+ All Categories
Home > Documents > School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were...

School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were...

Date post: 17-Sep-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
17
North Hollywood High School: Pre-Planning Survey 5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning 10 June 2010 North Hollywood High School: Campus Pre-Planning Survey School Name North Hollywood High School Location Code 8786 Board Member Tamar Galatzan Board District 3 Local District 2 High School Complex North Hollywood 5231 Colfax Avenue I North Hollywood, CA 91601 Los Angeles Unified School District Facilities Planning & Development I Master Planning Version 2 - June 2010 8786 ACSA Incorporated 17163 Osborne Street Northridge, CA 91325 Location Code Survey Architect LAUSD Contact: Asset Manager: Ed Van Ginkel Project Manager: Pavan Bhatia
Transcript
Page 1: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

North Hollywood High School: Campus Pre-Planning Survey

School Name

North Hollywood High School

Location Code

8786

Board Member

Tamar Galatzan

Board District 3

Local District 2

High School Complex

North Hollywood

5231 Colfax Avenue I North Hollywood, CA 91601

Los Angeles Unified School District Facilities Planning & Development I Master Planning

Version 2 - June 2010

8786

ACSA Incorporated17163 Osborne Street

Northridge, CA 91325

Loca

tion

Cod

e

Survey Architect

LAUSD Contact:Asset Manager: Ed Van Ginkel

Project Manager: Pavan Bhatia

Page 2: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

Table of Contents & Executive Summary1.0

Executive SummaryNorth Hollywood High School

Neighborhood

North Hollywood High School is located in the San Fernando Valley region of the City of Los Angeles on a 25.1-acre site bounded by Chandler Boulevard (north), Colfax Avenue (east), and Magnolia Boulevard (south). Single-family and multi-family residential uses dominate the blocks surrounding the school.

Instruction

The school serves 9th through 12th grade. The campus is organized around multiple Small Learning Communities. In addition, the campus houses a Highly Gifted Magnet Center and the Biological Sciences Zoo Magnet. Amelia Earhart Continuation High School is located at the northeast corner of the campus.

Summary of Facilities

The main core buildings on the campus were built as early as 1927. A major expansion occurred in the mid-1950’s. In the late 1990’s, several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake in 1994.

