1) 2) 3) 4) 5)
n Vertex one , Aktau ,
ANY DOSSI
SewoSewoGateGateGate
Heavy In, Kazakhstan
ER
PRO
on Veon Veeway Eeway Eeway E
dustries n
OJEC
ertex aertex bEPM EPMEPM
CT LI
after Rbefore- Eng– Eng– Pro
STIN
Revivae Revigineergineeroject S
NG
al ival
ring red PrSuppli
roducties
ts
Year Client PO Number Item Description Project Status
2010 Peerless 10 /3185 / PP /A dtd 8.10.2010
Vertical Gas Seperator PetroKazakhstan Completed
2011 Saipem 571358 dtd 1.02.2011 Gas Racks EN 12079 AGIP Khasagan Completed
2011 Saipem 573620 dtd 9.02.2011 Gas Racks EN 12079 AGIP Khasagan Completed
2011 OGCC KazStroyService
KSS/KOA-K/PIC-1/2011/00929 dtd 21.02.2011
Potable Water Tank KOSHASAI GTU Completed
2011 TCO/GV Repair TCO Tengiz Completed
2011 ERSAI 582216 dtd 4/3/2011 Rolling AGIP Khasagan Completed
2011 Peerless 11/3261/PP/A dtd 4/3/2011
Vertical Gas Filter PetroKazakhstan Completed
2011 ERSAI 590557 dtd 30/3/2011 Incolloy fabrication AGIP Khasagan Completed
Sewon Vertex - Project Listing after Revival in November 2010
Project Listing after Revival in November 2010 1 of 7
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing after Revival in November 2010
2011 ALZ Laddles Completed
2011 ERASI 598376 dtd 20/4/2011 Flange Machining AGIP Khasagan Completed
2011 ERSAI 607995 dtd 21/5/2011 Gas Racks EN 12079 AGIP Khasagan Completed
2011 NABORS Machining Completed
2011 TCO / WORLEY PARSONS
R60002605-ME-POD-1010-001 dtd 3.06.2011
Product and Melter Tanks TCO SEP Completed
2011 KCOI / ROSSSETI KCOI-B-RFS-P-11-00004 dtd 21.06.2011
Gas Racks EN 12079 AGIP Khasagan Completed
2011 BUSACHI TRANSKURLYS
018-11-SVHI dtd 13/10/2011
Apparatus V=100m3 - 2NOS EP 25-2400-1-1 - 1NOS ГЭЭ 1-1-10 - 1NOS
Karshambasmunai Completed
Project Listing after Revival in November 2010 2 of 7
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing after Revival in November 2010
2011 WAGENBORG SVSC-10,13,16-011 dtd 27/07/2011
Helicopter landing structure AGIP Khasagan Completed
2011 Saipem 655798 dtd 21/10/2011 Boat Skips EN12079 AGIP Khasagan Completed
2011 Halliburton 9600041045 dtd 3/11/2011
90 m3 Tanks Refurbishment Completed
2011 ERSAI 661018 DTD 06/11/2011 Mooring Piles fabrication 35mm THK 900 tons
AGIP Khasagan Completed
2011 Saipem 667663 dtd 29/11/2011 Diesel Tanks AGIP Khasagan Completed
2012 Halliburton 4508871897 dtd 13/01/2012
Spreader Bar 25 tons Completed
Project Listing after Revival in November 2010 3 of 7
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing after Revival in November 2010
2012 AGIP KCO/ERSAI 695183 dtd 07/03/2012 ASME U2 Code stamp Repair incolloy UNS 8825
AGIP Khasagan Completed
2012 MAERSK D-PO-2355 dtd 02/04/2012
Pressure Vessels and Drain Tanks 9 units
Dunga In Progress
2012 MAERSK D-PO-1946 dtd 12/04/2012
Pressure Vessels Inspection & repair
Dunga Completed
2012 KSS -Kazstroy Service
KSS/CPC-PS-A/PRO/PIC-01-01/2012/04136/4135/4558 dtd 3/7/2012
Double walled drain tanks 100m3/75m3/40m3 - 15 units
Attyrau/ Tengiz Pump stations
In Progress
2012 KPO CAN-11/1911/BN dtd 26/04/2012
Heat Exchanger U Tube Bundles - ASME section VIII and TEMA R
Karchagnak Petroleum operating
Completed
2012 BUSACHI TRANSKURLYS
010/11-12-SVHI dtd 16/5/2012
200 m3 Buffer Tanks -2nos & 100m3 Seperator 1no
Karshambasmunai Completed
Project Listing after Revival in November 2010 4 of 7
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing after Revival in November 2010
2012 MAERSK D-PO-274 2 Stage Seperator supply + Site installation
Dunga Completed
2012 CW SINGAPORE 332/211/12 ASME "U" Stamped vessels 3 units
SOCAR Baku Completed
2012 MECHSTROY PDD 144-2012 Air receivers 3 units Bitumen plant Aktau Completed
2012 Saipem 752664 ASME U STAMP SS 316 L Vessels reapair 8 units . With NB "R" stamp
AGIP Khasagan Completed
2012 Worley Parsons PWKM02A Pressure Vessels 9 units ASME SEC Viii dIv1
AGIP Eskene West In Progress
2012 CW SINGAPORE 467/211/12 Piperacks offshore 200 Tons SOCAR Baku In Progress
Project Listing after Revival in November 2010 5 of 7
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing after Revival in November 2010
2012 CW SINGAPORE 472/211/12 Gas train pipe spools Carbon steel /stainless steels over 40000 inch dia
SOCAR Baku In Progress
2012 Sclumberger DKZ400187A/188A DNV/EN12079 CONTAINERS 2 units
In Progress
2012 CW SINGAPORE 526/560/211/12 Diesel & Glycol tanks - 2 units SOCAR Baku In Progress
2012 C&BI 794793 API 620 Tank components including Foam & deluge piping ,PWHT - 2 units
TCO Tengiz In Progress
2013 KSS -Kazstroy Service
113-02-007 Diesel & Dump TANKS - 4 units
Bienieu Shymkent Gas pipeline
In Progress
2013 TCO / IMTECH 13/MT-WRF-0004 Shop built tanks SS & CS 4 units
TCO WRF In Progress
Project Listing after Revival in November 2010 6 of 7
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing after Revival in November 2010
2013 BUSACHI OPERATING
PC13/264/00/E Drain tanks with pumps 100m3,12.5m3 & 8m3 - 5 units
