+ All Categories
Home > Documents > Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group...

Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group...

Date post: 11-Aug-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
22
Session #40 802.16mmr Opening Report – 11/14/05 IEEE 802.16 Presentation Submission Template (Rev. 8.3) Document Number: IEEE 802.16mmr-05/022 Date Submitted: 2005-11-14 Source: Mitsuo Nohara Voice: +81 3 6678 3599 MMR-SG Chair, KDDI Corp. Fax: +81 3 6678 0279 3-10-10, Iidabashi, Chiyoda-ku, Tokyo 102-8460 Japan E-mail: [email protected] Venue: IEEE 802.16 Session #40, Vancouver, Canada Base Document: None Purpose: SG Meeting organization Notice: This document has been prepared to assist IEEE 802.16. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. IEEE 802.16 Patent Policy: The contributor is familiar with the IEEE 802.16 Patent Policy and Procedures <http://ieee802.org/16/ipr/patents/policy.html>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <mailto:[email protected]> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.16 Working Group. The Chair will disclose this notification via the IEEE 802.16 web site <http://ieee802.org/16/ipr/patents/notices>.
Transcript
Page 1: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Session #40 802.16mmr Opening Report – 11/14/05

IEEE 802.16 Presentation Submission Template (Rev. 8.3)Document Number:

IEEE 802.16mmr-05/022Date Submitted:

2005-11-14Source:

Mitsuo Nohara Voice: +81 3 6678 3599MMR-SG Chair, KDDI Corp. Fax: +81 3 6678 02793-10-10, Iidabashi, Chiyoda-ku, Tokyo 102-8460 Japan E-mail: [email protected]

Venue:IEEE 802.16 Session #40, Vancouver, Canada

Base Document:None

Purpose:SG Meeting organization

Notice:This document has been prepared to assist IEEE 802.16. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in thisdocument is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.

Release:The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standardspublication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others toreproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16.

IEEE 802.16 Patent Policy:The contributor is familiar with the IEEE 802.16 Patent Policy and Procedures <http://ieee802.org/16/ipr/patents/policy.html>, including the statement "IEEE standards may include theknown use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with bothmandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibilityfor delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <mailto:[email protected]> asearly as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within theIEEE 802.16 Working Group. The Chair will disclose this notification via the IEEE 802.16 web site <http://ieee802.org/16/ipr/patents/notices>.

Page 2: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Session #40 802.16mmrOpening Report – 11/14/05

2nd Study Group Meeting on MobileMulti-hop Relay in IEEE 802.16

Chair:Mitsuo NoharaTime: 08:00 – 12:00, Tue. 15 – Thu. 17 Nov., 2005Place: British Room, The Fairmont Hotel Vancouver

Page 3: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Objectives of this 2nd SG Meeting

• To exchange views on Mobile Multi-hop Relay

– with contributions provided, referring to the 2nd call

for contributions,

– especially on the PAR and 5 Criteria

• To have open comments and discussions, and

• To plan future activity and schedule towards the PAR

and 5 Criteria preparation (to be completed at the #41

Meeting in New Delhi, Jan. ’06.)

1

Page 4: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

2

Agenda2. Session #39 Taipei

1st SG Meeting Summary

• Contribution Presentations• 23 in total, on;

• PAR & 5 Criteria,

• Scope & Scenario, and

• Technical Study.

• Open Discussions

also with 802.1 and 802.16h

• Meeting Summary

• Future Activity and Schedule

Page 5: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

3

1. Session #39 Taipei1st SG Meeting Summary

Page 6: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Scope of Proposed Relay Project• Develop Proposed Relay mode for fixed / mobile terminal

- PHY: Enhance normal frame structure

- MAC: Add new protocols for the Relay networking

4*Reference : C802.16-005/013

Page 7: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Main Features• Main features

- Tree structure: one of the end of relayed data path should beat BS

- Efficiently provide Relay connection to SS/MS (with smallnumber of hops)

- Support OFDMA as well as OFDM PHY mode

- Backward compatible to PMP mode

- PMP & Relay modes : share a same band, or use different butadjacent bands

• Considered RS types

- Fixed Infra RS, Nomadic Infra/Client RS, Mobile Infra. RS

5*Reference : C802.16-005/013

Page 8: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Contributions at the 1st SG Meeting

6

16 Contributions Submitted and Presented,

each categorized into:

• Requirements/Technical

• Updated from previous meeting

• Others

• Reference

then divided into two meeting groups.