Table of Contents 0.0. Cover Sheet

1.0. Table of Contents / Executive Summary

2.0. Complex Context Map

INSTRUCTIONAL INFORMATION

3.0. Project Location Map

4.0.Instructional & Campus Summary & Core Data

5.1. Existing Campus Plan

5.2 Existing Campus Building Data

6.1 Existing Campus Building Use - Basement

6.2 Existing Campus Building Use - First Floor

6.3 Existing Campus Building Use - Mezzanine

6.4 Existing Campus Building Use - Second Floor

7.1 Existing Campus Images

7.2 Existing Campus Images

7.3 Existing Campus Images

7.4 Existing Campus Images

8.0. Small Learning Communities (N/A)

9.0 Core Facilities Plans

PROJECTS

10.0. Existing Campus Projects

Page 3: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

2.0Complex Context Map

LAUSD LegendElementary School Special Education School

Middle School Magnet School

High School

Community Resources

DESCRIPTION LOCATION CITY

Valley Plaza Park Valley Plaza Park North Hollywood

North Hollywood Park North Hollywood Park North Hollywood

Moorpark Park Moorpark Park Studio City

Woodbridge Park 11220 Moorpark Street North Hollywood

Wilacre Park Wilacre Park State Park Studio City

Coldwater Canyon Park Coldwater Canyon Park Studio City

Fryman Canyon Park Fryman Canyon State Park Beverly Hills

Laurel Canyon Park 12061 Moorpark Street Studio City

Schools Surveyed

LOCATION CODE SITE NAME

SCHOOL MANAGEMENT

SERVICESSITE TYPE

GRADE LEVEL

CONFIG

WILLIAMS

2630 BURBANK ELEMENTARY Elem. School K- 5

2822 CARPENTER ELEMENTARY Elem. School K- 5

3164 COLFAX ELEMENTARY Elem. School K- 5

3712 FAIR ELEMENTARY Elem. School K- 5

4781 LANKERSHIM ELEMENTARY Elem. School K- 5 Yes

5918 OXNARD ELEMENTARY Elem. School K- 6 Yes

6288 RIO VISTA ELEMENTARY Elem. School K- 5

7521 VICTORY ELEMENTARY Elem. School K- 5

8355 REED MIDDLE SCHOOL Middle School 6- 8

8396 SUN VALLEY MIDDLE SCHOOL Middle School 6- 8 Yes

8786 NORTH HOLLYWOOD HIGH High School 9-12 Yes

8787 LA ZOO MAGNET Span Magnet 9-12

12 Total Sites

Campus Attendance Boundary

Page 4: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

3.0Project Location Map

Page 5: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

Instructional & Campus Summary4.0

Instructional SummaryWilliams School Yes

Performance Index PI1 (Year 1)

Academic Performance Index (API)

2009 Growth

2008 Base

2008-09 Growth Target

2008-09 Growth

Met Growth Target

772 685 6 37 yes

Adequate Yearly Progress (AYP) No

ORG Eligibility

Percentage of CDE Recommended Density:

# of ORG Eligible Portable Classrooms:

Schools on site:

North Hollywood High SchoolAmelia Earhart Continuation High School

Campus SummaryCurrent Useable Area: 25.10 Acres

Current Playground Area: 8.9 Acres

Rodriguez Consent Decree

Playground Area Required: No

Total Classrooms: 108

Classrooms in Portables: 33

Permanent Classrooms: 75

Classroom Status:

Available Classrooms: 103

Non-Instructional Classrooms: 5

Total Planned Site Capacity:

2-Semester School Capacity:

Projected Enrollment 2013: 2,666

Core Facilities Data

Item Category Existing Conditions - Square Footage

1 Food Prep & Serving Areas 8,126 Square Feet

2 Indoor Dining 6,230 Square Feet

3 Lunch Shelter N/A

4 Multi-Purpose/Assembly/Auditorium 9,579 Square Feet

5 Library 4,099 Square Feet

6 Administration 21,462 Square Feet

7 Gymnasium Building 31,734 Square Feet

8 Playground 8.7 Acres (380,360 SF)

9 Parking 192 Stalls

Page 6: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake
Page 7: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

Bldg Location Description SQFT - Bldg Bldg Insurance # PORT/PERMYear Built DSA Number DSA Year # of Stories Construction MatlType

