+ All Categories
Home > Documents > Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp...

Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp...

Date post: 05-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
11
Page | 1 Schoenberg in Hollywood 2018 RENTAL INFORMATION 11 Avenue de Lafayette, Boston, MA 02111 617.542.4912 Main, 617.542.4913 Fax
Transcript
Page 1: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 1

Schoenberg in Hollywood

2018

RENTAL INFORMATION

11 Avenue de Lafayette, Boston, MA 02111

617.542.4912 Main, 617.542.4913 Fax

Page 2: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 2

RENTAL INFORMATION Rental Fee $40,000 (including sets, costumes, props and video) Insurance Coverage $200,000

Damage/Security Deposit Load-in and load-out costs, supervisor fees, cleaning & damage deposit

Royalties Scenic Designer – Simon Higlett 10% of total rental fee Costume Designer – Nancy Leary 10% of total rental fee Lighting Designer – Pablo Santiago Right of First Refusal Media Designer – Peter Torpey Right of First Refusal Sound Designer – Ben Bloomberg Right of First Refusal Scenery Supervisor For Load-in to Rehearsal Hall and/or Theatre, and Strike Fees $453 Per Day (2018 IATSE Road Crew Rate) Per Diem (paid directly) $75 Per Day Transportation and Housing By Renter Costume Supervisor For load-in to Rehearsal Hall and/or Theatre, and Strike Fees (paid directly) $450 Per Day or negotiable, based on needs Per Diem $75 Per Day Transportation & Housing By Renter Notice for Loading 4 Weeks Number of Trucks 1 @ 53’ Air Ride Logistics Storage Facility Location Portsmouth, VA

TECHNICAL INFORMATION

Minimum Stage Width 45’-0” Largest Flying Unit 26’-8” W x 19’-0” H triangle

drop Minimum Stage Depth 40’-0” Largest Standing Unit 45’ W x 26’ H portal wall Number of Sets 1 Largest Prop Class B Grand Piano,

gutted Total Linesets Used 27 Type of Floor ¼” Masonite, Painted Linesets for Scenic 13 Degree of Rake 0 Linesets for LX 7 Weight of Heaviest Flyer 1200 lbs Linesets for Masking Linesets for Projector

4 3

Hand Props

20

Other scenic elements include: Wrap-around cyc, flying moving triangles, three traveler track sliding panel walls.

Furniture 6 Set Props 0 Weapons 2

Page 3: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 3

**ITEMS EXCLUDED FROM RENTAL To include, but not limited to:

• Soft goods (4 borders, 2 sets of tabs, 2 legs) • Wrap-around cyc (cyc pipes for curve are included) • 1950s Film Camera prop (could be rented separately from North Shore Music Theatre)

**SPECIAL RENTAL CONDITIONS The original production relies heavily on use of video, which features the original singers. Any subsequent production must either cast the same singers, or allow and budget for 2-3 days of filming with the desired singers to reproduce original shots. The orchestration of the opera relies heavily on electronic sound and effects. Any subsequent production must either hire the original sound designer and allow for a substantial reinforcement package, or make a separate agreement with the composer. The original production includes a need for 2 high power video projectors (32,000 lumen or similar) and must accommodate placement of front projector in house as well as a flying projector over stage. The original production relies heavily on choreography, and must use either a movement director or a stage director who is strong in choreography. HOME THEATRE INFORMATION Richard Orchard Stage, Paramount Center, Boston, MA Proscenium Width 31’-11 3/8 Proscenium Height 23’- 11” Stage Width 45’ Stage Depth 35’-10” Apron Depth 10’-4” Grid Height 56’-10” Line Load Capacity 1340 lbs

PRODUCTION INFORMATION Conductor David Angus Stage Director Karole Armitage Assistant Director Kirsten Cairns Set Designer Simon Higlett Costume Designer Nancy Leary Lighting Designer Media Designer Sound Designer

Pablo Santiago Peter Torpey Ben Bloomberg

Number of Principals 2 men, 1 woman Number of Chorus 0 Number of Supers 0 OWNERSHIP Boston Lyric Opera SHOPS Sets Constructed by: Boston Lyric Opera, 2018 American Repertory Theatre, 2018 Costumes Built by: Costume Works, 2018

Page 4: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 4

HISTORY Schoenberg in Hollywood – Boston Lyric Opera– November 2018 CONTACT For further rental information, please contact: Anna Labykina, Production and Technical Director [email protected] (617) 542-4912 x2590 Amanda Robie, Production Operations Manager [email protected] (617) 542-4912 x2550

