Services and ProductIntroduction and Overview
Premium Services and Products Designed for the Power, Industrial, Commercial, Bridge, and
Offshore Access Industry
SERVICES OVERVIEW
– Scaffolding Services– Design, Engineering, Labor, Supervision,
Material
– Insulation services– Installation or removal of all types of
industrial insulation products
– Painting & Blasting– Project specific availability
– Fireproofing– Installation of all types of cementitious
and select intumescent fireproofing
– Multi-craft services available‒ Long Term Maintenance Solutions
– Specialty Platform packages‒ Design, Engineering, Fabrication
– Custom fabrication‒ Design, Engineering, Fabrication
Corporate Structure
“Bartlett Group”
Deltak Manufacturing
Deltak Environmental
Coating Solutions
Global Scaffold Construction
Services
Global Mechanical
NextGen ExcelPetro-Chem
withExcel Modular
Material
Power, Industrial,
Commercialwith
InstantLock Material
Bartlett Group Geographical Footprint
California Office
2555 Birch Street
Vista, CA 92081
Main Line: (760) 598-0050
Fax: (760) 598-5053
Texas Office
7001 HWY 225
Deer Park, TX 77536
Main Line: (832) 429-0776
Fax: (832) 429-0798
Louisiana Office
17900 Excel Boulevard
Walker, LA 70785
Main Line: (225) 777-4157
Fax: (225) 777-4159
Louisiana Hiring Center
3919 W. Airline Hwy, Suite C
Reserve, LA 70084
Main Line: (985) 390-0010
Ohio Office
412 Commerce Drive
South Point, OH 45680
Main Line: (740) 523-0363
Fax: (740) 523-0365
Massachusetts Office
60 Industrial Park Road
Plymouth, MA 02360
Main Line: (508) 746-6464
Fax: (508) 746-5467
South Carolina Office
515 Winesap Circle
Anderson, SC 29621
Main Line: (823) 429-0783
Florida Office
710 Mooney Street
Bartow, FL 33830
Main Line: (832) 429-0784
Benefits and Features of
InstantLock
We have combined all the truly beneficial scaffold features within our
industry and engineered those
advantages into the most EFFICIENTand SAFE scaffold product to date.
InstantLock’s TrademarkSafety Benefits
• The design addresses the most common scaffold related accidents per OSHA statistics. (Slips, Trips, Dropped Tools, Fall Arrest); Reducing time walking horizontal members.
• When at rest the horizontal is always locked. (Other Systems Vibrate open, InstantLockVibrates closed)
One Step Benefits
• No Tools Cable Assist allows the erector to install and remove in place without traveling horizontal members
• Instant-Lock simplifies the entire scaffold process which helps eliminate complacency, decreasing the wear and tear on erectors, creating the safest work environment possible
• Less time relocating to proper anchorage points while erecting and dismantling
• Dismantle time vs other systems is reduced by up to 4.5x • The spring connector design will rotate completely when
installed properly. The wedge will rotate under the rosette preventing uplift forces and side impact dislodging. Since the spring has rotated completely during install it will allow for an easy removal of the horizontal.
InstantLock vs Safway - Erection
02468
1012141618
Tim
e
Horizontal by Length
Time per Horizontal by Size
NextGen
Safway Systems
InstantLock vs Safway - Dismantle
0
5
10
15
20
25
Tim
e
Horizontal by Length
Time per Horizontal by Size
NextGen
Safway Systems
SYSTEM SCAFFOLD COMPARISONCOMPONENT NextGen CUPLOCK PERI SAFWAY
Connection point spacing 21” 19 5/8" 19 ¾" 21"
Connection point typePositive
Locking!Friction Fit Friction Fit Friction Fit
Number of bars that can be attached to a
single leg rosette8 4 4 8
Hand tools required for basic tower construction No Yes Yes Yes
Structural integrity (leg load) 1 (9,000 lbs.) 2 4 3 (5,000 lbs.)
Tie-off rated from manufacturer (longest length) 10' No No No
Length of horizontals (non-truss) 10' 10' 6' 10'
Length of decking horizontals (non-truss) 10' 7' 6' 6'
Qualified for lifting rigs & trolley use Yes No No No
Most accessories #1 #4 #3 #2
Average weight of 10' vertical 33.8 lbs. 38.8 lbs. 42.7 lbs. 35.8 lbs.
Speed of system (erection/dismantle) #1 #4 #2 #3
Detailed user-friendly technical specification manual Yes No Yes Yes
Vertical ladders —100% 6" toe clearance Yes No No No
Ladders — 4:1 safety factor Yes No No No
Truss Dual Range in Motion for Expanding the platform in the Air
Vertical Range of Motion Horizontal Range of Motion
Starter platform that would be installed then raised into position at the bull nose. Notice the use of a Central Control Box (CCB).
This (CCB) controls all four motors at one time or independently so the erector can articulate the platform as needed.
The Safedeck System has designed a new method for installing water wall panels. We have an I-beam monorail
system that attaches to the
SAFEDECK truss along the perimeter of the platform. This monorail can
be installed within inches of the boiler walls. The boilermakers can now rig one panel a single time and
move it into position versus the current method of rigging to
temporary lifting lugs that are welded to the boiler wall.
The SAFEDECK
Monorail System
This new method eliminates a couple of procedures during the outage. 1. No more welding to the water wall risking cutting into the tubes.
2. No need to have someone inspect the lugs needed to rig panels
3. No more leap frogging water wall panels from rigging point to rigging point; now just one safe step.
• The SAFEDECK boiler system will greatly reduce man hours during erection and dismantle activities.
• Greatly reduces risk to erectors as compared to other scaffold systems erection and dismantle process.
• Allow for quicker repair during pendant tube leaks • The strongest suspended truss system on the market• A system that is totally compatible with Ring Lock Scaffold
system• One of the only suspended scaffold products that can
provide 100% access to the boiler during schedule outage inspection and repair
• The only system with a patent pending water wall replacement monorail system
• Access with minimal RISK!
In Conclusion: What is the SAFEDECK product?