Busachi oil field In Progress
Project Listing after Revival in November 2010 7 of 7
Year Client PO Number Item Description Project Status
Buffer tank 200(м3)
Flare gas seperator ГСФ-0,6-1400-2 V=11м3
ЕП-63-3000-2-2 with valume 63м³
2006 Karazhanbasmunai JSC
Additional Agreement №02 (455/1) to Agreement №80 from March,28 / 2006
Horizontal reserve pit ОГ-200м³
Completed
Buffer tank 200(м3)
Gauze gas seperator 11(м3)
ЕП-63(м3)
2007 Aktautermneft LLP №02-01(07) Surface Preperation and painting works
Completed
2007 Teploservice LLP №10-01(07) Shells / bridges Completed
Buffer tank 200(м3)
Gauze gas seperator11(м3)
ЕП-62(м3)
Sewon Vertex - Project Listing before Revival in November 2010
Additional Agreement №04 (36/1) to Agreement №80 from March,28 / 2006
Completed
2006 Karazhanbasmunai JSC
Additional Agreement №05 (274/1) to Agreement №80 from March, 28 / 2006 from 20.07.2007
Karazhanbasmunai JSC
2007 Completed
Completed
2006 Karazhanbasmunai JSC
Project Listing before Revival in November 2010 1 of 4
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing before Revival in November 2010
Additional Agreement Completed2006 Karazhanbasmunai 2007 Prominvestcomplect LLP
Agreement №18-03(07)SVHI-ПИК from 14.03.2007
Tank for light-oil products V=5 м3
Completed
2007 KomMunai LLP Purchase order № KOM-PO-ALM-07-013 from 30.03.2007
Tank for potable water of st3, 40м3
Completed
2007 Munaigaskurilis LLP Agreement №20-03(07)SVHI-МГК-1 from 15.03.2007
Metallic tank V=15м³ Completed
2007 Tasbolat Oil Corporation LLP
Quotation from 16.05.2007
Fabrication of pipe bend D-89-6-R-100мм
Completed
Fabrication of УНТ-0,2
Fabrication of drain tank ЕП-63м³
Fabrication of drain tank ЕП-16м³
2007 OrionEnergoMontazh LLP
Agreement № 28/SV from 05.07.2007
Surface Preperation and painting works
Completed
Fabrication of foundation bolts М20 / M24
Fabrication of caps
2007 Aktautermneft LLP Surface Preperation and painting works
Completed
2007 OrionEnergoMontazh LLP
Agreement №29/SV from 05.07.2007
Completed2007 HazarMunai LLP Agreement № б/н from 02.07.2007
Completed
Project Listing before Revival in November 2010 2 of 4
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing before Revival in November 2010
Additional Agreement Completed2006 Karazhanbasmunai 2007 Arystan-1 Agreement №13-02(07)SVHI-АРН-1 from 08.02.2007
НГС-1-0,6-1200 Completed
2007 Kuli LLP Agreement №35/SV from 16.08.2007
Fabrication of shells of steel sheets of 4 мм thickness, 7730*1500мм size, 2460мм
Completed
2007 Munaigaskurilis № 458-КС-100807 from 10.08.2007
Fabrication of metallic tank V=15м³
Completed
2007 HazarMunai LLP Additional Agreement №1 to Agreement б/н from 02.07.2007 from 02.09.2007
Tank V=15м³ for sulfakone-130 storage
Completed
Fabrication of bridges ø1840х1620<1690Fabrication of shells ø2245 L-2000
2007 Prominvestcomplect LLP
Agreement №673/SVHI from 07/11/07
Fabrication of tank for potable water
Completed
2007 PM Lukas Kazakhstan Surface Preperation and painting works
Completed
Buffer reservoir-63м3
Drain tank-40м3
Tank of sand seperator-40м3
Reservoir of potable water-4,5м3
2007 Joint constructing corporation JSC
Agreement №42 from 07.11.07
Ref.АЛ/584 from 20.08.2007 to Agreement № 10-01(07) SVHI-ТС from 24.01.2007
Teploservice LLP2007 Completed
Completed
Project Listing before Revival in November 2010 3 of 4
Year Client PO Number Item Description Project Status
Sewon Vertex - Project Listing before Revival in November 2010
Additional Agreement Completed2006 Karazhanbasmunai 2007 Energostroi-MGK LLP Ring of channel 12mm Completed
2007 OSK-West LLP Anchor bolt М20х800 / М12х400
Completed
2008 Karazhanbasmunai JSC
Add. agreement №06 (274/1) to Agreement №80 from March,28 /
ЕП-63-3000-2-2 of 63м³ volume
Completed
Flare seperator with low pressure of 12м³ volume
Flare seperator with high pressure of 12м³ volume
Drain reservoir with drain pump -63м3 Tank with pump diesel fuel storage-40м3Reservoir for fuel storage-3м3
Fabrication of tank
Supports for reservoir of drilling mud of 100м³ volume
Mixing reservoirs of 80м³ volume
Completed
Completed№ LKZ-203-P-040-SVI-07 from 05.02.08
PM Lucas Kazakhstan
CompletedHAL-1017-08 from 01.02.08
Halliburton2008
PM Lucas Kazakhstan2008 № LKZ-203-P-029-SVI-07 from 05.02.08
2008
Project Listing before Revival in November 2010 4 of 4
Project Services - Experience List Engineering
Year Client PO Number Description Project Status
2008 Petro Gas, Dubai GV/JCE/001/2008dated 25-Sep-09
Design Detail Engineering serevioces Crude production of 100,000bpd
New Processing and Storage Facility Expansion Project Phase
II - Dragon Oil Turkmenistan, CPF2
Completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
Pre bid Engineering Pre bid Engineering of Detailed engineering services for 2 x 41 MW
NATURAL GAS BASED POWER PLANT for AGIP trench-3, Karabatan, Kazakhstan
for Tender submission to AGIP by Montazh SpetsStroy.
