What happens downstream Lobith? Plans and trends
Daily practice of fairway management
Projects, and how they interfere with fairway management
Cooperation and exchange
no regret and economicpredictability of navigabilitylyfe-cycle approachsustainability(users do, we should)
Management of fairway profiles3 8 oktober 2009Rijkswaterstaat
1980 1985 1990 1995 2000 2005 2010 2015 2020 2025
assigned dredging (OLR-2,5m)
sand miningcontract
dredging
(OLR-2,5m)
contract dredging
(OLR-2,8m; 150 m)contract dredg.
OLR-2,8m;170m
?
construction
fixed layer
outer bank
nourishment
Bovenrijn
WFD
bank
projects
Delta Program
Nijmegen
What happens downstream Lobith? projects
dredging&dumping
Room for the River
groyne lowering
Waal, Pan.Kan.
Erlecom
St.Andries
Fixed layer
Bovenrijn
Management of fairway profiles4 8 oktober 2009Rijkswaterstaat
1830 1888 1872 1890
What happens downstream Lobith? trends
Management of fairway profiles5 8 oktober 2009Rijkswaterstaat
1830 1888 1872 1890
-1.4
-1.2
-1
-0.8
-0.6
-0.4
-0.2
0
0.2
1950 1960 1970 1980 1990 2000 2010
aver
age
bed
leve
l [m
] rel
ativ
e to
195
0
BovenrijnBovenWaalMiddenWaalBenedenWaal
-5.0
-2.5
0.0
2.5
5.0
855865875885895905915925935945955
rivierkilometer
bed
leve
l [m
]+NA
P
1950-1960 1960-1970
1970-1980 1980-1990
1990-2000 2000-2007
What happens downstream Lobith? trends
Management of fairway profiles6 8 oktober 2009Rijkswaterstaat
1830 1888 1872 1890
-1.4
-1.2
-1
-0.8
-0.6
-0.4
-0.2
0
0.2
1950 1960 1970 1980 1990 2000 2010
aver
age
bed
leve
l [m
] rel
ativ
e to
195
0
BovenrijnBovenWaalMiddenWaalBenedenWaal
-5.0
-2.5
0.0
2.5
5.0
855865875885895905915925935945955
rivierkilometer
bed
leve
l [m
]+NA
P
1950-1960 1960-1970
1970-1980 1980-1990
1990-2000 2000-2007
What happens downstream Lobith? trends
-2,5
-2,0
-1,5
-1,0
-0,5
0,0
0,5
800820840860880900920
Rivierkilometer
bode
mve
rand
erin
g [m
] tov
193
4
gemeten in 1960
gemeten in 1985
gemeten in 2000
prognose voor 2030
prognose voor 2060
prognose voor 2090
NiederrheinWaal Bovenrijn
Lobi
th
Pan
. Kop
Nijm
egen
Em
mer
ich
Erle
com
St.
And
ries
Management of fairway profiles7 8 oktober 2009Rijkswaterstaat
1830 1888 1872 1890
-1.4
-1.2
-1
-0.8
-0.6
-0.4
-0.2
0
0.2
1950 1960 1970 1980 1990 2000 2010
aver
age
bed
leve
l [m
] rel
ativ
e to
195
0
BovenrijnBovenWaalMiddenWaalBenedenWaal
-5.0
-2.5
0.0
2.5
5.0
855865875885895905915925935945955
rivierkilometer
bed
leve
l [m
]+NA
P
1950-1960 1960-1970
1970-1980 1980-1990
1990-2000 2000-2007
What happens downstream Lobith? trends
-2,5
-2,0
-1,5
-1,0
-0,5
0,0
0,5
800820840860880900920
Rivierkilometer
bode
mve
rand
erin
g [m
] tov
193
4
gemeten in 1960
gemeten in 1985
gemeten in 2000
prognose voor 2030
prognose voor 2060
prognose voor 2090
NiederrheinWaal Bovenrijn
Lobi
th
Pan
. Kop
Nijm
egen
Em
mer
ich
Erle
com
St.
