© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved. Seminar on Joint Crediting Mechanism (JCM) Implementation in Mexico 1 Feb. 5th, 2020 Mitsubishi Hitachi Power Systems de México, S.A. de C.V. Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved
Transcript
Page 1: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.

Seminar on Joint Crediting Mechanism (JCM) Implementation in Mexico

1

Feb. 5th, 2020

Mitsubishi Hitachi Power Systems de México,S.A. de C.V.

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Page 2: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

: Gas Turbine Combined Cycle: Integrated Coal Gasification Combined Cycle: Air Quality Control Systems: Artificial Intelligence: Information Communication Technology

U S CC C U S

: Ultra Super Critical: Carbon Capture

Utilization and Storage

The role of MHPS

Environment

Contribute to environmental conservation by advancing low-carbon energy with leading-edge clean power generation technologies.(GTCC, IGCC, USC, AQCS, CCUS, biomass,geothermal, fuel cells, hydrogen etc.)

EnergySecurity

Provide a stable supply of electricity by adapting to various fuels such as natural gas and providing output adjustment functionality to handle rapid load change as well as other means.

Economy(Economic

Growth)

Enhance economic efficiency in power generation and positively contribute to social development by providing highly efficient and extremely reliable power generation systems and optimizing operations and maintenance with AI and ICT.

The 3 pillars of energy production & MHPS’ role to achieve these standards

2

Page 3: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Products

Gas Turbine Combined Cycle (GTCC) Power Plant

Power Plants

Steam Power Plant (Boiler & Turbine, Generator)

Integrated coal Gasification Combined Cycle (IGCC)

Geothermal Power Plant

Gas Turbines Steam Turbines Boilers Environmental Equipment)((SCR/ESP/FGD)

Generators Control Systems Others

Products

Fuel Cells (SOFC))

3

Page 4: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

World Highest Performance J-Series Gas Turbine

M701JAC:440-560MW / M501JAC:330-420MWCombined Cycle 1on1, 2on1: 480MW- 1,230MW

Combined Cycle Efficiency > 64%

New “T-Point” Verification Plant isalready under construction.

65% is within reach

High Efficiency Large-Capacity Gas Turbine

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved 4

Page 5: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Reduce CO2 at large scale- Large CO2 reduction

(1 CCGT (440MW) 2,000,000 FCVs)

Fuels H2 infrastructure development- Large H2 demand for power generation- Gas Turbine can be fueled by H2 transported

by Ammonia / MCH / LH2

Hydrogen Society

Low Carbon Technology: “Next Stage of Gas Turbine”

MHPS Hydrogen (H2) Gas Turbine will contribute to Hydrogen SocietyNow, we are about to obtain CO2-free combustion technology that will turn into energy that supports society.

MHPS Achievements: Tests Large-scale High-efficiency Gas Turbine Fueled by 30% Hydrogen MixMHPS remain dedicated to achieve 100% hydrogen thermal power generation with DLN Combustor

5

Page 6: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Please read QR code and access!

Hydrogen Power Generation Handbook

etataaaaryry ryryry andandandandandandandaaa da d CoCoCoCoCoConfinfifififfififidendenenendeneneentiatiatiatiatiatiatiaaaatiaal Il Il Il IIInfonfnnfonfonnfnformammmmmmmmmrmrmrmmut prior written consent of Mit

oooododdddddddddoododdddddddddddododdddddoddddodododddddodddodooodododddddddodododododdddoododdddddodododddddodddddoddddoddddddodddoodododducuceuucucucececeuceuceuccuceeeuceeeuuuuuuuccceeeuceeeuuuuccucucucuuuuuccccucuccuceeeuuuuuuccccuceuuuuuucccuceeuuuuccuuuuucceuuucuuuuccccccuuuuuuceccccucceuuuuuccccuuuucccccuuuucccccuuuuuccccc ddd,dddddddddd,ddd,dddd,dddddddddddd,dddddd,dddddd,dd,d,dd,dddd,dddddd, tttttttrrararattttrrrtrttttttrtrratrrrrttttrrrrrratttrrtrrtrttrrrrtttrrrtrrrrattrrrratrrtttttrrttttttrrrttt nsmnsmn ittitted,ed, or or ddiiiiiiisssssissiisssisissssssiiiisssiidiisisiiissiississscccloclocloclocloclocloclocclocloclocloclocloloclocloclocloloccclololclooc occlolocc ololooc ooosedssesesesedededededdddddddddddedsededseseseedededddddddddddddddsessesesededededdddddddddddseedededededddddddddedssseseeeddddddddseseeeeedddddssesseseeseeeeddddsseeseedddddsseseeeeeedddddsseeeedddddddeeddddddddeeeeddddddddeeeeeddddddsedddddddeeeeeddddeeeddddededd

6

Page 7: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Geothermal

MHPS has wide line up and lots of supply records of geothermal power plant.

MHPS solves your energy issue as the leading company of geothermal power plant manufacturer.

MHPS installed Total Capacity: Over 3,000 MW MHPS installed Total Unit: Over 100 UnitsDifferent Steam & Brine in 13 Countries+MHPS has supplied more than 70 units on EPC basis since 1950

MHPS record in the World

Renewable Energy: “Earth Heat to Energy” - MHPS Geothermal Turbine Record -

7

Page 8: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems,Ltd. MHPS confidential

250kW Class SOFC (Solid Oxide Fuel Cell, Celda de Combustible Óxido Sólido)

ExpectedSpecification

MHPS250kW Class

Electrical Efficiency(LHV) 55 %

Hot water/Steam Output 86kW/50kW

Total Efficiency (LHV) Electrical + Thermal 73%/65%

NOx (16% O2) <5ppm

Unit Size W3.2 x L9.5 x H3.3 m

Weight 37ton

Noise Level 65dBHeat

3rdstage

2nd stage

1st stageLNG

BIOGAS

SOFC(Fuel cell)

MICROGAS TURBINE

H2

GAS

Variety of fuel can be applied.

55% 73% Various Gas

Electrical Efficiency

CogenerationEfficiency

Fuel Flexibility

• High Reliability

• Low noise

• Low emission (NOx, PM)

8

Page 9: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems,Ltd. MHPS confidential

MHPS SOFC Supply Record

In addition to 250kW-class, 1MW-class is under verification

J PowerMono-generation

Kyushu Univ.Mono generation

Operation time : 23,000hrs

NGK Spark PlugCo-generation/Steam

Toyota MotorCo-generation/Steam

MITSUBISHI ESTATECo-generation/Steam

Tokyo gasCo-generation /Hot water

HAZAMA ANDO Corp.Co-generation /Hot water

TAISEI Corp.Co-generation/ Hot water

1MW class

250kW class with H2 Rich Fuel

1MW demonstrationMono generation

9

Page 10: Seminar on Joint Crediting Mitsubishi Hitachi Power Systems ......2020/02/03  · M701JAC:440-560MW / M501JAC:330-420MW Combined Cycle 1on1, 2on1: 480MW- 1,230MW Combined Cycle Efficiency

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd. © 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Proprietary and Confidential Information. This document or information cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems, Ltd© 2019 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved

Mitsubishi Hitachi Power Systems

10


Recommended