+ All Categories
Home > Documents > SED NOTitle

SED NOTitle

Date post: 28-Jan-2022
Category:
Upload: others
View: 8 times
Download: 0 times
Share this document with a friend
14
Vehicle Crossing Infrastructure Index SED_NO Title VX0000 Vehicle Crossing Index VX0101 Residential Vehicle Crossing (Sheet 1 of 4) VX0102 Residential Vehicle Crossing (Sheet 2 of 4) VX0103 Residential Vehicle Crossing (Sheet 3 of 4) VX0104 Residential Vehicle Crossing (Sheet 4 of 4) VX0105 Typical driveway crossing through a swale VX0201 Commercial Vehicle Crossing (Sheet 1 of 4) VX0202 Commercial Vehicle Crossing (Sheet 2 of 4) VX0203 Commercial Vehicle Crossing (Sheet 3 of 4) VX0204 Commercial Vehicle Crossing (Sheet 4 of 4) VX0205 Typical commercial driveway crossing through a swale VX0301 Rural Vehicle Crossing VX0302 Rural Vehicle Crossing (Zone Speed=50km/hr) VX0303 Rural Vehicle Crossing (Zone Speed > 60km/hr) SED No. Date: Version Transport Design Manual | Standard Engineering Details VX0000 TDM TECHNICAL STANDARDS VX0000 Vehicle Crossing Index A 20/05/2021 N APPROVED C H I E F E G I N E E R
Transcript

Vehicle Crossing InfrastructureIndex

SED_NO TitleVX0000 Vehicle Crossing Index

VX0101 Residential Vehicle Crossing (Sheet 1 of 4)

VX0102 Residential Vehicle Crossing (Sheet 2 of 4)

VX0103 Residential Vehicle Crossing (Sheet 3 of 4)

VX0104 Residential Vehicle Crossing (Sheet 4 of 4)

VX0105 Typical driveway crossing through a swale

VX0201 Commercial Vehicle Crossing (Sheet 1 of 4)

VX0202 Commercial Vehicle Crossing (Sheet 2 of 4)

VX0203 Commercial Vehicle Crossing (Sheet 3 of 4)

VX0204 Commercial Vehicle Crossing (Sheet 4 of 4)

VX0205 Typical commercial driveway crossing through a swale

VX0301 Rural Vehicle Crossing

VX0302 Rural Vehicle Crossing (Zone Speed=50km/hr)

VX0303 Rural Vehicle Crossing (Zone Speed > 60km/hr)

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0000TDM TECHNICAL STANDARDS

VX00

00

Vehicle Crossing Index A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

VEHICLE CROSSING FOOTPATH NEXT TO KERB

VEHICLE CROSSING WITH FOOTPATH <1.8m

VEHICLE CROSSING FOOTPATH SEPARATED FROM KERB

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0101TDM TECHNICAL STANDARDS

VX01

01

Residential Vehicle Crossing (Sheet 1 of 4) A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

150

300

20

210

100

40

A

A

Berm

1000

(900

min

)th

roug

h ro

ute

@ 2

- 3%

REAR WIDTHSEE NOTE 7

REAR WIDTH + 1400

900 FO

OTPA

TH18

00 m

in

900 900

CHANNEL

VARI

ES10

00 m

in

BOUNDARY

SAWCUT

VEHICLE CROSSING RAMP900 @ 15% max

REAR BERMVEHICLE CROSSING @2-3%

WIDTH VARIES

VEHICLE CROSSING RAMP @2-3%1000 (900 Min)

150

FOOTPATH CROSSFALL @2-3%WIDTH VARIES (1800 Min)

600

REINSTATE ROAD PAVEMENT1000 MIN

(REFER TO GD014 FOR REINSTATEMENT)

Notes:1. All dimensions are in millimetres unless noted otherwise.2. If CBR of existing Subgrade is <3, Pavement Design should be provided and approved by Auckland

Transport.3. All concrete to be 20 Mpa and constructed in accordance with NZS 3109 with a broom finish and

may contain upto 4% oxide.4. Saw cut expansion joints at 4m centres maximum each way in addition to saw cuts shown on dwg.5. Any existing infrastructure within the crossing may require specific design approval for relocation.6. Construct in same material and finish as surrounding footpath.

