Shangrao Sanqingshan Airport Project
Environmental Management Framework
Beijing Guohuan Tiandi Environmental Technology Development
Center Co., Ltd.
October 2012
E4056 V3
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Contents
I. Projects included in environmental management framework .................................. 3
II. Compilation basis ......................................................................................................... 4
2.1 The laws and regulations for environmental protection ............................................................ 4
2.2 Technical specifications of the environmental assessment........................................................ 5
III. Environmental management procedures ................................................................. 6
3.1 Project classification ................................................................................................................. 6
3.2 The preparation and requirements of environmental documents .............................................. 7
3.3 Public consultation and information disclosure ........................................................................ 8
3.4 Complaint mechanisms ............................................................................................................. 9
3.5 Audit and approval .................................................................................................................... 9
3.6 Supervision.............................................................................................................................. 10
3.7 Reporting ................................................................................................................................. 10
IV. Environmental impact recognition .......................................................................... 10
4.1. Recognition content of environmental impact ....................................................................... 10
4.2 Essential environmental problems recognition ....................................................................... 13
4.3 Selection of environmental assessment tools .......................................................................... 13
4.4 Requirements of selecting locations and routes ...................................................................... 14
V. Environmental management process and organization .......................................... 15
5.1 Environmental management process ....................................................................................... 15
5.2 Environmental management organization and responsibilities ............................................... 15
VI. Environmental management regulations ............................................................... 19
Appendix 1 Site checklist before construction into the site ......................................... 45
Appendix 2 Environment checklist of construction site .............................................. 46
Appendix 3 Environmental rectification notice ........................................................... 55
I. Projects included in environmental management framework
Shangrao airport projects include the airport, the access road and auxiliary works. At present, only
the airport has been determined and in the phase of the feasibility study. Other off-site associated
works are in the planning and design phase, so the specific facilities programs are not determined yet.
The project management agency has commissioned an advisory body to establish a framework of
environmental management.
The framework will provide project management agencies and relevant departments with
environmental management guidance to ensure that the environmental management shall be in line
with the Chinese government and local government policies and legal requirements, in line with the
environmental assessment policies and procedures provided by the World Bank environmental
assessment business policies / programs (OP/BP4.01). Environmental management framework
provides environmental management contents, procedures, and responsibilities of all parties.
Specific contents included in the environmental management framework are shown in Table 2-1-1.
Table 1 the project contents included in the environmental management framework
Content of the
project Project description Property
Off-site matching
projects of the
airport (airport
access roads and
matching pipeline
projects)
1. Building an access road of 4.65 km long
2. Laying an off-site water supply pipeline of 7.6 km long
(with the diameter of DN500).
3. Laying a gas supply pipeline of 5km long along the
access road.
4. Laying airport sewage pipeline of 10km long along the
access road.
Non-World
Bank Loan
Projects, still in
the planning and
design phase
and put into the
framework of
environmental
management
Off-site power
supply project
1. Building a 10KV electric transmission line from
Maojialing substation to the airport of 7.5km long.
2. Building a 10KV electric transmission line from
Zaotou substation to the airport of 8km long.
Non-World
Bank Loan
Projects, the
environmental
impacts and
measures are put
in the
framework of
environmental
management
Farmland
irrigation
compensation
According to the survey by Shangrao Hydraulic Design
Institute, two ponds to be occupied by the airport are the
source of water for irrigation of about 300 acres.
Compensation and rehabilitation measures need further study.
NBF, will be put
in the
framework of
environmental management
Relocation of the
electric
transmission lines
1. The line for rerouting the high-voltage wires of 110kv
Maozao line is about 15km.
2. The line for rerouting the high-voltage wires of 110kv
Wangzao line is about 12.8km.
Non-World
Bank Loan
Projects, the
framework of
environmental
management
Borrow pits and
disposal sites To be further determined in the detiailed design
Non-World
Bank Loan , the
framework of
environmental
management
II. Compilation basis
2.1 The laws and regulations for environmental protection
(1) Environmental Protection Law of the People’s Republic of China, December 26, 1989;
(2) Law of the People’s Republic of China on the Prevention and Control of Atmospheric Pollution,
April 29, 2000;
(3) Law of Water Pollution Prevention of PRC, June 1, 2008;
(4) Law of the People’s Republic of China on the Prevention and Control of Environmental Pollution
by Solid Waste, April 1, 2005;
(5) Law of the People’s Republic of China on Prevention and Control of Pollution from Environmental
Noise, March 1, 1997;
(6) Law of the People’s Republic of China on Environment Impact Assessment, September 1, 2003;
(7) Law of the People’s Republic of China on Water and Soil Conservation, March 1, 2011;
(8) The Law of Land Administration of the People’s Republic of China, January 1, 1999;
(9) Cleaner Production Promotion Law of the People’s Republic of China, June 29, 2002;
(10) Regulations on the Administration of Construction Project Environmental Protection (98) Decree
No. 253 of the State Council, November 29, 1998;
(11) List of Category Management of Environmental Impact Assessment for Construction Projects
(SEPA Order No. 2) put into effect on October 1, 2008;
(12) List of Category Management of Environmental Impact Assessment for Construction Projects
(SEPA Order No. 5), March 1, 2009;
(13) Comments on Strengthening the Ecological Protection, Environment and Development [1997] No.
785 by National Environmental Protection Agency, November 28, 1997;
(14) Notice on Strengthening Environmental Impact Assessment Management and Prevention of
Environmental Risks, the document of the State Environmental Protection Administration,
Environment and Development [2005] No. 152;
(15) State Council’s Decision on Implementing Scientific Development Concept to Enhance
Environmental Protection [2005] No. 39, December 3, 2005;
(16) Notice on Strengthening the International Financial Organization Loan Construction Project
Environmental Impact Assessment Management, the State Environmental Protection Administration,
the State Development Planning Commission, Ministry of Finance, People's Bank of China, June,
1993;
(17) The command of Ministry of Communications [1990] No. 17, Transportation Construction
Project Environmental Protection Management Practices, 1990;
(18) The document of Ministry of Communications Highway Transportation Development [2004] No.
164, Notice on Issuing Several Opinions on the Strictest Farmland Protection System in Highway
Construction, April 6, 2004.
