Scrum with VS ALM
Presenter
Stephen GodboldReadify Senior Consultant
Microsoft VS ALM MVP CSM
Presentation Backlog
• As a Scrum team member I want to know how I can most effectively plan and manage my work with VS ALM
• As a Scrum team member I want to use the tools within the VS ALM suite to help me deliver quality software
• As a Scrum team member I want to be able to reduce the friction involved when I work with the VS ALM suite and Scrum
WORKING WITH TFS
Process Templates
• MSF for Agile 5
• Scrum 1.0
• Scrum for Team System 3.0
Refactoring
Enhancing the internals of an artefact without changing it’s external behaviour
Unit Testing
“A unit test is a fast, in-memory, consistent, automated and repeatable test of a functional unit-of-work in the system.”
-Roy Osherove
Build Automation
Repeatable, reliable process to producing artefacts
Continuous Integration
Continual automated quality assurance
Progress Tracking
• Sprint Burndown
• Release Burndown
• Velocity
INSPECT AND ADAPT
Retrospective
• Capture details directly in the sprint artefact
• Move anything that is an impediment to a work item
• Track resolution of impediments
REDUCING FRICTION
Urban Turtle
Team Spec
Work Item Manager and Dashboard
http://canberravsts.org