PIPELINE DESIGN DATA 1.1 GENERAL INFORMATION 1.2 APPLICANT/OWNER: SEADRIFT PIPELINE CORPORATION C/O THE DOW CHEMICAL COMPANY 1254 ENCLAVE PARKWAY HOUSTON. TX. 77077 ATTENTION: MR. JERE DIAL (281) 966-4068 1.3 PIPELINE NAME: 6’ UCAR PIPELINE 1.4 PRODUCT: Ethylene 2.1 PIPELINE DESIGN DATA 2.2 DESIGN CODES: CODE OF FEDERAL REGULATIONS TITLE 49, PART 192 MINIUM FEDERAL STANDARDS FOR THE TRANSPORTATION OF HAZARDOUS GAS BY PIPELINE THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS ASME B31.4. PIPELINE TRANSPORTATION FOR LIQUIDS ASME B31.8 GAS TRANSMISSION AND DISTRIBUTION 2.3 DESIGN PRESSURE: 1585 PSIG (MAXIMUM ALLOWABLE OPERATING PRESSURE) 2.4 TEST PRESSURE: 3020 PSIG (MINIMUM TEST PRESSURE) X 24 HRS 3.1 CARRIER LINE PIPE AND CROSSING PIPE DATA ITEM LINE PIPE 3.2 OUTSIDE DIAMETER: 6.625” 3.3 WALL THICKNESS: 0.312” AT CLASS 1 LOCATIONS 0.432” AT CLASS 3 LOCATIONS AND HDDS 3.3 SPECIFICATION: API 5L 2M or N X42 3.4 SPECIFIED TENSILE: 42,000 PSI (MIN) YIELD PROPERTIES 3.5 MATERIAL: CARBON STEEL 3.6 PROCESS OF MFG: ELECTRIC RESISTENCE WELDED (ERW) 3.7 EXTERIOR COATING: FUSION BONDED EPOXY 4.0 CATHODIC PROTECTION RECTIFIER IMPRESSED CURRENT 5.1 CONSTRUCTION METHODS 5.2 0.312 wt PIPELINE INSTALLED BY OPEN CUT WITH MINIMUM COVER OF 39” SEADRIFT PIPELINE CORPORATION 6” UCAR PIPELINE Sheell DRAWN BY CHECKED BY APPROVED BY REVISION DATE:11-14-17 DRAWING NUMBER -0- IWGMIJ0b#1O9614
Transcript

PIPELINE DESIGN DATA

1.1 GENERAL INFORMATION

1.2 APPLICANT/OWNER: SEADRIFT PIPELINE CORPORATIONC/O THE DOW CHEMICAL COMPANY1254 ENCLAVE PARKWAYHOUSTON. TX. 77077ATTENTION: MR. JERE DIAL (281) 966-4068

1.3 PIPELINE NAME: 6’ UCAR PIPELINE

1.4 PRODUCT: Ethylene

2.1 PIPELINE DESIGN DATA

2.2 DESIGN CODES: CODE OF FEDERAL REGULATIONSTITLE 49, PART 192MINIUM FEDERAL STANDARDS FOR THETRANSPORTATION OF HAZARDOUS GAS BY PIPELINETHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME B31.4. PIPELINE TRANSPORTATION FOR LIQUIDSASME B31.8 GAS TRANSMISSION AND DISTRIBUTION

2.3 DESIGN PRESSURE: 1585 PSIG (MAXIMUM ALLOWABLE OPERATING PRESSURE)

2.4 TEST PRESSURE: 3020 PSIG (MINIMUM TEST PRESSURE) X 24 HRS

3.1 CARRIER LINE PIPE AND CROSSING PIPE DATAITEM LINE PIPE

3.2 OUTSIDE DIAMETER: 6.625”3.3 WALL THICKNESS: 0.312” AT CLASS 1 LOCATIONS

0.432” AT CLASS 3 LOCATIONS AND HDDS

3.3 SPECIFICATION: API 5L 2M or N X423.4 SPECIFIED TENSILE: 42,000 PSI (MIN) YIELD PROPERTIES3.5 MATERIAL: CARBON STEEL3.6 PROCESS OF MFG: ELECTRIC RESISTENCE WELDED (ERW)3.7 EXTERIOR COATING: FUSION BONDED EPOXY

