Date post: | 30-Dec-2015 |
Category: |
Documents |
Upload: | cathleen-wade |
View: | 219 times |
Download: | 0 times |
Scene setting for CAATS II
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
Carlos RegidorIsdefeCAATS II
Brussels, 13 & 14 Oct 2009
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
2
Presentation outline
• Why CAATS II?• What is CAATS II?• What did CAATS II do?• How did CAATS II do it?• What will you learn today?
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
3
EC, Debate PlatformCAVA
Concerted Action in Validation(late 90´s)
EC, Debate PlatformCAVA
Concerted Action in Validation(late 90´s)
OCVSD: Operational Concept Validation Strategy document
VGH: Validation Guideline Handbook
VDR: Validation Data Repository
VMP: Validation Master Plan
Eurocontrol / FAAOCVSD(1998)
Eurocontrol / FAAOCVSD(1998)
EurocontrolOCVM, VDR
(VALSUP, G2G, 2004)
EurocontrolOCVM, VDR
(VALSUP, G2G, 2004)
ECVGH, VMP
(MAEVA, 2002)
ECVGH, VMP
(MAEVA, 2002)
EC/ Eurocontrol (JPB)E-OCVM, VDR
2006
EC/ Eurocontrol (JPB)E-OCVM, VDR
2006
Why CAATS II?
SESARSESAR Second Period(2008-2009)
Second Period(2008-2009)
First Period(2006-2008)
First Period(2006-2008)
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
4
CAATS II Project Data
Coordination action focussed on the management, consolidation and dissemination of the knowledge gained in
European ATM-projects• Budget 3.452.212 €• Duration: 3 years (from 06-11-2006 to 05-11-2009)• 12 partners
http://www.caats2.isdefe.es/
Cooperative Approach to Air Traffic Services II
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
5
CAATS II Consortium
ANSP’s
Universities
Industry
Eurocontrol
Research & Consultancy
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
6
Project objectives
Development of an integrated approach towards ATM Research
Development of case based approach model and introduction in the E-OCVM- Safety Case- Human Factors Case- Environment Case- Business Case
Interaction and support to projects Collaborate and cooperate with SJU
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
7
What is a Case?
“Structured way to describe the impact of a given concept on a certain stakeholder group”
Not only a processNot only a report
Not only a repository
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
8
Cases in the E-OCVM
… Case
Environment Case
Business Case 3
Safety Case
Human Factors Case
Stakeh
old
ersS
takeho
lders
1
Study results 2
V1 V2 V3V0
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
9
Case objectives
Concept refinement
Evidence
generation
V0 V3
Effort
Maturity
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
10
Maturity Assessment
Gather and assess ATM Performance
needs
Scope Operational Concept and
develop Validation Plans
Iteratively develop and evaluate
concept
Build, consolidate and test
Industrialisation and Approval
Implementation
V0
ATM Needs
V1
Scope
V2
Feasibility
V3
Integration
V4
Pre-Operational
V5
Operational
CAATS II Case Transition Criteria
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
11
How we did it
2 workshops
Maturity Assessment
Transition Criteria
Consolidated Guidelines
E-OCVM v3
• Map activities of ongoing projects• Map activities of ongoing projects• Map activities of ongoing projectsGood Practices
Safety Human Factors
Environment Business
• Map activities of ongoing projects• Map activities of ongoing projects• Map activities of ongoing projectsGuidelines
Safety Human Factors
Environment Business
Relationships between Cases
Info from Existing EC Projects
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
12
• How to better: understand the role of the Cases; know how to develop the Cases; describe the problems and solutions considering different
points of view; assess the maturity of your Project; position your project in the Lifecycle; describe your stakeholders’ needs; define your Validation Approach; plan and execute your validation Programme/
Project(s).
What you will learn…
Brussels, 13 & 14 Oct 2009
Ep
isod
e 3
- C
AA
TS
II Fin
al D
isse
min
ati
on E
vent
13
What´s next?
Case presentations Cases Relationship between cases
Questions allowed after each case presentation!
General contents CAATS II Approach Explanation of the case Guidelines Application tips