Seismic Improvement Program. Presented to: The Northern California Earthquake Hazards Workshop February 12, 2014. Water Treatment and Distribution. 1,300,000 customers 331 square-mile area ~ 4,000 miles of pipe ~ 135 pumping plants ~ 180 reservoirs/tanks ~ 125 pressure zones - PowerPoint PPT Presentation
Popular Tags:
24
Seismic Improvement Program Presented to: The Northern California Earthquake Hazards Workshop February 12, 2014
Transcript
Page 1: Seismic Improvement Program

Seismic Improvement Program

Presented to:The Northern California Earthquake

Hazards Workshop February 12, 2014

Page 2: Seismic Improvement Program

Water Treatment and Distribution

1,300,000 customers331 square-mile area~ 4,000 miles of pipe~ 135 pumping plants~ 180 reservoirs/tanks~ 125 pressure zonesElevation: MSL-1450 ft

Page 3: Seismic Improvement Program

Seismic Hazards in Service Area

Page 4: Seismic Improvement Program

Pressure Zone Damage

Page 5: Seismic Improvement Program

Predicted Damage: Seismic Evaluation Program

• 63% of our customers would be out of water

• Increased fire risk with 1/3 of reservoirs and 2/3 of pumping plants out of service

• Claremont Tunnel would be out of service • 5,500 pipeline breaks• 4 of 6 treatment plants would be out of

service

Page 6: Seismic Improvement Program

Capital Improvement Program

Package #1 ($3 million)―Improve service after smaller earthquakes

Package #2 ($84 million)– Limited service improvements after Hayward

M-7 Package #3 ($189 million)

– Improved service after Hayward M-7

Package #4 ($288-$360 million) – Low priority, low benefits

Page 7: Seismic Improvement Program

Water Treatment Plants

Page 8: Seismic Improvement Program

Column

WeldColumn Flange

Beam Flange

Backing Bar

Fracture During Earthquake

Beam-Column Connection

Structural system is a welded steel moment frameDesigned to the 1982 Uniform Building CodeSeismic Improvement Program implemented in 1994 to provide life safety for all occupied structuresLessons learned from the 1994 Northridge Earthquake• Welded joints do not perform as designed

Beam

Main Administration Building

Page 9: Seismic Improvement Program

Viscous Damper in Diagonal Brace State Office Building Project, San Francisco

Piston Damper Detail

Page 10: Seismic Improvement Program

Pumping Plants

Page 11: Seismic Improvement Program

Implementation -Tank Seismic Upgrade

Shotcrete over New Anchors Prestressed Strands

Shotcrete Cover

Page 12: Seismic Improvement Program

Emergency Bypass System

• Manual isolation valves and by-pass manifolds– Isolate ruptured pipe and restore flow with

temporary hoses

Page 13: Seismic Improvement Program

Pipeline Fault Crossings and Backbone Pipe at Landslides

Page 14: Seismic Improvement Program

Supplying the West of Hills

Page 15: Seismic Improvement Program

Southern Loop Pipeline

• 11-miles• 30 inch to 42 inch

diameter • 1,800 ft. of 9 ft.

dia. tunnel

• Connects Southern Part of Service Area

Page 16: Seismic Improvement Program

Claremont Tunnel Crosses the Hayward Fault

Page 17: Seismic Improvement Program

Claremont Tunnel Before Upgrade

Page 18: Seismic Improvement Program

STA b 9+ 09 TO STA b 8 + 0 1

R 9'-5"5'-0"

4'-0"

R 8'-3"

CC

CC

C

` TUNNEL

4'-0"

# 5 @ 1 2"

DESIG N LINE

#4 @ 7 1 /2 "

# 5 @ 7 1/2 "

#5 @ 12 "

# 5 @ 7 1/2 "

# 5 @ 12"

# 10 @ 7 1/2 "

# 9 @ 7 1/2 "

#5 @ 12"

#4 @ 1 2"

# 4 @ 7 1/2 "

# 4 @ 12"SL TUNNEL

4 '-1 9/16 "

1'-0" SL

SIDE DRIFTS

STA b 9 + 09 TO STA b 8+ 01

R 9 '-5"5'-0"

4'-0"

R 8'-3"

CC

CC

C

` TUNNEL

4'-0"

# 5 @ 12"

DESIG N LIN E

# 4 @ 7 1/2 "

# 5 @ 7 1/2 "

#5 @ 12 "

#5 @ 7 1/2 "

#5 @ 12 "

#10 @ 7 1 /2 "

# 9 @ 7 1/2 "

#5 @ 12"

#4 @ 12"

# 4 @ 7 1/2 "

# 4 @ 12"SL TUNN EL

4 '-1 9/16 "

1'-0" SL

SIDE DRIFTS

PlanConfiguration after design earthquake

b 8+00

b 9+00

V A ULT

`

V A ULTTRA N SITIO N

V A ULTTRA N SITIO N

b 8+00

b 9+00

V A ULT

`

V A ULTTRA N SITIO N

V A ULTTRA N SITIO N

Section

8.5ft 8.5ft

carrier pipei.d: 6ft; length: 85ft

Page 19: Seismic Improvement Program
Page 20: Seismic Improvement Program

Mokelumne Aqueduct No. 3

Elastomeric seismic isolation bearing install on 351 pipe supports

Page 21: Seismic Improvement Program

San Pablo Dam Seismic Upgrade

Page 22: Seismic Improvement Program

Chabot Dam Seismic Upgrade

Page 23: Seismic Improvement Program

Dam Remediation Design Alternatives

Cement Deep Soil Mixing (CDSM)Conventional Earth Replacement

Page 24: Seismic Improvement Program

Questions

Timothy McGowanAssociate Civil Engineer

P.O. Box 24055Oakland, CA 94623

(510) 287-1981