4.0 CATHODIC PROTECTION RECTIFIER IMPRESSED CURRENT

5.1 CONSTRUCTION METHODS

5.2 0.312 wt PIPELINE INSTALLED BY OPEN CUT WITH MINIMUM COVER OF 39”

SEADRIFT PIPELINE CORPORATION6” UCAR PIPELINE Sheell

DRAWN BY CHECKED BY APPROVED BY REVISION DATE:11-14-17 DRAWING NUMBER —

-0- IWGMIJ0b#1O9614 —

PIPELINE DESIGN DATA

1.1 GENERAL INFORMATION

1.2 APPLICANT/OWNER: SEADRIFT PIPELINE CORPORATIONC/O THE DOW CHEMICAL COMPANY1254 ENCLAVE PARKWAYHOUSTON. TX. 77077ATTENTION: MR. JERE DIAL (281) 966-4068

1.3 PIPELINE NAME: 10” MB PIPELINE

1.4 PRODUCT: Propane

2.1 PIPELINE DESIGN DATA

2.2 DESIGN CODES: CODE OF FEDERAL REGULATIONSTITLE 49, PART 192MINIUM FEDERAL STANDARDS FOR THETRANSPORTATION OF HAZARDOUS GAS BY PIPELINETITLE 49, PART 195MINIUM FEDERAL STANDARDS FOR THETRANSPORTATION OF HAZARDOUS LIQUID BY PIPELINETHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME B31.4. PIPELINE TRANSPORTATION FOR LIQUIDSASME B31.8 GAS TRANSMISSION AND DISTRIBUTION

2.3 DESIGN PRESSURE: 2116 PSIG (MAXIMUM ALLOWABLE OPERATING PRESSURE)

2.4 TEST PRESSURE: 3174 PSIG (MINIMUM TEST PRESSURE) X 24 HRS

3.1 CARRIER LINE PIPE AND CROSSING PIPE DATAITEM LINE PIPE

3.2 OUTSIDE DIAMETER: 10.750”3.3 WALL THICKNESS: 0.438” AT CLASS 1 LOCATIONS

3.3 SPECIFICATION: API 5L 2M or N X523.4 SPECIFIED TENSILE: 52,000 PSI (MIN) YIELD PROPERTIES3.5 MATERIAL: CARBON STEEL3.6 PROCESS OF MEG: ELECTRIC RESISTENCE WELDED (ERW)3.7 EXTERIOR COATING: FUSION BONDED EPOXY

4.0 CATHODIC PROTECTION RECTIFIER IMPRESSED CURRENT

5.1 CONSTRUCTION METHODS

5.2 0.438 wt PIPELINE INSTALLED BY OPEN CUT WITH MINIMUM COVER OF 39”

SEADRIFT PIPELINE CORPORATION10” MB PIPELINE Sheet I

DRAWN BY CHECKED BY APPROVED BY REVISION DATE:11-14-17 DRAWING NUMBER

-0- IWGMIJob#109614

SITE:LOCATION:

PROJECTLOCATION ‘qq/d

DIVISION: A4-MDT14O15-172413

LEGENDWATERS EDGE

WATER

WETLM~D

JOB NO: 109614

Di EN TRY..= 13:7s4,3e~.7.5

3.234.31852

TX-GV-MDT-0 0.70CENTERPOINT ENERGY

HOUSTON ELECTRIC LLC

PIPE SPECIFICATIONS10.750’ O.D X 0.438 W.T., X52DUAL FEE WITH ARC FBE TOPCOAT 35.40 MILSMAOP: 2116 PSIGTEST PRESSURE. 3174 PSIGPRODUCT PROPANECONSTRUCTION METHOD HDD

PIPE SPECIFICATIONS6.626’O.D.x ‘.312W.T X42D AL FBE WITH ARO FBE TOPCOA 35-41 MI SMAOP 1585 P510TEST PRESS RE. 3020 P510PRODUCT: ETHYLENECONSTRUCTION METHOD HDD

TX-GV-MDT-020.10FAY &FAY, LTD.

