Helping customers make the most of their energy Schneider Electric Microgrid Competency Center Confidential Property of Schneider Electric
Transcript

Helping customers make the most of their energySchneider Electric Microgrid Competency Center

Confidential Property of Schneider Electric

Past Performance

Page 2Confidential Property of Schneider Electric |

The most advanced microgrid in

the US, located near Dallas, Texas

Oncor Microgrid

Page 3Confidential Property of Schneider Electric |

Site microgrid controller +

DSO hardware

A truly Autonomous & Dynamic Microgrid

completed in under 6 months

Management of 9 different DER types

• 200 kW BES

• 120 kW Solar PV

• 06 kW Solar PV

• 65 kW Microturbine

Square D Switchboards

S&C Intellirupter

Schneider Electric Controllers and software

• 45 kW Gas recip

• 560 kW Diesels

• Wind - planned

Green Energy

• Predictive and real-time control of DER

• StruxureWare Demand Side Operation software platform

for economic optimization and dispatch

• Load preservation features for ensuring the most critical

loads are served Integration of MG Controller with BMS

• 4 separate Microgrids, autonomous and dynamic

• Coordinated Automatic Islanding and Reconnect

• Dynamic management of critical loads and generation

and storage assets

Project at a Glance

• Solar and cleaner gas (vs.

just diesel)

• Low emission CHP (not

utilizing thermal)

• Serves as a best practice to

deploying an environmentally

sustainable Microgrid, using

solar in island mode

Efficiency & Optimization

4Confidential Property of Schneider Electric

S

S

I

MV

V

Site:

Primary Meter Point

IntelliTeam on Grid Source

2 – Vista Switchgear

2 – Remote Switch

Area (3):

2 – 175 kW Diesel Backup Generators

1 – 25 kW/25kWh Battery

Area (2):

1 – 45 kW Propane Backup Generator

1 – 200 kW Diesel Backup Generator

Area (1):

Environmental Lab + Microgrid

Demonstration/Education Center

Solar – 112 kW south-facing

& 2kW west-facing

Battery – 200 kW / 400 kWh

Microturbine – 65 kW

M

I

S

V

3

1

2

Oncor Microgrids

5Confidential Property of Schneider Electric

ONCOR – SOSF

Microgrid

6Confidential Property of Schneider Electric

Energy storage system + Vista switch

Energy Storage System

200kW / 400kWh(converted from current source

to voltage source by project

team)

S&C MV Vista switch

7Confidential Property of Schneider Electric

Oncor System Overview

8Confidential Property of Schneider Electric

Oncor System Control

Town of Fairfield,

Public Services

Page 9Confidential Property of Schneider Electric |

Powers critical facilities during electrical

grid outage

• Modern and harden public safety infrastructure to withstand

severe weather supporting 59,000 residents

• Using distributed generation sources, a Microgrid control

system was installed to control power distribution both in

grid parallel and islanded modes

• Harness Solar and gas powered generation

Efficiency & Optimization

Green Energy• Distributed generation to provide 120% of critical power

demand during all peak periods

• Reduce demand and consumption at Police and Fire HQ

over 2 years by about 60 kW and 250,000 kWh annually

Project at a Glance

• Installed PV system at Fire HQ

• Use natural gas fired CHP generators

Reliable Energy

• Ensure 365/24/7 operations of critical infrastructure,

including police and fire HQ, emergency comm center,

cell phone tower service, and homeless shelter.

10Confidential Property of Schneider Electric

Town of Fairfield Microgrid

Net-Zero Project

US Coast Guard, PR

Page 11Confidential Property of Schneider Electric |

• 3 bases, San Juan and Aguadilla, Puerto Rico

• $49,984, 324 capital, self-funding

• ECMs on 300+ building and housing units

• 28% energy reduction

• 35% renewable energy production

• 63% energy cost savingsEfficiency & Optimization

Green Energy

• Building automation optimization

• Variable Refrigerant Flow (VRF) cooling units

• Lighting retrofits and controls

Project at a Glance

• ~3 MW solar PV power installed onsite

• Cool roofing systems

• Improved indoor air quality

• Water conservation measures

• Solar window tinting

Annual savings: $1,862,504 / year

4 Million kWh produced per year at $.02

less than PREPA (utility)

12Confidential Property of Schneider Electric

Net-Zero Project, USCG, PR

US DOE

Solar Decathlon Microgrids

Page 13Confidential Property of Schneider Electric |

Schneider Electric is the proud sponsor of this

innovative collegiate competition providing the

site microgrid since 2009

• Washington, DC (Irvine, Ca in 2013 & 2015)

• Designed, built, and interconnected the sites Net Zero

Microgrid

• 19 Connected solar powered homes

• 187 kW peak load

• 87 kW peak export to utility

• 0.5% voltage regulation

• Built to IEC, NEC, and NFPA standards

Green Energy

2011 Project at a Glance

• 100% solar PV generation

Reliable Energy• Ensure 365/24/7 operations of competition microgrid

• Managed the microgrid with 19 unique Solar PV

generators

14Confidential Property of Schneider Electric

Solar Decathlon Microgrid 2011

American Family InsuranceCorporate HQ & Disaster Operations

● Located in Madison, WI

● (4) Service Entrances

● (4) Diesel Generators

● (20+) Automated Substations

Modes of Operation

● Power Quality and Fault Direction Detection w/

Proactive CTT Island Mode, and seamless

transmission back to primary sources

● Automatic system reconfiguration after loss of

service entrance or generator

● Automatic load-shed and condition-based load

recovery and management after blackout

● Demand response / Curtailment modes including

generator operation and load shedding

● Full manual options

Bear Creek Mountain

Resort & Conference Center

● Located on more than 330 acres in Berks

County, Pennsylvania.