7. Rear Width to be as permitted under Auckland unitary Plan;2750-3000 - Single vehicle crossing5500-6000 - Two-Way Shared Access3000-3500 - One-Way Shared Access

VEHICLE CROSSINGFOOTPATH NEXT TO KERB

N.T.S

ROAD PAVEMENT ≤3%

PROP

ERTY

BOUN

DARY

SECTION A-AN.T.S

CHANNEL

PERSPECTIVE VIEWN.T.S

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0102TDM TECHNICAL STANDARDS

VX01

02

Residential Vehicle Crossing (Sheet 2 of 4) B

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

NEW CHANNEL

20mm CHAMFER

TRANSITION

TO BE ABOVE KEB LEVEL

SAW CUT

SUBGRADE TO HAVE MINIMUM CBR OF 3(SEE NOTE 2)

100mm MIN COMPACTED GAP 40

THE STANDARD RESIDENTIAL VEHICLE CROSSING IS UNREINFORCED,HOWEVER MESH REF 665 PLACED CENTRALLY IS REQUIRED WHENJOINING TO MORE THAN 4 DWELLINGS

150

REAR BERMVEHICLE CROSSING @2-3%WIDTH VARIES (1000 Min)

VEHICLE CROSSING RAMP @2-3%1800 (900 Min)VEHICLE CROSSING RAMP

900 @ 15% Max

FOOTPATH CROSSFALL @2-3%WIDTH VARIES (1800 Min)

600

REINSTATE ROAD PAVEMENT1000 MIN

(REFER TO KC0006 FOR REINSTATEMENT)

Berm

Berm

B

B

FOOT

PATH

180

0(9

00m

in)@

2-3%

REAR WIDTHSEE NOTE 7

800

min

900 900REAR WIDTH + 1400

900

FOOT

PATH

1800

min

VARI

ES10

00 m

in

CHANNEL

SAWCUT

BOUNDARY

150

300

20

210

100

40 VEHICLE CROSSINGFOOTPATH SEPARATED FROM KERB

N.T.SPR

OPER

TYBO

UNDA

RY

SECTION B-BN.T.S

CHANNEL

ROAD PAVEMENT ≤3%

Notes:1. All dimensions are in millimetres unless noted otherwise.2. If CBR of existing Subgrade is <3, Pavement Design should be provided and approved by Auckland

Transport.3. All concrete to be 20 Mpa and constructed in accordance with NZS 3109 with a broom finish and

may contain upto 4% oxide.4. Saw cut expansion joints at 4m centres maximum each way in addition to saw cuts shown on dwg.5. Any existing infrastructure within the crossing may require specific design approval for relocation.6. Construct in same material and finish as surrounding footpath.

7. Rear Width to be as permitted under Auckland unitary Plan;2750-3000 - Single vehicle crossing5500-6000 - Two-Way Shared Access3000-3500 - One-Way Shared Access

PERSPECTIVE VIEWN.T.S

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0103TDM TECHNICAL STANDARDS

VX01

03

Residential Vehicle Crossing (Sheet 3 of 4) B

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

20mm CHAMFER

SUBGRADE TO HAVE MINIMUM CBR OF 3(SEE NOTE 2)

100mm MIN COMPACTED GAP 40

THE STANDARD RESIDENTIAL VEHICLE CROSSING IS UNREINFORCED,HOWEVER MESH REF 665 PLACED CENTRALLY IS REQUIRED WHENJOINING TO MORE THAN 4 DWELLINGS

