1 | Page FEBRUARY 2020 HILLIARD CITY SCHOOLS SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT
Transcript
Page 1: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

1 | P a g e

F E B R U A R Y 2 0 2 0

H I L L I A R D C I T Y S C H O O L S

SCENARIOS &

OPTIONS FEEDBACK

RESULTS REPORT

Page 2: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

1 | P a g e

T A B L E O F C O N T E N T S

S E C T I O N P A G E

I N T R O D U C T I O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

A C K N O W L E D G E M E N T S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

E X E C U T I V E S U M M A R Y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

R E S U L S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

D E M O G R A P H I C Q U E S T I O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 5

Page 3: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

2 | P a g e

INTRODUCTION

On February 5, 2020, a Scenarios/Options questionnaire along with a presentation and supporting data was released to the Hilliard Public. This questionnaire was designed to gauge the preferences, tolerance, and thoughts of Hilliard’s community in regard to specific facility actions and grade configurations.

The questionnaire was available to complete for 1 week ending February 12, 2020. Eight hundred and fifty-two (852) responses were collected encompassing feedback with affi liations at every school in the District.

Cooperative Strategies would like to thank the student s, staff, Board of Education, and the community of the Hilliard City Schools for their commitment and dedication to the planning process.

ACKNOWLEDGEMENTS

District Leadership: Dr. John Marschhausen, Superintendent

School Board Members: Mark Abate, President Lisa Whiting, Vice President Paul Lambert , Member Nadia Long, Member Brian Perry, Member

Cooperative Strategies: Mr. Lee Hwang, Cooperative Strategies; Director Ms. Ashley Guzzo, Cooperative Strategies; Associate Director

Page 4: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

3 | P a g e

EXECUTIVE SUMMARY

Out of the 852 responses, below are the most prevalent comments/concerns:

• Logistics • Desire to understand effects through a pilot study • Additional building transitions • Cost implications • Equity among different grade configurations • Relationship building • Support for doing what is needed

There was more support for adding to/updating existing facil ities as opposed to building new facilities. Overall support for a new 6 t h grade facility was high . Having experiential learnings spaces with in every school also garnered much support.

Full results can be viewed on the subsequent pages.

Page 5: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

4 | P a g e

Q U E S T I O N 1

Scenario 1a 227 218 101 129 126

Scenario 1b 93 155 129 205 208

Scenario 1c 51 128 137 202 265

Scenario 1d 101 136 107 175 272

Please indicate your level of support for each Scenario.

High

SupportSupport

Don't

Know/No

Low

SupportNo Support

Scenario 1a Scenario 1b Scenario 1c Scenario 1d

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Please indicate your level of support for each Scenario

High Support

Support

Don't Know/No Opinion

Low Support

No Support

Page 6: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

5 | P a g e

QUESTION 2

Scenario 1a 376

Scenario 1b 111

Scenario 1c 75

Scenario 1d 149

Please select your preferred

Scenario from the choices

below.

Scenario 1a Scenario 1b Scenario 1c Scenario 1d

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Please select your preferred Scenario from the choices below.

Page 7: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

6 | P a g e

QUESTION 3

Yes 275

No 419

Don't Know / No Opinion 125

Do you support moving towards a K-

2, 3-5 campus model, district-wide?

Yes No Don't Know / No

Opinion

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Do you support moving towards a K-2, 3-5 campus model, district-wide?

Responses

Page 8: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

7 | P a g e

QUESTION 4

Scenario 2• Build new 6th Grade Center on site, TBD 229 254 137 100 97

Please indicate your level of support for Scenario 2.

High

SupportSupport

Don't

Know/No

Opinion

Low

SupportNo Support

Scenario 2• Build new 6th Grade Center on site, TBD

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Please indicate your level of support for Scenario 2.

High Support

Support

Don't Know/No Opinion

Low Support

No Support

Page 9: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

8 | P a g e

QUESTION 6

Avery ES rebuild 106 134 261 129 151

Avery ES renovations 96 283 241 94 64

Beacon ES rebuild 143 136 242 124 134

Beacon ES renovations 86 306 218 102 62

Brown ES rebuild 103 122 258 142 147

Brown ES renovations 84 281 244 95 66

Scioto Darby ES rebuild 93 116 253 144 155

Scioto Darby ES renovations 83 296 238 103 53

Experiential learning spaces at all ES buildings 187 279 151 86 81

Experiential learning ES HUB 98 198 188 136 155

Station 6th Grade rebuild 164 159 172 131 153

Station 6th Grade repurpose 102 231 219 107 113

Station 6th Grade maintain 99 217 202 142 107

Please indicate your level of support for each Option below.