2.2 Technical specifications of the environmental assessment
(1) HJ2.1-2012 Technical Guidelines for Environmental Impact Assessment General Provisions;
(2) HJ/T2.3-93 Technical Guidelines for Environmental Impact Assessment Surface Water
Environment;
(3) HJ2.4-2009 Technical Guidelines for Environmental Impact Assessment Sound Environment;
(4) HJ610-2011 Technical Guidelines for Environmental Impact Assessment Underground Water
Environment;
(5) HJ2.2-2008 Technical Guidelines for Environmental Impact Assessment Atmospheric Environment;
(6) HJ19-2011 Technical Guidelines for Environmental Impact Assessment- Ecological Impact;
(7) HJ/T87-2002 Technical Guidelines for Environmental Impact Assessment Constructional Project
of Civil Airport;
(8) HJ14-1996 Principle and Technical Methods for Regionalizing Ambient Air Quality Function;
(9) GB/T15190-94 Technical Specifications to Determinate the Suitable Areas for Environmental
Noise of Urban Area;
(10) February 14, 2006, the State Environmental Protection Administration (SEPA), the Environment
and Development, 2006 No. [28] Interim Measures for the Public Participation in Environmental
Impact Assessment;
(11) GB50433-2008 Technical Regulation on Water and Soil Conservation Plan of Development and
Construction Project;
(12) MH/T5105-2007 Surrounding Aircraft Noise Calculation and Prediction of Civil Airports;
(13) GB18218-2009 Identification of Major Hazard Installations for Dangerous Chemicals;
1.2.3 Safeguard policies of the World Bank
(1) Business policies of the World Bank- OP 4.01: Environmental Assessment
(2) Business policies of the World Bank- OP 4.12: Involuntary Resettlement
(3) Business policies of the World Bank- OP 4.11: Physical Cultural Resources
(4) Environmental, health, safety guidelines of the World Bank - EHS:
GENERAL EHS GUIDELINES: NTRODUCTION,
(5) Environmental, health, safety guidelines of the IFC - EHS: AIRPORTS
(6) Environmental, health, safety guidelines of the IFC - EHS: WASTEWATER AND AMBIENT
WATER QUALITY, water and health
(7) Environmental, health, safety guidelines of the IFC - EHS: ELECTRIC POWER
TRANSMISSION AND DISTRIBUTION
(8) Environmental, health, safety guidelines of the IFC - EHS: WASTE MANAGEMENT,
III. Environmental management procedures
Environmental management procedures of the off-site works include project preparation and 5 steps of
construction phase as well as 2 steps of implementation phase. Requirements and responsibilities of
each step are as follows:
A. Phases of project preparation and construction
1. Screening and classification of the off-site works
2. Preparation of all the environment documents
3. Public consultation (consultation of the public opinion and information disclosure)
4. Public grievance mechanism
5. Review and approval
B. Implementation phase
6. Supervision
7. Reporting
8. The requirements of the implementation progress of each project (some shall be completed
before the preparation of the airport project, such as farmland irrigation project and off-site
power supply project, etc. Implementation schedule requirements shall be listed for each project)
3.1 Project classification
The project contains seven projects in total, divided into two types of new construction and
reconstruction:
Type 1 New construction project
Project 1: New-built access road projects;
Project 2: New-built off-site water supply pipeline projects;
Project 3: New-built gas supply pipelines;
Project 4: New-built sewage lines;
Project 5: New-built Off-site power supply project
Project 6: Farmland irrigation compensation project
Type 2 Reconstruction project
Project 7: Relocation project of the electric transmission lines.
3.2 The preparation and requirements of environmental documents
The project borrower shall provide environmental documents and the relevant approval documents in
accordance with the requirements of the following table:
Table 1.1 Environmental documents
Project type Requirement of environmental documents*
Type 1 New construction project
Environmental assessment documents and
environmental management plans;
Environmental assessment documents have
been approved by the local environmental
protection agencies.
Type 2 Reconstruction project
For the requirements of the new line construction
Environmental assessment documents and
environmental management plans;
Environmental assessment documents have
been approved by the local environmental
protection agencies;
Environmental impact assessment document
This project borrower shall be responsible for the preparation of the environmental impact
assessment document. The project borrower should entrust the qualified and experienced
environmental impact assessment agencies approved by the environmental protection administration
department to carry out the environmental impact assessment and prepare environmental impact
assessment documents.
Environmental management plan
This project borrower shall be responsible for the preparation of the environmental management
plan. The environmental management plan shall include the environmental protection measures in the
project design, construction and implementation phases. These measures shall mitigate or compensate
the negative impacts of the activities on the environment and society, or reduce them to an acceptable
level at least.
3.3 Public consultation and information disclosure
The project borrower shall be responsible for public consultation according to the national and World
Bank's requirements. The primary responsibilities include: a) Issuing environmental documents; b)
Collection of public opinions and concerns; c) Recording important findings, summary, and
recommendation and feedback. The project borrower or its entrusted environmental impact assessment
organizations shall issue information announcement, disclose the environmental documents and
collect affected people’s opinions. Public consultation methods include questionnaires, seminars,
public meetings and others. The purpose of the public consultation is to collect the views of affected
residents on the project environmental impacts to determine the important environmental issues held
by the affected residents. Any important views in the public consultation will be included in the
environmental assessment documents.
Environmental management agencies or their hired consultant shall be responsible for reviewing the
records of public consultation, determining whether to provide feedback of comments and suggestions
from the public and giving full consideration in the preparation of the environmental documents.
Public consultation requirements of each project are as follows:
Table 1.2 Public consultation requirements
Project type Relevant requirements
Project 1: New-built access road Carry out the public consultation
Project 2: New-built off-site water supply
pipeline projects
Carry out the public consultation together with the
new access road projects
Project 3: New-built gas supply pipelines Carry out the public consultation together with the
new access road projects
Project 4: New-built sewage pipelines Carry out the public consultation together with the
new access road projects
Project 5: New-built off-site power supply
project Carry out the public consultation
Project 6: Farmland irrigation
compensation project Carry out the public consultation
Project 7: Relocation project of the electric
transmission lines Carry out the public consultation
Procedures and methods of the project information issuing and public consultation should be
formulated in accordance with the requirements of the national and World Bank’s public consultation
and information disclosure. The first round of public consultation and information disclosure shall
publish the project information, major environmental impacts and mitigation measures after the
completion of the environmental screening and before the completion of the draft environmental
documents in the affected areas, and collect the opinions and suggestions on environmental impacts of
the project by public meetings and feedback. The second round of public consultation and information
disclosure shall publish the full text of the environmental assessment documents after the completion
of the draft environmental documents in the affected areas, and collect the opinions and suggestions
on environmental impacts of the project by public meetings and feedback.