Trench-3 - 2 x 41 MW NATURAL GAS BASED POWER PLANT AT
KARABATAN, KAZAKHSTAN, FOR AGIP KCO
Completed
2009 Petro Gas, Dubai GV/JCE/001/2008 Amendment-1Dated 12- August-09
Design Detail Engineering serevioces Crude production of 100,000bpd
New Processing and Storage Facility Expansion Project Phase
II - Dragon Oil Turkmenistan, CPF2
Completed
2010 Petro Gas, Dubai GV/JCE/001/2008 Amendment-2 dated 20-March-10
Design Detail Engineering serevioces Crude production of 100,000bpd
New Processing and Storage Facility Expansion Project Phase
II - Dragon Oil Turkmenistan, CPF2
Completed
2010 ILK INSAAT, TAAHUT SANAYI VE TIC LTD STI,
ISTANBUL,TURKIYE
ILK-DPP-PO-008dated 10-Apr-10
Preparation of piping route starting from BV-1308 up to manifold , pipe support details and lay out, isometrics for road crossing and pie rack area, pipe stress calculation, pipe rack load calculation
EPIC FOR ONSHORE INTERCONNECTING PIPELINE
PROJECT - DRAGON OIL Turkmenistan
Completed
2010 ILK INSAAT, TAAHUT SANAYI VE TIC LTD STI,
ISTANBUL,TURKIYE
ILK-DPP-PO-009 dated 2-Jun-10
Design of the Pipe line from Manifold at CPF area to the tie-in near Balkanabad-
Hazar Road
EPIC FOR ONSHORE INTERCONNECTING PIPELINE
PROJECT - DRAGON OIL Turkmenistan
Completed
Experience List of Gateway Engineering and Project Management Group
Engineering 1 of 1
Project Services - Experience List Engineered Products
Year Client PO Number Item Description Project Status
2006 MontazhSpetsStroy, Almaty, Kazakhstan
2002/0973/P-166 dated 20th October 2006
Electric immersion heater for storage Tanks to stainless steel, LTCS and Monel
400 materials
AGIP KCO- Kashagan Field development Project
Completed
2006 MontazhSpetsStroy, Almaty, Kazakhstan
Service Order 2002/0973.E/НП-0092 to the Ctr. # 2002/0973.Е/П-
0073 dated 15.03.2006
Supply of prefabricated Nozzle materials( pipes, flanges, pipe fittings, Gaskets &
Fastners) for 21 nos. storage Tanks
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2006 MontazhSpetsStroy, Almaty, Kazakhstan
Supply of prefabricated internal & external materials materials for 21 nos.
storage Tanks
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2007 MontazhSpetsStroy, Almaty, Kazakhstan
2002/0973-E/P-0179/1 Supply of fire fighting equipments like Deluge foam skid, Hydrant mounted
monitors, water pumping monitor, water foam monitors and Hydrant cabinets
AGIP KCO- Kashagan Field development Project
Completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002-0973-E-P-0179 add. Agr.5
Supply of fire fighting equipments like Fire Equipment Cabinets, Foam Mixer,
Foam/Water Nozzle and Monitors Nozzle Pick-up tube
AGIP KCO- Kashagan Field development Project
Completed
2008 Petro Gas, Dubai TTE/GTE-TTE/001 Dated 26th November 2008
Supply of 2nos. Heater Treater with Skid New Processing and Storage Facility Expansion Project Phase
II - Dragon Oil Turkmenistan
Completed
2008 Petro Gas, Dubai PO-TTE/GT/001/2008 dated 01st December 2008
Amendment no#1
Supply of Skid mounted 3nos. Slug Catcher with pumps, 2nos. Skid Mounted
Scrubbers and 1no. Degassing Boot
New Processing and Storage Facility Expansion Project Phase
II - Dragon Oil Turkmenistan
Completed
2008 KazstroyService Almaty KSS/ZHM/GTU/SUB/2008/00203 DATED 10/10/08
Supply, Pre-commissioning/ commissioning & operator training of LPG Loading & Metering Station skid - 3nos.
Zhaikmunai Gas Treatment Plant Completed
Experience List of Gateway Engineering and Project Management Group
Engineered Products 1 of 4
Project Services - Experience List Engineered Products
Year Client PO Number Item Description Project Status
Experience List of Gateway Engineering and Project Management Group
2008 Petro Gas, Dubai PO-306/08/DOT-335 Supply of Pig Launchers, Pig Receivers to Size 30" x 36"-2nos, 20" x 24"-2nos,
18" x 22"-2nos
NPF TRUNKLINE AND TWO SUB-SEA PIPELINES –
CASPIAN SEA Dragon Oil Turkmenistan
Completed
2009 Petro Gas, Dubai PO-TTE/GT/001/2008 Dated 11th Febraury 2009 Amendment
no#2
Supply of 1no. Skid Mounted Knock Out Drum with Skid
New Processing and Storage Facility Expansion Project Phase
II - Dragon Oil Turkmenistan
Completed
2009 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002-0973-E/P-154 Dated dated Febraury'09
Supply of Condensate Drum with ASME "U" Stamp - 1no.
