SEMINAR ON INVESTMENT OPPORTUNITIES IN HEALTHCARE, HOSPITALITY AND
GREEN TECHNOLOGY
TOPIC : SUCCESS STORY OF GADING KENCANA
20 OCTOBER 2015
GADING KENCANA SDN BHD
Company ID 270511-H
Address 2-06-2, Blok 2, Presint Alami, Persiaran
Akuatik, Seksyen 13, 40100 Shah Alam,
Selangor
Telephone No 03 - 5513 9888
Incorporation Date 20 July 1993
Website www.gadingkencana.com.my
Managing Director Dato’ Ir Muhamad Guntor Mansor Tobeng
Authorized Capital RM25,000,000
Paid Up Capital RM 17,000,000
Ownership 100% Bumiputera
ISO & OHSAS Certified Energy Service
Company
COMPANY BACKGROUND
A Renewable Energy & Energy Efficiency Company
Certified Approved Photovoltaic Service Provider
(APVSP) by KETTHA
Registered with:
CIDB – G7
Ministry of Finance
Energy Commission (Electrical Contractor)
Energy Commission (Energy Services Company)
ISO 9001:2008 & OHSAS 18001:2007
OVERVIEW OF GADING KENCANA SDN BHD
PROJECT HIGHLIGHTS
Details
Solar System Capacity 8 MegaWatt
Solar Modules Used 29,092 Pcs
Solar Inverters Used 390 Nos
Cables DC 6mm:
24 km
AC Inverter to Feeder Pillar 5 Core 10mm:
26 km
AC Feeder Pillar to MSB:
25km
AC Switchgear to PPU 4 core 185mm:
4km
Manpower 230 pax
Electricity Generated Per Year 10,120 MWh
Land Size 17.7 Acres
Total Project Value RM84 Million
Registered Address Kompleks Hijau Solar,
Jalan Solar 1, Bandar Hijau, Hang Tuah
Jaya, 75450 Ayer Keroh, Melaka
No Description %
1 Land 5.5%
2 Preliminaries 4.6%
3 Site Clearance and Earthwork 8.1%
4 Main Access Road 3.4%
5 Infrastructure Work 1.7%
6 Main Building Works 0.9%
7 Solar PV Mounting Structure 12.1%
8 Electrical System for Solar Panel 11.0%
9 Electrical and Mechanical System for
Main Building
1.0%
10 Solar Panel 41.7%
11 Solar Inverter 9.9%
12 Balance of System 0.1%
Total 100.0%
Solar Panel 42%
Solar PV Mounting Structure
12%
Electrical System For Solar Panel
11%
Solar Inverter 10%
Site Clearance & Earthwork 8%
Land 5%
Preliminaries 5%
Main Access Road 3%
Infrastructure Work
2%
Electrical and Mechanical for Main Building
1%
Main Building Works 1%
Balance of System 0%
COST OF DEVELOPMENT
PROGRESS REPORT
No Description Year 2012 Year 2013 Year 2014
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
1 Registration of REPPA with SEDA
2 Corporate Negotiations &
Agreements
3 ST Public License (Provisional)
4 Appointment of Consultant
Preparation for Engineering Design
5 Engineering Design & Application
for Development Order
6 Financing Agreement(s)
7 Construction Work Start
8 First Payment Contractor
9 Construction Completion
11 FiT Commencement Date (SCOD)
MILESTONES OF THE PROJECT
DATE MILESTONES
09 December 2011 Received Feed-In Approval from
SEDA
06 November 2012 Loan Offer Issued By SME Bank
15 August 2013 Approval from MPHTJ
1 October 2013 Project Commencement
31 October 2014 Project Completion
11 December 2014 Initial Operation
23 December 2014 FIT Commencement
31 December 2014 Issuance of Completion and
Compliance Certificate (CCC)
24 February 2015 First FIT Income Received
ACTUAL ENERGY YIELD STUDY ANALYSIS
• The solar farm is required to produce at least 621.81MWh per month in order to pay for monthly loan repayment
Jan Feb Mar Apr May June Jul Aug Sept Oct Nov Dec
Actual energy (kWh) 964,788 1,028,528 1,089,838 1,015,557 968,116 937,919 960,499 1,004,351 824,578
Expected energy (kWh) 933,700 973,800 1,011,000 953,700 888,500 870,800 877,600 889,100 895,800
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
Ene
rgy
(kW
h)
Total energy yield for 8MW
621.81 MWh
158.34
102.68
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
Jan Feb Mac Apr May June July Aug Sept Oct Nov Dec
kWhm-2/month
2007 2008 2009 2010
Source of Data: 1) Malaysia Meteorological Department ( Source :http://www.met.gov.my) 2) Photovoltaic Monitoring Centre, University Teknologi Mara (PVMC-UiTM) 3) Meteonorm ( Source: http:// www.metenorm.com) 4) NASA ( Source: http: //eosweb.larc.nasa.gov/sse/)