NEW CHANNEL

TRANSITIONTO BE ABOVE KERB LEVEL SAW CUT

150

300

20

210

100

40

C

C

Berm

1000

mm

(900

min

)th

roug

h ro

ute

@ 2

- 3%

REAR WIDTHSEE NOTE 7

REAR WIDTH + 1400

90015

00

900 900

1800

CHANNEL

11001100

300

338

VARI

ES

BOUNDARY

SAWCUT

600

VEHICLE CROSSING RAMP1000 MIN

(REFER TO KC0006 FOR REINSTATEMENT)VEHICLE CROSSING RAMP

900

REAR BERMVEHICLE CROSSING @2-3%

WIDTH VARIES

VEHICLE CROSSING RAMP @2-3%1000 (900 Min)

150

FOOTPATH CROSSFALL @2-3%WIDTH LESS THAN 1800

600

VEHICLE CROSSINGWITH FOOTPATH <1.8m

N.T.S

PROP

ERTY

BOUN

DARY

SECTION C-CN.T.S

CHANNEL

ROAD PAVEMENT ≤3%

Notes:1. All dimensions are in millimetres unless noted otherwise.2. If CBR of existing Subgrade is <3, Pavement Design should be provided and approved by Auckland

Transport.3. All concrete to be 20 Mpa and constructed in accordance with NZS 3109 with a broom finish and

may contain upto 4% oxide.4. Saw cut expansion joints at 4m centres maximum each way in addition to saw cuts shown on dwg.5. Any existing infrastructure within the crossing may require specific design approval for relocation..6. Construct in same material and finish as surrounding footpath.

7. Rear Width to be as permitted under Auckland unitary Plan;2750-3000 - Single vehicle crossing5500-6000 - Two-Way Shared Access3000-3500 - One-Way Shared Access

PERSPECTIVE VIEWN.T.S

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0104TDM TECHNICAL STANDARDS

VX01

04

Residential Vehicle Crossing (Sheet 4 of 4) B

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

20mm CHAMFER

SUBGRADE TO HAVE MINIMUM CBR OF 3(SEE NOTE 2)

100mm MIN COMPACTED GAP 40

THE STANDARD RESIDENTIAL VEHICLE CROSSING IS UNREINFORCED,HOWEVER MESH REF 665 PLACED CENTRALLY IS REQUIRED WHENJOINING TO MORE THAN 4 DWELLINGS

TRANSITION

TO BE ABOVE KEB LEVEL

SAW CUT

B B

Gras

s be

rm

Foot

path

Swal

e in

vert

AA

Con

cret

e ch

anne

l and

gra

te (m

inim

um w

idth

150

mm

)Co

ncre

teed

ge s

trip

SECT

ION

B-B

SECT

ION

A-A

D D

Gras

s be

rm

Foot

path

Swal

e in

vert

CC

Conc

rete

edge

stri

p

SECT

ION

D-D

SECT

ION

C-C

Swal

eSw

ale

Conc

rete

chan

nel

and

grat

ing

Chan

nel i

nver

t

Edge

pro

tect

ion

beam

Edge

pro

tect

ion

beam

Drai

nage

pip

e

Swal

ein

vert

Con

cret

e ch

anne

l a

nd g

rate

(min

imum

wid

th 1

50m

m)

Drai

nage

pip

eCo

ncre

teed

ge b

eam

Road

carri

agew

ay

Boun

dary

Boun

dary

Grad

eGr

ade

Conc

rete

edge

bea

mCo

ncre

teed

ge b

eam

1500

500

1500

500

PLAN

PLAN

DRIV

EWAY

CRO

SSIN

G US

ING

DRAI

NAGE

PIP

EDR

IVEW

AY C

ROSS

ING

USIN

G GR

ATED

CHA

NNEL

Note: this drawing is for indicative purpose only and use only as a guide. Site specific designs will be required.