3.4 Public grievance mechanism
In order to continue to follow the public opinions during the project implementation, make the
information public and ensure the community involvement, the project borrower shall establish the
complaint mechanisms.
EIA documents should include a complaints mechanism to ensure a timely response to complaints of
all affected groups or individuals. The project borrower shall inform the affected groups or individuals
of the complaint channels in the public consultation. Complaint mechanisms shall include: (I)
Recording and reporting systems, including 2 forms of written and oral complaints; (II)) Person in
charge of handling complaints; (III) Time limits and procedures of dealing with complaints. The
complaint processes include: Groups or individuals suffering from adverse environmental impacts can
make a complaint directly to the project borrower in the oral or written form, and the sub-borrower
shall reply within the prescribed time limit after receiving the complaint. If the complainant is not
satisfied with the treatment results of the borrower, he can make complaint to the local environmental
protection administration agencies. If the complainant is still not satisfied with the results, he can take
legal action in the local People's Court.
3.5 Review and approval
Domestic review and approval: The borrower shall be responsible for the domestic approval of the
environmental documents. The borrower shall ensure simultaneously that the requirements of the
World Bank's related safeguard policies and guidelines and the procedures have been taken into
consideration in the preparation process of the environmental documents.
Review and approval of the World Bank: The World Bank will review environmental documents,
so as to ensure that the content of the environmental documents meet the domestic requirements, and
also comply with the requirements of the World Bank.
The implementation phase of the project: The borrower shall ensure the comprehensive effective
implementation of the environmental management plans, and shall invite the external environment
agency to monitor the environment according to the environmental management plans, and submit the
execution progress report of the environmental management plans.
3.6 Supervision
In the project implementation process, the World Bank will work jointly with the local environment
protection administration agencies and the project borrower to monitor the implementation of the
project, to ensure the implementation of the environmental management plan comply with the
requirements.
3.7 Reporting
During the project execution, the project borrower shall request the project construction superior to
report the implementation of the environmental management plan. The project construction superior
shall record the monitored results carefully according to the monitoring plan of the environmental
management plan, and at the same time confirm the correction or protective measures that must be
taken in the monitoring period. Progress reports submitted by the project construction superior shall
include the implementation of the environmental management plan (such as slow-down measures and
monitoring), whether there are significant environment problems as well as the solutions to the
corresponding problems. The project borrower shall submit the project implementation report about
the environmental management to the World Bank once every six months. The report includes 1) The
implementation of the environmental management plan, 2) The environmental problems occurred; 3)
The processing of environmental issues and the results.
IV. Environmental impact recognition
4.1. Recognition content of environmental impact
The projects included in this framework are mainly divided into the following categories: 1) Access
road projects, 2) Off-site pipeline projects, including water supply, gas supply and sewage pipelines, 3)
Off-site power supply and reconstruction of electric transmission lines, 4) Water replacement projects.
(1) Recognition of the access road project environmental impacts
Recognition of the access road project environmental impacts in the phases of construction and
operation is shown in Table 4-1-1.
Table 4-1-1 Recognition of access road project environmental impact factors
Phase Impact
activities
Ambient
air
Surface
water
Ground
water Sound Soil
Soil
and
water
losses
Vegetations Animal Scenery
Environmental
risks
Construction
period
Land
acquisition
and property
demolition
Earthworks
project
Subgrade and
pavement
projects
Bridge
engineering
Materials
transportation
Drainage
project
Construction
personnel
and vehicle
activities
Operation
period
Vehicle
traffic and
transportation
(2) Recognition of the off-site pipeline project environmental impacts
It includes off-site water supply, gas supply, and sewage pipeline projects. The environmental impacts
in the phases of the construction and operation are similar. The recognition of the environmental
impacts is shown in Table 4-1-2.
Table 4-1-2 Recognition of the off-site pipeline (water supply, gas supply, sewage pipelines) project environmental
impacts factors
Phase Impact activities Ambient
air
Surface
water
Ground
water Sound Soil
Soil
and
water
losses
Vegetations Animal Scenery
Environmental
Risks
Construction
period
Temporary land
occupation and
permanent land
occupation
Earthworks
project
Construction
personnel and
vehicle activities
Operation period Running of the
pipelines (gas
supply, sewage)
(3) Off-site power supply and electric transmission line reconstruction project environmental impact
identification
Recognition of the off-site power supply and electric transmission line reconstruction environmental
impacts in the phases of construction and operation is shown in Table 4-1-3.
Table 4-1-3 Recognition of the off-site power and electric transmission line reconstruction environmental impact
factors
Phase Impact
activities
Ambient
air
Surface
water
Ground
water Sound
Solid
waste Soil
Soil
and
water
losses
Vegetations Animal Scenery
Electromagnetic
radiation
Construction
period
Excavation
of lines and
tower
footing
Erection of
lines
Temporary
land
occupation
for
construction
Construction
personnel
and vehicle
activities
Operation
period
Electric
transmission
line
(4) Recognition of water replacement project environmental impacts
Recognition of water replacement project environmental impacts in the phases of construction and
operation is shown in Table 4-1-4.
Table 4-1-4 Recognition of water replacement project environmental impact factors
Phase Impact
activities
Ambient
air
Surface
water
Ground
water Sound Soil
Soil
and
water
losses
Vegetations Animal Scenery
Environmental
risks
Construction
period
Permanent
land
occupation
and
temporary
land
occupation
Construction
excavation,
filling
Materials
transportation
Drainage
project
Construction
personnel
and
machinery,
vehicle
activities
Operation
period
Running of
the
alternative
projects
4.2 Essential environmental problems recognition
(1) Recognition of sensitive areas
According to the field investigation, all the sites of the off-site projects and the areas along the line
determined in the framework do not involve nature reserves, national forest parks, national key
commonweal forests, scenic spots, nor involve the key cultural relic protection units at or above the
county level.
(2)Sensitive protect objective
After the determination of the project contents and lines, the field will be investigated in a detailed
way. Once an environmentally sensitive objective is detected, determine the environmental assessment
level in accordance with the national relevant requirements, and develop clear measures to reduce the
impacts.