AVERAGE SOLAR IRRADIANCE DATA FOR
MALACCA | (2007 – 2010)
• Creation of 230 highly skilled and high income Jobs for Malaysian Citizens
• Spin off business opportunity of RM 100.0 Million to local contractors and consultant
• Reduction of Carbon emission by 136,729 tonnes
• Support government policies in EPP9 in achieving 1.25GW RE connected to the grid by 2020
16
BENEFITS
17
• Export potential for Malaysian Solar Photovoltaic Industry products & services
No Country Product Quantity Amount
RM(Million)
1 Saudi Arabia Utility Scale Solar Farm 50 MW 500.0
2 Brunei Solar Farm on Land Field 10 MW 100.0
3 Indonesia Solar Farm In Lombok 8 MW 80.0
4 Djibouti Solar Home System for 1000 use 2 MW 20.0
5 Kenya Solar Home System for 5000 House 2 MW 20.0
6 Indonesia Solar Farm In Jakarta 2.0 MW 20.0
7 Turkey Solar BIPV 1 MW 10.0
8 Uganda Solar Home System 1000 Set 0.5 MW 5.0
9 Mauritius Solar Off Grid 0.10 MW 1.0
10 Ghana Solar Lantern Light 1000 Pcs 0.10 MW 0.9
TOTAL 75.7 MW 756.90
BENEFITS
Thin Film Mono Crystalline
Poly Crystalline
HIT
103.15 kWh/m2/y
170.00 kWh/m2/y
160.36 kWh/m2/y
197.63 kWh/m2/y
PILIHAN TEKNOLOGI SOLAR PV
PROSES PERLAKSANAAN PROJEK
PENILAIAN AWAL OLEH SEDA
PENGESAHAN SAMBUNGAN TNB
CADANGAN REKABENTUK
SAMBUNGAN OLEH TNB
PERMOHONAN LESEN FiT DAN PENYERAHAN
DOKUMEN
CABUT UNDI SEDA KELUAR SIJIL
FiT
TANDA TANGAN PERJANJIAN JUAL
BELI TENAGA (REPPA)
PEMBINAAN SISTEM SOLAR
PEMBELIAN METER
SOLAR DARI TNB
MOHON ATAS TALIAN
LULUS
TAMAT
PROJEK BATAL
PEMASANGAN METER & UJIAN AWALAN DGN
TNB
PENGUJIAN & PENTAULIAHAN BERSAMA OLEH
TNB, SEDA ,GKSB
BACAAN METER
PERTAMA
BAYARAN PERTAMA
6 BULAN
TOLAK
TOLAK
LULUS
TAMAT
GAGAL
MOHON SEMULA
Kemalangan fizikal (pecah, retak) atau
kecelakaan (bencana alam)
Kecekapan sel solar dan komponen yang
menurun
Faktor cuaca yang mendung, hujan, jerebu,
Perpindahan
Perbuatan khianat seperti vandalisme dan
sabotaj
Terputus sambungan ke grid
POTENSI RISIKO PROJEK
BANGUNAN KOTA CEMERLANG, KUMPULAN MELAKA BERHAD. 10kWp TAHUN 2011
OTHER BENEFITS COOLING EFFECTS ON BUILDING – SOLAR PANELS ACT AS ROOF SHADE This will reduce energy consumption used by cooling mechanism such as air conditioners.
THERMAL IMAGES OF A ROOF CEILING: UNDER FLAT PV ARRAY, UNDER TILTED PV ARRAY, UNDER EXPOSED ROOF Research by: University of California, San Diego
Perjanjian Pembelian Tenaga Baharu (REPPA)
selama 21 tahun
Pulangan atas pelaburan 14% - 18% setahun
Pengurangan pelepasan karbon sebanyak
391,230 tan
Projek ini menyokong inisiatif kerajaan - EPP10
Meningkatkan ekuiti sektor SME dalam industri
Tarif Galakan Solar
Penjanaan sumber pendapatan jangka panjang
yang lestari
KELEBIHAN KEPADA SYARIKAT
WISMA G&P, CHERAS, KUALA LUMPUR
M&A merangkumi; “menjana tenaga dari sumber
Tenaga Baharu dan menjual tenaga ke talian grid”
Bagi kuota <72kWp, saham berbayar minima RM20,000
Bagi kuota >72kWp, saham berbayar minima RM50,000
Pemilikan oleh warga negara Malaysia
Gading Kencana Sdn Bhd sebagai “service provider”
Pemasangan di bangunan komersil atau industri
Premis sendiri, atau pajakan bumbung 22 tahun
Mempunyai surat tawaran pembiayaan daripada
institusi kewangan semasa mohon kuota
SYARAT PERMOHONAN
GTFS, jaminan pinjaman 60% dan diskaun 2%
kadar faedah.
Tax Incentives 100% for 10 years
INSENTIF DANA PEMBANGUNAN
PROJEK SOLAR
2000kWp INTEGRATED PEPS-JV (M) SDN BHD, BATANG KALI, SELANGOR
PELAN TINDAKAN
ITEM 2015 2016
OCT NOV DEC JAN FEB
Perbentangan Cadangan Projek
Taklimat Kepada Koperasi
Cadangan Pindaan Perlembagaan
Kelulusan Pindaan Perlembagaan
Pengumpulan Dokumen
Mewujudkan Profil
Proses CCC & PSS oleh TNB
Aplikasi Online + Bayaran Prosesan SEDA
Non Individual Quota < 425 kwp
Non Individual Quota > 425 kwp
i) Submit Document
ii) Profile Creation
iii) Technical Evaluation
iv) KeTTHA Final Evaluation
19.2
4.12 23.11
30.11 4.12
7-10 Dec
Jan 2016
30.10
15.10
23.10
30.10
1.11 30.11
1.11 4.12
30.11 4.12
7.12 15.1
19.2 17.1