+ All Categories
Home > Documents > SEED: Burlington Department of Public Works Spring Interim Presentation.

SEED: Burlington Department of Public Works Spring Interim Presentation.

Date post: 22-Dec-2015
Category:
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
11
SEED: Burlington Department of Public SEED: Burlington Department of Public Works Works Spring Interim Presentation Spring Interim Presentation
Transcript

SEED: Burlington Department of Public WorksSEED: Burlington Department of Public WorksSpring Interim PresentationSpring Interim Presentation

Equipment Installed on the S74 TruckEquipment Installed on the S74 Truck

• Cirus Data Logger

• Drive-by Download System

• Temperature Sensor

• Salt Spreading Sensor

• GPS System

Salt Spreader

Salt Spreader Controls

Temperature Sensor

GPS Antenna Drive-by Download Transmitter

ArcGISArcGIS

Equipment on the WayEquipment on the Way

• General Dynamics Tablet PCGeneral Dynamics Tablet PC

• Second Cirus Logger SystemSecond Cirus Logger System

Short-Term Goals:Short-Term Goals:

• Continue Development of User InterfaceContinue Development of User Interface

• Develop Interface between Cirus Logger Develop Interface between Cirus Logger and Tablet PCand Tablet PC

• Continue Testing of ArcGIS to display Continue Testing of ArcGIS to display Desired DataDesired Data

Critical Issues

• Still don’t have a Cirus logging box in our hands

• There may be a compatibility / availability There may be a compatibility / availability issue with our in-truck computer and issue with our in-truck computer and wireless systemwireless system

• Can we get our hands on the ArcGIS SDK

Questions?


Recommended