Iiiz-J

I0I—

MPORARYWORKSPACE

“ii

‘~A 1I.

45’ TEMPORARYWORKSPACE ~t;~ t~/ Sjn

29 TEMPORARYTX-HR-MDT-012i0 • WORKSPACE

CENTE~OINT ENERGY4OIJSTON ELECTRIC U.C

A‘I

PROPOSED 6” PIPELINE& 10” PIPELINE

PLANSCALE: 1”= 1000’

TX-GV-M DT-0 18.50CENTER POINT ENERGY It~C

HOU$TO~EL.ECIR

I:p.

TX-HR-MDT-020.30HCFCD

TX-GV-MDT-020.00FAY& PAY, TO.

if

>-

I—zUJ~.

+

InC’,d

~1

.~ or

p *4•tt ~

4 ~ 80995 ~zes~qI~ 6~ONALt~’..f3

C,z

G9D

>

zw

InC0

0F0a

I 300

-30-60-90

•120-150

NATURAL%Ic$GROUND

-180-210

PROFILE1” = 1000’ HORIZ

1” = 200’ VERT.BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983NSRS 2007), SOUTH CENTRAL ZONE, US

SURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.

SEADRIFT PIPELINE CORPORATIONPROPOSED 6’ & 10” PIPELINES SECTION 10

CROSSING CLEAR CREEK CHANNEL

~T14015-172413STATE HIGHWAY 146 PIPELINE RELOCREV DATE SCALE ATION PROJECT

SHEET: 2OF3

Ui2‘C2LU-JU

SITE:LOCATION

~14;

PROJECTLOCATION ~b

DIVISION: A4-MDT14O15-172413

LEGEND

WATERS EDGE

WATER

WETLAND

JOB NO: 109614

fl-GV-MDT.O18.50CENTERPOINT ENERGY rib

-lousroS EtECTRIC

I—zLLJZDctS0—

+~fjCt,£

DL ENTRY= 13;764,36~.m

3.234.316.62

TX-GV-MDT-O 10.70CENTERPOINT ENERGY

HOUSTON ELECTRIC LLC

PIPE SPECIFICATIONSlO.750 0.0 X 0.438 W.T. X52DUAL FBE WITH ARO FBE TOPCOAT 3540 MILSMAOP: 2116 PSIGTEST PRESSURE 3174 P510PRODUCT: PROPANECONSTRUCTION METHOD HDD

PROFILE

PIPE SPECIFICA IONS 1:1000’ HORIZ,1 200 VERT.8.626 O.D. x ‘.3 12 W.T X42DUAL FBE WITH ~RO FBE TOPCOAT 3540 MILS.MAOP 1585 PSIGTEST PRESSURE. 3020 P510PRODUCT: ETHYLENECONSTRUCTION METHOD: HOD

TX-H R-MDT-02O,3OHCFCD

LUz-JIC)I—

EMPORARYRKSPAGE / Si

45 TEMPORARYWORKSPACE

TX-HRMDT4I2.10CENTERPOINT ENERGY

I4OUSTON ELECTRIC LLC

25’ TEftWORARYWORKSPACE

/‘‘‘‘

PROPOSED 6” PIPELINE& 10” PIPELINE

PLANSCALE: 1”,I000’

NATURALGROUND

TX-GV-MDT-O20.10FAY &FAY, LTD.

TX-GVMDT.02D.0OFAY&FAY, LTD.

