Australias
Sea King Disposal2011 - 2012
Request for Tender
Industry Brief19th September 2011
8/3/2019 Sea King Disposal RFT Industry Briefing
2/33
8/3/2019 Sea King Disposal RFT Industry Briefing
3/33
2011/12 2020/21 Disposals
up to 24 ships
up to 70 combat aircraft
up to 110 other aircraft
up to 120 helicopters
up to 600 armoured vehicles up to 12,000 other vehicles, and
a range of communications systems,
weapons (such as rifles, howitzer, etc.,) andexplosive ordnance (such as missiles,torpedos and munitions)
8/3/2019 Sea King Disposal RFT Industry Briefing
4/33
Up to 24 Ships - Indicative Program
Total Ships Dry Weight: ~ 31,000 tonnes
KDA Class
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Amphibious Lift
Guided Missile Frigates (FFG)
Mine Warfare
8/3/2019 Sea King Disposal RFT Industry Briefing
5/33
Up to 12,000 Vehicles - Indicative Program
*Disposal timeline is indicative only and is dependent on the delivery of the
replacement vehicle fleet
2012 2013 2014 2015 2016 2017 2018 2019 2020 TOTAL
Lightweight fleet
(Land Rover variant)600 450 475 475 260 260 260 260 260 3300
Light trailers(< 2 tonnes)
270 280 280 280 280 280 280 280 270 2500
Medium-weight fleet
(10 tonnes)136 262 262 136 349 1145
Medium trailers
(2-20 tonnes)75 75 75 75 300
Heavy fleet
(semi-trailer)18 36 36 18 110
Heavy trailers(40ft, low-loader)20 20 20 20 80
8/3/2019 Sea King Disposal RFT Industry Briefing
6/33
8/3/2019 Sea King Disposal RFT Industry Briefing
7/33
Australian Disposals 1997 2010
8/3/2019 Sea King Disposal RFT Industry Briefing
8/33
Strategic Priorities
Cost reduce and/or eliminate cost to return funding to thesustainment of current capability
Revenue generate and then maximise revenue from thesale of Defences military assets
Heritage ensuring that Defence heritage (and inparticular war heritage) is appropriately recognised and
preserved Industry provide opportunity for industry to add value in
the disposal of Defences military assets
Reform continue to reform disposal processes to supportthe above four priorities
8/3/2019 Sea King Disposal RFT Industry Briefing
9/33
Balancing Priorities
V
M2A2 Hamel
8/3/2019 Sea King Disposal RFT Industry Briefing
10/33
Product Development / Management
Defence Inputs Industry Inputs Output
Spares
Key
DefenceAsset
ExplosiveOrdinance
SupportEquipment
Training
Upgrade
Training
OngoingSupport
Refurbishment IntegratedProduct
8/3/2019 Sea King Disposal RFT Industry Briefing
11/33
Disposal Vision / Process
Strategy Market Activity Delivery
8/3/2019 Sea King Disposal RFT Industry Briefing
12/33
Potential Disposal Options
Foreign military, para-military, police or emergencyservices organisations
Other government organisations
International aid organisations
OEMs for refurbishment and on-sale
Spares harvesting
8/3/2019 Sea King Disposal RFT Industry Briefing
13/33
Overall requirements
Technical and financial feasibility;
Best overall value for money return for theCommonwealth;
Positive environmental management;
Positive occupational safety management; and
Compliance with all applicable laws andinternational conventions.