4.3 Selection of environmental assessment tools
Determination of the environmental assessment tools for the projects included in the framework
should be in accordance with the requirements in Table 4-3-1.
Table 4-3-1 Determination of the environmental assessment tools
Serial
No. Project Name Property Environmental assessment tools Remark
1 Access road projects New-built
Need to carry out environmental impact
assessment
Provide environmental management plan
Need to be approved by the
environmental protection agencies
2 Off-site water supply
pipeline projects New-built
Need to carry out environmental impact
assessment
Provide environmental management plan
Need to be approved by the
environmental protection agencies
3 Off-site gas supply
pipeline projects New-built
Need to carry out environmental impact
assessment
Provide environmental management plan
Need to be approved by the
environmental protection agencies
4 Off-site sewage pipeline
project New-built
Need to carry out environmental impact
assessment
Provide environmental management plan
Need to be approved by the
environmental protection agencies
5 Off-site power supply
project New-built
Need to carry out environmental impact
assessment
Provide environmental management plan
Need to be approved by the
environmental protection agencies
6
Rerouting projects of the
original electric
transmission lines
reconstruction
Need to carry out environmental impact
assessment
Provide environmental management plan
Need to be approved by the
environmental protection agencies
7 Land acquisition and - Need to develop a resettlement actionplan
resettlement under the guidance of the RAF.
8 Farmland irrigation
compensation -
Need to carry out environmental impact
assessment for the construction of water
facilities
Provide environmental management plan
9 Borrow pits and disposal
sites -
If it is needed to set up, the environmental
impact assessment shall be included in each
project and carried out together.
4.4 Requirements of selecting locations and routes
(1) Requirements of selecting routes for the road projects
①In the phase of designing routes, the advanced methods shall be used to carry on deep and careful
studies to the route plan to determine the most feasible route plan on the basis of verification and
comparison of multi criteria.
② Routes shall be designed to make the project quantity the smallest, the construction cost low, the
operation expenses reduced, the benefit good, and bring advantages to the construction and the
maintenance under the conditions of ensuring traffic safety, comfort and speed. If the increase of the
work amount is not much, the higher technical specification shall be used as far as possible, and the
lower one shall not be used, also shall not pursue the higher specification one-sidedly.
③The route shall be selected to occupy less farmland, and shall not occupy the high-yield fields, the
economic crop fields or economic forests fields as far as possible (for example tea fields, orchards)
and the like.
④The route shall avoid occupying nature reserves, scenic spots, and historical sites, etc., and attention
shall be paid to coordinating with the surrounding environment and the landscapes, appropriate
consideration to the beauty, and the protection of the important historical relics.
⑤Project geology and hydrogeology shall be investigated in depth when selecting routes to identify
the extent of its impact on highway projects.
⑥To consider the roads and bridges comprehensively under the principle that large and medium-sized
bridge sites shall be subject to the general direction of the route and shall not extend the route
excessively just because of the bridge sites. The bridge sites shall be selected to locate on river reach
of being straight, steady water flow and good geology as far as possible, and pay attention to the
convenience for the public. Small bridges and culverts shall be located in line with the direction of the
route, but also shall take the reasonableness of the locations into account without reducing the route
technical specifications.
⑦ To use bridge and tunnel structures reasonably to reduce the destruction of the original terrain, so as
to protect the environment; take full advantage of the big gradient in mountainous terrain to digest the
waste by filling ditches, so as to dispose the waste.
(2) Route selection requirements of electric transmission line
① Line path is short, special crosses less, and hydrogeologic conditions good.
② In selecting and locating the routes, the tower site shall avoid steep slopes and poor geological
sections.
③ To occupy small areas, try to occupy less or no basic farmland, and reduce deforestation and
demolition.
④ Apply avoidance measures in the environment sensitive areas.
(3) Requirements of selecting soil excavating and depositing sites
Both the ecological impacts and transportation costs shall be taken into account in selecting the soil
excavating sites. The requirements are mainly as follows:
① To select the areas with relatively sparse vegetation distribution, or to avoid the woodlands,
avoiding the destruction of the original vegetation.
② It shall be away from the village settlements, in order to avoid the dust material impact on the
surrounding crowd generated by earthwork excavation and the transport of soil. Also, avoid occupying
farmlands.
③ The soil from the selected areas shall be consistent with the requirements of filling subgrade. Field
survey shall be done in advance to avoid blind and random excavation.
④ Groundwater of the selected areas shall not be too shallow, avoiding hard exploitation and
expanding exploitation areas.
⑤ Transportation is in good conditions in the selected areas, and the distance is moderate.
⑥ The selected soil excavating and depositing sites shall have an appropriate straight line distance
from the highway, so as not to affect the visual landscape effects.
V. Environmental management process and organization
5.1 Environmental management process
Project environmental management process is shown as Figure 5-1-1.
5.2 Environmental management organization and responsibilities
Project environmental management organization and responsibilities are shown as Table 5-2-1.
工程类型确定
道路工程(进场路)
机场办
管线工程(供水、供气、污水管线)
输电线路工程(供电,输电线
路改建)水源替代工程 拆迁安置
机场有限公司及有关部门、环境影响评价机构、咨询专家按表5-2-1执行
环保主管部门、世界银行审核、批准
机场有限公司、机场办、世界银行
监督和报告
Figure 5-1-1 Environmental management flow chart
Project type determination Airport Office
Implement according to Table 5-2-1
review and approval
Supervision and reporting
Airport Co., Ltd. and relevant departments, environmental impact assessment institution, and consultancy expert
Environmental protection
department, the World Bank
Airport Co., Ltd., Airport Office
and the World Bank
Land qcuisition and
resettlement Road project
(access road)
Pipeline project (water
supply, gas supply,
sewage pipeline)
Transmission line project (power supply, transmission line reconstruction)
Irrigation water
compensation
project
Table 5-2-1 Organization of environmental management and responsibilities
Organization of environmental
management
Responsibilities
Airport Office
The preparation phase of the project: 1) Under the assistance of consultancy expert or institution, determine each
engineering project type and environmental file requirements; 2) Examine and verify the environmental files submitted by
Airport Co., Ltd.; 3) Examine and verify the capacity of Airport Co., Ltd. to implement environmental management plan
effectively; 4) Make sure elimination contract clause covers corporate responsibilities to implement environmental
management plan; 5) Demand Airport Co., Ltd. to prepare and submit Environmental Due Diligence Report;
Engineering project implementation phase: 1) Under the assistance of industry experts and local environmental protection
bureau, supervise the implementation of Airport Co., Ltd. environmental management plan; 2) Report regularly the
implementation of environmental management plan to the World Bank.