-J

tc_or

~

4 80995 /4J‘I 2~N~ft’fl / -

‘~~~t~S-’ 3/I ?/ t’

C,

gC-,

>

zLU

>-00

C

LU

C0-

300

-30-60-90

-120-150-180-210

::z::::.::z::: .:::::::::~:::::::::::::::::::::::: . .....:.:........-::,

PROPQSED-6~PIPEL/NE~

BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007 SOUTH CENTRAL ZONE USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.

SEADRIFT PIPELINE CORPORATION I ____

I V\/~f WOOD GROUP USA. INC.PROPOSED 6” & 10” PIPELINES SECTION 10 I ~S~SDENONE~F~F.2909

I PROJECT NO: 00006CROSSING CLEAR CREEK CHANNEL I

STATE HIGHWAY 146 PIPELINE RELOCATION PROJECTA4-MDT14O15-172413REV DATE SCALE ____________________

SHEET: 2OF3 _______

SITE:LOCATION

DIVISION: A4-MDT14O15-172413

LEGENDWATERS EDGE

WATER

PROJECT WETI.ANDLOCATION

JOB NO: 109614

ITh-GV-&4DT.Q 18.50

CENTERPOINT ENERGY u4’cH0USTOI~ $.EOTR

-180-210

o ENTRY13,76436~J5

—J.234 318.52

t(-GV-MDr-0 070CENTERPOINT ENERGY

HOUSTON ELECTRIC LLC

>-

I—2

Z~

+

U,C”a‘-C

PIPE SPECIFICATIONS10.750 0.0 X 0.438 W.T. X52DUAL FBE WiTH ARO FBE TOPCOAT 35-40 MILSMAOP 2116 PSIGTEST PRESSURE: 3174 PSIGPRODUCT’ PROPANECONSTRUCTION METHOD HDD

PIPE SPECIFICATIONS6.626 0.D. x ‘.312W. X42DUA FBE WITH ARO FBE TOPCOAT 35-40 MILS.MAOP 1585 P516TEST PRESSURE. 3020 PS 6PRODUC ETHYLENECONSTRUCTION METHOD: HOD

L

wz-J

xC-)I—

TEMPORARYWORKSPACE

20

45’ TEMPORARYWORKSPACE

‘I/

iii,TX4IR4IDT.012.10

CENTERPOINT ENERGYHOeJ~TON ELECTRIC Lit

25 TEMPORARYWORKSPACE

TX-GV-MOT.02O.IOFAY &FAY, LTD.

TX-GV-MDT-020.OOFAY & AY. LTD.

1~.0

4.

TX-HR-MDT-02o. I

HCFCD

PROPOSED 6” PIPELINE& 10” PIPELINE

/ ‘PLAN . -

SCALE: 1’=lOOO’

NATURALGROUND

~Si

‘t c.~4s / -

%iSIONAi. £,f3/13/f‘%%~4.~~

0

PC’)>

zw

00

I

300

-30-60-90

-120-150

PROFILE1’ = 1000’ HORIZ.

1” = 200’ VERT.

IiJ~flh.P.fr1vfle1I;I

BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007), SOUTH CENTRAL ZONE, USSURVEY FEET, ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS,

I I

SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10

CROSSING CLEAR CREEK CHANNEL

________ A4-M DT14O 15-1 724 13STATE HIGHWAY 146 PIPELINE RELOCREV DATE SCALE ATION PROJECT

SHEET: 2•F3•IIaiI’I’

LU

zUJ-JLJ~69

TX-HR-MDT-023.40OHN M. BURKLAND& WIFE BETTY J. 1XHR-MDT-023.60

BURKLAND STACEY 0000

TX-H R-MDT-023JOHN M. BURKLAND

PROPOSED 6” PIPELINE6 10” PIPELINE

‘1± ~ —.

100 X 200’ADDITIONAL

usl~ TEMPORARY~ WORKSPACE

zw

>-a,

BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007), SOUTH CENTRAL ZONE, USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.