And
ries -0.04
-0.03
-0.02
-0.01
0
0.01
0.02
0.03
1990 2000 2010 2020 2030 2040
pote
ntia
l bed
leve
l cha
nges
[m/a
] at k
m 8
65
base
d on
ups
trea
m o
bser
vatio
ns
record of 1975-1985 (without feeding)
record of 1985-1995 (with feeding)
record of 1995-2004 (with feeding)
Management of fairway profiles8 8 oktober 2009Rijkswaterstaat
shallow inner bend
bed forms over a point bar
Sediment Management & Fairway Maintenance
32%
31%
assigned dredgig
plough (Pflug)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
855865875885895905915925935945955
kilometer
dune
hei
ght [
m]
1999 2000 2001 2002 2003 2004 2005 2006
Management of fairway profiles9 8 oktober 2009Rijkswaterstaat
shallow inner bend
bed forms over a point bar
0.0
0.5
1.0
1.5
2.0
2.5
3.0
855865875885895905915925935945955
kilometer
dune
hei
ght [
m]
1999 2000 2001 2002 2003 2004 2005 2006
Sediment Management & Fairway Maintenance
32%
31%
plough (Pflug)
Management of fairway profiles10 8 oktober 2009Rijkswaterstaat
shallow inner bend
bed forms over a point bar
0.0
0.5
1.0
1.5
2.0
2.5
3.0
855865875885895905915925935945955
kilometer
dune
hei
ght [
m]
1999 2000 2001 2002 2003 2004 2005 2006
Sediment Management & Fairway Maintenance
32%
31%
0
100
200
300
400
500
600
500 1000 1500 2000 2500 3000 3500 4000
Rhine discharge [m3/s]
min
imum
dep
th [c
m] o
bser
ved
OLR-2,5 m (1991-2006)OLR-2,8m (2007-2008)
contract dredging
(OLR-2,5m)
plough (Pflug)
Management of fairway profiles11 8 oktober 2009Rijkswaterstaat
shallow inner bend
bed forms over a point bar
0.0
0.5
1.0
1.5
2.0
2.5
3.0
855865875885895905915925935945955
kilometer
dune
hei
ght [
m]
1999 2000 2001 2002 2003 2004 2005 2006
Sediment Management & Fairway Maintenance
32%
31%
0
100
200
300
400
500
600
500 1000 1500 2000 2500 3000 3500 4000
Rhine discharge [m3/s]
min
imum
dep
th [c
m] o
bser
ved
OLR-2,5 m (1991-2006)OLR-2,8m (2007-2008)
0
200000
400000
600000
800000
1000000
1200000
1998 2000 2002 2004 2006 2008 2010
jaar
lijks
beu
nvol
ume
[m3]
Bovenrijn km 856-867BovenWaal km 867-885MiddenWaal km 886-915BenedenWaal km 915-955totaal
assigned dredging contract dredging
(OLR-2,5m)
contract dredging
(OLR-2,8m)
plough (Pflug)
Management of fairway profiles12 8 oktober 2009Rijkswaterstaat
Impact of projects on fairway maintenance(40 years bed level changes, dredge&dump strategies)
Ruimte voor de Rivier project
Delft3D model available and applied
Delft3D model available end of 2009
40 years simulation, 80 km length; four days modelling&computing
Management of fairway profiles13 8 oktober 2009Rijkswaterstaat
Impact of projects on fairway maintenance(40 years bed level changes, dredge&dump strategies)
Ruimte voor de Rivier project
Delft3D model available and applied
Delft3D model available end of 2009
40 years simulation, 80 km length; four days modelling&computing
Management of fairway profiles14 8 oktober 2009Rijkswaterstaat
Flood plain lowering near nautical bottle neck
• Dredging of bottle neck = no regret (wait and see…)• If dumping is optimized, downstream shallows can reduce as well
Present situation Shallow fairway Planned excavation Predicted sedimentation
at least 2,8 m depth & 4 m width-averaged (95% of the year)with 5 days of dredging per 15 km at maximum
Management of fairway profiles15 8 oktober 2009Rijkswaterstaat
Lowering of groynes over 85 km
• Crest from OLR+3,0 m to OLR+1,2 m• Sedimentation and maintenance in the fairway? (2D model)
Expert judgement• Do banks erode ?• Do bed levels in groyne fields change?