Driv

eway

Driv

eway

Road

carri

agew

ay

Edge

pro

tect

ion

beam

Conc

rete

edge

bea

mRo

adca

rriag

ewayRo

adca

rriag

eway

Swal

e in

vert

Exte

nt o

f edg

epr

otec

tion

beam

Exte

nt o

f edg

epr

otec

tion

beam

Swal

e in

vert

Edge

pro

tect

ion

beam

Edge

pro

tect

ion

beam

Edge

prot

ectio

nbe

amSw

ale

inve

rt

Chec

kda

m

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0105TDM TECHNICAL STANDARDS

VX01

05

Typical driveway crossing through a swale A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

VEHICLE CROSSING FOOTPATH NEXT TO KERB

VEHICLE CROSSING WITH FOOTPATH <1.8m

VEHICLE CROSSING FOOTPATH SEPARATED FROM KERB

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0201TDM TECHNICAL STANDARDS

VX02

01

Commercial Vehicle Crossing (Sheet 1 of 4) A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

150

300

20

210

100

40

A

A

Berm

1000

(900

min

)th

roug

h ro

ute

@ 2

- 3%

REAR WIDTHSEE NOTE 8

REAR WIDTH + 1400

900 FO

OTPA

TH18

00 m

in

900 900

CHANNEL

VARI

ES10

00 m

in

BOUNDARY

SAWCUT

VEHICLE CROSSING RAMP900 @ 15% max

REAR BERMVEHICLE CROSSING @2-3%

WIDTH VARIES

VEHICLE CROSSING RAMP @2-3%1000 (900 Min)

200

FOOTPATH CROSSFALL @2-3%WIDTH VARIES (1800 Min)

600

REINSTATE ROAD PAVEMENT1000 MIN

(REFER TO GD014 FOR REINSTATEMENT)

VEHICLE CROSSINGFOOTPATH NEXT TO KERB

N.T.S

ROAD PAVEMENT ≤ 3%

PROP

ERTY

BOUN

DARY

SECTION A-AN.T.S

PERSPECTIVE VIEWN.T.S

CHANNEL

Notes:1. All dimensions are in millimetres unless noted otherwise.2. If CBR of existing Subgrade is <3, Pavement Design should be provided and approved by Auckland

Transport.3. All concrete to be 20 Mpa and constructed in accordance with NZS 3109 with a broom finish and may

contain upto 4% oxide.4. Saw cut expansion joints at 4m centres maximum each way in addition to saw cuts shown on dwg.5. Any existing infrastructure within the crossing may require specific design approval for relocation.6. Construct in same material and finish as surrounding footpath.7. Width of vehicle crossing to be designed by using tracking curves for intended large heavy vehicles.

8. Rear Width as permitted under Auckland Unitary Plan;COMMERCIAL USE;

3700-4000 - Single vehicle crossing6000-7000 - Double vehicle crossing

RESIDENTIAL USE;2750-3000 - Single vehicle crossing5500-6000 - Two-Way Shared Access3000-3500 - One-Way Shared Access

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0202TDM TECHNICAL STANDARDS

VX02

02

Commercial Vehicle Crossing (Sheet 2 of 4) A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

CENTRALLY PLACED 661 MESH

4-D12 BARS WITH 50mm COVER

R6 STIRRUPS @ 600mm CENTRESWITH 60mm COVER

20mm CHAMFER

TRANSITION

TO BE ABOVE KEB LEVEL

SAW CUT

SUBGRADE TO HAVE MINIMUM CBR OF 3(SEE NOTE 2)

100mm MIN COMPACTED GAP 40

200

REAR BERMVEHICLE CROSSING @2-3%WIDTH VARIES (1000 Min)

VEHICLE CROSSING RAMP @2-3%1800 (900 Min)VEHICLE CROSSING RAMP

900 @ 15% Max

FOOTPATH CROSSFALL @2-3%WIDTH VARIES (1800 Min)

600

REINSTATE ROAD PAVEMENT1000 MIN

(REFER TO GD014 FOR REINSTATEMENT)