SITE:LOCATION:

DIVISION

LEGEND

JOB NO: 109614

WATERS EDGE

WATER

WETLANDPROJECT NLOCATION

TX-HR-MDT-02O.20~ FAY&FAY, LTD.

45’ TEMPORARYWORKSPACE

TX-I-IR-MDT-021 .10CENTERPOINT ENERGY INC

HOUSTON ELECTRIC

0z‘9D

C,>

7

= -

STATE HWY. 146 UNION PACIFICRAiLROAD

TX-HR-MDT-021 .10CENTERPOINT ENERG INC

HOUSTON ELECTRIC

PLANSCALE: 1” 1000’

+

NATURALGROUND

Io—Sa- -a

-“-(S

0

I0

—IC,

0

zm

~ PIPE SPECIFICATIONS10.750’ O.D.X .438”W T. X52DUAL FBE WITH ARO FBE TOPCOAT 35.40 MILS

~ MAOP2II6PSIG5 TEST PRESSURE. 3174 PSIG~ PRODUCT PROPANE5 CONSTRUCTION METhOD HDD

I9~ SPEC JS 02/01/2018~ CHKD PAC 0310912018~ APPD WRA 03/09/2018

£

25’ TENPO~YWORKSPACE

HDD EXITN 13,775,285.12E = 3,231,126.28 D(-HR-MDT-023.70

CENTERPOJNT ENERGY INCTX-HR-MDT-023.10 HOUSTON ELECTRICfl-HR-MDT-021 .60

CENTERPOINT ENERGY INCHOUSTON ELECTRIC

F><

Co

or:

1wCoCD

-30-60-90-120-150-180-210

PIPE SPECIFICATIONS626 OD x .312WT.,X42

D ALFBEWTHAROFBETOPCOAT 35-4OMILMAOP 1585 P510TEST PRESSURE 3020 P510PRODUCT: ETHYLENECONSTRUCTION METHOD: HOD

W WOOD GROUP USA. INC.TDAS P1OS1~€D SeEERNO R~APROJECT NO: 109514

A4-MDT14O16-1 72413

PROPOSED 6” PIPELINE& 10” PiPELiNE

PROFILE1” — 1000’ HORIZ.

V— 200’ VERT.

BY DATE SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10

CROSSING CLEAR LAKE CHANNELSTATE HIGHWAY 146 PIPELINE RELOCATION PROJECTREV DATE SCALE 1 “lOOO

w

zw-JLILii

-J SHEET: 3OF3

SITE:LOCATION:

DIVISION: JOB NO: 109614

TX-HR-MDT-023.40JOHN M. BURKLAFID

& WIFE BETTY J.BURKLAND

rnHR-~DT-o23.eoSTACEY Oboe

WATERS EDGE

WATER

WETLAND

LEGEND

PROJECT NLOCATION

TX-H R-MDT-020.20~ FAY&FAY, LTD.

45’ TEMPORARYWORKSPACE

TX-HR-MDT-O2 1.10CENTERPOINT ENERGY INC

HOUSTON ELECTRIC

PROPOSED 6” PIPELINE& 10’ PIPELINE

TX-HR-MDT-023.50JOHN M. BURKLAND

a — ———--_____ - . __

STATE HWY. 146-JUi

0 UNION PACIFICRAILROAD

TX-HR-MDT-021.10CENTERPOINT ENERGY INC

HOUSTON ELECTRIC

PLANSCALE: 1’ = 1000’

25’ TEMPORARYWORKSPACE

NbC EXITN 13775,285.12E 3,231,126.28

TX-HR-MDT-023.1OTX-I-IR-MDT-021 .60

CENTERPOINT ENERGY INCHOUSTON ELECTRIC

bfl~LJZ

(3z0D

0

>

zLU

0

C

0-J0-

BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1985(NSRS 2007) SOUTH CENTRAL ZONE, USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.

