[1] SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT OUTLINE 4/11/19 BACKGROUND This project is a renovation of Terminal 2 to provide additional office space to the terminal. The impact of the renovation is that it will reconfigure the area of the terminal where the three Mark Adams tapestries, Pond in Golden Gate Park; Garden in San Andreas Valley; Garden Outside Gate, and Cilindro Costruito, (1985; cast bronze) by Arnaldo Pomodoro, are located. ART OPPORTUNITIES Terminal 2 is a recently completed terminal and as such has a robust art program already in place. The new modifications do not provide opportunities for new artwork. However, the building changes do necessitate the relocation of the Adams tapestries and the Pomodoro sculpture. The relocation costs of the above artworks, including construction of a new base for the Pomodoro and building the new case for the tapestries, will be borne by the Airport as part of construction. Some of the Art Enrichment funds will be used for conservation of the above artworks when they are relocated. However, recommended use of the bulk of the art enrichment funds will be to reallocate them to another location. Recommended site is the SFO Hotel for the purchase of additional 2-D artwork. PROJECT GOAL Relocate the Adams tapestries and the Pomodoro sculpture in a new location where the artwork can be displayed well and where it has good public visibility. Use Art funds for another Airport site where additional art is needed. TOTAL ART ENRICHMENT: $360,000 Management fee: $72,000 Conservation: $36,000 Art: $252,000 PROPOSAL: 1. Re-install Mark Adams tapestries, Pond in Golden Gate Park; Garden in San Andreas Valley; Garden Outside Gate, on re-configured wall space in T2 Meet and Greet area. 2. Re-install Cilindro Costruito by Arnaldo Pomodoro in elevator lobby of T2 non-secure connector (Control Tower building) 3. Conserve T2 artworks as needed 4. Re-allocate Art funds to SFO Hotel for additional 2-D art purchases.
Transcript
Page 1: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

[1]

SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT OUTLINE 4/11/19 BACKGROUND This project is a renovation of Terminal 2 to provide additional office space to the terminal. The impact of the renovation is that it will reconfigure the area of the terminal where the three Mark Adams tapestries, Pond in Golden Gate Park; Garden in San Andreas Valley; Garden Outside Gate, and Cilindro Costruito, (1985; cast bronze) by Arnaldo Pomodoro, are located. ART OPPORTUNITIES Terminal 2 is a recently completed terminal and as such has a robust art program already in place. The new modifications do not provide opportunities for new artwork. However, the building changes do necessitate the relocation of the Adams tapestries and the Pomodoro sculpture. The relocation costs of the above artworks, including construction of a new base for the Pomodoro and building the new case for the tapestries, will be borne by the Airport as part of construction. Some of the Art Enrichment funds will be used for conservation of the above artworks when they are relocated. However, recommended use of the bulk of the art enrichment funds will be to reallocate them to another location. Recommended site is the SFO Hotel for the purchase of additional 2-D artwork. PROJECT GOAL Relocate the Adams tapestries and the Pomodoro sculpture in a new location where the artwork can be displayed well and where it has good public visibility. Use Art funds for another Airport site where additional art is needed. TOTAL ART ENRICHMENT: $360,000

• Management fee: $72,000 • Conservation: $36,000 • Art: $252,000

PROPOSAL:

1. Re-install Mark Adams tapestries, Pond in Golden Gate Park; Garden in San Andreas Valley; Garden Outside Gate, on re-configured wall space in T2 Meet and Greet area.

2. Re-install Cilindro Costruito by Arnaldo Pomodoro in elevator lobby of T2 non-secure connector (Control Tower building)

3. Conserve T2 artworks as needed 4. Re-allocate Art funds to SFO Hotel for additional 2-D art purchases.

Page 2: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL
Page 3: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL
Page 4: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL
Page 5: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSIONCONTRACT NO. 9034.66 - TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL AIRPORT

SAN FRANCISCO, CALIFORNIA

SIGN BLOCK

SFO Derrick Homer, Project Manager

Turner Brendan Crockett, Project Manager

Woods Bagot Carsten Voecker, Principal

AE3 Partners Douglas Davis, Principal

T2 BB POMODORO

RELOCATION SUBMITTAL

JANUARY 16, 2019

SFO T2 POMODORO SCULPTURE RELOCATION

Page 6: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

& ANDANGLE

@ ATCENTERLINE

° DEGREES (45 DEGREES)Ø DIAMETER OR ROUND# POUND OR NUMBER

PROPERTY LINE< LESS THAN> GREATER THAN

A/C AIR CONDITIONINGAB ANCHOR BOLTAC ASPHALTIC CONCRETEACOUS ACOUSTICALACT ACOUSTIC CEILING TILEAD AREA DRAINADA AMERICANS WITH DISABILITIES ACTADJ ADJUSTABLEAFF ABOVE FINISH FLOORAGGR AGGREGATEALUM ALUMINUMAPPROX APPROXIMATEARCH ARCHITECTURALASPH ASPHALTICAUTO AUTOMATICAVG AVERAGEAV ACOUSTICAL VENT

BD BOARDBITUM BITUMINOUSBLDG BUILDINGBLK BLOCKBLKG BLOCKINGBM BEAMBO BOTTOM OFBSMT BASEMENTB/T BETWEENBUR BUILT-UP ROOFBUWP BUILT-UP WATERPROOFING

CAB CABINETCB CATCH BASINCC CENTER TO CENTERCEM CEMENTCER CERAMICCG CORNER GUARDCI CAST IRONCIP CAST IN PLACECJ CONTROL JOINTCLG CEILING CLKG CAULKING CLO CLOSETCLR CLEARCNTR COUNTERCO CLEAN OUTCOL COLUMNCOMB COMBUSTIONCOMP COMPOSITIONCMU CONCRETE MASONRY UNITCONC CONCRETECONN CONNECTIONCONSTR CONSTRUCTIONCONT CONTINUOUSCORR CORRIDORCPT CARPETCS CASEMENT (WINDOW)CT CERAMIC TILECTR CENTERCTSK COUNTERSUNKCYL CYLINDER

(D) DEMOLISHD DEEPDBL DOUBLEDEPT DEPARTMENTDF DRINKING FOUNTAINDFPT DOUGLAS FIR PRESSURE TREATEDDH DOUBLE HUNG (WINDOW)DIA DIAMETER DIF DIFFUSER DIM DIMENSIONDIMP DIMENSION POINTDISP DISPOSALDN DOWNDO DOOR OPENINGDR DOORDS DOWNSPOUTDSP DRY STANDPIPEDET DETAILDW DISHWASHERDWG DRAWING

JST JOISTJT JOINT

KIT KITCHENKHB KEYED HOSE BIB

LAM LAMINATELAND LANDINGLAV LAVATORYLCC LEAD COATED COPPERLH LEFT HAND LP LOW POINTLT LIGHTLWT LIGHTWEIGHT

MAT MATERIALMAX MAXIMUMMB MACHINE BOLTMBL MARBLEMBX MAILBOXMC MEDICINE CABINETMD MEDIUM DENSITYMECH MECHANICAL MED MEDIUMMEMB MEMBRANEMET METAL OR METALLICMFR MANUFACTURERMH MANHOLEMIN MINIMUMMIR MIRRORMISC MISCELLANEOUSMO MASONRY OPENINGMTD MOUNTEDMUL MULLIONMW MICROWAVE