1 ADMINISTRATIVE BLDG 66,782 8786-001CDG perm 1927 A12708 1954 2+B MASONRY OR CONCR2 CLASSROOM BLDG 21,634 8786-002BCJ perm 1937 A1413 1936 2 REINFORCED CONCR3 CAFETERIA BLDG 12,171 8786-025DAR perm 1966 A25788 1965 1 WOOD FRAME4 STUDENT STORE BLDG 797 8786-024DAR perm 1966 A25788 1965 1 WOOD FRAME5 SOCIAL ARTS CLASSROOM BLDG 30,588 8786-003BCM perm 1950 A6864 1949 2 REINFORCED CONCR6 LIBRARY & CLASSROOM BLDG 7,587 8786-006CAG perm 1927 A29473 1967 1 MASONRY OR CONCR7 GYMNASIUM & AUDITORIUM BLDG 23,190 8786-005CBG perm 1927 A14685 1957 1+B MASONRY OR CONCR8 SHOP & MECHANICS BLDG 9,357 8786-004CAG perm 1927 A2285 1926 1 MASONRY OR CONCR9 SHOP BLDG 9,302 8786-027DAR perm 1966 A25153 1964 1 WOOD FRAME10 AUTO SHOP 4,100 8786-026DAR perm 1966 A25153 1964 1 WOOD FRAME11 TWO/THREE UNIT RELOCATABLE 1,632 8786-X0536L port 1949 A6338 1948 1 WOOD FRAME12 STORAGE UNIT RELOCATABLE 360 8786-M0887S port 1974 NO DSA 1 WOOD FRAME13 STORAGE UNIT RELOCATABLE 360 8786-M0913S port 1974 NO DSA 1 WOOD FRAME14 STORAGE UNIT 2 360 8786-014DOP perm 1960 NO DSA 1 WOOD FRAME15 SINGLE UNIT RELOCATABLE 912 8786-A0499L port 1949 A6584 1948 1 WOOD FRAME16 GIRLS PHYSICAL EDUCATION BLDG 5,846 8786-007BAJ perm 1937 A1667 1936 1 REINFORCED CONCR17 CANDY STORE BLDG (FORMER X0198G) 511 8786-009DAG perm 1928 NO DSA 1 WOOD FRAME18 TWO/THREE UNIT RELOCATABLE 1,824 8721-X0121L port 1945 A4198 1945 1 WOOD FRAME19 TWO/THREE UNIT RELOCATABLE 1,728 8142-X0962M port 1950 A7819 1950 1 WOOD FRAME21 INSTRUMENTAL MUSIC CLSSRM BLDG 1,680 8786-008DAN perm 1957 A16056 1957 1 WOOD FRAME22 STORAGE UNIT RELOCATABLE 768 8786-M0092J port 1938 NO DSA 1 WOOD FRAME23 FLAMMABLE STORAGE UNIT 60 8786-019BOM perm 1953 NO DSA 1 REINFORCED CONCR24 STORAGE UNIT 3 (FORMER M0949T) 360 8786-029DOT perm 1975 NO DSA 1 WOOD FRAME26 FIELD LIGHTS VAULT 72 8786-010DON perm 1956 A15423 1957 1 WOOD FRAME27 STORAGE UNIT 4 140 8786-030DOT perm 1977 NO DSA 1 WOOD FRAME28 SANITARY RELOCATABLE 912 6565-J0048L port 1949 A6490 1948 1 WOOD FRAME29 BOYS PHYSICAL EDUCATION BLDG 25,702 8786-011CAN perm 1955 A11622 1954 1 MASONRY OR CONCR30 STORAGE UNIT RELOCATABLE 24 8786-M0668M port 1950 A7769 1950 1 WOOD FRAME31 FARM BUILDING RELOCATABLE 256 8786-Y0083M port 1950 A7769 1950 1 WOOD FRAME32 BARN BLDG 1 (FORMER M0666M) 2,483 8786-013DOM perm 1950 A7769 1950 1 WOOD FRAME33 AGRICULTURAL CLASSROOM BLDG 2,310 8786-012DAM perm 1950 A7769 1950 1 WOOD FRAME34 GREENHOUSE 747 8786-028SOS perm 1974 A36106 1973 1 GREENHOUSE- GLAS35 STORAGE UNIT RELOCATABLE 384 8786-M0474J port 1939 NO DSA 1 WOOD FRAME36 POTTING SHED 501 8786-015DOT perm 1978 NO DSA 1 WOOD FRAME37 LATH HOUSE 1,128 8786-016SOT perm 1978 A41019 1977 1 GREENHOUSE- GLAS46 PORTABLE BUILDING 590 8786-Y0085M port 1 WOOD FRAME48 PORTABLE BUILDING 824 8786-Y0084M port 1 WOOD FRAME51 TWO/THREE UNIT RELOCATABLE 1,824 H072-X0320L port 1947 A4865 1947 1 WOOD FRAME52 TWO/THREE UNIT RELOCATABLE 1,728 8160-X0824M port 1950 A7702 1950 1 WOOD FRAME53 BLEACHERS 3 6,290 8786-022GON perm 1956 NO DSA 1 PERMANENT BLEACH54 BLEACHERS RELOCATABLE 3,278 8786-V0009G port 1927 NO DSA 1 METAL55 STORAGE UNIT RELOCATABLE 192 8786-M0652J port 1936 NO DSA 1 WOOD FRAME58 PORTABLE BUILDING 400 8786-Y0088M port 1 WOOD FRAME59 SANITARY MODULAR 480 8786-J0363Z port 2000 1 WOOD FRAME60 DOUBLE UNIT MODULAR 1,920 8786-X4008Y port 1998 1 WOOD FRAME61 DOUBLE UNIT MODULAR 1,920 8786-X4009Y port 1998 1 WOOD FRAME62 DOUBLE UNIT MODULAR 1,920 8786-X4010Y port 1998 1 WOOD FRAME63 STANDARD CLASSROOM RELO-(GRW) 960 8786-A2126Y port 1997 A68794 1997 1 RELOCATABLE64 SINGLE UNIT MODULAR 960 8786-A2124Y port 1997 A68794 1997 1 WOOD FRAME65 SINGLE UNIT MODULAR 960 8786-A2121Y port 1997 A68794 1997 1 WOOD FRAME66 SINGLE UNIT MODULAR 960 8786-A2122Y port 1997 A68794 1997 1 WOOD FRAME67 SINGLE UNIT MODULAR 960 8786-A2123Y port 1997 A68794 1997 1 WOOD FRAME68 SINGLE UNIT MODULAR 960 8786-A2125Y port 1997 A68794 1997 1 WOOD FRAME69 DOUBLE UNIT MODULAR 1,920 8786-X4013Z port 2000 1 WOOD FRAME70 DOUBLE UNIT MODULAR 1,920 8786-X4012Z port 2000 1 WOOD FRAME71 DOUBLE UNIT MODULAR 1,920 8786-X4011Z port 2000 1 WOOD FRAME72 SINGLE UNIT MODULAR 960 8786-A2222Z port 2000 1 WOOD FRAME