Airport Co., Ltd.
The preparation phase of the project: 1) Under the cooperation of relevant government departments, take charge of the
planning ,design and implementation of each project, prepare environment file according to the requirements (e.g.
environmental assessment, environmental management plan, environmental due diligence report), and public participation
(public opinion consultation and information disclosure).
The implementation phase of the project: 1) Launch activity in accordance with approved environmental file, and assist in
project inspection and supervision; 2) Make sure the bidding document and relevant contracts contain the requirements of
environmental management plan; 3) Record monitoring results in accordance with the monitoring plan in the
environmental management plan, in the meanwhile confirm the corrective and preventive measures which are necessary
during the monitoring period, and record the results of similar activities which have already been launched in the prophase
reporting phase; 4) Submit progress report to project management organization and this report should include the
implementation of environmental management plan.
Environmental assessment
institution or consultancy experts
Commissioned by Airport Co., Ltd., prepare environmental impact assessment document(hereinafter referred to as “EIA
document”) and environmental management plan;
Assist Airport Co., Ltd. to implement environmental management plan.
The local administrative
department of environmental
protection
The preparation phase of the project: Approve environmental impact assessment document;
The implementation phase of the project: 1) Supervise the implementation status of environmental management plan
carried out by Airport Co., Ltd.; 2) Make sure the project enterprise follow “three at the same time” system and related
environmental policy during the process of replacing and transforming the devices; 3) Launch other routine work, such as
assist to deal with pollution accident and pollution disputes.
World Bank Check the project environment file and supervise the implementation status of environmental management plan.
VI. Environmental management procedure
For the project that included in the environmental management framework, formulate a set of
environmental management procedure to launch effective environmental management to the general
influence that appears in the working progress. In this procedure environmental management measure,
organization, environmental supervision procedure and requirements are included. For the sensitive
points appeared in the process of analyzing environmental impact and formulating abatement measure
according to the selected EIA tools, specific impact analysis and measures will be made.
Environmental management framework is shown in the table below.
Project Environmental impact mitigation measures Implemented
body
Supervisory
bodies
Monitoring
organization
Design phase
Implement environment
measures in the process of
working drawing design
and bidding documents
formation
(1) The building engineering project contractor is
asked to equip 1~2 site environmental engineers in
each construction site to take charge of the
implementation of environmental protection
measures during the whole construction period,
make sure the construction activities of the project
and every sub contractor (if there is one) meet all
the requirements of this procedure, and make sure
necessary environmental protection measures are
adopted during the construction progress.
(2) During the construction progress, the contractor
should communicate and negotiate with the public
in the project area, set up bulletin boards at the
entrance of every construction site and inform
public the specific construction activities and
construction time. Meantime provide the contact
person and contact number so that the public can
complain and advice the construction activities.
(3) Contractor should actively cooperate with the
environmental supervision unit that commissioned
by the owner to launch environmental supervision
work during the construction period.
(4)After the contractor signing the contract and
before starting working, the construction scheme
should include “site environmental management
plan”.
Pro
ject Office
Pro
ject office, o
wners, C
ity E
nviro
nm
ental P
rotectio
n B
ureau
and
Road
Tran
sport B
ureau
(5) Contractor must follow the relevant regulation
of the local safe and civilized construction.
(6) The building project contractor and construction
supervision unit are asked to have accepted relevant
environmental protection and management training
before starting working;
(7) As to serious environmental impact caused by
non-compliance of the environmental protection
measures that proposed in this environmental
protection code of practice, environmental
supervision and civil work contractor should take
immediate remedial measures and inform the
corresponding World Bank Project Office within
24h. City and county project organization should
supervise and assist building project contractor to
take remedial measures. Contractor should record
the measure implementation status and report to the
construction supervision unit and county project
organization.
(8) Contractor reserves the environmental
management deposit from the project contract funds
according to annual budget. The amount should
account for about 3% of the budget.
Construction phase
Enviro
nm
ental
pro
tection
imp
lemen
tation
pro
cedure
durin
g
constru
ction
site prep
aration
ph
ase
(1) Confirm project permanent land occupation and
temporary land occupation (construction production
area, construction camps, access road and
construction yard) scope and handle project land
relevant formalities.
Co
nstru
ction u
nit
Pro
ject office,
ow
ners,
City
Enviro
nm
ental
Pro
tection
Bu
reau
and R
oad
Tran
sport B
ureau
The
ow
ner
entru
sts qu
alified
institu
tion to
un
dertak
e in
fo
rm of
contract
(2) The existing pipeline survey work should be
done in the construction area and damage to the
existing pipeline should be avoided in construction.
(3) Construction production area, construction
camps, pioneer road and borrow area, abandoned
dreg site should be far away from the surface water
body.
(4) Construction unit should negotiate with city
(county) project organization to determine
appropriate public water source. It should choose
municipal tap water as drinking water sources and
newly chiseled well is strictly forbidden.
Constru
ction site m
anag
emen
t
Main
body o
f the p
roject co
nstru
ction area en
viro
nm
ental im
pact co
ntro
l
Surface
cleaning
(1) Pay attention to water
dust-controlling to reduce
dust pollution.
(2)Construction muck that
produced should be
removed in time, and closed
transport vehicles should be
used to transport earthwork,
muck and construction
garbage.
Subgrade
construction
(1) Strictly control subgrade
and pipeline excavation and
avoid overexcavation
damaging vegetation
ground. Arbitrarily cutting
down trees is forbidden out
of construction area.
(2) The produced waste slag
should be removed in time,
and the earthwork, slag and
construction waste must be
transported in a closed
transport vehicle.
(3) Sprinkle water to control
dust and reduce dust
pollution at construction
area.
Pavement
construction
Asphalt mixing station
should adopt centralized
plant mixed mode and
mixing station should be
located within the construction production
area. It is strictly forbidden
to set up asphalt mixing
station in the main site of
the project construction
area.
Ecological
remediation
(1) Before the construction
project completes,
ecological remediation
should be made to the
damaged earth at least
restore to the status before
construction.
