SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative
Transcript
Page 1: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

SD Energy Infrastructure Authority“Transmission 101”

June 9, 2006

SD Energy Infrastructure Authority“Transmission 101”

June 9, 2006

Mike RisanSenior Vice President, TransmissionBasin Electric Power Cooperative

Mike RisanSenior Vice President, TransmissionBasin Electric Power Cooperative

Page 2: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.
Page 3: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

ConstraintsConstraints

ofof

RulesRules ofof ManMan

Nature

Nature

RulesRules

Page 4: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Rules of NatureRules of Nature

Laws of Physics Regional Characteristics

Laws of Physics Regional Characteristics

Page 5: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Laws of Physics

Power

GenerationLoad

Page 6: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Power

ContingenciesLightning

Page 7: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Contingencies

Power

Page 8: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Power

Overload?

Page 9: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Low Voltage?

Power

Page 10: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Transient Stability?

Power

Page 11: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Weakest LinkWeakest Link

OverloadOverload LowLow

VoltageVoltage

TransientTransient

StabilityStability

Page 12: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Transfer Capability

Power

Limit

Page 13: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.
Page 14: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Natural CharacteristicsNatural Characteristics

Coal Hydro Wind Location Load

Coal Hydro Wind Location Load

Page 15: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

CoalCoal

Page 16: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

HydroHydro

OaheOahe BigBendBigBend

FortRandall

FortRandall

Gavins PointGavins Point

Fort PeckFort Peck GarrisonGarrison

Page 17: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

WindWind

50m (164ft)PowerClass

Wind Power(W/m2)

Speed*(m/s)

Page 18: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

LocationLocation

Page 19: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

LoadLoad

Load

Generation

Limit

Page 20: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

LoadLoad

NDEX

Page 21: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

WNE WKSWNE WKS COOPERSCOOPERS

FTCALSFTCALSGRIS LNCGRIS LNC

GGSGGS

NDEXNDEXMWSIMWSI

MHEXMHEX

Page 22: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Rules of Nature SummaryRules of Nature Summary

Complex Regional problem Need regional solution Technically feasible

Complex Regional problem Need regional solution Technically feasible

Page 23: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Rules of ManRules of Man

Regulatory Rules/Processes More Problematic In a state of flux Deregulation

Regulatory Rules/Processes More Problematic In a state of flux Deregulation

Page 24: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Regulatory Rules/ProcessRegulatory Rules/Process Federal Energy Regulatory Commission

Regulates jurisdictional utilities directly,others indirectly

Interstate transportation Leading restructuring initiatives

Federal Energy Regulatory Commission Regulates jurisdictional utilities directly,

others indirectly Interstate transportation Leading restructuring initiatives

FERC

States Transmission line permitting & siting Eminent Domain authority Rate Recovery

States Transmission line permitting & siting Eminent Domain authority Rate Recovery

PUC

Page 25: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

FERCRestructuring Initiatives

FERCRestructuring Initiatives

Orders 888/889 – 1996 Order 2000 – 1999

Orders 888/889 – 1996 Order 2000 – 1999

Page 26: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Orders 888/889Orders 888/889

Open Access Pro-Forma Tariff Standards of Conduct Electronic reservation system (OASIS) Tariff Process (FIFO) Consider all requests sequentially Correctly assign costs

Open Access Pro-Forma Tariff Standards of Conduct Electronic reservation system (OASIS) Tariff Process (FIFO) Consider all requests sequentially Correctly assign costs

Page 27: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Cost ProvisionsCost Provisions

Rate =

Expansion uses “OR” Pricing Incremental Average

Rate =

Expansion uses “OR” Pricing Incremental Average

CostUsage

Page 28: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

$100,000,000+ $100,000,000+

Page 29: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.
Page 30: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Confirm Service

Tariff ProcessTariff ProcessRequest

TransmissionRequest

Transmission

Impact StudyImpact Study

Facility Study

Decision PeriodDecision Period

Page 31: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.
Page 32: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

RR

TTOO

Page 33: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Order 2000Order 2000

Regional Transmission Organizations Regional pricing to eliminate pancaking Coordinated operations for reliability

improvement Regional transmission planning

Regional Transmission Organizations Regional pricing to eliminate pancaking Coordinated operations for reliability

improvement Regional transmission planning

Same goals as the IS!

Page 34: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Rate IssuesRate Issues

RTO rate License Plate Postage Stamp

Bottom line = Who Pays?

RTO rate License Plate Postage Stamp

Bottom line = Who Pays?

Page 35: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

No Cost/BenefitNo Cost/Benefit

BenefitsBenefits CostsCosts

Page 36: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Other Impedimentsto New TransmissionOther Impediments

to New Transmission

Opposition and litigation Siting across multiple jurisdictions Impacts vs. benefits? Who has responsibility to build? Uncertain cost recovery Risky – Who will invest?

Opposition and litigation Siting across multiple jurisdictions Impacts vs. benefits? Who has responsibility to build? Uncertain cost recovery Risky – Who will invest?

Page 37: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

Rules of Man SummaryRules of Man Summary

Regulatory arena in a state flux Process in gridlock Much uncertainty Who pays?

Regulatory arena in a state flux Process in gridlock Much uncertainty Who pays?

Page 38: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

SolutionSolution

Expand Bulk Transmission System System Wide Average Rate (HV only) Common Rate Zone (IS) Cost Effective/Efficient Least Cost Planning Allow Immediate Recovery for Investments Incentives Unnecessary

Expand Bulk Transmission System System Wide Average Rate (HV only) Common Rate Zone (IS) Cost Effective/Efficient Least Cost Planning Allow Immediate Recovery for Investments Incentives Unnecessary

Page 39: SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.

SolutionSolution

This will promote: Economic Development Energy Independence Competition Reliability

This will promote: Economic Development Energy Independence Competition Reliability