+ All Categories
Home > Documents > School Renovation Project- Havaili AJK

School Renovation Project- Havaili AJK

Date post: 02-Jun-2018
Category:
Upload: karwan-development-foundation
View: 218 times
Download: 0 times
Share this document with a friend

of 6

Transcript
  • 8/10/2019 School Renovation Project- Havaili AJK

    1/6

    IMPLEMENTED BY: KARWAN DEVELOPMENT FOUNDATION, PAKISTAN

    Construction of

    New School Buildingin District Haveli, AJK-Pakistan

    FUNDED BY

    DANISH MUSLIM AID

  • 8/10/2019 School Renovation Project- Havaili AJK

    2/6

    Kerni is a small village of 18,000 inhabitants in the mountains of Pakistan side

    of Kashmir. This village is situated in a very difficult terrain near Indian

    border. Life is not very easy up there in these mountains. There are very few

    medical and educational facilities available in this area. Most of the people

    in this area are small farmers and laborers.

    Government Boys Secondary School is the only outlet in this area provid-

    ing education facility up to grade ten. The building of this school was dam-

    aged in 2005 earthquake and even after eight years it was not repaired.

    Teachers were conducting classes in open ground. In snowfall or rain it

    was diff icult to open the school for studies.

    When DM-AID decided to support this school, the school building was in

    dangerous condition. Over the past few years, hundreds of students left

    this school due to unavailability of basic facilities. Upon the request of

    head master, the KDF team visited this school and conducted its initial

    assessment of most urgent needs. DM-AID immediately decided to sup-

    port this school and transfer funds to KDF for reconstruction of the school.

    The basic reconstruction and renovation work has recently been complet-

    ed. The details are as under:

    Government Boys Secondary School - Kerni, AJK Pakistan (Old Building)

    School Construction Project

  • 8/10/2019 School Renovation Project- Havaili AJK

    3/6

    School Construction Project

    Phases of Construction

  • 8/10/2019 School Renovation Project- Havaili AJK

    4/6

    Community MobilizationKDF team involved the local community in the school improvement process and

    conducted various sessions with the community members. The community not only

    showed interest in sending their children to school but they also decided to

    contribute resources for the development of school in their area. Free labor, wood,stone and some other resources were contributed by local community.

    Features of New Building: Construction of five new class rooms is completed.

    Teachers Chairs & mats for the students have been provided.

    Principals office and staff room has been constructed.

    School Construction Project

  • 8/10/2019 School Renovation Project- Havaili AJK

    5/6

    Schools New Look

    School Construction Project

  • 8/10/2019 School Renovation Project- Havaili AJK

    6/6

    KARWAN DEVELOPMENT FOUNDATIONH # 594-B, St # 29, G-10/2, Islamabad - PAKISTAN

    Phone: +9251 250 5552, +9251 831 2170 | Fax: +9251 831 2171

    [email protected] | www.karwan.pk


Recommended