(N) NEWN NORTHNA NOT APPLICABLE NIC NOT IN CONTRACTNO NUMBERNOM NOMINALNR NON RATEDNTS NOT TO SCALEOBS OBSCURE (GLASS)OC ON CENTEROD OUTSIDE DIAMETEROFD OVERFLOW DRAINOPER OPERABLEOPG OPENINGOPP OPPOSITE

PC PIECE OR PRECASTPERP PERPENDICULAR PKT POCKET (DOOR)PL PLATE PLAM PLASTIC LAMINATEPLAS PLASTERPLYWD PLYWOODPNL PANELPOL POLISH(ED)POLY POLYETHYLENEPOS PER OWNER'S SELECTIONPR PAIRPRCST PRECASTPREFAB PREFABRICATEDPT POINTPTCL PARTICLEPTDIS PAPER TOWEL DISPENSERPTD PAINTEDPTN PARTITIONPTREC PAPER TOWEL RECEPTACLEPVC POLY VINYL CHLORIDE

QT QUARRY TILEQTY QUANTITYQUAL QUALITY

(R) RELOCATEDR RISER OR RADIUSRAD RADIUSRD ROOF DRAINREBAR REINFORCING BARREF REFERENCE REFL REFLECTED OR REFLECTIVEREFR REFRIGERATORREINF REINFORCEDREQ REQUIREDRET RETAININGREV REVISION OR REVISEDREVER REVERSED

ABBREVIATIONS

DWR DRAWER

(E) EXISTINGE EASTEA EACH EFOS EXTERIOR FACE OF STUDEJ EXPANSION JOINTEL ELEVATIONELEC ELECTRICALELEV ELEVATOREMER EMERGENCYENCL ENCLOSUREEO EDGE OFEP ELECTRICAL PANELEQ EQUALEQT EQUIPMENTEWC ELECTRICAL WATER COOLEREXH EXHAUSTEXP EXPANSIONEXPO EXPOSEDEXT EXTERIOR

F FIXED POSITION (WINDOW)FA FIRE ALARMFAU FORCED AIR UNITFD FLOOR DRAINFDN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOORFHC FIRE HOSE CABINETFHMS FLAT HEAD MACHINE SCREWFIN FINISHFIXT FIXTUREFL FLOORFLASH FLASHINGFLUOR FLUORESCENTFO FACE OFFOF FACE OF FINISHFOS FACE OF STUDFOT FACE OF TREADFPL FIREPLACEFPRF FIREPROOFFR FIRE RESISTIVEFRMG FRAMINGFRP FIBERGLASS REINFORCED POLYESTER PANELFS FULL SIZEFSK FLOOR SINKFT FEET OR FOOTFTG FOOTINGFURR FURRING

GA GAUGEGALV GALVANIZEDGB GRAB BARGEN GENERALGFRC GLASS FIBER REINFORCED CONCRETEGFRG GLASS FIBER REINFORCED (GYPSUM) PLASTER GFI GROUND FAULT INTERRUPTEDGI GALVANIZED IRONGLAZ GLAZINGGND GROUNDGR GRADEGRAN GRANITEGSM GALVANIZED SHEET METALGYP GYPSUMGWB GYPSUM WALL BOARD

H HIGHHB HOSE BIBHC HOLLOW COREHCP HANDICAPPED HD HEADHDWD HARDWOODHDWE HARDWAREHM HOLLOW METALHO HOPPER (WINDOW)HORZ HORIZONTALHP HIGH POINTHR HOURHT HEIGHTHVAC HEATING VENTING & AIR CONDITIONINGHWH HOT WATER HEATER

ID INSIDE DIAMETERINCAN INCANDESCENTINSUL INSULATIONINT INTERIOR

JAN JANITORJCT JUNCTION

RF RESILIENT FLOORINGRH RIGHT HAND RM ROOMRND ROUNDRO ROUGH OPENING RO ROUGH OPENING ROW RIGHT OF WAY RWD REDWOOD RWL RAIN WATER LEADER

S SOUTHS&P SHELF AND CLOTHES POLE SAD SEE ARCHITECTURAL DRAWINGS SC SOLID CORE SCD SEE CIVIL DRAWINGS SCHED SCHEDULE SCWD SOLID CORE WOOD DOOR SD SOAP DISH OR DISPENSER SEC SECTION SED SEE ELECTRICAL DRAWINGSSF SQUARE FEETSFPD SEE FIRE PROTECTION DRAWINGSSGD SLIDING GLASS DOOR SH SINGLE HUNG (WINDOW) SH SHELF SHR SHOWER SHT SHEET SHTG SHEATHING SIM SIMILARSLAD SEE LANDSCAPE DRAWINGSSLTD SEE LIGHTING DRAWINGS SMD SEE MECHANICAL DRAWINGS SMW SHEET METAL WATERPROOFING SND SANITARY NAPKIN DISPENSER SNR SANITARY NAPKIN RECEPTACLE SOG SLAB ON GRADE SP STANDPIPE SPEC SPECIFICATIONSPD SEE PLUMBING DRAWINGS SPO STANDPIPE OUTLET SPRM SINGLE PLY ROOF MEMBRANE SQ SQUARE SS STAINLESS STEELSSD SEE STRUCTURAL DRAWINGS STD STANDARD STL STEEL STN STAINLESS STOR STORAGE STRL STRUCTURAL SUPS SUSPENDEDSV SHEET VINYL SYM SYMMETRICAL

T TREAD T&B TOP AND BOTTOM T&G TONGUE AND GROOVE TB TOWEL BAR TC TRASH COMPACTOR TDIS TOWEL DISPENSER TEL TELEPHONE TEMP TEMPERED TEMPOR TEMPORARY TER TERRAZZO THK THICK THRSD THRESHOLD TO TOP OF TOW TOP OF WALL TPH TOILET PAPER HOLDER TRASH TRASH RECEPTACLE TS TUBE STEEL TYP TYPICAL

UL UNDERWRITERS LABORATORIES, INC.UNF UNFINISHED UON UNLESS OTHERWISE NOTED

W/ WITH W/D WASHER AND DRYER W WEST OR WIDE W/O WITHOUT WC WATER CLOSET WD WOOD WH WATER HEATER WO WHERE OCCURS WP WATERPROOF WPM WATERPROOFING MEMBRANE WR WATER RESISTANT WS WEATHERSTRIPPING WSCT WAINSCOT WSP WET STANDPIPE WT WEIGHT

VCT VINYL COMPOSITE TILE VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD

GRAPHIC SYMBOLS

1. THE CONTRACT DOCUMENTS INCLUDE THESE DRAWINGS, SPECIFICATIONS AND/OR PROJECT MANUAL, AND ANY OTHER DOCUMENTS PER AGREEMENT BETWEEN THE SFO AND THE CONTRACTOR FOR CONSTRUCTION.

2. THE CONTRACT DOCUMENTS CONTAIN INFORMATION THAT DESCRIBES THE DESIGN INTENT FOR THE SCOPE OF WORK. SUCH INFORMATION SHALL NOT BE CONSTRUED TO BE COMPREHENSIVE, EXHAUSTIVE, OR DESCRIBE ALL LABOR, MATERIALS AND ITEMS NECESSARY TO COMPLETE THE SCOPE OF WORK.

