programme. CSPTCL ---

3 400 315 MVA ICT bank-II at 400 KV S/s Khedamara.

10.12.2018 9:00 11.12.2018 17:00 Continuous Annual Maintenance Programme. CSPTCL ---

A

Maintenance / Shutdown programme of Transmission Elements for the month of December-2018.

S.No KV Lines/ ICT Particulars From To Daily /

Continuous Reason Agency Remarks

Page 22: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

ANNEXURE III

From To

1132KV S/s Rajnandgaon

132KV Rajnandgaon-

Traction-I03.12.2018 10:00 13:00 Daily

Post monsoon Mainteanance

This shutdown will be taken only if Load managed by 132KV

Rajnandgaon-Traction-II feeder.

2132KV S/s Rajnandgaon

132KV Rajnandgaon-

Traction-II03.12.2018 14:00 17:00 Daily

Post monsoon Mainteanance

This shutdown will be taken only if Load managed by 132KV

Rajnandgaon-Traction-I feeder.

3220 KV S/s Bemetara

220KV Bemetara-Khedamara

06.12.2018 10:00 17:00 DailyPost monsoon Mainteanance

This shutdown will be taken only if Load managed by other adjacent EHV

S/s.

4132KV S/s Gandai

132KV Gandai-Saja Ckt

12.12.2018 10:00 13:00 DailyPost monsoon Mainteanance

There will be total intrruption during s/s load can be managed by adjacent

EHV S/s.

5220 KV S/s Thelkadih

220KV Khedamara-Thelkadih Ckt-I

14.12.2018 09:00 13:00 DailyPost monsoon Mainteanance

Load will be managed by another ckt-II

6220 KV S/s Thelkadih

220KV Khedamara-Thelkadih Ckt-II

14.12.2018 13:00 17:00 DailyPost monsoon Mainteanance

Load will be managed by another ckt-I

7220KV S/s Kawardha Gendpur

160MVA X-mer -I 19.12.2018 10:00 16:00 DailyPost monsoon Mainteanance

There will be total intrruption during s/s load can be managed by adjacent

EHV S/s.

8132KV S/s Pandariya

132KV Pandariya-Mungeli feeder

21.12.2018 10:00 16:00 DailyPost monsoon Mainteanance

This shutdown will be taken only if Load managed by other adjacent EHV

S/s.

9132KV S/s Rajnandgaon

132KV Rajnandgaon-Dongargaon

24.12.2018 10:00 16:00 DailyPost monsoon Mainteanance

This shutdown will be taken only if Load managed by other adjacent EHV

S/s.

10132KV S/s Rajnandgaon

40MVA-I 26.12.2018 10:00 16:00 DailyPost monsoon Mainteanance

This shutdown will be taken only if Load managed by 40MVA-II other

adjacent EHV S/s.

11132KV S/s Kawardha

132KV Pandariya-kawardha feeder

29.12.2018 10:00 16:00 DailyPost monsoon Mainteanance

This shutdown will be taken only if Load managed by other adjacent EHV

S/s.

1132 KV S/s Kawardha

40MVA 04.01.2019 11:00 16:00 DailyGeneral Maintenance

This shutdown will be taken only if load manged by 63 MVA X-mer I and other adjacent EHV S/s

2132KV Dongargaon

40MVA II 9.01.2019 10:00 16:00 DailyGeneral Maintenance

This shutdown will be taken only if load manged by 40 MVA X-mer I and other adjacent EHV S/s

3132KV S/s Gandai

40MVA II 17.01.2019 11:00 16:00 DailyGeneral Maintenance

This shutdown will be taken only if load manged by 40 MVA X-mer I and other adjacent EHV S/s

4132KV S/s Dongargarh

20MVA 23.01.2019 10:00 16:00 DailyGeneral Maintenance

This shutdown will be taken only if load manged by 40 MVA X-mer and other adjacent EHV S/s

5132KV S/s Pandariya

40MVA II 30.01.2019 11:00 16:00 DailyGeneral Maintenance

This shutdown will be taken only if load manged by 40 MVA X-mer I and other adjacent EHV S/s

Dec-18

Jan-19

OUTAGE PLANNING OF TRANSMISSION FEEDER / POWER TRANSFORMER OF S/S DN.,CSPTCL, RAJNADGAON DURING THE PERIOD (01.12.2018 TO 31.01.2019)

S.No.Name of

Substation Name of feeder

/X-mer Bay

Proposed / Tentetive

Date

Duration of Shutdown

BasisPurpose of Shutdown

Remarks

Page 23: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

ANNEXURE III

S No. Name of S/S X-mer Details

220KV S/S Barsoor 160 MVA, 220/132KV

40 MVA, 132/33 KV

2 132KV S/S Kirandul 40 MVA, 132/33KV

3 132KV S/S Charama 40 MVA, 132/33KV

4 132KV S/S Sukma 40 MVA, 132/33KV

5 132KV S/S Kanker 40 MVA I and II, 132/33KV

OUTAGE PLANNING OF S/S DN.,CSPTCL, JAGDALPUR DURING THE PERIOD (01.12.2018 TO 31.01.2019)