(2) dyke up the arable
surface soil that stripped in
the construction temporarily
at the relatively flat area of
the filed and use bagged soil
to form a temporary
retaining wall, in the
surrounding area set up
temporary drainage ditch
and settling measures, and
use dust-proof net to cover
which can also be used for
ecological remediation of
the construction camps after
the construction completes.
Construction
noise
(1) Strictly control the
construction time. In
construction site that is
within 150m from
residential area, construction
equipment with big noise
should stop working at
night(22:00 ~ 06:00). For
worksite that has to do
continuous construction
work, construction unit
should according to the
specific situation get in
touch with local
environmental protection
department in time, apply
night construction certificate
in accordance with
provisions, and at the same
time release announcement
to utmost get public support.
(2) For sensitive points that
are relatively close to the
construction site (within
50m), mobile or temporary
sound barriers and other
noise prevention measures
should be taken.
(3) Construction site should
be as far as possible from
surrounding schools,
hospitals. Operation
schedule of strong noise
machine near school should
be discussed with the school
authority and avoid
construction during school
examination time.
Others (1) At construction site, it is
strictly forbidden to burn
various kinds of waste.
Con
structio
n
pro
du
ction
area
enviro
nm
ental
impact
contro
l
Surface
cleaning
(1) Pay attention to water
dust-controlling to reduce
dust pollution.
(2) Construction muck
produced should be cleared
in time and disposed reasonably.
Asphalt mixing (1) Priority relies on
municipal asphalt mixing
plant purchase.
(2) Asphalt concrete mixing
station should use mixing
equipment well enclosed
and with high dust removal
efficiency. It is strictly
forbidden to use semi-closed
asphalt boiling process.
Concrete
Mixing
(1) Commercial concrete are
preferred.
(2) Concrete is mixed in a
wet way and the mixing
process should be done in a
sealed state.
Material
handling
storage
(1) In the process of
transportation, temporary
storage and handling of bulk
materials such as earthwork,
cement and lime, wind
shielding measures and dust
prevention measures should
be taken.
(2) Material storage area site
should be flat and solid.
(3) Stacking yard for storing
construction material such
as cement, lime, etc. should
adopt containment measures
and be covered with
tarpaulin to avoid pollution
caused by wash of rainfall.
Construction
transport
vehicles
(1) Equipment for washing
the vehicles should be
installed at the entrance and
exit of construction site. Vehicles that go out of the
site should be cleaned up.
The road between vehicle
flush equipment and site
exit should be laid with
concrete, asphalt or
hardcore. Silt shall not be
taken out of site.
(2) Closed transport vehicles
should be used to transport
earthwork, muck and
construction garbage.
Precast yard (1) Concrete mixing
wastewater can not be
discharged directly. It
should be reused for water
spraying for
dust-controlling measures
after being collected and
handled by settling pond.
After the construction
completes, the settling pond
should be covered with soil
and the ecology should be
recovered.
Construction
noise
(1) Fixed mechanical
equipment with large
vibration (such as blender)
should be retrofitted with
vibration reduction engine
base.
(2) Fixed strong noise
source (such as dynamo
etc.) should be retrofitted
with soundproof shield or
settled to operate indoors.
(3) Strictly control the
construction time. In
construction site that is within 150m from
residential area, construction
equipment with big noise
should stop working at
night(22:00~06:00).
Others (1) Before the project
completes, ecological
remediation should be made
to the damaged earth at least
back to the status before
construction.
(2) Bank up the arable
surface soil that stripped in
the construction temporarily
at the relatively flat area of
the filed and use bagged soil
to form a temporary
retaining, in the surrounding
area set up temporary
drainage ditch and settling
measures, and use
dust-proof net to cover
which can also be used for
ecological remediation of
the construction camps after
the construction completes.
(3) At construction site, it is
strictly forbidden to burn
various kinds of waste.
Const
ructio
n
equip
ment
mana
geme
nt
Drip oil
pollution
control
(1) Try best to chose advanced equipments,
machines to effectively reduce run, reek, drip, leak
quantity and mechanical maintenance times, so that
to reduce production of oily sewage.
(2) In unavoidable run, reek, drip, leak process, try
to use solid oil absorption material(such as cotton
yarn, chip, oil absorbing sheet, etc.), collect waste
oil and transform waste oil to solid matter ,and avoid producing overmuch oily sewage.
(3) Repair and maintenance of machines, equipment
or transport vehicles try to focus on the
maintenance point of each section in order to collect
oily sewage.
(4) Horizontal flow settling pond should be settled
at mechanical maintenance place. Oily sewage
collected by settling pond can be discharged after
simple treatment of acid and alkali neutralization,
precipitation, deoiling and deslagging. After
construction completes, the settling pond should be
covered with soil and afforested.
(5) Equipment maintenance place ground should be
dealt with hardening, seepage prevention treatment
to avoid soil pollution caused by drip soil.
(6)Establish equipment repair and maintenance
record, and conduct regular maintenance according
to the running situation of the equipment.
Equipment
noise control
(1) The construction unit must select the
construction machinery and transport vehicles
according with the relevant national standards and
try to use the low-noise construction machinery.
(2) The fixed mechanical equipment with large
vibration should be retrofitted with damping base.
For fixed strong noise source, should consider the
installation of soundproof barrier (such as power
generation vehicle, etc.) or operation indoors.
(3) Strengthen the care and maintenance of all types
of construction equipments, and keep their good
operation, in order to fundamentally reduce noise
and vibration sources.
Equipment
exhaust
emission
control
(1) The construction unit must select construction
machinery equipment and transport vehicles
according to national health protection standards, to
ensure that its emissions are in line with the relevant
national standards.
Solid waste
control
(1) The scattered hazardous waste (oil gloves, oil
gauzes, etc) shall be recycled and disposed by the
qualified units commissioned by the Project
Ministry. (2) The oil penetrating into the soil should be
promptly collected and archived by scraping device,
then transported to the qualified disposal site for
centralized treatment.
(3) When the maintenance of machinery, if
equipment and transport vehicles can not be
maintained in the designated maintenance sites, the
container or solid oil-absorbing material should be
used to absorb oily wastewater generated by the
equipment, and for treatment after collecting , while
the location should select the nearby abandoned
dreg site with the qualification of disposing such
waste.
Enviro
nm
ental p
rotectio
n p
ractice standard
s in co
nstru
ction site
Lev
eling
of site
(1) The produced waste slag should be timely
removed, and the earthwork, slag and construction
waste must be transported in a closed transport
vehicle.
