SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016
Transcript
Page 1: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

SFOBB West Span BPM PathFeasibility and Environmental Public Workshop

Pier 1 – Bayside RoomJanuary 20, 2016

Page 2: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

22

Welcome!

Page 3: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

33

Workshop Agenda

• Arrival (6:00)• Presentation (6:10-6:45)• General Q&A (6:45-7:00)• Feedback Stations (7:00-7:40)

o Project Process, Funding, and Environmentalo San Franciscoo Main Spano Yerba Buena Island (YBI)

• Station Reports (7:40-7:45)• Adjourn (7:45)

Page 4: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

44

Previous Studies

• Feasibility Study (2002) PSR-PDS (2014)

Page 5: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

55

Project Goals

• Downtown San Francisco bicycle & pedestrian link to East Bay & Treasure Island

• Facilitate and not hinder Caltrans maintenance access • Buildable and fundable alternative

InspiringApprovableAffordable

Page 6: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

66

• San Francisco touchdown ~2500 feet or ½ mile• Main Span 10,000 feet or ~ 2 miles• YBI touchdown and path ~ ½ mile

Profile to follow

Project Description

DowntownSan Francisco Main Span

Yerba Buena Island

Page 7: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

77

Project Benefits

• Transportation link from East Bay and Treasure Island to/from San Francisco.

• Connects to East Span Pathway (Bay Bridge Trail)• Tourism, health and recreation• Closure link for the Bay Trail• Class 1 - Protected from vehicular traffic • Accessible (ADA) – 5% or less continuous or 12H:1V

w/landings

Page 8: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

88

Workshop Goals

• Project information and process• Feedback on initial alternatives• How will you use the path?• Where should the path connect?• Features and Amenities• Suggestions or Concerns

Page 9: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

Pathway Options

Page 10: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1010

The Distance

Pathway SegmentsLength(miles) (mins) (mins)

BPM Pathway 2.9 17 57SF Approach 0.5Main Span (West) 2.0YBI Approach and Path 0.4

Bay Bridge Trail 4.4 26 88East Span 2.3Approach 1.1Emeryville(Shellmound) 1.0

Total Bay Bridge Trail & Pathway 7.3 44 145

• How far and how long?

Page 11: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1111

Pathway Section

Ohlone Greenway: El Cerrito

Page 12: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1212

Pathway Width

East Span 15½’ Golden Gate:10’ max

Tilikum Crossing 2 x 14’ Brooklyn 8’ to 16’

Page 13: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1313

Amenities

• Benches• Look Out• Lighting• Safety/ Call Boxes• Wayfinding• Interpretive Displays

Page 14: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

San Francisco Landing Options

Page 15: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1515SFOBB West Span BPM Path

• 19 Alternatives 6 Alternatives

• Touchdown locations range from Essex Street to The Embarcadero

• North and South bridge connections

Downtown SF ApproachesWhere should the path connect in San Francisco?

Page 16: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1616

Downtown SF North Approaches

SFOBB West Span BPM Path

• 3 Alternatives considered for further study1. Essex Street 2. Caltrans Paint Yard 3. The Embarcadero

1

2 3

Page 17: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1717

Downtown SF South Approaches

SFOBB West Span BPM Path

• 3 Alternatives considered for further study1. Beale Street2. Caltrans Paint Yard3. The Embarcadero

1 2 3

Page 18: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1818

Elevator Option • At Pier W1 – touchdown just

west of Embarcadero

• Elevator Only Option – no ramps

• Dual High Speed – high capacity

Page 19: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

1919

Essex Street Landing

Page 20: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2020

Paint Yard Landing

Page 21: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2121

Embarcadero Landing

Page 22: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2222

San Francisco Path OptionsCross-Sections

Stand-alone

Attach to Existing

On-deck

Page 23: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

Yerba Buena Island Options

Page 24: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2424

YBI Options

SFOBB West Span BPM Path

• Interface with ongoing projects

Page 25: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2525

YBI Options

SFOBB West Span BPM Path

• 6 major options

Page 26: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2626

YBI - East Bike/Ped Vista Point• Connection from East Span Trail• Vista Point w/bathrooms, water, bike racks, signage/info

SFOBB West Span BPM Path

Page 27: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2727

YBI – Below Hillcrest-1 • Cut or retained fill with some structures• Interference with Cost Guard Access

Retained Wall - Fill

Page 28: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2828

YBI – Below Hillcrest-2• Cut or retained fill with some structures• Steep terrain and slopes

Typical Viaduct

Retained Wall - Fill

Retained Wall - Cut

Page 29: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

2929

YBI – Above Hillcrest – N/S• Cut or retained fill above Hillcrest (to inside)• North option – use of west side ramps

SFOBB West Span BPM Path

Page 30: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3030

YBI – Suspended & Tunnel Options

SFOBB West Span BPM Path

• Tie-in to Main Span Suspended Option• Option to continue through crown of existing tunnel

Suspended Path at West Portal

Page 31: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

Main Span Options

Page 32: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3232

Main Span Alignments• North or South Options; similar alignments

• Suspended Elevated Deck Option

• Structural and architectural alternatives

Page 33: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3333

North or SouthDo you prefer the path on the north or south side of the bridge?

Page 34: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3434

Propped Cantilever Options

Page 35: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3535

Cantilever Beam w/Moment Connection

Page 36: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3636

Pinned Boomerang Deck

Extended Alternate

Page 37: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3737

Outboard Deck w/Existing Suspension Cable

Page 38: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3838

Deck Uplift w/stay cables

Tamar Bridge Path Addition

Page 39: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

3939

Suspended Elevated Deck

Page 40: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

4040

Suspended Elevated Deck

Page 41: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

4141

Project Timeline• Funding required to advance design and construction

Public Workshops

Current BPM Project Future Phases (Est. 8‐10 Years)2015 2016

Alternatives Screening

Conceptual Design

Preliminary Design

Environmental Studies

Final Design (PS&E)

Funding/Procurement

Construction 

Page 42: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

4242

Agenda – Q&A

• Arrival (6:00)• Presentation (6:10-6:45)• General Q&A (6:45-7:00)• Feedback Stations (7:00-7:40)

o Project Process and Environmentalo San Franciscoo Main Spano Yerba Buena Island (YBI)

• Station Reports (7:40-7:45)• Adjourn (7:45)

Page 43: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

4343

Breakout Stations

• Arrival (6:00)• Presentation (6:10-6:45)• General Q&A (6:45-7:00)• Feedback Stations (7:00-7:40)

o Project Process and Environmentalo San Franciscoo Main Spano Yerba Buena Island (YBI)

• Station Reports (7:40-7:45)• Adjourn (7:45)

Page 44: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

4444

Summary of Breakouts

• Project Overview and Planning• San Francisco Touchdown• Main Span• Yerba Buena Island

SFMain SpanYBI

Page 45: SFOBB West Span BPM Path 0120_SFOBB West Span... · SFOBB West Span BPM Path Feasibility and Environmental Public Workshop Pier 1 – Bayside Room January 20, 2016

4545

Next Steps

• Evaluate Feedback – inform design process• Conceptual design and initial cost estimates• 2nd Workshop – Fall 2016• Complete Environmental Studies• Final Design• Funding• Construction

SFOBB West Span BPM Path