*Presentation Program as shown next:

Page 9: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

PHY aspects in MMR-enabled networksAlvarionNaftaliChayat

Smmr-05_01916

Throughput improvement withRelay-augmented cellular architecture

ITRI, NCTUI-Kang FuCmmr-05_00815

Factors that affect performance of a mobile multihoprelay system

Fujitsu LAB EuropeMike HartCmmr-05_01714

A Recommendation on PMP Mode Compatible FrameStructure

CCL/ITRIFang-Ching RenCmmr-05_00513

FSO-based relaying/backhauling architectureCCL/ITRIShou-Sheu LinCmmr-05_00612

Duplex and Multiplex Configurations for OFDMA In-Band Relay

NortelPeiying ZhuCmmr-05_01111

reliminary Performance Benefit of Single-Hop OFDMARelay in IEEE802.16

NortelPeiying ZhuCmmr-05_01010

Session #2, 13:00 - 17:00 Thu., 15 Sept. 2005

IEEE802.11 TGs: An IntroductionMotorolaShyamalRamachandran

Cmmr-05_0149

Introduction to Opportunity Driven Multiple Access(ODMA)

National Taiwan Univ. ofScience and Tech.

Ray-Guang ChengCmmr-05_0128

Flexible Relay Wireless OFDM-based networksINTRACOM*Mitsuo NoharaCmmr-05_0077

Mobility Management for Mobile Multi-hop RelayNetworks

CCL/ITRIYu-Ching HsuCmmr-05_0036

Recommendation on Design 802.16 TGe PMP modebackward compatible Frame Structure

HuaweiJohn LeeCmmr-05_0045

Scope Considerations for Mobile Multihop RelayMotorolaMasahito AsaCmmr-05_0134

Method for integration of cooperative relaying into the802.16 standard

IntelYigal EliaspurSmmr-05_0153

Classification of RS Type in Mobile Multi-hop RelaySystem

Samsung ElectronicsJaeWeon ChoCmmr-05_0022

Study of IEEE802.16 Mobile Multi-hop RelayKDDI R&D Labs.Kenji SaitoCmmr-05_0011

TitleAffiliationPresentationRef.No.

Session #1 08:00 - 12:00 Wed., 14 Sept. 2005

1st SG Meeting Presentation Program

7

Page 10: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Output of the 1st SG meeting

• Exchanged the concepts for Mobile MultihopRelay through the Contribution Presentations

• Discussed and agreed as follows :– Need for clarification/revision of theconcept table.

– Need for Common Terminology– Call for Contributions to be issued :• PAR and 5 Criteria• Scope of MMR task including evaluationcriteria, backward compatibility.

8

Page 11: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Motion to SG• Motion : To empower study groupchair to prepare new call forcontributions and also preparereport for the session.–Motion : Naftali Chayat, Second : JaewonCho

– Unanimous voice consent

-> 2nd Call for Contributions Issued.

9

Page 12: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

2. Contributions

10

Page 13: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

2nd Call for Contributions

11

Areas of activities:

• Assess feasibility of Multi-hop Relay for fixed / mobileterminal including PHY/MAC modifications;

• Study the impact on PHY with enhancement of normalframe structure and backward compatibility with802.16 TGe PMP mode;• Study the impact on MAC protocols to be newly addedfor the relay networking including handover cases;• Study spectral scenario including frequency reuseand interference among the links between Basestation (BS) and Relay station (RS), and ones betweenRS and Mobile/Subscriber station (MS/SS);• Study the security between BS and Mobile Subscriberstation (MS) via RS;

Page 14: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

2nd Call for Contributions

12

Contribution Provisions:

In preparation for the second SG Meeting, furthercontributions addressing the above topics arerequested. The contributions should provide:

•Technical issues relevant to a “PAR and Five Criteria”preparation and other works

•Direction of MMR activities for high level issues suchas service scenarios, network topologies, etc.

Note that the Study Group plan is to initiatediscussions on and create a first draft text of a “PARand Five Criteria” during Session #40.

Page 15: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Contribution Presentations

13

* List of 1st Authors: Mariana Goldhamer

Ozgur Oyman Gang Shen

Jimin Liu Xiaobing Leng

Deng Shiqiang Fang-Ching Ren

Kyungjoo Suh Tzu-Ming Lin

D. J. Shyy D. J. Shyy

Masahito Asa Shyamal Ramachandran

Byoung-Jo Kim David Steer

Weng Tong Yousuf Saifullah

Aeran Youn Mitsuo Nohara

Kenji Saito I-Kang Fu

Amir Rubin Mike Hart

(23 Presentations in total)

• Each of those 23 Presentations will be categorized into:“PAR & 5 Criteria” / Scope, Scenario and System Definition

/ Technical Analysis and DesignT

P

S

P

T

T

T

T

T

T

S

S

S

S S

S P

T P

S S

P S

S

S

P

Page 16: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

System Performance of Relay-based CellularSystems in Manhattan-like Scenario

National Chiao TungUniv.

I-Kang FuCmmr-05_04110

MMR Topology Study with 6 ConfigurationsNortelNetworks

Weng TongCmmr-05_0369

A Case for Multihop BackhaulMotorolaShyamalRamachandran

Cmmr-05_0338

CDMA2000 Network Repeater DeploymentExperience.