NATURALGROUND

C-)

r

7

PIPE SPECIFICATIONS

ODq

-jUJ

IOU’ X 200’ADDITIONALTEMPORARYWORKSPACE

TX-HR-MDT-023.70CENTERPOINT ENERGY INC

HOUSTON ELECTRIC

30C-30-60-90-120-150-180-210

PIPE SPECIFICATIONS6.626’ O.D. x 0.3 12 W.T. X42DUAL FEE WITH ~RO FBE TOPCOAT 35-40 NMAOP 1585 P510TEST PRESS RE. 3020 PS CPRODUCT: EThYLENECONSTRUCTION METHOD HDD

PROFILE1” = 1000’ HORIZ.

1’ = 200’ VERT.10.750’ O.D.X O.438’W.T.. X52DUAL FEE WITH ARO FSE TOPCOAT 3540 MILSMAOP: 2116 P510TEST PRESSURE. 3174 P510PRODUCT’ PROPANECONSTRUCTION METHOD HDD

_no SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10

CROSSING CLEAR LAKE CHANNEL

~T14016-172413.STATE HIGHWAY 146 PIPELINE RELOCREV DATE SCALE ATION PROJECT

SHEET: 30F3

w

zUi-JU-6,

SITE:LOCATION:

DIVISION: JOB NO 109614

fl_I, ‘c,<~I~,: ~ ~‘) ~

.H,fou~.1..- .4

L~J4~~“

‘I N’ ~‘ r

TX-H R-MD’r-02O.20PAY & FAY, LTD.

45’ TEMPORARYWORKSPACE

fl-HR-MDT-023.40JOHN M. BURKLAI4D

& WIFE BETTY J.BURKLAND

TX-HR-MDT-02 1.10CENTERPOINT ENERGY INC

HOUSTON ELECTRIC

PROPOSED 6’ PIPELINE& 10” PIPELINE

TX,I-IR-MDT-023.60&TACE’Y âbDO

TX-H R’-MDT-023.5OJOHN Id. BURKLAND

NATURALGROUND

25’ TENPOMRYWORKSPACE

NDD EXITN =13775285.12E 3,231,126.28

TX-HR-MDT-023. 10TX-HR-MDT-O2~ .60

CENTERPOINT ENERGY INCHOUSTON ELECTRIC

Lflj

7wCDCD

300-30-60-90

-120-150

180210

100’ X 200’ADDITIONALTEMPORARYWORKSPACE

LEGEND

nil”PROJECTLOCATION

“ill

WATERS EDGE

WATER

WETLM4D

STATE HWY. 146 UNION PACIFICRAJLROAD

Tx-H R-MDT-021.1DCENTERPOINT ENERGY INC

HOUSTON ELECTRIC

PLANSCALEH”~1O00’

-3’‘U

ii’

~t~— ‘~:..° BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007) SOUTH CENTRAL ZONE, USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM OPS OBSERVATIONS.

C,z

0D

0

TX-HR-MDT-023.70CENTERPOINT ENERGY INC

HOUSTON ELECTRIC

I>t

On

I—

C~)IrzI]1

PIPE SPECIFICATIONS

j

l0.750 0.D.X .436’W.T., X52DUAL FBE WITH ARC FBE TOPCOAT 35-40 MILSMAOP’ 2116 P510TEST PRESSURE: 3174 PSIGPRODUCT PROPANECONSTRUCTION METHOD HDD

PROFILE1” = 1000’ HORIZ.

1” =200 VERT.PIPE SPECIFICATIONS

- 626 00, x 0.312 W.T., X42O AL FBE WITH ARC FBE TOPCOAT 35-40 MMAOP 1565 P510TEST PRESSURE: 3020 PSIGPRODUCT: ETHThENECONSTRUCTION METHOD HDD

SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10

CROSSING CLEAR LAKE CHANNELSTATE HIGHWAY 146 PIPELINE RELOCATION PROJECTREV DATE SCALE A4-MDT14O16-172413.

SHEET: 3OF3