Scenario Builder and Watershed Model Progress toward the MPA Gary Shenk Modeling Workgroup 10/5/2015 1
Transcript
Page 1: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Scenario Builder and Watershed Model Progress toward the MPA

Gary Shenk Modeling Workgroup 10/5/2015

1

Page 2: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Scenario Builder and Watershed Model Progress toward the MPA

Gary Shenk Modeling Workgroup 10/5/2015

2

Page 3: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

3

REVIEWThe Models

CREATEThe Models

USEThe Models

Crunch time Expect changesNothing guaranteed

Page 4: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Crunch Time – 10/1 – 12/20

• No new information from partnership past 9/30

• Lot of work to put all the pieces together

• Calibration

4

Page 5: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Development Timeline• October 2014 – Rough Draft of major changes to nutrient processing in Scenario Builder will

need to be complete. Continued sensitivity refinement

• February 2015 - draft targets for draft land Uses

• March 2015 – All major partnership decisions are made on changes to scenario builder processing and data. Scenario builder final modifications begin.

• April 2015 - final targets approved by Modeling Workgroup for draft land uses

• Early October 2015 – All inputs are final and delivered to the WSM by the scenario builder team for the final calibration run. Final targets are based on this information.

• December 2015 - Phase 6 draft model is complete.

• December 2015 – December 2016 - Evaluation followed by fine tuning during the next year. Key scenarios available

• September 2016 – Final comments on the draft Phase 6 model

• December 2016 - All models are final. The partnership decision-making process begins to discuss how these new models will be used in the WIP3 process

5

Page 6: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

6

Each box represents a dataset, model, or process

Finished

Potentially Finished

Planned Update in 2016

Planned Update in 2015

No Default

7/21/15

Page 7: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

7

Each box represents a dataset, model, or process

Finished

Potentially Finished

Planned Update in 2016

Planned Update in 2015

Area of Concern

9/3/15

Page 8: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

8

Each box represents a dataset, model, or process

Finished

Potentially Finished

Planned Update in 2016

Planned Update in 2015

Area of Concern

Today

Page 9: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

9

Each box represents a dataset, model, or process

Finished

Planned Update in 2015

Land Use,Sparrow,Targets

Nutrient Targets

Sparrow

Land to water factors

Stream to River factors

Scenario Builder Nutrient Data

Land Use Acreage

Soil P history

Page 10: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Each box represents a dataset, model, or process

Finished

Planned Update in 2015

LagTime rSASUNEC

or

Estimated Travel Time Distributions

Modeled Travel Time Distributions

Temporal Disaggregation

Page 11: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Each box represents a dataset, model, or process

Finished

Planned Update in 2015

River andSediment

Sparrow

Stream to River factors

Urban Stream Source Ratio

Reservoir Specifications

ConowingoSimulation

Stream Geomorphic Mass Balance

Land Data Team RUSLE2

Page 12: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Phase 612

EstimatedAverage

Load + Sensitivity * Inputs

*Watershed Delivery Variance

*Stream Delivery

*

River Delivery

*BMPs

Load for a land use in a segment =

Page 13: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

13

+ Sensitivity * Inputs

*Watershed Delivery Variance

*Stream Delivery

*

River Delivery

*BMPs

Simulated in HSPFCalibrated with data, WRTDS, and Sparrow

Estimated with SparrowEstimated by USGS / WVU / Land Data team

Estimated with SparrowEstimated by Land Data team

Scenario Builder

EstimatedAverage

Load

Multiple modelsMultiple Lines

of EvidenceAnd multiple models

“Calibration”

Page 14: Scenario Builder and Watershed Model Progress toward the MPA · Development Timeline • October 2014 –Rough Draft of major changes to nutrient processing in Scenario Builder will

Crunch Time – 10/1 – 12/20

• No new information from partnership past 9/30

• Lot of work to put all the pieces together

• Calibration

14