MITRED. J. ShyyCmmr-05_0317

Military Usage Scenario for 802.16 MMRMITRED. J. ShyyCmmr-05_0306

Recommendation on Mobility Management ofMulti-hop Relay

Huawei TechnologiesDeng ShiqiangCmmr-05_0265

Day#1-2 10:00 - 12:00 Tue. 15 Nov., 2005

Self-backhaul RelayAclatel Shanghai BellJimin LiuCmmr-05_0244

Advantages of a Coexistence Protocol forRelay Operation

AlvarionMarianaGoldhamer

Cmmr-05_0203

Recommendations for the Scope and Purposeof the Mobile Multihop Relay Task Group

MotorolaMasahito AsaCmmr-05_0322

Considerations on Mobile Multi-hop Relay forIEEE802.16

KDDI R&D Labs.Kenji SaitoCmmr-05_0401

TitleAffiliation1st AuthourRef.No.

Day#1-1 08:00 - 09:40 Tue. 15 Nov., 2005

2nd SG Meeting Presentation Program

14

* Each presentation consists of 15-minutes presentation and 5-minutes Discussions.

Page 17: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

MR PAR and Five Criteria Draftortel

etworksavid Steermmr-05_035

20

Analysis of Simple Infrastructure MultihopRelay Wireless System

AT&TByoung-Jo KimSmmr-05_03419

Decision method of relayed MS in MMR-enabled networkingG Electronics

Aeran YounCmmr-05_03818

Modification for enabling the RS OperationsITRITzu-Ming LinCmmr-05_02917

Open Problems in Mobile Multi-hop RelaySystem

Samsung ElectronicsKyungjoo SuhCmmr-05_02816

ecommendation on PMP Mode CompatibleTDD Frame Structure

TRIang-Ching Renmmr-05_02715

Day#2-2 10:00 - 12:00 Tue. 15 Nov., 2005

A frame structure for mobile multi-hop relaywith different carrier frequencies

Aclatel Shanghai BellXiaobing LengCmmr-05_02514

Recommendation on 802.16 MMR withBackward Compatibility

Alcatel Shanghai BellGang ShenCmmr-05_02313

Throughput Improvements in Micro-CellularMulti-Hop Networks

IntelOzgur OymanCmmr-05_02212

Cooperative Relaying Systemntel

Amin RubinCmmr-05_04211TitleAffiliation1st AuthourRef.No.

Day#2-1 08:00 - 09:40 Tue. 15 Nov., 2005

2nd SG Meeting Presentation Program

15

* Each presentation consists of 15-minutes presentation and 5-minutes Discussions.

Page 18: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

PAR and Five Criteria for 802.16 Mobile RelayKDDI

Mitsuo NoharaCmmr-05_03923

Input text to the PAR ande Five CriteriaFujitsu Lab. EuropeMike HartCmmr-05_04322

Issues and Scope of MMRNokia

Yousuf SaifullarCmmr-05_03721

TitleAffiliation1st AuthourRef.No.

Day#3-1 08:00 - 09:20 Thu. 16 Nov., 2005

2nd SG Meeting Presentation Program

16

• Each presentation consists of 15-minutes presentation and 5-minutes Discussions.

• Discussions on PAR and 5 Criteria Preparation to follow.

Page 19: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

3. Future Activity and Schedule

17

Page 20: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

Tentative Schedule

• PAR & 5 Criteria Preparation towards #42 Plenary

18

2005

SG: the 2nd meeting#40 PlenaryNov.

TG: the 4th meeting

TG: the 3rd meeting

TG: the 2nd meeting

TG: the 1st meeting

802 EC endorses PAR approval

SG: the 3rd meeting – Complete a PAR

SG: the 1st meeting

Propose to form SG – Approved

Actions802.16 sessionMonthYear

#45 InterimSept.

#44 PlenaryJuly

#38 PlenaryJuly

#39 InterimSept.

Nov.

May

Mar.

Jan.

2006#43 Interim

#46 Plenary

#42 Plenary

#41 Interim

Page 21: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

To Do List

• At This Meeting- Contributions/Discussions- PAR & 5 Criteria Discussions to start

• After This Meeting towards Next #41 Meeting- Comments and Discussions

• At the Next #41 Meeting- Make “PAR & 5 Criteria” ready- Tutorial Preparation (to be held in #42 Session,Mar. 2006)

- dot16 “forum” website: http://dot16.org/forum/

19

Page 22: Session #40 802.16mmr Opening Report – 11/14/05 · Opening Report – 11/14/05 2nd Study Group Meeting on Mobile Multi-hop Relay in IEEE 802.16 Chair:Mitsuo Nohara Time: 08:00 –

20*Reference: C802.16-005/013

MMR-SG08:00 – 12:00, Tue. 15 – Thu. 17,

Nov. , 2005 (3 Meeting Slots)Place: British Room,

The Fairmont Hotel VancouverPlease Join and see you!


Recommended