AGIP KCO- Kashagan Field development Project
Completed
2009 Zeromax, Uzbekistan ZM-GV 55 Supply of Pig Launchers, Pig Receivers to size 42" x 48", 600# - 6nos.
Uzbekistan-China Pipeline Project
Completed
2009 GMMOS, Kazakhstan PO 052/09 dated 17 November'09
Electric immersion heater for storage Tanks
AGIP KCO- Kashagan Field development Project
Completed
2009 GMMOS, Kazakhstan PO 052/09 dated 17 November'09
Electric immersion heater for storage Tanks
AGIP KCO- Kashagan Field development Project
Completed
2010 NCG Services Co Ltd. SSPL14_8-P-GATEWAY-018 Supply of Pig Launchers, Pig Receivers, Pig handling System, Jib Crane,Pig
Signaller, to size 8" x 600# - 2nos. And 14" x 600# - 2nos.
Subsea pipelines Project for Dragon Oil Turmenistan
Completed
2010 NCG Services Co Ltd. B1-P-GATEWAY-040 Supply of Pig Launchers and Receivers, Pig handling System, Jib Crane,Pig
Signaller to size 8" x 600#- 1no., 20" x 600# -1no., 18" x 600# - 1no.
EPIC Blocl-1 Project for Dragon Oil Turmenistan
Completed
2010 Petro Gas, Dubai PO#: 086/10/DOT-335 Dated 10th March'09
Pig handling System, Jib Crane,Pig Signaller to Size 30" x 36"-2nos, 20" x 24"-
2nos, 18" x 22"-2nos
New Processing and Storage Facility Expansion Project Phase
II - Dragon Oil Turkmenistan
Completed
Engineered Products 2 of 4
Project Services - Experience List Engineered Products
Year Client PO Number Item Description Project Status
Experience List of Gateway Engineering and Project Management Group
2010 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002-0973-E/P-397 add. Agr.20
Electric immersion heater for storage Tanks
AGIP KCO- Kashagan Field development Project
Completed
2010 Kazstroy Service Almaty KSS/KOA-A/CS/PIC-1/2010/00700
LPG/LMS Loading Arms with metering skid - 2nos
KOA CGTP-Alibekmola & GPU-Kozhasai
Completed
2010 Kazstroy Service Almaty KSS/KOA-A/CS/PIC-1/2010/00726
SNG Loading Arms - 1no. KOA CGTP-Alibekmola & GPU-Kozhasai
Completed
2010 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002-0973-E/P-397 add. Agr.22 dated 1st September'10
Condensate Dampening Pot (Compensator LP)
AGIP KCO- Kashagan Field development Project
Completed
2010 Peerless Europe LTD,UK 10/3185/PP/A 1 no. Vertical Gas Separator JSC Petro Kazkhstan, Kumkol Resources
Completed
2011 Saipem Kazakhstan Branch PO 573620 3nos. Baskets suitable for 16 Oxygen and 9 Propane Gas Cylinders BS
EN12079:2006 Certified for Offshore
AGIP KCO- Kashagan Field development Project
Completed
2011 Saipem Kazakhstan Branch PO 571358 20 nos.Baskets suitable for 12 Gas Cylinders BS EN12079:2006 Certified for
Offshore
AGIP KCO- Kashagan Field development Project
Completed
2011 Kazstroy Service Almaty KSS/KOA-K/CS/PIC-1/2011/00929
1no. 10m3 water tank Kazkh Oil Aktobe - Gas Treatment Plant at Kozhasai
Oilfield
In progress
2011 ER SAI Caspian Contractor LLC
PO 582216 Service for 50 nos.bending of Rectangular Hollow sections for reels to
Material S235JO
AGIP KCO- Kashagan Field development Project
Completed
2011 ER SAI Caspian Contractor LLC
PO 590557 Fabrication of INCOLOY 825 Strips AGIP KCO- Kashagan Field development Project -
Pre fabric. Work HUC AGIP
Completed
Engineered Products 3 of 4
Project Services - Experience List Engineered Products
Year Client PO Number Item Description Project Status
Experience List of Gateway Engineering and Project Management Group
2011 ER SAI Caspian Contractor LLC
PO 598376 Machining and concentric spiral serrations on Weldo & Socktweld Flange
34nos.