3. INTERNAL REFERENCING WITHIN THE CONTRACT DOCUMENTS IS FOR CONVENIENCE ONLY AND IS NOT INTENDED TO LIMIT THE APPLICATION OF ANY DRAWINGS OR DETAIL. DETAILS NOT SHOWN ARE SIMILAR TO THOSE DETAILED ELSEWHERE.

4. THE DRAWINGS ARE ORGANIZED INTO DISCIPLINES AND SECTIONS FOR CONVENIENCE; HOWEVER THIS IS NOT INTENDED TO CONTROL THE DIVISION OF WORK OR THE CONTRACTOR'S ORGANIZATION OF TRADES. THE CONTRACTOR IS FULLY RESPONSIBLE FOR REVIEWING THE WHOLE OF THE CONTRACT DOCUMENTS (DRAWINGS, SPECIFICATIONS (AND OTHER SUPPORTING DOCUMENTS) AND ENSURING THAT ALL TRADES ARE FULLY COORDINATED.

5. ALL WORK SHALL CONFORM WITH GOVERNING CODES AND ORDINANCES.

6. THIS PROJECT IS IN AN ACTIVE AIRPORT TERMINAL. TSA WILL REMAIN OPERATIONAL DURING CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE WITH THE SFO AND THE CBP TO MINIMIZE INTERFERENCE WITH OPERATIONS AND ALLOW FLIGHTS TO BE PROCESSED.

7. THE CONTRACTOR IS SOLELY AND COMPLETELY RESPONSIBLE FOR MEANS AND METHODS IN COMPLETING THE WORK, CONDITION OF THE JOBSITE, AND THE SAFETY OF ALL PERSONS / PROPERTY LOCATED WITHIN THE JOB SITE AND SCOPE OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL PERSONNEL WITHIN THE WORK AREA ARE PROTECTED FROM HAZARDOUS MATERIALS AND OTHER OCCUPATIONAL HAZARDS. SHOULD THE CONTRACTOR IDENTIFY OR DISCOVER ANY SUCH MATERIALS OR HAZARDS DURING ITS COURSE OF WORK THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE SFO.

8. THE CONTRACTOR, DURING ITS ENTIRE DURATION ON THE JOBSITE, IS RESPONSIBLE FOR PROTECTING ALL WORK, MATERIAL, EQUIPMENT, AND ALL PROPERTY FROM DIRT AND DAMAGE DURING THE COURSE OF CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL BUILDING SYSTEMS INCLUDING BUT NOT LIMITED TO HVAC, FIRE, SPRINKLER, TELEPHONE AND DATA SYSTEMS FROM DAMAGE, DUST AND DEBRIS DURING THE COURSE OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO SURFACES AND EXISTING BUILDING SYSTEMS / COMPONENTS TO THEIR ORIGINAL CONDITION.

9. THE CONTRACTOR SHALL ERECT SUITABLE BARRIERS (ALL CONSTRUCTION BARRIERS SHALL BE NON-COMBUSTIBLE) TO SEPARATE THE JOBSITE / WORK AREA FROM NONWORK AREAS AND PROVIDE APPROPRIATE TRAFFIC AND PEDESTRIAN CONTROLS TO ROUTE PERSONS AND TRAFFIC AROUND THE SITE. EXCEPT AS OTHERWISE PERMITTED BY THE SFO IN WRITING, THE CONTRACTOR SHALL KEEP THE GENERAL PUBLIC AND ALL NON-CONSTRUCTION PERSONNEL FROM THE WORK AREA. THE CONTRACTOR SHALL ENSURE THAT THE APPROPRIATE CODE REQUIRED EGRESS PATHS AND SIGNAGE ARE MAINTAINED FROM AND AROUND THE WORK AREA DURING THE DURATION OF CONSTRUCTION.

10. PRIOR TO COMMENCING WORK, THE CONTRACTOR, IN CONFERENCE WITH THE SFO AND FACILITIES MANAGEMENT, SHALL PREPARE A LIST OF ITS ACTIVITIES THAT WILL IN ANY WAY AFFECT THE NORMAL OPERATIONS OF THE BUILDING, SITE AND ADJACENT PROPERTIES. PROTECTIVE MEASURES AND SCHEDULING SHALL BE ESTABLISHED TO MINIMIZE DISRUPTION AND PROTECT PROPERTY NOT RELATED TO THIS PROJECT. PROVIDE THE SFO AND ARCHITECT WITH A COPY OF THE SCHEDULE AND DESCRIPTION OF PROTECTION FOR SFO APPROVAL, TWO WEEKS IN ADVANCE OF THE WORK. UPDATE THE SCHEDULE TO THE SFO DAILY.

11. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS FOR ACCURACY AND CONFIRMING THAT THE WORK IS BUILDABLE PRIOR TO PROCEEDING WITH ANY CONSTRUCTION. IF THE CONTRACTOR HAS ANY QUESTION OR ISSUES, THEY SHALL BE SUBMITTED IN WRITING AS A REQUEST FOR INFORMATION (RFI) TO OBTAIN CLARIFICATION FROM THE ARCHITECT BEFORE PROCEEDING WITH THE WORK FOR QUESTION. THE ARCHITECT AND SFO SHALL NOT CONSIDER CHANGE ORDERS OR ADDITIONAL CHARGES FOR THE CONTRACTORS FAILURE TO PROPERLY VERIFY FIELD DIMENSIONS AND EXISTING CONDITIONS PRIOR TO START OF WORK.

12. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL GOVERN.

13. THE CONTRACTOR SHALL PROMPTLY REPORT TO THE SFO ANY DISCREPANCIES FOUND BETWEEN EXISTING CONDITIONS IN THE FIELD, AND THOSE SHOWN ON THE DRAWINGS BY SUBMITTING A WRITTEN RFI TO THE ARCHITECT.

14. ALL MATERIALS, FIXTURES AND EQUIPMENT CALLED OUT IN THE DRAWING ARE NEW UNLESS OTHERWISE NOTED (U.O.N.) IN THE DRAWING SET.

15. ALL WALL DIMENSIONS ARE TO FACE-OF-FINISH UNLESS OTHERWISE NOTED.

16. CONTRACTOR SHALL ALWAYS PROVIDE FIRE STOP IN ALL WALLS, FURRED SPACES AND ABOVE-CEILING AREAS ETC. AS REQUIRED BY CODE AND SHALL PROVIDE APPROPRIATE SMOKE/FIRE DAMPERS AT DUCTWORK THAT CROSSES THROUGH RATED ASSEMBLIES.

17. COMPLIANCE WITH CHAPTER 33 OF THE CFC IS REQUIRED DURING ALL PHASES OF THE PROJECT.

18. CONTRACTOR SHALL OBTAIN A "HOT WORK" PERMIT FROM AIRPORT FIRE MARSHAL'S OFFICE FOR ALL HOT WORKS TO BE PERFORMED.

19. CONTRACTOR SHALL APPLY FOR A "PLACE OF ASSEMBLY" PERMIT AT THE AIRPORT FIRE MARSHAL'S OFFICE.

20. INSTALLATION OF NEW AND/ OR UPGRADED ELEVATOR SHALL BE IN COMPLIANCE WITH CALIFORNIA ELEVATOR CODE: CCR TITLE 8 AND THE ADOPTED NATIONAL ELEVATOR CODE- ASME A17.1.