1 TWO-STORY RELOCATABLE 1,792 8788-Z0186S port 1973 A36065 1973 2 WOOD FRAME

Building Data

Page 8: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake
Page 9: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake
Page 10: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake
Page 11: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake
pavan.bhatia
Text Box
Former speciality classrooms is now used a general classroom.
Page 12: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

Photo -8Administration: Building #1 Interior of clerical area

Photo -7Auditorium: Building #7 Interior of auditorium with fixed seating

Photo -6Music Room: Building #21Interior of music room

Photo -5Choral Room: Building #5 Interior of choral room

Photo -4Science Lab: Building #1 Interior of typical science lab

Photo -3Library: Building #6 Interior of library reading area and book shelves

Photo -2Computer Lab: Building #1 Interior of typical computer lab

Photo -1Classroom: Building #1 Interior of typical classroom

7.1Existing Campus Images

Page 13: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

Photo -16Wood Shop: Building #8 Interior of wood shop with tool equipment

Photo -15Auto Shop: Building #10 Interior of auto shop with lifts

Photo -14Faculty Dining: Building #3 Interior of faculty dining with serving area

Photo -13Art Classroom: Building #5 Interior of art classroom

Photo -12Student Cafeteria: Building #3 Interior of student dining area

Photo -11Gymnasium #2: Building #7 Interior of girl’s gymnasium

Photo -10Gymnasium #1: Building #29 Interior of boy’s gymnasium

Photo -9Kitchen: Building #3 Interior of main kitchen area

7.2Existing Campus Images

pavan.bhatia
Text Box
Interior of Gymnasium
pavan.bhatia
Text Box
Interior of Gymnasium
Page 14: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

Photo -24Parking #1 Adjacent to building #5

Photo -23Secondary Field Located at Northeast corner of the campus

Photo -22Main Field Located at North of the campus

Photo -21Gymnasium Building: Building #29 Adjacent to main field

Photo -20Cafeteria: Building #3 Adjacent to auditorium

Photo -19Auditorium: Building #7 Adjacent to cafeteria

Photo -18Workout Gym: Building #7 Former corrective room

Photo -17Wood Shop: Building #8 Outside work area

7.3Existing Campus Images

Page 15: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

Photo -32Amelia Earhart Cont. High School Located at Northeast corner of the campus

Photo -31Modernization Project Adjacent to Building #2

Photo -30Sanitary Portable: Building #28Restroom modernization

Photo -29Animal Shelter: Building #46 Located at Southwest corner of the campus

Photo -28Green House: Building #34 Adjacent to agricultural classrooms

Photo -27New Sanitary Portable: Building #59 Located at Northwest corner of the campus

Photo -26Courtyard Adjacent to cafeteria and auditorium

Photo -25Parking #2 Adjacent to gymnasium

7.4Existing Campus Images

Page 16: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake
Page 17: School Name Survey Architect Board Member Northridge, CA ... 7...several modular buildings were installed to support an increase in the number of students due to the Northridge earthquake

North Hollywood High School: Pre-Planning Survey5231 Colfax Avenue I North Hollywood, CA 91601 I LAUSD – Facilities Planning & Development- Master Planning