8/3/2019 Sea King Disposal RFT Industry Briefing
14/33
LOTS 1 to 5
Fleet status is correct
as at
8th September 2011
8/3/2019 Sea King Disposal RFT Industry Briefing
15/33
LOT 1 N16 114
20-Nov-11420 daysR8 Due on
21-Jan-12315 daysR7 Due on
10-Aug-11210 daysR6 Due on
10-Aug-11105 daysR5 Due on
62.8 A/F Hrs400hrlyR4 Due in
36.7 A/F Hrs300hrlyR3 Due in
34.4 A/F Hrs100hrlyR2 Due in33.6 A/F Hrs50 hrlyR1 Due in
8983.2 Air Frame Hours. This aircraft has retired fromservice.
8/3/2019 Sea King Disposal RFT Industry Briefing
16/33
LOT 2 N16 125
30-Jul-12420 daysR8 Due on
29-Dec-11315 daysR7 Due on
3-Jan-12210 daysR6 Due on
20-Sep-11105 daysR5 Due on
202.1 A/F Hrs400hrlyR4 Due in
136.7A/F Hrs300hrlyR3 Due in
86.7 A/F Hrs100hrlyR2 Due in
36.7 A/F Hrs50 hrlyR1 Due in
8209.8 Air Frame Hours. Retires from service 31 Dec 11.
8/3/2019 Sea King Disposal RFT Industry Briefing
17/33
LOT 3 N16 238
26-Jan-10420 daysR8 Due on
5-Jul-10315 daysR7 Due on
9-Mar-10210 daysR6 Due on
17-Mar-10105 daysR5 Due on
3.6 A/F Hrs400hrlyR4 Due in
0.5 A/F Hrs300hrlyR3 Due in
3.6 A/F Hrs100hrlyR2 Due in15.9 A/F Hrs50 hrlyR1 Due in
7770.5 Air Frame Hours. This aircraft has retired fromservice.
8/3/2019 Sea King Disposal RFT Industry Briefing
18/33
LOT 4 N16 239
7-Feb-12420 daysR8 Due on
11-Mar-12315 daysR7 Due on14-Aug-11210 daysR6 Due on
14-Aug-11105 daysR5 Due on
111.2 A/F Hrs400hrlyR4 Due in
109.3 A/F Hrs300hrlyR3 Due in
9.3 A/F Hrs100hrlyR2 Due in8.0 A/F Hrs50 hrlyR1 Due in
7732.2 Air Frame Hours. This aircraft is scheduled to retirefrom service in Oct 11
8/3/2019 Sea King Disposal RFT Industry Briefing
19/33
LOT 5 N16 918
27-Aug-12420 daysR8 Due on
28-Sep-11315 daysR7 Due on
26-Jan-12210 daysR6 Due on
13-Oct-11105 daysR5 Due on
188.2 A/F Hrs400hrlyR4 Due in
164.2 A/F Hrs300hrlyR3 Due in
64.2 A/F Hrs100hrlyR2 Due in
14.2 A/F Hrs50 hrlyR1 Due in
8005.5 Air Frame Hours. Retires from service 31 Dec 11.
8/3/2019 Sea King Disposal RFT Industry Briefing
20/33
LOT 6 Simulator
8/3/2019 Sea King Disposal RFT Industry Briefing
21/33
LOT 6 Simulator
8/3/2019 Sea King Disposal RFT Industry Briefing
22/33
LOTS 7 to 9
Ex UK MoD Mk 6 Airframes
XZ 571XZ 647
XV 710 All aircraft have exceeded 10,000
airframe hours and have beenharvested for spare parts
8/3/2019 Sea King Disposal RFT Industry Briefing
23/33
LOTS 7 to 9
8/3/2019 Sea King Disposal RFT Industry Briefing
24/33
LOTS 7 to 9 Harvested Items
Some floor panels
Some fuel cells
Tail pylons Most avionic and electrical repairable items
Some instruments
Transmissions
Engines
Drive train items Blades
Some flight control components
8/3/2019 Sea King Disposal RFT Industry Briefing
25/33
LOT 10 Unique Sea King Repairable
Items & Break Down Spares transmission change units
main and tail rotor assemblies
sponsons tail pylons
fairings
fuel cells flooring
avionics and electrical systems
lightweight radar
generators
inverters
automatic flight control systems
8/3/2019 Sea King Disposal RFT Industry Briefing
26/33
LOT 11 Ground Support Equipment,
special tooling, etc servicing platforms
rigging kits
aircraft blanks and covers
special tools
1st line test equipment (used on aircraft) including
Pitot Static Test Set
Shut Off Cock Actuator Test Set
Flight Control Test Set
2nd line test equipment (used at workshops) including, Lightweight Radar Test station
Radalt Test Station etc
8/3/2019 Sea King Disposal RFT Industry Briefing
27/33
LOT 12 Uninstalled RR Gnome Engines
up to seven complete uninstalled Gnome Mk 3020 and3021 engines
engine housings exhaust casings
wiring harnesses overspeed trip units
compressor blades
fuel computers
8/3/2019 Sea King Disposal RFT Industry Briefing
28/33
LOT 13 METS
T700 / Gnome Engine Test System / Mobile Engine Test Stand(METS) including
control cabin
test trailer
Dynamometer
electrical harnesses etc
8/3/2019 Sea King Disposal RFT Industry Briefing
29/33
Location
8/3/2019 Sea King Disposal RFT Industry Briefing
30/33
Sea King RFT Timing
Tender Release
1 September 2011
Inspection Day
13 October 2011
Tender Close
1 November 2011
Delivery
first half of 2012
8/3/2019 Sea King Disposal RFT Industry Briefing
31/33
Other HelicoptersSquirrel helicopter Seahawk helicopter
Kiowa helicopter Black Hawk helicopter
8/3/2019 Sea King Disposal RFT Industry Briefing
32/33
Defence Disposals Agency
Help Desk [email protected]
Write to: The DirectorDefence Disposals Agency
Level 12, Defence Plaza
270 Pitt St
Sydney NSW 2000
Phone: 02 9393 2914