Berm

Berm

B

B

FOOT

PATH

180

0(9

00m

in)@

2-3%

REAR WIDTHSEE NOTE 8

800

min

900 900REAR WIDTH + 1400

900

FOOT

PATH

1800

min

VARI

ES10

00 m

in

CHANNEL

SAWCUT

BOUNDARY

150

300

20

210

100

40

VEHICLE CROSSING-FOOTPATHSEPARATED FROM KERB

N.T.S

ROAD PAVEMENT ≤ 3%

PROP

ERTY

BOUN

DARY

SECTION B-BN.T.S

CHANNEL

Notes:1. All dimensions are in millimetres unless noted otherwise.2. If CBR of existing Subgrade is <3, Pavement Design should be provided and approved by Auckland

Transport.3. All concrete to be 20 Mpa and constructed in accordance with NZS 3109 with a broom finish and may

contain upto 4% oxide.4. Saw cut expansion joints at 4m centres maximum each way in addition to saw cuts shown on dwg.5. Any existing infrastructure within the crossing may require specific design approval for relocation.6. Construct in same material and finish as surrounding footpath.7. Width of vehicle crossing to be designed by using tracking curves for intended large heavy vehicles.

8. Rear Width as permitted under Auckland Unitary Plan;COMMERCIAL USE;

3700-4000 - Single vehicle crossing6000-7000 - Double vehicle crossing

RESIDENTIAL USE;2750-3000 - Single vehicle crossing5500-6000 - Two-Way Shared Access3000-3500 - One-Way Shared Access

PERSPECTIVE VIEWN.T.S

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0203TDM TECHNICAL STANDARDS

VX02

03

Commercial Vehicle Crossing (Sheet 3 of 4) A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

CENTRALLY PLACED 661 MESH

SUBGRADE TO HAVE MINIMUM CBR OF 3(SEE NOTE 2)

100mm MIN COMPACTED GAP 40

4-D12 BARS WITH 50mm COVER

R6 STIRRUPS @ 600mm CENTRESWITH 60mm COVER

20mm CHAMFER

TRANSITIONTO BE ABOVE KERB LEVEL SAW CUT

150

300

20

210

100

40

C

C

Berm

1000

mm

(900

min

)th

roug

h ro

ute

@ 2

- 3%

REAR WIDTHSEE NOTE 8

REAR WIDTH + 1400

90015

00

900 900

1800

CHANNEL

11001100

300

338

VARI

ES

BOUNDARY

SAWCUT

VEHICLE CROSSING RAMP1000 MIN

(REFER TO GD014 FOR REINSTATEMENT)VEHICLE CROSSING RAMP

900

REAR BERMVEHICLE CROSSING @2-3%

WIDTH VARIES

VEHICLE CROSSING RAMP @2-3%1000 (900 Min)

200

FOOTPATH CROSSFALL @2-3%WIDTH LESS THAN 1800

600

VEHICLE CROSSINGWITH FOOTPATH <1.8m

N.T.S

ROAD PAVEMENT ≤ 3%

PROP

ERTY

BOUN

DARY

SECTION C-CN.T.S

CHANNEL

Notes:1. All dimensions are in millimetres unless noted otherwise.2. If CBR of existing Subgrade is <3, Pavement Design should be provided and approved by Auckland

Transport.3. All concrete to be 20 Mpa and constructed in accordance with NZS 3109 with a broom finish and may

contain upto 4% oxide.4. Saw cut expansion joints at 4m centres maximum each way in addition to saw cuts shown on dwg.5. Any existing infrastructure within the crossing may require specific design approval for relocation.6. Construct in same material and finish as surrounding footpath.7. Width of vehicle crossing to be designed by using tracking curves for intended large heavy vehicles.