● The resort has gone thru several expansions,

adding a 65-room hotel, multiple additions to

ski lifts, a new pump house, and 125 high-

powered snow guns.

● There is a 5 MVA cap on incoming power from

the Utility due to transmission constraint

● In warmer weather, the resort must run in

“heavy snow-making mode” the resulting

facility load can reach 7.2 MVA.

Solution Includes

● Load forecasting algorithm

● Menu driven load prioritization

● Automatic load and generator management

Project Size

$6,372,000

Annual Dollar Savings

$508,077 /year (guaranteed)

Annual Energy Savings

962,916 kWh/yr and 1,203 kW/yr

Contract Term

18 years

GSA St Croix 100% Net Zero (DOE ESPC)

This is the first federal building to achieve 100% Net Zero

Energy through an ESPC. Schneider Electric is guaranteeing

a total of $13,496,819 in energy savings and renewable energy

production over the 18 year contract term ($508,077

guaranteed in Year 1).

Schneider Electric’s ESPC at the Almeric Christian Federal Building will enable the site to reach 100% Net Zero Energy.

This project will install

enough energy efficiency

improvements and

renewable energy systems at

the site to achieve Net Zero

Energy status – that is, the

GSA will eliminate 100% of

their brown power annual

energy use at this site – with

no upfront capital required.

• Utility: PREPA

• ~5GW of utility generation capability, but generation is not ideally located vs. loads

• Leads to voltage, frequency issues

• Can be considered to operate as a very large-scale microgrid

Microgrid Services - VAR

Management in Puerto

Rico

●Many solar developers have acquired land in PR

● 300MW+ of PV interconnection applications

● PREPA has Minimum Technical Requirements that solar plant must meet in order to maintain system stability

● Voltage Regulation

● Frequency regulation

● Ramp rate regulation

● Typically requires energy storage and capacitor bank and/or STATCOM/DSTATCOM

Refinery Load Preservation

Microgrid

K e e p i n g 1 6 0 M W + o f C H P u p w h e n

t h e g r i d i s d o w n

• Multiple locations (including CA, USA)

• Designed, engineered, and constructed a load

preservation system microgrid for 165 MW co-

generation systems serving 185 MV of load in the

initial phase.

• 90% net-zero (gas-fired CHP)

• 7 cycle islanding to preserve steam system from

tripping offline

• 100 breakers shed at high, medium, and love

voltage, closed transition

• Export of power to utility (SCE)

• Integration of sequence of events recording

• Typical of 15 similar projects in chemicals,

refining, and paper

• Existing CHP retrofits

• Completed 1999, updated 2012 – present

Project at a Glance

Investment: ~$4.5 million CA

Result: Multiple outages

avoided

Refinery Load Preservation Microgrid

ADMS Experience:

Hydro One

“Hydro One connects over 10,000 distributed generation

systems…it is simply not possible to do this and maintain

stability without a sophisticated control system at the

distribution level."

Optimize management of DG (DG Management, Energy Storage)

Adaptive relay protection

Optimize outage restoration (FLISR – fault management)

Improve network asset planning (Load Forecasting, Simulation, Device Placement)

Arming under frequency relays

General Services

Administration Buildings

Page 22Confidential Property of Schneider Electric |

• 14 buildings in 8 Region 7 Texas cities

• Building Automation System integration

• Central Plant updates

• Data center controls update

• Lighting and controls retrofit

• Water conservation measures

• Irrigation system controls

• ~ 1 MW solar PV installed across five (5) different

sites

Project at a Glance

Investment: $17,934,397

Annual savings: $1,031,290 / year

Accomplished through energy and water

savings + renewable generation (PV)

• Smart grid functionality in Grenoble and

Lyon, France, to benefit C&I and residential

end users

• Standardize and showcase a functional smart

grid that integrates consumer, facilities

renewable energy (solar, CHP, etc.), electric

vehicles, and smart meters

• Ultimately incorporates over 1,000 residential

customers and 40 commercial building sites

• 43 million Euros investment over 4 years (2012-

2016)

Greenlys

Page 23Confidential Property of Schneider Electric |

• France’s first district smart grid in Issy les

Moulineaux, Paris

• Demonstrates how energy consumption peaks

can be smoothed across an eco-neighbourhood

of prosumers

• Operational since 2013, it shows that intelligent

management of energy resources can benefit

landlords, building managers, and occupants all

at the same time

• Over 9,000 professionals and 3,000 residents

occupying the integrated building spaces are

positively impacted by this project

• 2 million Euro investment

Issygrid

Page 24Confidential Property of Schneider Electric |

• First smart grid-ready, energy storage and

management system for an office building in

France

• Management of a microgrid including: EV,

energy storage, PV, wind farm, and flexible loads

• Maximize self-consumption from solar and wind

energy production while storing or selling excess

production when optimized to do based on tariff

information

• Prevent site interruption and provide ride through

capacity for blackout events by using the onsite

produced energy when islanded.

SDEM

Page 25Confidential Property of Schneider Electric |

• EQI, the largest Schneider Electric

R&D Center, located in Grenoble,

France, is optimized with the

Prosumer DSO solution starting in

2013

• Management of HVAC, EESS, EV

charging stations, and monitoring and

forecasting of PV production

• Tours available upon request, by

appointment

EQI

Prosumer Smart Building

Page 26Confidential Property of Schneider Electric |

4

1

2

3 DER BOX

HVAC

SHOWROOM

PV

EESS

PV

EV CHARGING

STATION


Recommended