SDL: MOST point of view CNES / J-F Fronton / D Hallouard
LSWT Venice, 30/03-01/04/2009
2 LSWT meeting, Venice, 30/03-01/04/2009
Inputs
Instrument Flight Operation Plan
Today status: all except Sesame, Ptolemy, Cosac
IFOP Complementary to Science Objectives doc
Merge of the documents and extraction of SDL & LTS requirements
3 LSWT meeting, Venice, 30/03-01/04/2009
SDL inputs SDL requirements
15 requirements from all instruments except APXS & SD2
Instrument Requirement Description Priority CIVA R-SDL-LCI-1 Orbiter imaging 1mn after separation 2 CIVA R-FSS-LCI-1 First panorama imaging 1
CONSERT R-SDL-LCN-1 descent monitoring 1 COSAC ROS-PHI-COS-SDL-001 MS sniffing 3
MUPUS ROS-PHI-MUP-SDL-001 ANC-M and ANC-T measurements during PHILAE touchdown 1
MUPUS ROS-PHI-MUP-SDL-0002 Temperature (infrared) measurements (looking at deep
space). 1
PTOLEMY ROS-PHI-PTO-SDL-001 Sniff mode 3 ROMAP ROS-PHI-ROM-SDL-001 Slow Mode 1Hz continuously 1
ROLIS R-SDL-RLS-1 ROLIS DIT imaging (Descent imaging with Immediate
Transmission) 1
ROLIS R-SDL-RLS-2 ROLIS DIS imaging (Descent Imaging with local Storage) 0.2
Hz starting at Tlanding-15m 1
ROLIS R-SDL-RLS-3 ROLIS DIS image data transfer 1 SESAME ROS-PHI-SES-SDL-001 SESAME-CASSE register the landing impact 1 SESAME ROS-PHI-SES-SDL-002 SESAME-DIM particle flow rate and direction 1
SESAME ROS-PHI-SES-SDL-003 SESAME-DIM Analyze the impact amplitude vs. impact
duration 1
SESAME ROS-PHI-SES-SDL-004 SESAME-PP Monitor electron density variation and the
comet's outgassing activity 2
4 LSWT meeting, Venice, 30/03-01/04/2009
SDL inputs
SDL requirements SDL working group selected the requirements from:
- CIVA (orbiter imaging and panoramic)- MUPUS (Calibration and Anchoring measurement)- ROMAP in Slow mode- ROLIS (DIT and DIS)- SESAME (PP, DIM,CASSE)- a total of 12 requirements
5 LSWT meeting, Venice, 30/03-01/04/2009
SDL requirements chart –First version
6 LSWT meeting, Venice, 30/03-01/04/2009
METHODOLOGY 1/4
1) Library:
For each instrument creation of sequences based on requirement or LIOR
Each sequence includes one or several tasks
Sequences can be combined to create macro-sequences
7 LSWT meeting, Venice, 30/03-01/04/2009
METHODOLOGY 2/4
2) Sequence Plan:
Built by assembling sequences Macroscopic and sequential view of the activities Association of this plan to a context file Generation of the final plan
8 LSWT meeting, Venice, 30/03-01/04/2009
METHODOLOGY 3/4
3) Scenario:
Customizable plan (add, modify, delete)
Each color is a chain : sub-system or experiment
Sequences are displayed in tasks
All boxes and links are configurable
9 LSWT meeting, Venice, 30/03-01/04/2009
METHODOLOGY 4/4
Generic scenario:The scenario presents the activities independently of the application context (time, energy source, temperature, data rate, visibilities, day / night cycle)
Context description:- set of applicable parameters- different contexts are induced by landing site, attitude, platform etc … - different contexts can be applied to the same scenario
10
LSWT meeting, Venice, 30/03-01/04/2009
Used context 1/2
Scheduling : 11/11/2014 11:30 to 11/11/2014 13:30 (30mn before separation to CIVA-P panoramic data transfer)
---------------- References dates : -------------------------- ON battery : 11/11/2014 11:30
Separation : 11/11/2014 12:00 Touch Down : 11/11/2014 12:40
Day / Night cycle : D=N=6h15 Beginning date D0 = 11/11/2014 11:00:00 (1 comet day = 12h30mn equator plan )
----------------------- Lander / Orbiter visibility : No Visibility during SDL, Visibility after Touch Down
----------------------------------- .