8. Rear Width as permitted under Auckland Unitary Plan;COMMERCIAL USE;

3700-4000 - Single vehicle crossing6000-7000 - Double vehicle crossing

RESIDENTIAL USE;2750-3000 - Single vehicle crossing5500-6000 - Two-Way Shared Access3000-3500 - One-Way Shared Access

PERSPECTIVE VIEWN.T.S

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0204TDM TECHNICAL STANDARDS

VX02

04

Commercial Vehicle Crossing (Sheet 4 of 4) A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

4-D12 BARS WITH 50mm COVER

R6 STIRRUPS @ 600mm CENTRESWITH 60mm COVER

CENTRALLY PLACED 661 MESH

20mm CHAMFER

SUBGRADE TO HAVE MINIMUM CBR OF 3(SEE NOTE 2)

100mm MIN COMPACTED GAP 40

TRANSITION

TO BE ABOVE KEB LEVEL

SAW CUT

B B

Gras

s be

rm

Foot

path

Swal

e in

vert

AA

Con

cret

e ch

anne

l and

cla

ss D

gra

te (m

inim

um w

idth

150

mm

)

Conc

rete

edge

stri

p

SECT

ION

B-B

SECT

ION

A-A

D D

Gras

s be

rm

Foot

path

Swal

e in

vert

CC

Conc

rete

edge

stri

p

SECT

ION

D-D

SECT

ION

C-C

Swal

eSw

ale

Conc

rete

chan

nel

and

grat

ing

Chan

nel i

nver

t

Edge

pro

tect

ion

beam

Edge

pro

tect

ion

beam

Drai

nage

pip

e

Swal

ein

vert

Con

cret

e ch

anne

l a

nd g

rate

(min

imum

wid

th 1

50m

m)

Drai

nage

pip

eCo

ncre

teed

ge b

eam

Road

carri

agew

ay

Boun

dary

Boun

dary

Grad

eGr

ade

Conc

rete

edge

bea

mCo

ncre

teed

ge b

eam

1500

500

1500

500

PLAN

PLAN

DRIV

EWAY

CRO

SSIN

G US

ING

DRAI

NAGE

PIP

EDR

IVEW

AY C

ROSS

ING

USIN

G GR

ATED

CHA

NNEL

Note: this drawing is for indicative purpose only and use only as a guide. Site specific designs will be required.

Driv

eway

Driv

eway

Road

carri

agew

ay

Edge

pro

tect

ion

beam

Conc

rete

edge

bea

mRo

adca

rriag

ewayRo

adca

rriag

eway

Swal

e in

vert

Exte

nt o

f edg

epr

otec

tion

beam

Exte

nt o

f edg

epr

otec

tion

beam

Swal

e in

vert

Edge

pro

tect

ion

beam

Edge

pro

tect

ion

beam

Edge

prot

ectio

nbe

amSw

ale

inve

rt

Chec

kda

m

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0205TDM TECHNICAL STANDARDS

VX02

05

Typical commercial driveway crossing through a swale A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

RURAL VEHICLE CROSSING (ZONE SPEED=50km/hr)

RURAL VEHICLE CROSSING (ZONE SPEED > 60km/hr)

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0301TDM TECHNICAL STANDARDS

VX03

01

Rural Vehicle Crossing A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

4000

3000

1528

VARI

ES(4

500

TYPI

CAL)

3000

A

1000

A

6500

MIN

1528

TABL

E DR

AIN

R6000

1000MIN

6500MIN

VARIES (4500 TYPICAL)

NOTES:

1. All dimensions are in millimeters unless noted otherwise2. The radius of 6.0m may increase to a maximum width of 9.0m if needed to accommodate

the tracking path of a large heavy vehicle.3. The 6.5m minimum gate distance may increase as needed for length of large vehicles

frequently using access.4. Drainage culvert ≥ 300mm diameter is required in most cases.5. Pavement design to be approved by AT for use other than single residential life style lot.6. Table drain may need to be deepened and diverted away from road to install culvert7. Whole driveway in the private property to be soild, either concrete or hotmix, to avoid

tracking of materials, detritus, metal etc on to the public road.8. Larger Slabs to have expansion cuts 4m center to center