GENERAL NOTES

SPONSORING AGENCY AND OWNER:

AIRPORT COMMISSIONSAN FRANCISCO INTERNATIONAL AIRPORTCITY & COUNTY OF SAN FRANCISCO

PROJECT MANAGEMENT:

NATHAN ENGLISHTURNER CONSTRUCTION300 FRANK H. OGAWA PLAZA, SUITE 510OAKLAND, CA [email protected]

ARCHITECTURE JOINT VENTURE:

KEVIN MOOREWOODS BAGOT228 GRANT AVE. 5TH FLOORSAN FRANCISCO, CA [email protected]

DOUG DAVISAE3 PARTNERS275 BATTERY STREET, SUITE 1050SAN FRANCISCO, CA [email protected]

STRUCTURAL ENGINEERING

ANINDYA DUTTASIMPSON, GUMPERTZ & HEGER100 PINE STREET, SUITE 1600SAN FRANCISCO, CA [email protected]

M/E/P/FP ENGINEERING:

RANDY MEYERSMEYERS+ ENGINEERS98 BATTERY STREET, SUITE 502SAN FRANCISCO, CA [email protected]

PROJECT DIRECTORY

VICINITY MAP

CO

NT

RA

CT

NO

.

PR

OJE

CT

TIT

LE

SH

EE

T T

ITLE

ARCHITECT / ENGINEER SEAL

SCALE DATE

Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited.

NOTE: If this drawing is not on 36" x 48", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable

Sheet Printed On:

SAN FRANCISCO INTERNATIONAL AIRPORT

TE

RM

INA

L 2

B

UIL

DB

AC

K P

RO

JE

CT

SA

N F

RA

NC

ISC

O I

NT

ER

NA

TIO

NA

L A

IRP

OR

T

90

34

Turner Construction75 Hawthorne, Floor 20San Francisco, CA 94105

Terminal 2

Woods Bagot AE3 JV228 Grant Ave, 5th FloorSan Francisco, CA 94108

C:\U

sers

\ravid

\Docu

men

ts\9

03

4_T

2_P

OM

OD

OR

O_S

_R

ELO

CA

TIO

N_

ravid

.rvt

As indicated

1/17/2019 11:40:11 AM

A00.0.01

GE

NE

RA

L N

OT

ES

,G

RA

PH

IC S

YM

BO

LS

,A

BB

RE

V. &

SH

EE

T I

ND

EX

01/16/2019

- ARCHITECTURAL -SHEET NUMBER SHEET NAME

A00.0.00 COVER SHEET

A00.0.01 GENERAL NOTES, GRAPHIC SYMBOLS, ABBREV. & SHEET INDEX

A02.1.03 OVERALL FLOOR PLAN

A08.1.01 DETAILS

- STRUCTURAL -SHEET NUMBER SHEET NAME

S08.1 POMODORO RELOCATION DETAILS

- ELECTRICAL -SHEET NUMBER SHEET NAME

E00.0.01 ELECTRICAL LEGEND, ABBREVIATIONS AND SHEET LIST

E08.1 ELECTRICAL

ISSUE DATE DESCRIPTION

Page 7: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

LOCATION OF RELOCATED POMODORO SCULPTURE

A08.1.01

5

CO

NT

RA

CT

NO

.

PR

OJE

CT

TIT

LE

SH

EE

T T

ITLE

ARCHITECT / ENGINEER SEAL

SCALE DATE

Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited.

NOTE: If this drawing is not on 36" x 48", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable

Sheet Printed On:

SAN FRANCISCO INTERNATIONAL AIRPORT

TE

RM

INA

L 2

B

UIL

DB

AC

K P

RO

JE

CT

SA

N F

RA

NC

ISC

O I

NT

ER

NA

TIO

NA

L A

IRP

OR

T

90

34

NORTH

Turner Construction75 Hawthorne, Floor 20San Francisco, CA 94105

Terminal 2

Woods Bagot AE3 JV228 Grant Ave, 5th FloorSan Francisco, CA 94108

C:\U

sers

\ravid

\Docu

men

ts\9

03

4_T

2_P

OM

OD

OR

O_S

_R

ELO

CA

TIO

N_

ravid

.rvt

1/16" = 1'-0"

1/17/2019 11:40:23 AM

A02.1.03

OV

ER

ALL

FL

OO

R P

LA

N

01/16/2019

NOTE:• NO CHANGES TO NUMBER OF OCCUPANTS OR BUILDING EGRESS PASSAGE.• NO CHANGES OUTSIDE SCULPTURE BASE (NO WALL, FLOOR OR CEILING CHANGES).

SCALE: 1/16" = 1'-0"1

OVERALL FLOOR PLAN - LOCATION OF RELOCATED POMODOROSCULPTURE

ISSUE DATE DESCRIPTION

Page 8: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

LOCATION OF RELOCATED POMODORO SCULPTURE

NOTE:• NO CHANGES TO NUMBER OF OCCUPANTS OR BUILDING EGRESS PASSAGE.• NO CHANGES OUTSIDE SCULPTURE BASE (NO WALL, FLOOR OR CEILING CHANGES).

AREA OF SCOPE OF WORK

5' -

0"

W 12X26, S.S.D.

2"

1' -

8 3

/8"

1"

(E) CONCRETE SLAB

(E) TERRAZZO

3"

1/4" RADIUS (TYP.)

1" PLATE, S.S.D.

(E) POMODORO SCULPTURE

MC 18X42.7, S.S.D.

W12X26, S.S.D.* 2X FURRING STRIPS

1/4" FRAMED STUD @ REAR OF CORIAN PANEL TO FIT IN 1/4" SLOT @ FLANGE 2" FROM ENDS AND MIDDLE OF PANEL

*ALL WOOD TO BE FIRE TREATED

3/8" OIL RUBBED BRONZE STAINLESS STEEL FLANGE / SEAT GUARD

1" CORIAN PANELS, TYP.

COUNTERSUNK LOCK SCREW

*POST STUB W/ NEOPRENE PAD MOUNT AT MID POINT OF SPAN

*FURRING STRIP W/ NEOPRENE PAD

"J" TRACK W/1/2" TRACK @ BOTTOM

POST CONNECTION TO SLAB, S.S.D

1/16" S.S. METAL FLANGE/ BASE

PLAN VIEW OF THE CORNER

2"

2"

(E) POMODORO BASE PLATE, S.S.D.

1/4" FRAMED STUD @ REAR OF CORIAN PANEL TO FIT IN 1/4" SLOT @ FLANGE 2" FROM ENDS AND MIDDLE OF PANEL

MAX.1/2"

CL

MAX.1/2"

1" PLYWOOD

4

A08.1.01

8' - 0"

4' -

0"

4' -

0"

8' -

0"

CL

CL

RELOCATED POMODORO SCULPTURE

POMODORO BASE

A08.1.01

4

RELOCATED POMODORO SCULPTURE

1' -

7 3

/8"

1"

1' -

8 3

/8"

2"

BASE REVEAL

3/8" STAINLESS STEEL FLANGE / SEAT GUARD

POMODORO BASE

MARLA GRAY S207

CO

NT

RA

CT

NO

.

PR

OJE

CT

TIT

LE

SH

EE

T T

ITLE

ARCHITECT / ENGINEER SEAL

SCALE DATE

Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited.

