Damien Lafarge on behalf of IMWGEngineering Department
Scheduling and Coordination of works in restricted areas with
IMPACT toolKaty Foraz
Damien LafargeJurgen De Jonghe
Peter SollanderFernando Pedrosa
Intervention Management Planning &ActivityCoordinationTool
AMMW 201315th November 2013
EN-MEFEN-HEGS-AISBE-OPPH-AIO
Damien Lafarge on behalf of IMWGEngineering Department
ContentsOrigins of the tool
Current status
Future developments
Conclusion
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 3
Damien Lafarge on behalf of IMWGEngineering Department
Introduction Scheduling and coordination vital in restricted areas at
CERN
IMPACT (Intervention Management Planning and Activity Coordination Tool) has been developed in-house
IMPACT tool linked with access system
IMPACT tool linked with radioprotection database
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 4
Damien Lafarge on behalf of IMWGEngineering Department
Origins of the tool – needs Legal background (France and
Switzerland)→ Need to authorize each intervention→ Need to trace radiation doses
Most of restricted areas are space-limited
→ Need to optimize interventions - coordination
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 5
Damien Lafarge on behalf of IMWGEngineering Department
Origins of the tool – project
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 6
2010 beginning of LHC operation - 13 different tools in operation (1 per facility)
Intervention Management Working Group (IMWG) launched in 2011 to specify needs for common tool for experiments and accelerators One single database A web tool Integrated with other CERN tools
Coordination with Maintenance Management Project (integrations with CMMS)
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – workflow
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 7
Prepare Pre-schedule
RequestCoordination validation
Safety validation Schedule
Perform interventionReport
Close
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – workflow
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 8
1. Prepare (CMMS, excel..) 2. Pre-schedule3. Request (IMPACT)6. Schedule8. Report to coordination9. Close
4. Approval in TIOC meetings
4. ApprovalSchedule
5. Approval(fire permits, DIMR…)
7. Support for accesses
SafetyCoordination
Service
FacilityCoordination
OperationTIOC
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 1 : Prepare Lists of intervention Constraints
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 9
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 2 : Pre-schedule Several tools used at CERN, specific to services
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 10
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 3 : Request Service fills request
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 11
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 4 : Coordinate Coordination checks co-activity (date & location)
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 12
Ser
vice
sid
e
Coo
rdin
atio
n si
de
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 5 : Safety IMPACT allows to pre-fill many safety declarations
(fire permits, DIMR, VIC…) handled in other tools
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 13
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 6 : Schedule Validation of feasibility Fine tuning of the schedule
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 14
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 7 : Perform Access granted only to people declared in an
Activity and only between access dates Attachment of doses to Activity Weekly report to coordination Only coordination teams can modify access dates
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 15
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Step 7 : Report After access end date → status “late” Status “finish” indicates end of work Link with CMMS to get comments from technicians
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 16
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Request in 2013 More than 11’000 activities in 2013
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 17
January February March April May June July August September October November0
200
400
600
800
1000
1200
1400
1600
235
993
1411 1406
1263
1131 1148
10361109
1337
377
Activites created per month - 2013
Damien Lafarge on behalf of IMWGEngineering Department
Current Status – Figures 20’000 activities since 2012 4’200 safety documents attached to activities 35’000 personal dose records since march 2013
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 18
Dec-20
11
Jan-2
012
Feb-20
12
Mar-20
12
Apr-20
12
May-20
12
Jun-2
012
Jul-2
012
Aug-20
12
Sep-20
12
Oct-20
12
Nov-20
12
Dec-20
12
Jan-2
013
Feb-20
13
Mar-20
13
Apr-20
13
May-20
13
Jun-2
013
Jul-2
013
Aug-20
13
Sep-20
13
Oct-20
13
Nov-20
130
1000
2000
3000
4000
5000
6000
7000
Personal doses recorded per month
Damien Lafarge on behalf of IMWGEngineering Department
Future developments DIMR – access rights Improved integration with CMMS Enlargement of IMPACT to non restricted areas Shutdown notification (« Note de Coupure ») Lock-outs Dig permit AOC - Notification of work start
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 19
Damien Lafarge on behalf of IMWGEngineering Department
Future developments - Planbook Integrated scheduling tool using MS Project Synchronizes dates from several systems (CMMS,
IMPACT, local project file)
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 20
Damien Lafarge on behalf of IMWGEngineering Department
Conclusions Success of the tool – only intervention
management system at CERN Enlargement of the scope => CERN-wide approach Development still on-going Training of IMPACT users Training of CMMS users
Geneva, Nov. 15th 2013 Asset and Maintenance Management Workshop 21