AGIP KCO- Kashagan Field development Project - Offshore Hook-Up Module Assembling
Completed
2011 Peerless Europe LTD,UK 11/3261/PP/A 4nos. Vertical Gas Filter Sarybulak Gas Fields Developement, East Kazakhstan
In progress
2011 ER SAI Caspian Contractor LLC, Kazakhstan
PO 607995 80 Baskets suitable for 16 Oxygen and 9 Propane Gas Cylinders BS
EN12079:2006 Certified for Offshore
AGIP KCO- Kashagan Field development Project - Hook-up
2011/2012 scope
In progress
2011 Worley Parsons,Kazakhstan R60002605-ME-POD-1010-001 REV0
1no. MELTER TANK and 1no. PRODUCT TANK
TCO Sulfur ExpAnsion project In progress
2011 NCG Services Co Ltd. CFT545A-P-GATEWAY-019 10" X 14" Pig Reciever 600# -2nos., Pig handling system Pig reciever - 2nos., 2 ton capacity Jib crane for Pig recievers-2nos., 2" pig signaller for pipe line-2nos
EPIC of Block-4 Riser Platform and future risers
In progress
Engineered Products 4 of 4
Project Services - Experience List Project suppliesYear Client PO Number Description Origin Project Status
2005 ERSAI caspian Contractors, Aktau
PO-000703-2004 Power Cables, cable Glands, Terminal Ferrule lugs
Greece & UK ERSAI fabrication yard upgrading project
Completed
2005 ERSAI caspian Contractors, Aktau
PO-000518-2004 Power Cables, Earthing cables,cable Glands, Terminal Ferrule lugs and cable
Trays
Japan, UK, Thialand ERSAI fabrication yard upgrading project
Completed
2005 ERSAI caspian Contractors, Aktau
PO-000518-2004 Power Cables, Earthing cables,cable Glands, Terminal Ferrule lugs and cable
Trays
Japan, UK, Thialand ERSAI fabrication yard upgrading project
Completed
2005 ERSAI caspian Contractors, Aktau
PO-000872-2004 Power Cables, Earthing cables, Cable Trays, EXE lightings, Plugs & Sockets
Italy, France, Germany
ERSAI fabrication yard upgrading project
Completed
2005 GMMOS Kazakhstan 360/05 rev.4 Supply of SA516Gr.60/70 plates Western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2005 GMMOS Kazakhstan 398/05 rev.3 Supply of pipes, pipe fittings, flanges, fastners and Gaskets
Western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2005 GMMOS Kazakhstan 515/05 Supply of pipes, pipe fittings, flanges, fastners and Gaskets
Eastern/Western European
Mud mixing Tanks for Haliburton Completed
2006 ERSAI caspian Contractors, Aktau
PO-000384-2006_PR-230 Supply of Inconel 825 and CuNi pipes Spain, UK, Italy WPS development for Kashagan project
Completed
2006 MontazhSpetsStroy, Almaty, Kazakhstan
Ctr. # 2002/0973.Е/П-0073 dated 15.03.2006 Supply of Scaffolding materails for Storage Tanks
Indian/ western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2006 GMMOS Kazakhstan Add. PO No.: 416,354/06 Supply of pipes, pipe fittings, flanges, fastners and Gaskets
Western European Origin
Petro gas FZE/Dragon oil, Turkmenistan
Completed
2006 GMMOS Kazakhstan 584/06 Supply of quick opening closures USA Petro gas FZE/Dragon oil, Turkmenistan
Completed
2006 GMMOS Kazakhstan 583/06 Supply of pig signaler UK Petro gas FZE/Dragon oil, Turkmenistan
Completed
2006 GMMOS Kazakhstan 201/06 Supply of square hollow profiles Eastern European Skips for offshore to ERSAI caspian Contractors, Aktau
Completed
2006 GMMOS Kazakhstan 202/06 Supply of square hollow profiles Russian Gas Racks for offshore to ERSAI caspian Contractors, Aktau,
Completed
2006 MontazhSpetsStroy, Almaty, Kazakhstan
No 2002/0973 – Е/П – 0143 DD: 20th October 2006
Supply of LTCS and Stainless steel pipe fittings( both butt weld and forged),
Flanges,Fastners and Gaskets for sour services and ordinary services
Indian/ western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
Experience List of Gateway Engineering and Project Management Group
Project Supplies 1 of 7
Project Services - Experience List Project suppliesYear Client PO Number Description Origin Project Status
Experience List of Gateway Engineering and Project Management Group
2006 MontazhSpetsStroy, Almaty, Kazakhstan
2002-0973.E/P-135 Supply of SAW pipes ( ~2000 tons, 15km) to diameter from 16" to 36" to material specification ASTM A671-CL13 & 22
Korea AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2007 MontazhSpetsStroy, Almaty, Kazakhstan
Contract #: 2002-0973. E/P-0164 DD: 8 January 2007
Supply Cathodic Protection materails and acessories
U.K. AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2007 GMMOS Kazakhstan 245/07 rev.1 Supply of structural profiles (Beams, channels, angles) & plates to material
S355NL/ML and S275J2+AR
Western European Origin
Platforms, Ladders and cable racks for ACP project of TCO at
Tengiz Oil Field
Completed
2007 MontazhSpetsStroy, Almaty, Kazakhstan
Supply structural profiles( beams, channels,Angles), plates to material
specification S55NL/ML grades
Western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2007 GMMOS Kazakhstan 262/07 rev. 2 Supply of structural profiles (Beams, channels, angles) & plates to material
S355NL/ML and S275J2+AR
Western European Origin
Platforms, Ladders and cable racks for ACP project of TCO at
Tengiz Oil Field
Completed
2007 GMMOS Kazakhstan 441/07 rev.1 Supply of structural profiles (Beams, channels, angles) & plates to material
S355NL/ML and S275J2+AR
Western European Origin
Platforms, Ladders and cable racks for ACP project of TCO at
Tengiz Oil Field
Completed
2007 MontazhSpetsStroy, Almaty, Kazakhstan
Supply structural profiles( Beams, channels,Angles), plates to material
specification S55NL/ML grades
Western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2007 MontazhSpetsStroy, Almaty, Kazakhstan
Supply structural profiles( Beams, channels,Angles), plates to material
specification S55NL/ML grades
Western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2007 MontazhSpetsStroy, Almaty, Kazakhstan
Add Arg. # 9 to the contract 2002/0973 З/П - 166 DD: 16 August 2007
Supply of spring hanger supports for piping;materials grade S355NL
Western European Origin
AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2007 GMMOS Kazakhstan 087/07 rev.2 Supply of structural profiles (Beams, channels, angles, plates to material
S355NL/ML and S275J2+AR
Western European Origin
Platforms, Ladders and cable racks for ACP project of TCO at
Tengiz Oil Field
Completed
2007 MontazhSpetsStroy, Almaty, Kazakhstan
Add Arg. # 4 to the contract 2002/0973 З/П - 166 Supply of spring hanger supports for piping;materials grade S355NL
U.K. AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
Project Supplies 2 of 7
Project Services - Experience List Project suppliesYear Client PO Number Description Origin Project Status
Experience List of Gateway Engineering and Project Management Group
2008 ERSAI caspian Contractors, Aktau
PO 338679 Supply of Pneumatic Fenders Indian Offshore Hook-up module assembling
Completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
Contract #: 2002-0973. EН/П-0612 DD: 17 April 2008
Supply of fabricated rectangular, annular grating panels, safegrid stair treads,
grating clips etc.