NOTE: If this drawing is not on 36" x 48", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable

Sheet Printed On:

SAN FRANCISCO INTERNATIONAL AIRPORT

TE

RM

INA

L 2

B

UIL

DB

AC

K P

RO

JE

CT

SA

N F

RA

NC

ISC

O I

NT

ER

NA

TIO

NA

L A

IRP

OR

T

90

34

Turner Construction75 Hawthorne, Floor 20San Francisco, CA 94105

Terminal 2

Woods Bagot AE3 JV228 Grant Ave, 5th FloorSan Francisco, CA 94108

C:\U

sers

\ravid

\Docu

men

ts\9

03

4_T

2_P

OM

OD

OR

O_S

_R

ELO

CA

TIO

N_

ravid

.rvt

As indicated

1/17/2019 11:40:28 AM

A08.1.01

DE

TA

ILS

01/16/2019

SCALE: 1/8" = 1'-0"5

FLOOR PLAN - LOCATION OF RELOCATED POMODORO SCULPTURE

SCALE: 3" = 1'-0"4

POMODORO DETAIL

SCALE: 1/2" = 1'-0"2

POMODORO-FLOOR PLAN

SCALE: 1/2" = 1'-0"3

POMODORO ELEVATION

SCALE: 3" = 1'-0"1

POMODORO FINISHES

ISSUE DATE DESCRIPTION

Page 9: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

2

3

CB.5 C.5

55.S

B

0205CORRIDOR

0227

NON-SECURECORRIDOR

A -F6 - S

A -F6 - S

A -F1 - S

A -F1 - S

0204A

ALIGN

S08.1

CO

NTR

AC

T N

O.

PR

OJE

CT

TITL

E

SH

EE

T TI

TLE

ARCHITECT / ENGINEER SEAL

SCALE DATE

Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Any reproduction, publication, oruse by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited.

NOTE: If this drawing is not on 36" x 48", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable

As Noted 12/21/2018

Sheet Printed On:

ISSUE DATE DESCRIPTION

SAN FRANCISCO INTERNATIONAL AIRPORT

TE

RM

INA

L 2

BU

ILD

BA

CK

PR

OJE

CT

SA

N F

RA

NC

ISC

O I

NT

ER

NA

TIO

NA

L A

IRP

OR

T

NOT FOR CONSTRUCTION

9034

Turner Construction75 Hawthorne, Floor 20San Francisco, CA 94105

Terminal 2

Woods Bagot AE3 JV228 Grant Ave, 5th FloorSan Francisco, CA 94108

SIMPSON GUMPERTZ & HEGEREngineering of Structuresand Building Enclosuresl

Simpson Gumpertz & Heger100 Pine Street, Suite 1600San Francisco, CA 94111

PO

MO

DO

RO

RE

LOC

ATI

ON

DE

TAIL

S

01/10/2019 ISSUED FOR PERMIT

AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
14
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
CONDITION WHERE BEAM & GIRDER ARE EQUAL IN DEPTH
AutoCAD SHX Text
k PER AISC
AutoCAD SHX Text
k PER AISC
AutoCAD SHX Text
BEAM, SEE PLAN
AutoCAD SHX Text
GIRDER, SEE PLAN
AutoCAD SHX Text
FOR SHEAR ~P & BOLTING, SEE
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
BEAM TO GIRDER
AutoCAD SHX Text
GRAVITY MOMENT CONNECTION
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
SFOT_S08.1_D02
AutoCAD SHX Text
SYMM. SYMM.
AutoCAD SHX Text
FOR WELD SEE
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
@ LOCATIONS W/ 2 ROWS OF BOLTS
AutoCAD SHX Text
T&B
AutoCAD SHX Text
d = BOLT DIAMETER
AutoCAD SHX Text
SHOWN THUS ON PLANS:
AutoCAD SHX Text
"A"
AutoCAD SHX Text
SCHEDULE OF BEAM CONNECTIONS
AutoCAD SHX Text
SINGLE SHEAR PLATE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
SFOT_S08.1_D03
AutoCAD SHX Text
NOTES: 1. SHORT SLOTTED HOLES ARE REQUIRED PER AISC 360-16 FOR BEAMS W24 AND LARGER. SHORT SLOTTED HOLES ARE REQUIRED PER AISC 360-16 FOR BEAMS W24 AND LARGER. 2. DESIGN STRENGTHS ARE BASED ON ASTM F3125 GRADE A325 BOLTS, WITH THREADS DESIGN STRENGTHS ARE BASED ON ASTM F3125 GRADE A325 BOLTS, WITH THREADS INCLUDED IN THE SHEAR PLANE. 3. DESIGN STRENGTHS ARE APPLICABLE FOR INDICATED BOLT DIAMETER AND GRADE 50 DESIGN STRENGTHS ARE APPLICABLE FOR INDICATED BOLT DIAMETER AND GRADE 50 PLATE MATERIAL. 4. DESIGN STRENGTHS ARE NOT APPLICABLE TO HSS CONNECTIONS.DESIGN STRENGTHS ARE NOT APPLICABLE TO HSS CONNECTIONS.
AutoCAD SHX Text
BEAM SIZE
AutoCAD SHX Text
BOLTS
AutoCAD SHX Text
WEB ~P THICK.
AutoCAD SHX Text
WELD SIZE
AutoCAD SHX Text
LFRD DESIGN STRENGTH
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DIA.
AutoCAD SHX Text
W8, W10, C8, C10
AutoCAD SHX Text
2
AutoCAD SHX Text
1"
AutoCAD SHX Text
38"
AutoCAD SHX Text
516"
AutoCAD SHX Text
44 KIPS
AutoCAD SHX Text
W12, W14, C12
AutoCAD SHX Text
3
AutoCAD SHX Text
1"
AutoCAD SHX Text
38"
AutoCAD SHX Text
516"
AutoCAD SHX Text
67.2 KIPS
AutoCAD SHX Text
W16
AutoCAD SHX Text
4
AutoCAD SHX Text
1"
AutoCAD SHX Text
38"
AutoCAD SHX Text
516"
AutoCAD SHX Text
87.8 KIPS
AutoCAD SHX Text
W18, W21
AutoCAD SHX Text
5
AutoCAD SHX Text
1"
AutoCAD SHX Text
38"
AutoCAD SHX Text
516"
AutoCAD SHX Text
108 KIPS
AutoCAD SHX Text
W24
AutoCAD SHX Text
6
AutoCAD SHX Text
1"
AutoCAD SHX Text
38"
AutoCAD SHX Text
516"
AutoCAD SHX Text
199 KIPS
AutoCAD SHX Text
W27
AutoCAD SHX Text
7
AutoCAD SHX Text
1"
AutoCAD SHX Text
12"
AutoCAD SHX Text
516"
AutoCAD SHX Text
227 KIPS
AutoCAD SHX Text
W30
AutoCAD SHX Text
8
AutoCAD SHX Text
1"
AutoCAD SHX Text
12"
AutoCAD SHX Text
516"
AutoCAD SHX Text
227 KIPS
AutoCAD SHX Text
W33, W36
AutoCAD SHX Text
9
AutoCAD SHX Text
1"
AutoCAD SHX Text
12"
AutoCAD SHX Text
38"
AutoCAD SHX Text
254 KIPS
AutoCAD SHX Text
PARTIAL PLAN
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text
S08.1 RELOCATION DETAILS
AutoCAD SHX Text
C
AutoCAD SHX Text
MC18x42.7
AutoCAD SHX Text
MC18x42.7
AutoCAD SHX Text
MC18x42.7
AutoCAD SHX Text
W12x26
AutoCAD SHX Text
W12x26
AutoCAD SHX Text
MC18x42.7
AutoCAD SHX Text
W12x26
AutoCAD SHX Text
~P 1x16" SQ.
AutoCAD SHX Text
(E) POMODORO BASE AND THREADED RODS
AutoCAD SHX Text
EDGE OF (E) POMODORO BASE
AutoCAD SHX Text
NOTE: S.A.D. FOR DIMENSIONS U.O.N.
AutoCAD SHX Text
4
AutoCAD SHX Text
-
AutoCAD SHX Text
TYP
AutoCAD SHX Text
5
AutoCAD SHX Text
-
AutoCAD SHX Text
14
AutoCAD SHX Text
-
AutoCAD SHX Text
TYP
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
SCALE: 1"=1'-0"
AutoCAD SHX Text
SFOT_S08.1_D04
AutoCAD SHX Text
MC18 BEAM PER PLAN
AutoCAD SHX Text
516
AutoCAD SHX Text
W12 BEAM PER PLAN
AutoCAD SHX Text
(E) CONC. SLAB
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
BOLTS, SEE
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
~<5x5x 38
AutoCAD SHX Text
W12 BEAM
AutoCAD SHX Text
(2) " ADHESIVE 58" ADHESIVEANCHOR W/ 4" EMBED
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
SCALE: 1 1/2"=1'-0"
AutoCAD SHX Text
SFOT_S08.1_D05
AutoCAD SHX Text
W12 BEAM PER PLAN, TYP.
AutoCAD SHX Text
BASE ~P 1" PER PLAN
AutoCAD SHX Text
(E) POMODORO SCULPTURE BASE~P AND THREADED RODS
AutoCAD SHX Text
MOMENT CONNECTION, SEE
AutoCAD SHX Text
2
AutoCAD SHX Text
-
AutoCAD SHX Text
TYP
AutoCAD SHX Text
516
AutoCAD SHX Text
BASE ~P TO W12 FLANGE, TYP
AutoCAD SHX Text
1" NON-SHRINK GROUT
AutoCAD SHX Text
LEVELING NUT AS REQ'D
AutoCAD SHX Text
(E)5/8" DIA. WELDED 5/8" DIA. WELDED DIA. WELDED THREADED RODS ON (E) SCULPTURE BASE PLATE. VERIFY BOLT SPACING IN FIELD
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
SCALE: 1"=1'-0"
AutoCAD SHX Text
SFOT_S08.1_D14
AutoCAD SHX Text
MC18 BEAM PER PLAN
AutoCAD SHX Text
516
AutoCAD SHX Text
MC18 BEAM PER PLAN
AutoCAD SHX Text
(E) CONC. SLAB
AutoCAD SHX Text
~<5x5x 38
AutoCAD SHX Text
58" ADHESIVEANCHOR W/ 4" EMBED
Page 10: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

