Page 1: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole
Page 2: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

Mission: Deliver a high-quality transportation

system for Seattle

Vision: connected people, places, and products

Committed to 5 core values to create a city that is:

• Safe

• Interconnected

• Affordable

• Vibrant

• Innovative

For all

SDOT’s Mission and Vision

2

Page 3: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

Complete the Burke-Gilman Trail to create a safe, direct, and well-defined route for people of all ages and abilities traveling across the City and through Ballard.

Improve predictability for motorized and non-motorized users while maintaining safe truck and freight access to local businesses.

SDOT’s Project Mission and Vision

3

Page 4: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

4

Page 5: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

5

Page 6: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

6

Page 7: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

7

Page 8: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole
Page 9: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

9

Page 10: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

10

Page 11: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

1. Restriped parking at the Ballard Locks

2. Relocated bus stop to the southwest corner of Market St / 28th

3. Improved connections to the Neighborhood Greenway at 28th / Market

4. Added westbound left turn lane with protected signal phase at Market / 28th

5. Converted 26th to one-way south of Market St

6. Reconfigured 24th / Market intersection, modified sidewalk cafes, and added mixing zone

7. Extended bicycle lanes on 24th to Market St and added crossing treatments11

2

3

45

1

6

7

Page 12: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

12

Page 13: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole
Page 14: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

14

Page 15: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

15

Page 16: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

16

Page 17: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

1. Added landscape terrace at 24th / Shilshole

2. Extended 54th and converted 24th to a dead end

3. Added rapid flash beacons and crosswalk at 54th / Shilshole

4. Added signal to Shilshole / Vernon

5. Incorporated LED signs at key locations along Shilshole trail

6. Extended sidewalk and landscaping at 20th Street End

7. Added left turn pocket at 17th and Shilshole

8. Installed crosswalks and a half-signal at Dock / Shilshole

9. Redesigned 17th / Shilshole for truck turning movements

10. Added lighting, fencing, and signage at improved trail/railroad crossing

17

1

2

4

5

3

67

89

10

Page 18: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

18

Page 19: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

19

Page 20: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

20

Page 21: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

21

Page 22: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

1. Connected the trail to the existing King County bike lane including new crosswalks, rapid flash beacons, and pedestrian lights

2. Increased lane width to 11 feet on 45th St to accommodate large trucks

3. Retained loading access for properties on the south side of 45th

4. Restriped parking on the south side of 45th

22

1

2

3 4

Page 23: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

23

Page 24: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

24

Page 25: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

25

Page 26: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

26

Page 27: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

• FEIS included a worst case scenario estimating 344 spaces lost

• Counts on the current design show approximately 209 spaces lost (35% of supply along the route). This can still go up or down!

• We were able to gain regulated stalls at the Ballard Locks, along the proposed NW 54th

extension road, and along the north side of Shilshole.

27

Page 28: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole
Page 29: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

29

• Attend upcoming events:

• Self-guided Walking Tour

• Design Advisory Committee Meetings

• Provide your thoughts to the Design Advisory Committee: [email protected]

• Sign up for email updates: [email protected]

• Call the project team: (206) 256-5264

• Request a briefing. We are happy to join your meeting.

• Visit the website for updates and upcoming events: seattle.gov/transportation/BGT_MissingLink.htm

Page 30: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole
Page 31: SDOT’s Mission and Vision › ... › BGT › ...Presentation_WEB(0).pdfto a dead end 3. Added rapid flash beacons and crosswalk at 54th / Shilshole 4. Added signal to Shilshole

31


Recommended