High

SupportSupport

Don't

Know/No

Opinion

Low

SupportNo Support

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

Please indicate your level of support for each Option below

High Support

Support

Don't Know/No Opinion

Low Support

No Support

Page 10: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

9 | P a g e

QUESTION 7

Avery ES rebuild 175

Avery ES renovations 327

Avery ES maintain as needed 210

Please select your preferred action from

the choices below.

Avery ES rebuild Avery ES renovations Avery ES maintain as needed

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

50.00%

Please select your preferred action from the choices below.

Page 11: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

10 | P a g e

QUESTION 8

Beacon ES rebuild 231

Beacon ES renovations 295

Beacon ES maintain as needed 185

Please select your preferred action from

the choices below.

Beacon ES rebuild Beacon ES renovations Beacon ES maintain as

needed

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

Please select your preferred action from the choices below.

Page 12: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

11 | P a g e

QUESTION 9:

Brown ES rebuild 176

Brown ES renovations 305

Brown ES maintain as needed 227

Please select your preferred action from

the choices below.

Brown ES rebuild Brown ES renovations Brown ES maintain as needed

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

50.00%

Please select your preferred action from the choices below.

Page 13: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

12 | P a g e

QUESTION 10

Scioto Darby ES rebuild 146

Scioto Darby ES renovations 342

Scioto Darby ES maintain as needed 218

Please select your preferred action from the

choices below.

Scioto Darby ES rebuild Scioto Darby ES renovations Scioto Darby ES maintain as

needed

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Please select your preferred action from the choices below.

Page 14: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

13 | P a g e

QUESTION 11

Experiential learning spaces at all ES buildings 517

Experiential learning ES HUB 178

Please select your preferred action from the choices

below.

Experiential learning spaces at all ES

buildings

Experiential learning ES HUB

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

Please select your preferred action from the choices below.

Page 15: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

14 | P a g e

QUESTION 12

Station 6th Grade rebuild 253

Station 6th Grade repurpose 186

Station 6th Grade maintain 295

Please select your preferred action from

the choices below.

Station 6th Grade rebuild Station 6th Grade repurpose Station 6th Grade maintain

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

Please select your preferred action from the choices below.

Page 16: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

15 | P a g e

DEMOGRAPHIC QUESTIONS

Under 18 0

18 - 29 29

30 - 39 262

40 - 49 371

50 - 64 136

65 + 8

Your Age

Do not have children in the District 72

Parent/guardian of child less than 5 years old 160

Parent/guardian of a current kindergarten thru 3rd grade student 336

Parent/guardian of a current 4th thru 5th grade student 189

Parent/guardian of a current 6th grade student 97

Parent/guardian of a current 7th thru 8th grade student 186

Parent/guardian of a current 9th thru 12th grade student 228

Parent/guardian of a current private, charter, or parochial student 7

Parent/guardian of former student or graduate of Hilliard City Schools 107

Grandparent of a current student or graduate of Hilliard City Schools 10

Current or former Hilliard City Schools student 63

Parental / Guardian / Student Status (Please mark all that apply)

Yes 189

No 599

Are you an employee

or retiree of Hilliard

City Schools?

Less than 2 years 26

2 - 5 years 108

6 - 10 years 145

11 - 15 years 144

16 - 20 years 164

More than 20 years 181

Not Applicable - I do not live in the District 32

How many years have you lived in the District?

Page 17: SCENARIOS & OPTIONS FEEDBACK RESULTS REPORT · 2020-02-19  · OPTIONS FEEDBACK RESULTS REPORT. 1 | P a g e T A B L E O F C O N T E N T S S E CTION P A GE I N ... encompassing feedback

HCS SCENARIO S & OPTIO NS FEEDB AC K FEBRU ARY 202 0

16 | P a g e

All 20

None 18

PK-2 Alton Darby / 3-5 Darby Creek Campus (2020-2021 SY) 136

Avery Elementary 62

Beacon Elementary 63

K-2 Britton / 3-5 Norwich Campus 66

Brown Elementary 39

Crossing Elementary 34

Hoffman Trails Elementary 57

Horizon Elementary 27

J.W. Reason Elementary 21

Ridgewood Elementary 45

Scioto Darby Elementary 39

Washington Elementary 54

Station Sixth Grade School 93

Tharp Sixth Grade School 93

Heritage Middle School 72

Memorial Middle School 71

Weaver Middle School 104

Bradley High School 101

Darby High School 95

Davidson High School 126

HCSD Preschool 25

Innovation Campus 50

Other (please specify) 27

Indicate the Hilliard City school(s) with which you are currently affiliated.

(Please mark all that apply)


Recommended