Management of fairway profiles16 8 oktober 2009Rijkswaterstaat
Lowering of groynes over 85 km
• Crest from OLR+3,0 m to OLR+1,2 m• Sedimentation and maintenance in the fairway? (2D model)
Expert judgement• Do banks erode ?• Do bed levels in groyne fields change?
Management of fairway profiles17 8 oktober 2009Rijkswaterstaat
Lowering of groynes over 85 km
• Crest from OLR+3,0 m to OLR+1,2 m• Sedimentation and maintenance in the fairway? (2D model)
Expert judgement• Do banks erode ?• Do bed levels in groyne fields change?
0,2 -0,3 m sedimentation (redistribution)raise of OLR (less maintenance)potential & temporal supply from groyne fields
Management of fairway profiles18 8 oktober 2009Rijkswaterstaat
learning by doing, 10 km pilot
August 2009
Monitoring (> 1 year) of10 km-scale
bed levels (multibeam echosounding)maintenance (contractor)bank (laser-altimetry by plane)recovery of vegetation
4 selected groyneswater levels (waves and hydrograph)velocities (high and low flow)
Management of fairway profiles19 8 oktober 2009Rijkswaterstaat
Removal bank protection ship wavesPartial closure of groyne fields siltation
Water Framework Directive (2015 – 2027)Low-velocity zones of water,
Sheltered from ship waves
Sand bed, sand banks
For spawning, resting and young fish
Lowering of bank zones
1980 1985 1990 1995 2000 2005 2010 2015 2020 2025
assigned dredging (OLR-2,5m)
sand miningcontract
dredging
(OLR-2,5m)
contract dredging
(OLR-2,8m; 150 m)
construction
fixed layer
outer bank
nourishment
Bovenrijn
WFD
bank
projects
Delta Program
Nijmegen
pp p j
dredging&dumping
Room for the River
groyne lowering
Waal, Pan.Kan.
Erlecom St.Andries
Fixed layer
Bovenrijn
Management of fairway profiles20 8 oktober 2009Rijkswaterstaat
170 m maximum260 m
30 m
80 m
Combination of nature, flood capacity and fairway maintenance
on average larger depth, some sedimentation nearentrance (optimization design & after construction..)
Costs….
Alternative for Room for the River & Water Framework Directive (decision 2011)
Management of fairway profiles21 8 oktober 2009Rijkswaterstaat
170 m maximum260 m
30 m
80 m
Combination of nature, flood capacity and fairway maintenance
on average larger depth, some sedimentation nearentrance (optimization design & after construction..)
Costs….
Alternative for Room for the River & Water Framework Directive (decision 2011)
Management of fairway profiles22 8 oktober 2009Rijkswaterstaat
170 m maximum260 m
30 m
80 m
Dynamic banks, sheltered zone and parallel dam to compensate for effect on fairway
on average larger depth, some sedimentation nearentrance (optimization design & after construction..)
Costs….
