+ All Categories
Home > Documents > School Board Workshop May 10 th, 2011. Expenditure for Maintenance, Repair, and Renovation from...

School Board Workshop May 10 th, 2011. Expenditure for Maintenance, Repair, and Renovation from...

Date post: 02-Jan-2016
Category:
Upload: jeffry-tracy-curtis
View: 212 times
Download: 0 times
Share this document with a friend
Popular Tags:
8
School Board Workshop May 10 th , 2011
Transcript
Page 1: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.

School Board WorkshopMay 10th, 2011

Page 2: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.

Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO

Capacity Project Schedule Other Project Schedule Additional Project Schedule Non Funded Growth Management Project

Schedule Each must match its funding stream

Page 3: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.

Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO

Page 4: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.
Page 5: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.
Page 6: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.

Project Schedules

Page 7: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.

We have a number of projects to consider. At this time specifics of these are not in our plan.

Some to discuss are:◦ Administration Building relocation. Glynn Archer

or possibilities in the Marathon area.◦ Space Consolidation at Schools with less than

75% usage. The following slide has school usage.◦ Transportation Garage, Key West or Marathon.◦ PKS replacement or renovation

Page 8: School Board Workshop May 10 th, 2011.  Expenditure for Maintenance, Repair, and Renovation from 1.50-Mills and PECO  Capacity Project Schedule  Other.

•Marathon HS 45%•Switlik School 54%•Sugarloaf School 61%•Gerald Adams School 67%•Plantation Key School 67%•Key Largo School 72%

At some of the older schools like Plantation, Gerald Adams, and Switlik, the capacity may be slightly higher since some class rooms may be being used for non classroom service.


Recommended