SAMPLE LOAD-IN SCHEDULE (numbers include BLO Road Crew)

Day 1 8 am – 11 pm Electrics, Masking, Rigging, Audio 10 Carp 14 Elec 6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10 Carp 12 Elec 2 Audio/Video 2 Props 2 Wardrobe Typical Tech / Run 2 Deck Carp 1 Rail 2 Elec (1 deck, 1 board op) 2 Props

4 Wardrobe 2 Wigs/makeup

2 Sound (1 board, 1 A2) 2 Projection (1 board, 1 tech)

Page 5: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 5

Show Stills

Page 6: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 6

Show Stills

Page 7: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 7

Show Stills

Page 8: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 8

Show Stills

Page 9: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

Page | 9

Show Stills

Page 10: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

1

LINESET SCHEDULE SCHOENBERG IN HOLLYWOOD

revised November 15, 2018

House set #

From 0'-0" (Proscenium) Description of Piece Weight

(lbs.) Bricks Dimension Trim High Trim Mid Trim Low Notes

#0 0’-3” Fire Curtain GRID#1 1'-4" House Curtain GRID#2 1'-10" DS FLYING WALL 600 13.50 GRID 18'-7.5"#3 3'-4" LX #1 580 13.50 29'-8" Cable x-over for cue lights and 1bmr#4 4'-10" Black Border #1 2.50 27'-0"#5 5'-6" -empty-

#6 6'-2" LX #2 320 7.50 29'-9"#7 6'-10" Cable X-over 210 5.00 40'-0" 2 BMR#8 7'-6" -empty-

#9 8'-2" -empty-

#10 8'-10" Black Border #2 2.50 24'-0"#11 9'-6" -empty-

#12 10'-2" LX #3 580 13.50 28'-2"#13 10’-10" -empty-

#14 12'-0" LX #4 370 8.50 28'-9" Cable drops for Deck units#15 12'-6" -empty-

#16 12'-5" Black Border #3 2.50 23'-9.75"#17 13'-6" HALF WALL 200 4.50 49'-6" 27'-0"#18 14'-2" US PORTAL 500 11.50 32'-6"#19 14'-10" US TRACKING WALL 800 18.50 18'-6" Tracking Unit; Anchored to Deck#20 15'-6" TRACKING WINDOWS 600 13.50 18'-6" Tracking Unit; Anchored to Deck#21 16'-2" RP SCREEN 300 7.00 29'-0"#22 16'-10" DS TRIANGLES TBD TBD GRID TBD Aluminum Frames with Fabric#23 17'-6" US TRIANGLES TBD TBD GRID TBD Aluminum Frames with Fabric#24 18'-2" Cable X-over 180 4.50 40'-0" 3 BMR#25 18'-10" -empty- xl#26 19'-6" LX #5 330 7.50 h 30'-6"#27 20'-2" -empty-

#28 20'-10" -empty-

#29 21'-6" -empty-

#30 22'-2" Black Border #4 2.50 22'-8.5"#31 22'-10" -empty-

#32 23'-6" White Cyc Surround 50 36'-0" Cyc Pipe is connected to other linesets

#33 25'-2" -empty-

#34 26'-2" REAR PROJECTOR 14'-7" Held for Space; "Empty"#35 27'-2" REAR PROJECTOR 300 7.00 14'-7"#36 28'-2" REAR PROJECTOR 14'-7" Held for Space; "Empty"

#37 29'-2" White Cyc Surround 50 36'-0" Cyc Pipe is connected to other linesets

#38 30'-2" -empty-

#39 31'-2" -empty-

#40 32'-2" LX #7 320 7.50 40'-0" Actual ELX is tailed down#41 33'-2" -empty-

#42 34'-2" White Cyc Surround 100 36'-0" Cyc Pipe is connected to other linesets

EmersonSoftGoodstoHang

Weight (lbs)

Trim LowTrim MidDimensionDescription of Piece NotesHouse set #

Orchard Stage - Paramount Center November 2018

From 0'-0" (Curtain Line)

Trim High

Page 11: Schoenberg in Hollywood6 Audio/Video Day 2 8 am – 11 pm Scenic Load-in / Electrics / Audio 10 Carp 10 Elec 6 Audio/Video Day 3 8 am – 11 pm Focus / Props & Wardrobe Load-in 10

BOSTON LYRICOPERAP R E S E N T S

SCHOENBERG INHOLLYWOOD

DIRECTED BY BRAHAM MURRAY

WRITTEN BY TOD MACHOVER

MUSIC BY TOD MACHOVER

TECHNICAL SUPERVISION ANNA LABYKINA

FILM DESIGN BY PETER TORPEY

COSTUME BY NANCY LEARY

LIGHTING BY PABLO SANTIAGO

SCENERY BY SIMON HIGLETT

LIGHTING SUPERVISION LIGHTING SUPERVISOR

These drawings represent visual andconstruction suggestions only. It is not the

designer's responsibility to determine structuralappropriateness of this design. Neither the

designer nor the draftsman assume anyresponsibility for improper engineering,

construction, handling, or use of the scenery,lighting, rigging, or any other equipment herein

represented or described.