Alternative for Room for the River & Water Framework Directive (decision 2011)
Management of fairway profiles23 8 oktober 2009Rijkswaterstaat
Niederrhein (Emmerich), river axis km 854
-6
-3
0
3
6
9
850860870880890900910920930940950
[m]+
NA
P
GLW & OLR 2002bed level (2002)
Die Qual den Waal
Management of fairway profiles24 8 oktober 2009Rijkswaterstaat
Niederrhein (Spyck), river axis km 857Niederrhein (Emmerich), river axis km 854
-6
-3
0
3
6
9
850860870880890900910920930940950
[m]+
NA
P
GLW & OLR 2002bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002
bed level (2002)Die Qual den Waal
Management of fairway profiles25 8 oktober 2009Rijkswaterstaat
Niederrhein (Spyck), river axis km 857Bovenrijn (Tolkamer) river axis km 862
Niederrhein (Emmerich), river axis km 854
-6
-3
0
3
6
9
850860870880890900910920930940950
[m]+
NA
P
GLW & OLR 2002bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002
bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002bed level (2002)
Die Qual den Waal
Management of fairway profiles26 8 oktober 2009Rijkswaterstaat
Niederrhein (Spyck), river axis km 857Bovenrijn (Tolkamer) river axis km 862
Waal (Nijmegen), river axis km 880
Niederrhein (Emmerich), river axis km 854
-6
-3
0
3
6
9
850860870880890900910920930940950
[m]+
NA
P
GLW & OLR 2002bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002
bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002
bed level (2002)Die Qual den Waal
Management of fairway profiles27 8 oktober 2009Rijkswaterstaat
Niederrhein (Spyck), river axis km 857Bovenrijn (Tolkamer) river axis km 862
Waal (Nijmegen), river axis km 880Waal (Zaltbommel) river axis km 929
Niederrhein (Emmerich), river axis km 854
-6
-3
0
3
6
9
850860870880890900910920930940950
[m]+
NA
P
GLW & OLR 2002bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002
bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002
bed level (2002)
-6
-3
0
3
6
9
850860870880890900910920930940950[m
]+N
AP
GLW & OLR 2002bed level (2002)
Die Qual den Waal
Management of fairway profiles28 8 oktober 2009Rijkswaterstaat
pilot feeding Bovenrijn (2009)
monitoring
water and bed levelsvelocities13.500 m3 granite tracer (Medusa)bed samplingbackscattermethod (TU Delft)
sediment feeding
fixed layer
• appr. 60.000 m3 every 2nd year• 0,3 m x 150 m between km 861-864 • outer bend, left of axis• lower than OLR-3,5 m• composition conform bed (&sand)
Fairway maintenance and bifurcation Pannerdensche Kop ???
Management of fairway profiles29 8 oktober 2009Rijkswaterstaat
pilot feeding Bovenrijn (2009)
monitoring
water and bed levelsvelocities13.500 m3 granite tracer (Medusa)bed samplingbackscattermethod (TU Delft)
sediment feeding
fixed layer
• appr. 60.000 m3 every 2nd year• 0,3 m x 150 m between km 861-864 • outer bend, left of axis• lower than OLR-3,5 m• composition conform bed (&sand)
Fairway maintenance and bifurcation Pannerdensche Kop ???
Management of fairway profiles30 8 oktober 2009Rijkswaterstaat
pilot feeding Bovenrijn (2009)
monitoring
water and bed levelsvelocities13.500 m3 granite tracer (Medusa)bed samplingbackscattermethod (TU Delft)
sediment feeding
fixed layer
• appr. 60.000 m3 every 2nd year• 0,3 m x 150 m between km 861-864 • outer bend, left of axis• lower than OLR-3,5 m• composition conform bed (&sand)
Fairway maintenance and bifurcation Pannerdensche Kop ???
Management of fairway profiles31 8 oktober 2009Rijkswaterstaat
pilot feeding Bovenrijn (2009)
monitoring
water and bed levelsvelocities13.500 m3 granite tracer (Medusa)bed samplingbackscattermethod (TU Delft)
sediment feeding
fixed layer
• appr. 60.000 m3 every 2nd year• 0,3 m x 150 m between km 861-864 • outer bend, left of axis• lower than OLR-3,5 m• composition conform bed (&sand)
Fairway maintenance and bifurcation Pannerdensche Kop ???
Management of fairway profiles32 8 oktober 2009Rijkswaterstaat
• nourishment Bovenrijn (Rijkswaterstaat & WSD; Deltares-BAW-BfG)
• Realisation• Modelling• Monitoring• Evaluation
• Revitalising banks and groyne fieldsat locations with heavy traffic
• Expertise on parallel dams
• Flood plain dynamics
Cooperation and exchange is needed
• Efficiency in fairway maintenance
• More (fine) sediment from the Niederrhein..
Management of fairway profiles33 8 oktober 2009Rijkswaterstaat