Services Update. Progress on services Detector cabling Gas systems Cooling systems Rack footprint Primary electrical distribution Utilities Principle Priorities For Q4 2003. Services on RB26 side Must be installed this year, in order to close the doors Complex routing & limited space - PowerPoint PPT Presentation
21
ALICE Collaboration Meeting Heidelberg Services Update Progress on services Detector cabling Gas systems Cooling systems Rack footprint Primary electrical distribution Utilities Principle Priorities For Q4 2003
Transcript
Page 1: Services Update

ALICE Collaboration Meeting Heidelberg

Services Update

Progress on services Detector cabling

Gas systems

Cooling systems

Rack footprint

Primary electrical distribution

Utilities

Principle PrioritiesFor Q4 2003

Page 2: Services Update

ALICE Collaboration Meeting Heidelberg

Progress On Services

Services on RB26 side Must be installed this year, in order to close the doors Complex routing & limited space Temporary supports will be required inside the L3 magnet

Layout at time of lastALICE week

Basic Bus Bar layout

Some cables

Some gas & cooling pipes

Page 3: Services Update

ALICE Collaboration Meeting Heidelberg

Detector Cabling (1)

Inventory well advanced Over 1600 cables to be

installed on RB26 side

LV+ 3.3 V, 60 A 18 Analog Bus Bars (2) A13/B13

+ 2.5 V, 150 A 18 Digital Bus Bars (2) A13/B13

+ 3.3 V 1 LV-Clock/Trigger Cable (2) A13/B13

1 LV-ELMB Cable (2) A13/B13

HV1 HV (100 kV)

4 HV-sense 04.31.52.050.8 CR4

6 edge/cover/skirt 04.31.52.050.8 CR4

Electrical Signals6 Temp. sens. (elmb) CR3

108 DCS/Ethernet Special CR3

36 Calib. Pulser BNC D14

108 Gating Pulser HV BNC D13

14 Clock/Trigger

36 LV BB sense wires Twisted pair A13/B13

Optical Signals108 DDL Optical Fibers (2) CR1

4 TTC Optical Fiber (1) LTU

Rack allocation

Cable type CERN standard or special

Typical inventory for TPC

Page 4: Services Update

ALICE Collaboration Meeting Heidelberg

Detector Cabling (2)

Inventory Integrated Ordered Installed

ITS

Pixel

Drift

Strip

75%

75%

75%

20%

20%

20%

Vo 60% 20%

To 80% 20%

FMD 20% 20%

TPC 90% 60%

TRD 90% 60%

TOF 90% 60%

HMPID 90% 10%

CPV 25% 5%

PHOS 5% 5%

MUON

Tracking

Trigger80%

80%

50%

60% 40%

Page 5: Services Update

ALICE Collaboration Meeting Heidelberg

Detector Cabling (3)

High voltage and signal cables Will be installed using the existing EST/LEA industrial support contract Under the direct supervision of the ALICE team Cables will be installed and cut to approximate length Cables will be cut to the exact length and connectors will be added,

when the detectors have been put in place

Fiber optic cables ALICE team will install the ducts The specialist team from ST/EL will blow the fibers at a later date

Page 6: Services Update

ALICE Collaboration Meeting Heidelberg

Gas Systems

Preliminary design

Final design PRR Construction Installation

TPC Completed Completed Completed In progress

TRD Completed Completed

TOF Completed Completed Completed

HMPID Completed Completed Completed In progress

CPV Completed Completed Completed

PMD Completed Completed Completed

Muon Track Completed Completed Completed In progress

Muon Trig Completed Completed Completed In progress

Status 1st. September 2003

Page 7: Services Update

ALICE Collaboration Meeting Heidelberg

Cooling Systems

Status 1st. September 2003

Preliminary design

Final Design PRR Construction Installation

ITS Completed Completed Completed

TPC Completed Completed

TRD Completed Completed

TOF Completed

Bus Bars Completed

HMPID Completed Completed

CPV In progress

PHOS In progress

PMD In progress

MUON Trac. In progress

Page 8: Services Update

ALICE Collaboration Meeting Heidelberg

Layout of Services (1)

Start off with a clean sheet

Page 9: Services Update

ALICE Collaboration Meeting Heidelberg

Layout of Services (2)

Gas, Cooling & BusBars on back frame

ITS services

Bus Bars

Fiber optic cables

Cooling & Gas pipes

Page 10: Services Update

ALICE Collaboration Meeting Heidelberg

Layout of Services (3)

Cooling & Gas pipesThrough doors

Bus Bars

Page 11: Services Update

ALICE Collaboration Meeting Heidelberg

Layout of Services (4)