This design and these drawingsare the shared property of the

designer. By viewing thesedrawings you agree that you

will not copy, duplicate,transfer, or by any other meansdivulge their contents without

express written consent from thedesigners.

GENERAL

LOGO AND STAMPSHOW PICTUREOF

PLATESCALE:

CREATED:DRAWN BY:

REVISED:FILE:

3/8"=1'-0"

06/13/2018

GL

Schoenberg In Hollywood 07.11.vwx

7/11/18 16:01:21

12

1GROUND PLAN

US ARCH D - 24" X 36"FIRTS ISSUE.V1 6/13/18

NEW DIMENSIONS US PLATFORM.V2 6/16/18

NEW DETAIL PLATES.V3 7/2/18

GA

LLER

YC

LEA

RAN

CE

18-0

"

HVA

C D

UC

TC

LEA

RAN

CE

12'-1

0"

1'-4"PL

1'-10"PL

3'-4"PL

4'-10"PL

5'-6"PL

6'-2"PL

6'-10"PL

7'-6"PL

8'-2"PL

8'-10"PL

9'-6"PL

10'-2"PL

10'-10"PL

12'-0"PL

12'-6"PL

13'-0"PL

13'-6"PL

14'-2"PL

15'-6"PL

16'-2"PL

16'-10"PL

17'-6"PL

18'-2"PL

18'-10"PL

19'-6"PL

20'-2"PL

20'-10"PL

21'-6"PL

22'-2"PL

22'-10"PL

23'-6"PL

25'-2"PL

26'-2"PL

27'-2"PL

28'-2"PL

29'-2"PL

30'-2"PL

31'-2"PL

32'-2"PL

33'-2"PL

34'-2"PL

All scenic trim heights from show deck to bottom of piece.

All electric trim heights from show deck to bottom of batten.

Dark lineset numbers are electrified.

+#'-##"4 Unit

+#'-##"5 Unit

+#'-##"6 Unit

+#'-##"7 Unit8 BRANCH+15'-6"

+#'-##"10 Unit

+#'-##"11 Unit

+#'-##"13 Unit

+#'-##"14 Unit+#'-##"15 Unit

+#'-##"21 Unit

+#'-##"22 Unit

+#'-##"23 Unit

+#'-##"24 Unit

+#'-##"25 Unit

+#'-##"26 Unit

+#'-##"27 Unit

+#'-##"28 Unit

+#'-##"29 Unit30 BORDER+22'-8 1/2"

+#'-##"32 Unit

+#'-##"33 Unit

+#'-##"34 Unit

+#'-##"35 Unit

31 CYC+23'-0"

37 PROJECTION+14'-7"

38 PROJECTION+14'-7"

+#'-##"40 Unit

36 CYC+23'-0"

+#'-##"42 Unit

0'-3"PL

1 MAIN DRAPE+#'-##"

3 #1 ELECTRIC+#'-##"

14'-10"PL

18 IRIS WALLS+18'-7 1/2"

2 FRONT IRIS+18'-7 1/2"

20 US PROJ SCREEN+19'-7 1/2"

+#'-##"12 Unit

0 FIRE CURTAIN+#'-##"PLASTER LINE

19 IRIS WINDOWS+18'-7 1/2"

17 IRIS VERTICAL+26'-1"

41 CYC+23'-0"

9 MOON BOX+17'-1"

39 PROJECTION+14'-7"

16 BORDER+23'-9 3/4"

LED HERELED HERE

MOON BOX

PIANO

FLOWN RP SCREEN

DESK

ROSTRA+1'-6"+0'-6"

+1'-0"

+0'-6

"

+1'-0

"

+1'-6

"

+2'-0

"

+2'-6"

+6'-4"+3'-0"+3'-6"

+4'-0"+4'-6"

+5'-0"

+5'-6"

+3'-0

"

+3'-6

"

+4'-0

"

+4'-6

"

+5'-0

"

+5'-6

"

+0'-6

"

+1'-0

"

+1'-6

"

+2'-0

"


Recommended