UAE AGIP KCO- Kashagan Field development Project -
expertimental programme project
Completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002/09733.E/P-0250 add agr2 Supply of special supports of pipelines UK AGIP KCO- Kashagan Field development Project
Completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002/09733.E/P-0220 add agr6 Supply of support materials for Pipes Western European Origin
AGIP KCO- Kashagan Field development Project
Completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002/0973.E/P-0179/1 add.agr.4 Supply of LTCS SA 333 Gr6 Seamless Pipes, SA350LF2 Flanges, SA 420 WPL6
butweld fittings, SA 350 LF2 forged fittings, SA320L7M/A194 bolts and nuts
Western European Origin
AGIP KCO- Kashagan Field development Project
Completed
2008 ERSAI caspian Contractors, Aktau
PO-372026 Supply of fittings, gate valves, and flanges Western European Origin
AGIP KCO- Kashagan Field development Project
Completed
2008 ERSAI caspian Contractors, Aktau
PO - 376381 Supply of SB444 UNS no.6625, SB423 UNS 8825, SA358 TP316/316L, SA312
TP 316/316L, CuNi 90/10 Pipes
UK, Italy AGIP KCO- Kashagan Field development Project
Completed
2008 Kerneu Limited Supply of Cables Greece KEGOC Electrical Sub stations Completed
2008 ERSAI caspian Contractors, Aktau
PO-377362 Supply of LTCS SA 333 Gr6 Seamless Pipes, SA350LF2 Flanges, SA 420 WPL6
butweld fittings, SA 350 LF2 forged fittings, SA320L7M/A194 bolts and nuts
Italy AGIP KCO- Kashagan Field development Project
Completed
2008 ERSAI caspian Contractors, Aktau
PO-387992 Supply of LTCS SA 333 Gr6 Seamless Pipes, Inconel 625 Oval ring Gaskets
Italy AGIP KCO- Kashagan Field development Project
Completed
2008 ERSAI caspian Contractors, Aktau
PO-390819 Supply of Seamless pipes, Flanges and butweld fittings to grade SS 316L, Duplex
SS S3180, Inconel 825 & 625
Italy, UK AGIP KCO- Kashagan Field development Project
Completed
2008 Akerkvaerner PO-AKCT-001-0049 Supply of Heaters UK AGIP KCO- Kashagan Field development Project
Completed
2008 Akerkvaerner PO-PAXV01-0008 Supply of Sandblasting adrasive garnet UAE AGIP KCO- Kashagan Field development Project
Completed
2008 Harcon GVFZC-2260-08 Supply of Structual Steel Materials European Union AGIP KCO- Kashagan Field development Project
Completed
2008 ERSAI caspian Contractors, Aktau
PO-392214 Supply of Seamless Pipes to material spec. CuNi90/10
European Union AGIP KCO- Kashagan Field development Project
Completed
2008 Worley Parsons PO-70006105-5031 Supply of Strainers UK AGIP KCO- Kashagan Field development Project
Completed
Project Supplies 3 of 7
Project Services - Experience List Project suppliesYear Client PO Number Description Origin Project Status
Experience List of Gateway Engineering and Project Management Group
2008 ERSAI caspian Contractors, Aktau
PO-396031 Supply of Seamless SS & Duplex Steel, Welded SS pipes to grade SS316L &
S31803
Italy AGIP KCO- Kashagan Field development Project
under execution
2008 ERSAI caspian Contractors, Aktau
PO-399104 Supply of Seamless SS, Duplex Steel & Incoloy Pipes to Grade S31803, S316L & 825, Welded pipes to grade 825, SS316L
European Union AGIP KCO- Kashagan Field development Project
completed
2008 ERSAI caspian Contractors, Aktau
PO-398688 Supply of LTCS SA 333 Gr6 Seamless Pipes, SA350LF2 Flanges, SA 420 WPL6
butweld fittings, SA 350 LF2 forged fittings,
Italy AGIP Kazakhstan NEW PIPERACKS
completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002/0973.E/P-179/1 add.agr.8 Supply of Cable Accessories European Union AGIP KCO- Kashagan Field development Project
completed
2008 ERSAI caspian Contractors, Aktau
PO-391601 Supply of Seamless Pipes to material spec. CuNi90/10, 625 and 825 & Welded
Pipes to 625 and 825
European Union AGIP KCO- Kashagan Field development Project
completed
2008 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002/0973/E.P-0179/1 add.arg.10 Supply of Valves with pressure regulator Western European Origin
AGIP KCO- Kashagan Field development Project
Completed
2008 ERSAI caspian Contractors, Aktau
PO-401386 Supply of Seamless LTCS Pipes to grade SA 333 Gr6 and LSAW pipes to Grade
ASTM A 671 CC60 for Sour Service
South Korean & Western European
Origin
AGIP KCO- Kashagan Field development Project
completed
2008 ERSAI caspian Contractors, Aktau
PO-402225 Supply of seamless and welded Butweld fittings to grade SA 420 WPL6 and forged
fittings to grade SA350 Gr LF2
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2008 ERSAI caspian Contractors, Aktau