Energy : ------------ Primary Battery Secondary battery
---------------------- --------------------------. Initial capacity : 1000 Wh . Initial capacity : 98 Wh. Min Threshold capa : 0 Wh . Min Threshold capa : 0 Wh. Stop threshold capa : NO . Stop threshold capa : NO. Authorized max Power : 210 W . Authorized max Power : 151 W. Optimization’s Power : 0 W . Optimization’s Power : 0 W. Integration’s time : 0 s . Integration’s time : 0 s. Initial temperature : 20°C . Initial temperature : 20°C
11
LSWT meeting, Venice, 30/03-01/04/2009
Used context 2/2
Transfer rate to orb : 14Kbits/s ---------------------------
DC/DC Converters efficiency: 50% (TBC) Instruments: LPC ----------------------------------------- Transfer rate to MM :
---------------------------- Nb EXP priority priority HIGHMM write In Kbits/s
1 1 132 1 112 2 103 1 103 2 93 3 84 1 94 2 84 3 74 4 6…
Experiment Priority (transfer) : 1 - ROMAP------------------------------------------ 2 - CIVA / ROLIS
3 - MUPUS 4 -SESAME
12
LSWT meeting, Venice, 30/03-01/04/2009
MOST Process
MOST performs accurately the energy management
MOST needs improvements regarding the data transfers & management (cf. MOST CDMS simulation).
Data management is one of the highest constraint (indirect & calculated) with energy and thermal.
Therefore:- result of global planning is not realistic- presentation of results instrument by instrument
- energy profiles and quantities- data volume - data transfer duration calculated in view of
GRM tests performance
13
LSWT meeting, Venice, 30/03-01/04/2009
Results by instrument
1) SDL Time Line for ROMAP : Romap SLOW Mode
14
LSWT meeting, Venice, 30/03-01/04/2009
Results for Romap1) Power consumption :
Instrument input : ~=1,7W Converter input : ~=3,5W
2) Total power asked
3) Residual energy : Er~=994Wh Ebus = 4,65Wh for 1h20
15
LSWT meeting, Venice, 30/03-01/04/2009
1) SDL Time Line for MUPUS : mapper mode, calib, anchor M &T
Results by instrument
16
LSWT meeting, Venice, 30/03-01/04/2009
Results for MUPUS1) Power consumption : map, calib, anchor
Instrument input : ~2; 5; 2W Converter input: ~4,5; 10; 4W
2) Total power asked
3) Residual energy : Er~=993Wh Ebus ~= 5Wh for 1h
17
LSWT meeting, Venice, 30/03-01/04/2009
1) SDL Time Line for SESAME : health check CAS, DIM, PP
PP, DIM-AM, PP, DIM-BM, PP, CAS-TM
Results by instrument
18
LSWT meeting, Venice, 30/03-01/04/2009
Results for SESAME1) Power consumption :(HC,PP,DIM-AM,DIM-BM,CAS-TM)
Instrument input : ~0,7; 0,25; 0,1; 0,7W Converter input : ~1,3; 0,5; 0,2; 1,3W
2) Total power asked
3) Residual energy : Er~=999,7Wh Ebus ~= 0,4Wh for 1h
19
LSWT meeting, Venice, 30/03-01/04/2009
1) SDL Time Line for ROLIS : Dump, DIT, DIS
Results by instrument
20
LSWT meeting, Venice, 30/03-01/04/2009
Results for ROLIS1) Power consumption :
Instrument input : ~6(DIT); 8(DIS)W Converter input : ~12,5(DIT); 16(DIS)