10 June  2010

Existing Campus Projects

3,136,0013,136,001PLANNING

0001/23/132/4/11FUNDING HOLDDESIGN SERVICESCONST : REPLACE BOILERS, AIR HANDLERS, CONTROLS/ RECIPROCATING CHILLER23.067551ZDI7-1MJR_Y

01/12/1111/4/10ON HOLDDESIGN SERVICESJOC CONST : SLC MODERNIZATION PHASE 123.081591ZO91-1SLC

317,777317,77709/30/108/9/10DSADES AETJOC CONST : CERTIFICATION OF PORTABLES (RHU)11.049368786P-1RHU

1,954,7631,954,76307/5/117/6/10DSADESIGN SERVICESCONST : RENOVATE LIBRARY23.07171ZGD4-1BPY

07/1/105/3/10ON HOLDMOCCONST : REPLACE DETERIOR IRRIGATION CONTROLLER(S)33.094231ZV38-1MJR_R

863,461863,46104/4/102/4/10AWARDMOCCONST : REM & RPL DETERIOR CONC PAVING33.090571ZTL5-1D_M

FCACBUDGET CURRENT

% COMPLETE

FINISHSTARTPMSTBIHACTIVITY NAMEPIC# (MICRO DATA NO)

IFS (PRNO)#

PROG TYPE

Projects In Planning/ Pre-Construction

13,954,88113,954,881CONSTRUCT

1,677,6801,677,6803/15/119/11/09CONSTRUCTFA_CONSTRUCTIONCONST : FIRE ALARM57.00568529Q2-1BD2

894,757894,75711/30/105/27/09CONSTRUCTCONSTRUCTIONCONST : R / R GRANDSTANDS23.065691ZF34-1CRF_Y

2,042,5292,042,5299/22/094/27/09CLOSE OUTMOCCONST : ROOFING33.084941ZMN2-1YBR

393,145393,1457/2/102/18/09CONSTRUCTCONSTRUCTIONCONST : RENOVATE AUDITORIUM23.00258208Q2-1M_K

2/11/092/11/09CLOSE OUTMOCCONST : RE ROOFING & R&R GUTTER/DOWNSPOUTS23.067561ZDI6-1MJR_Y

134,986134,98612/8/0911/30/08CLOSE OUTMOCCONST : PORTABLES HVAC23.072391ZHN8-1PHVA

746,881746,8816/17/098/12/08CLOSE OUTCCTJOC CONST : REPLACE INTERIOR BLEACHERS AND ADA23.00299375Q4-1M_K

1,052,5381,052,5388/28/084/14/08CLOSE OUTMO - ATUCONST : NO HOLLYWOOD SH23.045021Z862-1ATY

617,576617,57611/1/083/31/08CLOSE OUTCONSTRUCTIONJOC CONST : FOOD SERVICE MODERNIZATION PROJECT23.075171ZK48-1CRF_Y

100,287100,28712/2/083/31/08CLOSE OUTMOCCONST : INSTALL ELECTRIC GATES23.071651ZHB8-1AIR

278,011278,0116/19/086/18/07CLOSE OUTCONSTRUCTIONJOC CONST : ADA57.00408265Q0-1BD2

1,412,5151,412,5156/22/079/25/06CLOSE OUTCCTCONST : REPAIR EXISTING EXT. BLEACHERS - VISITORS97A011158786G-3B_B

643,943643,9436/29/076/27/06CLOSE OUTCONSTRUCTIONCONST : COPS-GYMNASIUM A/C11.03224P3224-2CPS

942,213942,2136/29/076/27/06CLOSE OUTCONSTRUCTIONCONST : COPS-AUDITORIUM A/C11.03224P3224-1CPS

3,017,8213,017,82112/14/044/1/02CLOSE OUTCCTCONSTRUCTION : 100/117 CLSRMS, SAFETY & TECH.97.002378786H-1B_B

0011/21/005/30/00CLOSE OUTCCTCONST : REPAIR / REPLACE BLEACHERS97.011158786G-1B_B

FCACBUDGET CURRENTFINISHSTARTPMSTBIHACTIVITY NAMEPIC# (MICRO

DATA NO)IFS (PRNO)#

PROG TYPE

Projects In Construction

10.0


Recommended