(2) Sprinkle water to control dust, then to reduce
dust pollution.
Dom
estic wastew
ater contro
l
(1) Canteens should set up oil separator, and entrust
the removal and transportation unit to clean up
promptly. The waste removal and transportation
units shall hold the waste assimilating qualification
and license approved by the relevant departments.
(2) Construction site should set up temporary toilets
and septic tanks, and the temporary toilets septic
tanks should be done with seepage treatment.
(3) Construction site should set up drainage ditch
and settling ponds and the sewer line. Pipelines in
canteen, toilet and shower should be equipped with
filters. The construction wastewater can only run
into the municipal sewer network or river after
precipitation. And at the same time guarantee
drainage ditch clean and drainage ditch smooth.
(4) Construction site should keep the drainage
unobstructed, without black smelly water and no
defecates and urinates anywhere phenomenon.
(5) A variety of domestic wastewater shall be prohibited to dump and discharge along water
distribution network, and domestic garbage and
construction waste can not be piled up nearby the
construction site.
Dom
estic
exhau
sting
gas co
ntro
l
(1) The dining in construction site should use clean
energy such as natural gas and electricity
conforming to the provisions of local environmental
protection department.
Solid (1) The recyclable waste (such as waste paper, etc.)
should be collected to recycle and disposal.
Waste
contro
l
(2) Construction site should set up closed garbage
station to collect workers’ garbage and remove and
transport them timely in accordance with the
provisions.
(3) The closed swill buckets should be set up
outside of canteen, and should be timely removed
and transported.
(4) Septic tank trustees should timely clean and
bury them by soil at the end of construction.
Eco
logical im
pacts co
ntro
l
(1) Within a month after the construction project
completes, the provisional infrastructure should be
completely demolished and repaired to the
pre-construction state.
(2) Bank up the arable surface soil that stripped in
the construction temporarily at the relatively flat
area of the filed and use bagged soil to form a
temporary retaining, in the surrounding area set up
temporary drainage ditch and settling measures and
use dust-proof net to cover which can also be used
for ecological remediation of the construction
camps after the construction completes.
Other
requirements
(1) Provisional infrastructure in construction site
shall be prohibited to use clay bricks, and shall
comply with safety and fire requirements and
relevant national regulations. (2) Construction camp should be divided clearly
with the construction area, and appropriate
quarantine measures shall be taken to ensure that
construction site in a neat orderly state.
(3) It is strictly prohibited to burn all types of waste
in construction site.
Constru
ction m
aterials field en
viro
nm
ental p
rotectio
n p
ractice
Borro
w area en
viro
nm
ent im
pact co
ntro
l
Overall requirement (1) During
construction, deep
excavation should be
avoided and should
balance the excavation
and filling as far as
possible. If it is needed
to borrow, priority
should be given to the
procurement of goods
earth or the waste soil
coordinating urban
construction projects,
to avoid only setting up
the borrow area , which
can fundamentally
eliminate the impact
of the borrow area on
environment.
(2) The project should
fetch soil in a
concentrate excavating
method to reduce the
number of the borrow
area.
Dust control (1) During the
operating process, it is
necessary to pay
attention to sprinkle
water to control dust,
then to reduce dust
pollution brought by earth excavation.
Ecological impacts
control
(1) When excavating,
topsoil should be kept
for land reclamation,
and topsoil should be
temporarily piled in a
relatively flat area, and
use the bagged soil for
temporary block, while
temporary drainage
ditch and grit measures
are build around, and
adopt dust network
coverage, for the
ecological restoration
of abandoned dreg site
after the completion of
construction.
(2) Vegetation
restoration should be
carried out at the end of
the project.
Landscape control (1) Appropriate
environmental
protection measures
should be taken in
accordance with the
requirements of each
project EIA report.
Aban
don
ed
dreg
site
env
iron
men
tal
impact co
ntro
l
Overall requirement (1)The abandoned soil,
if any, should be
considered first to
recycle in situ or
transport to other site
for reuse, or to be
reused for vegetation
restoration of the
borrow area. Avoid
setting up the borrow
area singly, which can fundamentally
eliminate the impact of
the borrow area on
environment.
(2)When the
abandoned soil can not
be recycled, it is
necessary to first
investigate whether
there are the specified
architecture muck
consumptive places in
local, if any, they
should be required to
apply for muck
removal and
transportation
procedures according
to the regulations, and
shipped to the
designated
consumptive places.
Dust control (1) Abandoned dreg
site should be layered
and compacted, which
can effectively inhibit
the generation of dust.
(2)To take the method
of sprinkling water to
inhibit dust, then to
reduce dust pollution of
the bare ground.
Ecological impacts
control
(1) Before entering the
abandoned dreg site,
topsoil should be
excavated for land
reclamation, and
topsoil should be
temporarily piled in a relatively flat area, and
use the bagged soil for
temporary block, while
temporary drainage
ditch and grit measures
are build around, and
adopt dust network
coverage, for the
ecological restoration
of abandoned dreg site
after the completion of
construction.
(2) Vegetation
restoration after
excavating soil
Sch
eme fo
r water an
d so
il loss p
reven
tion
Main
pro
ject constru
ction area
(1) Topsoil shall not be piled on the runoff pooled
ground; shall not be stacked in the nearby sensitive
areas of road or river of the project; shall not be
stacked in the region affects the construction or
clear road; try to pile in the low-lying idle plots to
reduce the protective measures engineering amount.
Topsoil shall be piled temporarily within the land
acquisition on both sides of subgrade; to avoid fall
of earth, temporary weaving soil bag block shall be
set around the bulldozers; the temporary stockpiling
topsoil shall be used for the latter part of the slope
green cover soil.
(2) Slope protection should be carried out promptly,
based on the subgrade slope protection principles.
Because the roads included in the project are urban
roads, taking into account the land development of
both sides, ecological protection should be
emphasized and light branch block be
supplemented. According to the engineering
geological and hydrological conditions, geonets
slope stabilization shall be adopted in the filling
sections, and blocking muck walls in partial sections.
(3) Block shall be set in the temporary earth piles to
prevent rain erosion.
(4) Set settling pond in the subgrade drainage ditch
export.
Constru
ction
prev
entio
n
and
contro
l area
(1) The prevention focus of the construction
production areas is soil erosion in construction site.