2) Total power asked
3) Residual energy : Er~=993Wh Ebus ~= 8Wh for 40mn
21
LSWT meeting, Venice, 30/03-01/04/2009
1) SDL Time Line for CIVA-P : Dump, 2CIVA-P, 7CIVA-P
Results by instrument
22
LSWT meeting, Venice, 30/03-01/04/2009
Results for CIVA-P 1) Power consumption :
Instrument input : ~10,5W (Imaging) Converter input : ~21,5W (Imaging)
2) Total power asked
3) Residual energy : Er~=987Wh Ebus ~= 12.5Wh for 1h26mn
23
LSWT meeting, Venice, 30/03-01/04/2009
1) SDL Time Line for CDMS, PSS, TCU1, TCU2 :
Results by sub-systems
24
LSWT meeting, Venice, 30/03-01/04/2009
Results for CDMS, PSS,TCU1, TCU21) Power consumption :
Instrument input : ~= 6W
Converter input : ~= 12W
2) Total power asked
3) Residual energy : Er~=966Wh Ebus ~= 24 Wh for 2 hours
25
LSWT meeting, Venice, 30/03-01/04/2009
CDMS, PSS,TCU1, TCU2 with secondary battery 1) Power consumption :
Instrument input : ~= 6W
Converter input : ~= 12W
2) Total power asked
3) Residual energy : Er~=72Wh Ebus ~= 24 Wh for 2 hours
26
LSWT meeting, Venice, 30/03-01/04/2009
CDMS, PSS, TCU1, TCU2 Energy 1/2
1) Theory: At battery level the total available energy is function of temperature and current.
Primary battery theoretical initial capacity (discharge 56mA, 20°C)= 1491 Wh
Secondary battery theoretical initial capacity (discharge 60mA , 20°C)= 151 Wh
Primary battery theoretical estimated capacity in 2014(capacity lost 10,2%, for discharge current 56mA and 20°C)= 1339 Wh
Secondary battery theoretical estimated capacity in 2014 ( capacity lost 19% and charge at 95%, discharge current 60mA and 20°C) = 116 Wh
27
LSWT meeting, Venice, 30/03-01/04/2009
CDMS, PSS, TCU1, TCU2 Energy 2/2
Energy WhT°C
Battery-10° 0° 20°
Primary
Secondary
966 Wh
71,7 Wh71,2 Wh70,7 Wh
963 Wh957 Wh
2) Additional tests:Hypothesis: Primary battery Initial capacity: 1000WhSecondary battery Initial capacity: 98Wh
Residual energy after SDL discharge in function of temperature
28
LSWT meeting, Venice, 30/03-01/04/2009
SDL additional results
SDL data volume and transfer duration
Priority data rate IM to MM- ROMAP 1 9 Kb/s- CIVA & ROLIS 2 8 Kb/s- MUPUS 3 7 Kb/s - SESAME 4 6 Kb/s
Data rate MM to Orbiter: 14 Kb/s
Instruments Data volume
Kbyte Transfer duration: Instr Mem to MM
Transfer duration: MM to Orbiter
CIVA-P orb 250 4 mn 2 mn 20 s MUPUS 16 20 s 9 s ROMAP 41 40 s 23 s ROLIS 1255 21 mn 12 mn
SESAME 506 11 mn 5 mn
CIVA-P pano 875 15 mn 8 mn 20s
29
LSWT meeting, Venice, 30/03-01/04/2009
SDL analysis comments
Data management is one of the highest constraint (indirect & calculated) with energy and thermal.
SDL scheduling is very time constraint Low degree of freedom to optimize energy profile and data
transfer periods All inputs should be re-evaluated in view of the flight data
First study of a long series of iterations with different scenario and contexts (inputs & feedback from scientists)