PO-403492 Seamless Pipe to SA333Gr.6 Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2008 ERSAI caspian Contractors, Aktau
PO-406918 Supply of Seamless and welded Pipes to material incoloy 625 and 825
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2008 ERSAI caspian Contractors, Aktau
PO-405547 Supply of SS, Dulpex Steel, Incoloy & CuNi Seamless and welded Pipes &
fittings to material grade SS316L, S31803, 825 & 90/10
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2008 Petro Gas, Dubai PO-307/08/DOT-335 Supply of Ball Valves (various sizes 3/4" 800# to 24" 600# rating)
Indian Origin EPIC of CPSF Production facilities expansion Phase II-
Dragon Oil Turkmenistan
completed
2009 ERSAI caspian Contractors, Aktau
PO-412253 Supply of SS, CuNi Seamless and welded Pipes & fittings to material grade SS316L
& 90/10
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2009 ERSAI caspian Contractors, Aktau
PO-413238 LSAW pipes to Grade ASTM A 671 CC60 for Sour Service
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
Project Supplies 4 of 7
Project Services - Experience List Project suppliesYear Client PO Number Description Origin Project Status
Experience List of Gateway Engineering and Project Management Group
2009 MontazhSpetsStroy, Almaty, Kazakhstan
PO-2002/0973.E/P-0397 Supply of seamless and welded Butweld fittings to grade SA 420 WPL6 and forged
fittings to grade SA350 Gr LF2
UK, Italy,Austria, India AGIP KCO- Kashagan Field development Project -
expertimental programme project
completed
2009 ERSAI caspian Contractors, Aktau
PO-414378 Supply of SS, Duplex Steel & Incoloy Pipes to grade 316L, 825, S31803
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2009 ERSAI caspian Contractors, Aktau
PO-414213 Supply of LTCS + CuNi Weld Overlay Flanges, CuNi Butweld & Forged Fittings
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2009 ERSAI caspian Contractors, Aktau
PO-414214 Supply of LTCS SA 420 WPL6 Buttweld Fittings
Western European Origin
AGIP KCO- Kashagan Field development Project
completed
2009 Petro Gas, Dubai PO-067/09 Supply of Ball Valves (various sizes 4" 600# to 30" 600# rating)
Indian & Western European Origin
EPIC for new 30” BLOCK 2 - NPF trunk line and two sub-sea
pipelines-Dragon Oil Turkmenistan
completed
2009 Petro Gas, Dubai PO#: 067,218,364/09/DOT-342 Supply of gate, globe, check, needle, shut down, ball valves
Indian & Western European Origin
CFT/45/07/342 completed
2009 Worley Parsons PO 80008207-5037 Supply of stud bolts UK TCO Sulfur Expension project Completed2009 KSS KSS/PLK/Pipe;ine/2007/A10/PROC/01616 Supply of pipes, plates, bars, bolts, nuts Russian Kashagan east field
development experimental programme
Completed
2009 Altai Ken Baytu PO #0035 Supply spares for Flygt Pump BS 2151.011
Sweden Supply material for water pump Completed
2010 Altai Ken Baytu PO#116 Supply spares for Flygt Pump BS 2151.011
Sweden Supply material for water pump Completed
2010 Danfon Communication, Almaty
FZC-10-D311 Supply of Electrical Cables Greece Metropolitan, Almaty completed
2010 Saipem Kazakhstan Branch PO 536446 Supply of Electrical Cable Glands c/w accessories
UK AGIP KCO- Kashagan Field development Project
completed
2010 Saipem Kazakhstan Branch PO 549924 Supply of Electrical Cable Glands c/w accessories
UK AGIP KCO- Kashagan Field development Project
completed
2010 Petro Gas, Dubai PO 445/10 Supply of Ball Valves Spain Dragon Oil (Turkmenistan), Project: CFT/45/07/335
completed
2010 Petro Gas, Dubai PO 444/10 Supply of Ball Valves India Dragon Oil (Turkmenistan), Project: CFT/45/07/335
completed
2010 Petro Gas, Dubai PO 446/10 Supply of Weldolets UK Dragon Oil (Turkmenistan), Project: CFT/45/07/335
completed
2010 Petro Gas, Dubai PO#709/10/DOT-335 Ball Valve UK Dragon Oil (Turkmenistan), Project: CFT/45/07/335
completed
2010 KIOS L170/10 Ridgit shoe pipe bender KZ Factory expansion completed
2010 ERSAI caspian Contractors, Aktau
PO 551262 PVC Coated,TBE Nipple,screwed U.A.E AGIP KCO -Kashagan Development Experimental
Programme
completed
Project Supplies 5 of 7
Project Services - Experience List Project suppliesYear Client PO Number Description Origin Project Status
Experience List of Gateway Engineering and Project Management Group
2010 Petro Gas, Dubai PO 448/10 Supply of Ball Valves France Dragon Oil (Turkmenistan), Project: CFT/45/07/335
completed
2010 KSS KSS/PLK/PROC/PIC-2/2010/01832 Supply of pipes, plates,bolt, nut, PFC Russian,Western European origin
AGIP KCO -Kashagan Development Experimental
Programme
Completed
2010 MontazhSpetsStroy, Almaty, Kazakhstan