Access passage aroundBack frame

Page 12: Services Update

ALICE Collaboration Meeting Heidelberg

Detector Cabling (5)

Installation schedule for cables on RB26 sideBetween September & December 2003

Page 13: Services Update

ALICE Collaboration Meeting Heidelberg

Rack Footprint (1)

Standard 52U high racks

UX25 cavern 133 racks have been

identified Racks allocated to sub-

detectors Numbering follows

CERN ST/EL standard Grouped into 4 areas

(see following slide)

PX24 counting rooms Existing racks will be

used Allocated as required

UX25 PX24

ITS 12

TPC 9

TRD 12

TOF 13

HMPID 3

PHOS/CPV 3

PMD 2

MUON Trac. 12

MUON Trig. 14

CTP 9

Small detectors 10

Misc. 7

DAQ (P1) 38

HLT (P2) 0

DCS (P3) 20

Detectors (P4) 39

Total 106 97

Reserve 27 0

Grand Total 133 97

Page 14: Services Update

ALICE Collaboration Meeting Heidelberg

Rack Footprint (2)

Inside machine

Outside machine

Big block house Small block house

Page 15: Services Update

ALICE Collaboration Meeting Heidelberg

Rack Footprint (3)

Crate allocation (UX25) Well advanced ~60 out of 132 racks have

detailed crate layout Rack Number: C1

Sub Detector-Function: TPC-LV

JPV, 15/7/2003

525150 Ventilation + Control4948 Heat Exchanger4746 LV Crate 145444342 LV Crate 2414039 Ventilation38 Heat Exchanger3736 LV Crate 335343332 LV Crate 4313029 Ventilation28 Heat Exchanger2726 LV Crate 5252423 Ventilation22 Heat Exchanger21 DEFLECTOR 2U2019181716151413121110 UNUSED987654321

Rack Number: C4

Sub Detector-Function: TPC-GP

JPV, 15/7/2003

525150 Ventilation + Control4948 Heat Exchanger4746 Pulsercrate 1454443 Pulsercrate 2424140 Pulsercrate 33938 Ventilation37 Heat Exchanger3635 Pulsercrate 4343332 Pulsercrate 5313029 Pulsercrate 62827 Ventilation26 Heat Exchanger2524 Distribution/conversion Box232221 Powersupply 1201918 Powersupply 21716 Ventilation15 Heat Exchanger1413 Powersupply 31211 DEFLECTOR 2U1098765 UNUSED432

Page 16: Services Update

ALICE Collaboration Meeting Heidelberg

Primary Electrical Distribution

Now well understood Power for counting rooms supplied from surface

transformer Power to Experimental Area

One transformer will supply power to racks A separate transformer will supply power to equipment with

pumps etc.

Page 17: Services Update

ALICE Collaboration Meeting Heidelberg

Primary Electrical Distribution

EBD2/29

EBD3/29

EXD1/25 EQD1/25 EBD1/25

EBD3/25

EBD4/25

EXD1/2X EBD1/2X

EBD5/2X EBD3/2X

EBD1/20BOUCHON

Niv.4

Niv.1

Niv.2

Niv.3

1,25MVA Transformer

1,25MVA1,25MVA1,25MVA

2MVA Transformer

Eclairage,clim PX24S.G. SX2 et PX24

ST-CV

700KVARech. Cryo

Free

Alim S.G. UX25Pont roulantForce 125A-63A,….

Alim S.G. UX25Eclairage,petite forceAuxiliaires,…….

EXD-/20

Page 18: Services Update

ALICE Collaboration Meeting Heidelberg

TPC Lasers

New shielding layoutgives better accessto TPC lasers

Page 19: Services Update

ALICE Collaboration Meeting Heidelberg

Vo Cable Length

Cable length 25m

Page 20: Services Update

ALICE Collaboration Meeting Heidelberg

Utilities

Installed at Point 2 IR1 estimates IR2 estimates

Electrical power supply 3,25MVA 2,62MVA 2,62MVA

Mixed water supply

Chilled water supply

172m3/h

72m3/h

161m3/h

66,5m3/h

155m3/h

66m3/h

Cavern ventilation 150kW 134kW 129kW

Mixed water supply Rack filling factor of 100% Cooling efficiency 90% Number of racks reduced

From 140 to 133

Cavern ventilation 4% reduction

Page 21: Services Update

ALICE Collaboration Meeting Heidelberg

Priorities For Last Quarter of 2003

Side structures For racks To allow Bus

Bar & cable installation

Services through RB26 doors

Bus Bars Cables Gas pipes Cooling pipes

Modified side structures(UX25)

Detector

To counting room (P4)

Cable installation

Rack positions


Recommended