ABBREVIATIONS LEGEND

LOW VOLTAGE SWITCH

MOMENTARY CONTACT SWITCH

SINGLE POLE SWITCH

DUPLEX RECEPTACLE SPLIT WIRED - 125V, 15A

DUPLEX RECEPTACLE - 125V, 15A E EMERGENCY POWER

2ND L PANELBOARD 120/208V H PANELBOARD 277/480V DL DISTRIBUTION PANEL 120/208V

DSL SWITCHBOARD 120/208V

BUS BUS DUCT

3RD 1 FLOOR LEVEL

EXAMPLE EPL-1WA-2,4,6

6TH 2,4,6 CIRCUIT NUMBERS

RECESSED FLUSH

STS

S I

SMC

OS

SLV

CLOCK STYLE RECEPTACLE - 125V, 15A

WIRED FURNITURE SYSTEM POWER CONNECTION

POWER PLUG STRIP LENGTH APPROXMATELY ASSHOWN

T

S K

PHOTOCELL

S F

S L

ELECTRICAL LEGEND AND ABBREVIATIONS

CEILING MOUNTED OCCUPANCY SENSOR

OCCUPANCY SENSOR SWITCH

DIMMER SWITCH

PILOT LIGHT SWITCH

ILLUMINATED HANDLE SWITCH

TIMER SWITCH

THREE WAY SWITCH

TELECOM OUTLET

SPECIAL PURPOSE RECEPTACLE RATING AS SHOWNOR SCHEDULED

TWIN DUPLEX RECEPTACLE - 125V, 15A

SIMPLEX RECEPTACLE - 125V, 15A

EQUIPMENT NAMING LEGEND1ST NONE NORMAL POWER

S LEGALLY REQUIRED STANDBY POWER O OPTIONAL STANDBY POWER U UPS POWER

DH DISTRIBUTION PANEL 277/480V

DSH SWITCHBOARD 277/480V MS MAIN SWITCHBOARD MCC MOTOR CONTROL CENTER PDU POWER DISTRIBUTION UNIT T TRANSFORMER ATS AUTOMATIC TRANSFER SWITCH

4TH W WEST, EAST, NORTH OR SOUTH

5TH A FIRST ON FLOORPOKE THROUGH RECESSED FLUSH

RAISED ACCESS FLOOR BOX

DEVICE KEY SIMILAR TO RECESSED FLUSH TYPE

S 3

S

S P

SD

SOS

PUSHBUTTON

BUZZER

BELL

B

B

POWER AND TELECOM PLUG STRIP LENGTHAPPROXIMATELY AS SHOWN

WIRED FURNITURE SYSTEM TELECOM CONNECTION

TELEVISION OUTLETTV

TRANSFER FAN SWITCH

KEY SWITCH

LINE INTERRUPTER SWITCH

PC

AMPERE RATING OF FUSE/SWITCH

A/V AUDIO/VISUAL

EXISTING TO REMAIN

EMT

ELEVATOR

FURNISHED BY OTHERS

FCC

G

GROUND FAULT INTERRUPTER

ISOLATED GROUND

NEW

NORMALLY CLOSED

RSC

SCC

UON UNLESS OTHERWISE NOTED

WP

EXISTING TO BE DEMOLISHED

WEATHERPROOF

EXPLOSION PROOF

MCP MOTOR CIRCUIT PROTECTOR

MIC MINERAL INSULATED CABLE

AMPERES

AFF ABOVE FINISHED FLOOR

AF/AS

AT/AF

BMS BUILDING MANAGEMENT SYSTEM

(E)

EC EMPTY CONDUIT

ELEV

ELECTRICAL METALLIC TUBING

FBO

FIRE CONTROL CENTER

GFI

GROUND

IG

(N)

NC

NO NORMALLY OPEN

NTS NOT TO SCALE

PVC POLYVINYL CHLORIDE CONDUIT

(R) RELOCATE EXISTING

RIGID STEEL CONDUIT

SECURITY CONTROL CENTER

TYP TYPICAL

V VOLTS

(X)

XP

C CONDUIT

ECC ENGINEERING CONTROL CENTER

RAC RIGID ALUMINUM CONDUIT

TEL TELECOMMUNICATIONS

A

POWER LEGENDELECTRICAL EQUIPMENT, SIZE APPROXIMATELY ASSHOWN. FRONT SHOWN DOUBLE LINE

TRANSFER SWITCH

GENERATOR

DISCONNECT SWITCH WITH FUSE

VARIABLE FREQUENCY DRIVE

MOTORIZED DOOR OR GRILLE CONTROLLER (FBO)