PROPERTY ACCESS

PROPERTY BOUNDARY

EDGE OF ROADWAY

EDGE OF ROADWAY

ROADWAY

3% SLOPE

VEHICLE CROSSING PLANN.T.S

3D VIEWN.T.S

3% SLOPEROADWAYROADWAY

SECTION A-AN.T.S

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0302TDM TECHNICAL STANDARDS

VX03

02

Rural Vehicle Crossing (Zone Speed=50km/hr) A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

EXPANSION CUTS TO BE 4m CENTER TO CENTERFOR LARGER SLABS

SLOPE 1V:3H MAX CONCRETE BOUND RIPRAP

DRAINAGE CULVERT

GATE ENTRANCE

FENCE/PROPERTY BOUNDARY

VEHICLE CROSSING AREA TO BEHOT MIX OR CONCRETE

SLOPE 1V:3H MAX

CONCRETE BOUND RIPRAP

SHOULDER AREA TO BEHOT MIX

DRAINAGE CULVERT

GATE TO BE RECESSED BACK FROM EDGE OF ROADWAYAT LEAST 6500 mm AND SUFFICIENT DISTANCE TO ALLOWANY VEHICLE USING DRIVEWAY TO STOP CLEAR OFTRAFFIC LANES WHILE THE GATE IS OPENED.

7000

3500

7000

VARI

ES(4

500

TYPI

CAL)

3500

A

1000

A

1300

0 M

IN

1528

TABL

E DR

AIN

R7000

4000

R6000

1000MIN

13000MIN

VARIES (4500 TYPICAL)

NOTES:

1. All dimensions are in millimeters unless notedotherwise

2. The radius of 7.0m minimum is needed for a vanwith 20km/hr speed on entering the access.

3. For larger vehicles, the proposed turning speedand tracking need to be supplied. And sealedsurface extended to match path.

4. The 13.0m minimum distance to the gate allowsfor a van turning at 20km/hr to stop. The distancemay need to be increased for use by largervehicles.

5. Drainage culvert ≥ 300mm diameter is requiredin most cases.

6. Pavement design to be approved by AT for useother than single residential life style lot.

7. Table drain may need to be deepened anddiverted away from the road to install culvert

8. Whole driveway in the private property to be soild,either concrete or hotmix, to avoid tracking ofmaterials, detritus, metal etc on to the public road.

9. Larger Slabs to have expansion cuts 4m center tocenter

PROPERTY ACCESS

PROPERTY BOUNDARY

EDGE OF ROADWAY

EDGE OF ROADWAY

ROADWAY

3% SLOPE

VEHICLE CROSSING PLANN.T.S

3D VIEWN.T.S

3% SLOPEROADWAYROADWAY

SECTION A-AN.T.S

SED No.

Date:

Version

Transport D

esig

n M

anual |

Sta

nd

ard

Eng

ineering

Deta

ils

VX0303TDM TECHNICAL STANDARDS

VX03

03

Rural Vehicle Crossing (Zone Speed > 60km/hr) A

20/05/2021

N

APPROVEDC

H I E F

E

G I N E ER

EXPANSION CUTS TO BE 4m CENTER TO CENTERFOR LARGER SLABS

SLOPE 1V:3H MAX

CONCRETE BOUND RIPRAP

DRAINAGE CULVERT

GATE ENTRANCE

FENCE/PROPERTY BOUNDARY

VEHICLE CROSSING AREA TO BEHOT MIX OR CONCRETE

SLOPE 1V:3H MAX

CONCRETE BOUND RIPRAP

SHOULDER AREA TO BE HOTMIX

DRAINAGE CULVERT

GATE TO BE RECESSED BACK FROM EDGE OFROADWAY AT LEAST 13000 mm AND SUFFICIENTDISTANCE TO ALLOW ANY VEHICLE USINGDRIVEWAY TO STOP CLEAR OF TRAFFIC LANESWHILE THE GATE IS CLOSED.


Recommended