EE ( S/S) Dn.,

Jagdalpur

Post monsoon maintenance

Remarks

1 Post monsoon maintenance

Post monsoon maintenance

Post monsoon maintenance

Post monsoon maintenance

Page 24: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Annexure IV

Item No. 10 :- Status & Tentative plan for the following Substation under (Communication & Telemetry) CSPTCL, Dn. Bilaspur & Korba. S.N. Name of the

Substation Status & Tentative plan

1 220 KV S/s Bishrampur

The RTU has to be commissioned by the turn key contractor M/s Alstom. Note sheet for the same has been sent vide this office U.O. Note No. 757 Dtd 01.02.2018.

2 132 KV S/s Balrampur

RTU is not available at 132 KV Substation Balrampur. The requirement for the same has been sent vide this office letter No.131 Dtd. 09.05.2018, No. 919 Dtd. 02.01.2017, No. 882 Dtd. 28.01.2016 No. 42 Dtd. 09.04.2015 & No. 604 Dtd. 26.10.2018.

3 132 KV S/s Prattappur

Work will be done shortly.

4 132 KV S/s Takhatpur

1 Set of Twin channel carrier cabinet (2 Nos.) are required for transmission of real time data of these two substations. The same has been sent vide this office U.O. Note No. 472 Dtd. 06.09.2018.

5 132 KV S/s Lormi

6 132 KV S/s Rajpur The work of RTU commissioning is still pending on the part of M/s Brahmin. Meeting for completion of the above work is held on Dtd.23.10.2018. Also, intimated vide this office letter No. 603 Dtd. 26.10.2018.

7 132 KV S/s Wadrafnagar

8 132 KV S/s Kondatari

9 Sets (18 Nos.) of Twin channel carrier cabinets are required for transmission of real time data of 4 substations. The same has been sent vide this office U.O. Note No. 420 Dtd. 07.08.2018.

9 132 KV S/s Dhabhra 10 132 KV S/s Bataoli 11 132 KV S/s Kansabel 12 132 KV S/s

Sheorinaryan 1 No. ETL-600 is required for the counter part i.e. 220 KV S/s Banari. The same is intimated vide this office U.O. Note No. 643 Dtd. 13.12.2017.

Page 25: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

Annexure IV Item no. 10. Telemetry issues:

1. The Real Time telemetry of following sub-station is still not available to SLDC .

Sl.NO. EHV S/s Remarks

1 220KV Kawardha

Estimate for requirement of PLCC carrier cabinet is to be submitted.

At present Gateway is not configured at 220KV S/s Kawardha (Gendpur).

2 220KV Borjhara

Estimate for requirement of PLCC carrier cabinet is to be submitted.

At present RTU(ABB) is not

configured and commissioning of PLCC carrier cabinet is balance.

3 220KV S/s Kutherel (Dharsiwa)

RTU is not configured and commissioning of PLCC carrier cabinet is balance.

4 132KV S/s Mana

On dtd 09.04.2015 RTU has commissioned, but AI data showed zero ,regarding rectification, already informed to M/s Shree Elecrtic Ltd vide T.O. letter no.903 dtd 14.12.2015, 1210 dtd 19.01.2017 , 1416 dtd 29.03.2017, 115 dtd 24.04.2017 and O/o SE(T&C) circle, CSPTCL, Bhilai’s letter no.10-70/RTU/1671 dtd 17.12.2015 and 1961 dtd 06.02.2016, 1324 dtd 01.10.2016. and O/o CE (P&P), CSPTCL, Raipur’s letter no.2531 dtd 15.10.2018

Page 26: Scanned by CamScannersldccg.com/wif-for-website/unifam/831-minutesof46thsoapmeeting2… · Minutes of 46 th SOAP Meeting held on 29.10.2018. Page 2 Minutes of 46th meeting of Sub

5 132KV Sector A Heera Pooling

Out door and indoor PLCC equipment including Battery and Battery charger has drawn and handed over to EE(S/s )Division vide T.O. letter no. 960 dtd 02.01.2018,203 dtd 17.05.2018,550 dtd 24.08.2018 and 623 dtd 14.09.2018.

6 132KV S/s Sukama

RTU is not available.requirement is submitted .

7 132KV S/s Mohla

RTU Work is balance.

8 132KV S/s Basana

RTU Work and PLCC work is balance.

9 132KV S/s Bhakhara

RTU Work and PLCC work is balance

10 132KV S/s Nagari

RTU work is balance.

11 132KV S/s Pakhanjur

No progress of PLCC work,only battery and battery charger is commissioned. RTU work is balance.

For above S/s for telemetry ,requirement of PLCC carrier cabinet

has been already vide T.O. letter no. 586 dtd 04.08.2018 .Draft estimate is to be submitted as early as possible.


Recommended