GROUND BUS CABINET

MOTOR CONNECTION

SPLICE BOX

FUSED SWITCH

DRAWOUT CIRCUIT BREAKER

NORMALLY CLOSED CONTACT

TELECOM BACKBOARD

EQUIPMENT TAGPOWER SOURCE

VFD

ST

M

M

AC-3L-1B1/20,22

SURFACE MOUNTED PANEL, SIZEAPPROXIMATELY AS SHOWN

DISCONNECT SWITCH

MOTOR STARTER

COMBINED MOTOR STARTER/DISCONNECT SWITCH

COMBINED VARIABLE FREQUENCYDRIVE/DISCONNECT SWITCH

MOTORIZED SHADE CONTROLLER (FBO)

FAN SPEED CONTROLLER (FBO)

PROJECTION SCREEN CONTROLLER (FBO)

THERMAL OVERLOAD/DISCONNECT SWITCH

POWER OFF SWITCH

GROUND ROD

JUNCTION BOX CEILING MOUNTED

PULL BOX

CIRCUIT BREAKER

DRAWOUT FUSED SWITCH

UTILITY METER WITH CT's

NORMALLY OPEN CONTACT

TB

RELAY WITH COIL DE-ENERGIZED

TRANSFORMER

J

VFD

SMD

SMS

SFS

SPS

PO

JUNCTION BOX WALL MOUNTED

G

RECESSED MOUNTED PANEL, SIZEAPPROXIMATELY AS SHOWN

BUS DUCT RISER WITH PLUG-IN UNIT

BUS DUCT

CABLE TAP BOXCTB

TRANSFORMER STEP DOWN TYPE

WIRING DEVICE LEGEND

PHASE CONDUCTORS

ISOLATED GROUNDING CONDUCTOR

CONDUIT HOMERUN

2 HOUR RATED CABLE IN CONDUIT

MINERAL INSULATED CABLE

TV

CONDUIT STUB WITH CAP

CONDUIT CONCEALED BELOW GRADE OREMBEDDED IN FLOOR SLAB

CONDUIT UP

T

TWIN DUPLEX RECEPTACLE - 125V, 15A

FLOOR BOX LEGEND

SPECIAL PURPOSE RECEPTACLE RATING AS INDICATED

WIRED FURNITURE SYSTEM TELECOM CONNECTION

COMBINED DUPLEX RECEPTACLE/TELECOM - 125V, 15A

GROUNDING CONDUCTOR

NEUTRAL CONDUCTOR

SECURITY SYSTEM RACEWAYS

2H

MI

GROUNDING SYSTEM RACEWAYG

FIRE ALARM SYSTEM RACEWAYFA

CABLE TELEVISION SYSTEM RACEWAY

CABLE TRAYCT

AUDIO/VISUAL SYSTEM RACEWAYAV

CONDUIT STUB WITH BUSHING

CONDUIT DOWN

CONDUIT CONCEALED WITHIN WALL OR CEILING SPACE

RACEWAY LEGEND

TELECOM SYSTEM RACEWAY

COMBINED DUPLEX RECEPTACLE ANDTELECOM - 125V, 15A

COMBINED TWIN DUPLEX RECEPTACLE ANDTELECOM OUTLET - 125V, 15A

TELECOM OUTLET

WIRED FURNITURE SYSTEM POWER CONNECTION

DEVICE KEY SIMILAR TO PEDESTAL TYPE

DUPLEX RECEPTACLE - 125V, 15A

DUPLEX RECEPTACLE - 125V, 20A

TWIN DUPLEX RECEPTACLES - 125V, 15A

COMBINED TWIN DUPLEX RECEPTACLE/TELECOM- 125V, 15A

TELECOM OUTLET

DUPLEX RECEPTACLE - 125V, 15A

CEILING MOUNTED LIGHTING FIXTURE

LIGHTING LEGEND

WALL MOUNTED LIGHTING FIXTURE

CEILING MOUNTED LIGHTING FIXTURESIZE APPROXIMATELY AS SHOWN

WALL MOUNTED LIGHTING FIXTURESIZE APPROXIMATELY AS SHOWN

LIGHTING FIXTURE CONNECTED TO EMERGENCYPOWER SYSTEM

CONTINUOUS ROW LIGHTING FIXTURE CEILINGMOUNTED

ADJUSTABLE OR WALL WASH LIGHTINGFIXTURE CEILING MOUNTED

POLE MOUNTED LIGHTING FIXTURE

aLIGHTING FIXTURE SUBSCRIPTSNUMBER INDICATES PANELBOARD CIRCUITLETTER INDICATES SWITCH/ZONE CONTROL

2

LIGHTING TRACK OR STRING WITH FIXTURES LENGTHAPPROXIMATELY AS SHOWN

WALL MOUNTED EXIT SIGN

CEILING MOUNTED EXIT SIGN

RECESSED WALL MOUNTED EXIT SIGNR

PENDENT MOUNTED EXIT SIGNP

LOW LEVEL EXIT SIGN RECESSED IN WALLL

(F) FUTURE

TELECOM MAIN GROUND BUSTMGB

F-1 LIGHTING FIXTURE TAG

AMPERE RATING OF CIRCUIT BREAKER TRIP/FRAME

VACUUM CIRCUIT BREAKER

C

P

VCB VACUUM CIRCUIT BREAKER

DUPLEX RECEPTACLE - 125V, 20ADUPLEX RECEPTACLE - 125V, 20A

ELECTRICAL LEGEND, ABBREVIATIONS, AND SHEET LIST

SHEET LISTE00.0.01

ELECTRICALE08.1

OS OCCUPANCY SENSOR WITH DIMMER SWITCH

DIRECT WIRING TO FURNITURE

ELECTRONIC METERINGEM

P B

S B

T F

G

MAIN GROUND BUSMGB

KIRK KEY INTERLOCKK

GFI

IG

WEATHERPROOFWP

ISOLATED GROUND

LOWER CASE LETTER INDICATES SWITCH CONTROLZONE

SUBSCRIPT KEY

2

AC ABOVE COUNTER

C CEILING MOUNTED

GROUND FAULT INTERRUPTER

a

NUMBER INDICATES BRANCH CIRCUIT NUMBER

INDICATES 50% OF POWER OUTLETS INDEVICE PERMANENTLY LABELED AS"CONTROLLED" AND CONNECTED TOCIRCUIT WITH AUTOMATIC SHUTOFF

=

INDICATES 100% OF POWER OUTLETS INDEVICE PERMANENTLY LABELED AS"CONTROLLED" AND CONNECTED TOCIRCUIT WITH AUTOMATIC SHUTOFF