Contract 2002/0973 E/P-0220 ADD. AGR 14 Supply of pipe suppots U.K AGIP KCO- Kashagan Field development Project
Completed
2010 MontazhSpetsStroy, Almaty, Kazakhstan
Contract 2002/0973 E/P-0220 ADD. AGR 5 Supply of pipe suppots U.K AGIP KCO- Kashagan Field development Project
Completed
2010 Bonatti Spa Kazakhstan OA/10000637 Union,reducer,coupling U.A.E Completed2010 MontazhSpetsStroy, Almaty,
KazakhstanContract 2002/0973 E/P-0220 ADD. AGR 24 Supply of fasteners (U- type bolts) U.A.E AGIP KCO- Kashagan Field
development ProjectCompleted
2010 MontazhSpetsStroy, Almaty, Kazakhstan
Contract 2002/0973 E/P-0220 ADD. AGR 26,29,30
Pipes, fittings, flanges and strainers. Italy, UK, UAE, AGIP KCO- Kashagan Field development Project
Completed
2010 Worley Parsons 60002605-PI-POD-5033-001 REV 1 Fittings: Split Tees & Split Crosses Italy TCO Sulfur Expension project Completed2010 Worley Parsons 60002605-PI-POD-5004-003 rev.0 Fittings: Split Tees & Split Crosses Italy TCO Sulfur Expension project Completed2010 Punj Lloyd Kazakhstan Russian,Western
European originAGIP KCO Completed
2010 ERSAI caspian Contractors, Aktau
PO 560306 Flanges U.A.E AGIP Kazakhstan service Completed
2010 Kazstroy Service Almaty KSS/ZHM-G/PROC/PIC-2/2010/02377 Electrical Materials (Adapter Reducers) UK Zhaikmunai Gas Plant Completed
2011 CCC HUPCCA-KAZ-0068-11 REV3 Beams, plates to S355G3+N, Bolts&Nuts to A320 Gr7&A194 Gr7 (S4)
Germany, UAE AGIP KCO- Kashagan Field development Project
Completed
2011 CCC HUPCCA-KAZ-0073-11 Fittings: Elbows SA420 GrWPL6 Sour, Galvanized Nipples SA333Gr6 and
Elbows SA350LF2, Unoin Pipes , Plugs; Cu-Ni Fittings: Elbows, Unoins, Tees
Austria, Italy, UK AGIP KCO- Kashagan Field development Project
Completed
2011 CCC HUPCCA-KAZ-0067-11 SS plates, caps, Bolts&Nuts, Threaded Rods, Pipes to A316L
Italy, Belgium, Spain AGIP KCO- Kashagan Field development Project
Completed
2011 North Caspian Service Company
PO 563773 Check Valves and Flanges The Netherlands,UK
AGIP KCO- Kashagan Field development Project
Completed
2011 Kazstroy Service Almaty KSS/KPO/PRO/PIC-2/OO-01-01/2011/03048 Insulating Gasket 12" UAE Karachaganak-Uralsk Gas Pipeline
Completed
2011 Kazstroy Service Almaty KSS/KOA-A/PRO/PIC-2/00-01-01/2011/03144 Shut Down valves China and Italy KOA CGTP-Alibekmola & GPU-Kozhasai
In progress
2011 Kazstroy Service Almaty KSS/KOA-A/PRO/PIC-2/00-01-01/2011/03100 Control valves, Self-regulating valves Canada, USA, UK KOA CGTP-Alibekmola & GPU-Kozhasai
In progress
Project Supplies 6 of 7
Project Services - Experience List Project suppliesYear Client PO Number Description Origin Project Status
Experience List of Gateway Engineering and Project Management Group
2011 ERSAI caspian Contractors, Aktau
PO 599106 Check Valves, Ball Valve & Gate Valves Italy, Japan Supply of Internal Piping Fuel Plan System
In progress
2011 Burren Resources Petroleum Limited
PO 2010/14805 Pipes, Ball Valve, flanges and Elbow. Italy,Japan.UK Water Injection materials- Balkanabat Turkmenistan
Completed
2011 Saipem Kazakhstan Branch PO 587360 Gate valve DN350 PN 4 66 25 Turkey Castoro 16 Completed
2011 Worley Parsons 60002605-PI-POD-5025-001 Rev1 Insulation (sections & accecories) Poland, UK TCO Sulfur Expension project Completed
2011 Worley Parsons 60002605-CI-POD-7029-001 Spring Tension Clip Tool UK TCO Sulfur Expension project Completed
2011 Worley Parsons 60002605-PI-POD-5062-001 Flanges and bolts UK TCO Sulfur Expension project Completed
2011 Worley Parsons 60002605-PI-POD-5061-001 Insulation (sections & accecories) Poland, UK TCO Sulfur Expension project In progress
2011 Worley Parsons R60002605-PI-POD-5050-001 Insulation (sections & accecories) Poland, UK TCO Sulfur Expension project In progress
2011 Worley Parsons 60002605-PI-POD-5066-001 Self drilling screw KZ TCO Sulfur Expension project Completed
2011 Worley Parsons 60002605-PI-POD-5068-001 Rev0 Screw pitch gauges USA TCO Sulfur Expension project In progress
2011 JV INKAI LLP PO#9680 Breather valve Spain In progress
2011 Altai Ken Baytu PO#65 Supply spares for Flygt Pump BS 2151.011
Sweden Supply materials for water pump In progress
2011 ERSAI caspian Contractors, Aktau PO#596625
Elbow,nipple,reducer Russia,Canmec UK AGIP KCO- Kashagan Field development Project
In progress
2011 ERSAI caspian Contractors, Aktau
PO#598811 Insulation kit U.A.E. AGIP KCO-TRB TEMPORARY REFUGE BARGE
In progress
2011 ERSAI caspian Contractors, Aktau
PO#597293 Y-Strainer flange UK Supply of Internal Piping Fuel Plan System
In progress
Project Supplies 7 of 7