=

FRE FREEZER

GD GARBAGE DISPOSAL

MW MICROWAVE

REF REFRIGERATOR

USB WITH DUAL USB CHARGING PORTS

FIRE ALARM LEGEND

SMOKE DETECTOR - DUCT MOUNTED

COMBINATION FIRE ALARM SPEAKER/VISUALALARM STROBE - CEILING MOUNTED

AREA SMOKE DETECTOR - CEILING MOUNTED

WATER OR SPRINKLER FLOW SWITCH

FAN CONTROL

FIRE/SMOKE DAMPER

SMOKE DAMPER

F

T

D

FSD

HEAT DETECTOR - CEILING MOUNTED

H

ELECTRIC DOOR LOCK

STAIRWELL EMERGENCY TELEPHONE

FIRE ALARM CONTROL PANEL

P

FACP

FIRE ALARM SATELLITE PANEL

FATC

FIRE ALARM REMOTE ANNUNCIATOR

FPSP

GSP GENERATOR STATUS PANEL

FSAE FIRE SERVICE ACCESS ELEVATOR STATUS PANEL

FIRE ALARM SPEAKER - WALL MOUNTED

FIRE ALARM SPEAKER - CEILING MOUNTED

VISUAL ALARM - CEILING MOUNTED

VISUAL ALARM - WALL MOUNTED

COMBINATION FIRE ALARM SPEAKER/VISUALALARM STROBE - WALL MOUNTED

TAMPER SWITCH

SPRINKLER VALVE TAMPER SWITCH

KITCHEN HOOD FIRE SUPPRESSION SYSTEM

DAMPER CONTROL

V

FV

S

S D

W

V

K

F

SD

F

V

FV

SMOKE DETECTOR - BEAM TYPES B

H

CLEAN AGENT FIRE SUPPRESSION SYSTEMC

MAGNETIC DOOR HOLDER

L

ELEVATOR LOBBY 2-WAY TELEPHONEE

FASP

FIRE ALARM TERMINAL CABINET

FARA

VOICE ALARM COMMUNICATION PANELVACP

VOICE ALARM SATELLITE PANELVASP

FAN/DAMPER CONTROL PANEL

FIRE PUMP STATUS PANEL

ESP ELEVATOR STATUS PANEL

FCP FIRE DEPARTMENT COMMUNICATION PANEL

FDCP

PS MANUAL PULL STATION

FIRE SERVICE ELEVATOR TEMPERATURE SENSORT

H

H

H

FIRE ALARM HORN - CEILING MOUNTED

COMBINATION FIRE ALARM HORN/VISUALALARM - WALL MOUNTED

FIRE ALARM HORN - WALL MOUNTED

RMC RESIDENTIAL METER CENTER

POKE THROUGH PEDESTAL

J

P:\2

016\

16.1

0007

.00-

SFI

A-T

2 D

emo\

CA

D\E

LEC

\SH

EE

TS -

PO

MO

DO

RO

\E00

-0-0

1 - E

LEC

TRIC

AL

LEG

EN

D A

BB

RE

VIA

TIO

NS

AN

D S

HE

ET

LIS

T.dw

g

1/11/2019 11:25:34 AM

01/14/2019

ISSUE DATE DESCRIPTION

CO

NTR

AC

T N

O.

PR

OJE

CT

TITL

E

SH

EE

T TI

TLE

ARCHITECT / ENGINEER SEAL

SCALE DATE

Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Anyreproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited.

NOTE: If this drawing is not on 36" x 48", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable

Sheet Printed On:

SAN FRANCISCO INTERNATIONAL AIRPORT

TE

RM

INA

L 2

BU

ILD

BA

CK

PR

OJE

CT

SA

N F

RA

NC

ISC

O IN

TE

RN

AT

ION

AL A

IRP

OR

T

9034

Turner Construction75 Hawthorne, Floor 20San Francisco, CA 94105

Terminal 2

Woods Bagot AE3 JV228 Grant Ave, 5th FloorSan Francisco, CA 94108

Meyers+ Engineers98 Battery St, Suite 502San Francisco, CA 94111

NTS

E00.0.01

ELE

CTR

ICA

L LE

GE

ND

,A

BB

RE

VIA

TIO

NS

, AN

DS

HE

ET

LIS

T

Page 11: SFO-TERMINAL 2 BUILDBACK PUBLIC ART PROJECT ......2019/04/17  · CITY AND COUNTY OF SAN FRANCISCO AIRPORT COMMISSION CONTRACT NO. 9034.66 -TERMINAL 2 BUILDBACK SAN FRANCISCO INTERNATIONAL

0204RECEPTION

SHAFT

0216

MEN'SRESTROOM

0211COMM

02ST04STAIR 4

0215JC

0207TELCO

0227

NON-SECURECORRIDOR

02ST01STAIR 1

0217ACORRIDOR

SHAFT

0201CORE LOBBY

0202SERVICE AREA

0208LOGISTICS

0205CORRIDOR

02ST02STAIR 2

02ST03STAIR 3

0203SERVICE AREA

02EL200ELEV 200

02EL201ELEV 201

0217BFAA STORAGE

CHASE

PLUMB CHASE

CHASE

0244STORAGE

0209

J J J

2 2 2

1

2

3

4

3.9

T1.F

T1.D

T1.E

3.2

C EA DB.5 C.5B

P:\2

016\

16.1

0007

.00-

SFI

A-T

2 D

emo\

CA

D\E

LEC

\SH

EE

TS -

PO

MO

DO

RO

\E08

-1 -

ELE

CTR

ICA

L.dw

g

1/15/2019 2:49:35 PM

01/14/2019

ISSUE DATE DESCRIPTION

CO

NTR

AC

T N

O.

PR

OJE

CT

TITL

E

SH

EE

T TI

TLE

ARCHITECT / ENGINEER SEAL

SCALE DATE

Copyright 2015 by the City and County of San Francisco. These construction documents are the sole property of the City and County of San Francisco and are protected by the Copyright Act. Anyreproduction, publication, or use by any method, in whole or in part, without the express written consent of the San Francisco Airport Commission is prohibited.

NOTE: If this drawing is not on 36" x 48", it has been revised from its original size. Scales as noted on drawings / details are no longer applicable

Sheet Printed On:

SAN FRANCISCO INTERNATIONAL AIRPORT

TE

RM

INA

L 2

BU

ILD

BA

CK

PR

OJE

CT

SA

N F

RA

NC

ISC

O IN

TE

RN

AT

ION

AL A

IRP

OR

T

9034

Turner Construction75 Hawthorne, Floor 20San Francisco, CA 94105

Terminal 2

Woods Bagot AE3 JV228 Grant Ave, 5th FloorSan Francisco, CA 94108

Meyers+ Engineers98 Battery St, Suite 502San Francisco, CA 94111

1/4" = 1'0"

E08.1

ELE

CTR

ICA

L

SCALE:LIGHTING PLAN - LOCATION OF RELOCATED POMODORO SCULPTURE

1/4" = 1'-0"1

NUMBERED NOTES:PROVIDE 3/4"C - 2#12 & 1#12 GROUND AND CONNECT TOEXISTING CIRCUIT SUPPLYING NEARBY EXISTING F12LIGHTING FIXTURES FROM PANEL T267-HD5-2-3.

PROVIDE JUNCTION BOX RECESSED INTO EXISTINGARCHITECTURAL BEAM COVER. PROVIDE NEW LIGHTFIXTURE AT EACH JUNCTION BOX, 277V - 66W. NEWFIXTURE SHALL BE SIMILAR TO EXISTING TYPE F12FIXTURE EXCEPT MONOPOINT TYPE MOUNTED TOJUNCTION BOX, AMERLUX CYLINDRIX C4TV-66-LED-277V.

1

2

GENERAL NOTES:A. VERIFY EXACT LOCATION OF LIGHTING FIXTURES WITH

ARCHITECT.

B. VERIFY LIGHT FIXTURE TYPE WITH LIGHTING CONSULTANT.