And due to the vehicles frequency and stockpile
need, the construction site should be all hardened by
cement.
(2) During the rainy season, temporary block
ditches should be set up outside the low-lying land
in the project area to prevent rain erosion.
(3) Make dust network coverage to the topsoil and
stockpile, and set block to prevent rain erosion.
(4) Reasonably arrange for the duration to shorten
the temporary land use time, and make vegetation
restoration or reclamation to the temporary land at
the end of construction.
Constru
ction
deto
ur p
reven
tion
and co
ntro
l area
(1) For the new opened construction detour, it is
necessary to well perform the engineering
protection and drainage project.
(2) Reasonably arrange for the duration to shorten
the temporary land use time, and make vegetation
restoration or reclamation to the temporary land at
the end of construction.
Constru
ction
site
prev
entio
n
and
con
trol area
(1)Temporary green should be given to the shed and
the areas outside the hardening region, and sowing
grass and planting shrubs to green and beautify the
site environment.
(2) Brick drainage ditches shall be constructed to
quickly rule out the stagnant water.
(3) At the late period of project, demolish the shed
and hardened area, remediate land and restore
vegetation.
Bo
rrow
area
prev
ent
ion an
d
contro
l
area
(1) Necessary drainage measures shall be
constructed before excavating soil in the borrow
area: drainage ditch shall be set in the surrounding
of the borrow area, settling pond exports, while
inside, rainwater runs into nearby natural ditch after
sediment deposition; the intercepting ditches shall
be set in excavating soil slope platform and
excavating soil slope outside, to connect with
drainage ditch.
(2)Try to cover soil to restore one, green and
renovate one after excavating one, to prevent large
areas of bare surface caused by excavation and the
caused serious soil erosion. Prior to the
implementation of greening measures, it is
necessary to take topsoil backfill to a green area
and to implement the land settling measures.
(3) The slope plant measures in excavating soil
areas are difficult to quickly recover in short term,
and temporary covering is needed in case of heavy
rainfall, to avoid runoff scouring slope.
(4) At the end of construction, it is needed to
recover vegetation or reclamation in borrow area.
Abandoned
dreg site
prevention
area
(1) If it is difficult to implement, abandoned dreg
site should be set up, and col or low-lying areas
shall be selected as the abandoned dreg site.
(2) Prior to disposing, the blocking muck wall shall
be constructed in the downside of abandoned dreg
site according to terrain features. And the blocking
muck wall should be built according to the waste
piling up and terrain features, and it should be safe,
economic, and reasonable.
(3) Drainage ditches shall be constructed in the
upside of the abandoned dreg site to intercept slope
runoff, and settling pondshall be set up in both ends.
Energy dissipation facilities shall be set up when
drainage ditches terminal has a large gradient.
(4) Disposal waste shall be promptly rolled and
drainage ditches shall be located after flattening.
(5) Ecological restoration shall be made in the abandoned dreg site after the completion of
construction.
Ecological restoration (1) Ecological restoration should make full use of
topsoil stored during clean-up process in the site,
without excavating new soil.
(2) The combination of arbor and shrub grass
should be used for planting operations, and higher
density growth evergreen broad-leaved shrubs shall
be used as under plants at the time of the selection
of arbor greening plants, with comprehensive
greening and non blank to prevent the invasion of
alien species.
(3) Greening Plants prohibits the use of alien
species.
Preservation of cultural
relics
(1) If immovable cultural relics (including ancient
ruins, ancient tombs, etc.) are found during
construction period, it is necessary to immediately
stop the construction and protect the site under the
supervision of the construction supervisor, while
they are not allowed to be dealt with privately, and
should immediately report to the local cultural relics
management department.
(2) After the identification and clean-up of cultural
relics by cultural relics management department, the
construction unit should develop cultural relics
section construction program, and acquire the
consent of the cultural relics department before
construction.
(3)The movable heritage (including the life and
production objects of every time), if found, should
be initiatively handed in to the cultural relics
management department, and can not be accounted
for own.
Construction traffic
management
(1) Reasonably arrange for the construction period
to shorten the temporary land use time.
(2) Closed transport vehicles should be used to
transport earthwork, muck and construction
garbage.
(3)When there are patches of residents within 50m
from the construction detour, the transportation of
construction materials on the detour should be
prohibited at night.
(4) Construction transport vehicles should avoid the
local road traffic peaking hours, to prevent traffic
congestion and safety incidents.
(5) Construction vehicles shall travel on the
specified lane, and can not change driving route
privately and make damage to agricultural land and
woodland.
Traffic safety (1) Drivers shall be emphasized for safe driving
while vehicles shall travel alongside road planning
line, without changing running lines and driveways
at will.
(2)The drivers must improve their driving skills and
be required to have a license.
(3) Limit traveling time, and drivers take turns to
drive. Avoid traveling in dangerous road and time,
so as to minimize the accident, and vehicles as well
as pedestrians shall go through in accordance with
the signal, and obey the on-site command by traffic
police.
(4) To install speed control system in the trucks,
and supervise drivers’ driving.
(5) To timely purchase spare parts for maintenance
of vehicles, and avoid serious accidents due to
equipment failure or premature component failure.
(6) To minimize the situation of confound using
roads by pedestrians and construction vehicles, and
when crossing the street, they shall go through
crosswalk or overpass, underpasses, without
grabbing with the motor vehicles.
(7) To improve the signpost visibility and
strengthen the traffic safety all-round.
(8) To carry out traffic safety and pedestrian safety
education in communities nearby school.
(9) To coordinate with emergency responders to
ensure that appropriate aids are provided in the
event of an accident. Try to purchase local materials
in order to reduce the transportation distance.
Large vans are used in construction site to reduce
the amount of traffic crossings. Adopt traffic safety
restrictions and use road signs and signals workers
to remind pedestrians and vehicles to pay attention
to the dangerous traffic situation.
Temporary footbridges shall be built in sensitive
sections, such as schools, hospitals, residential area
and nursing homes, as well as the business district
to ensure the safety of pedestrians when crossing
the street.
(10) Use local materials as much as possible in
order to shorten the transport distance, and use the
shuttle and others vehicles to transport workers to
reduce the use of alien vehicles as far as possible.
(11)To avoid the transport vehicles overloading,
cover the transport vehicles to avoid the goods
transported scattering, and plan vehicle
transportation routes and time with details, in order
to avoid traveling in central areas, traffic sections
and residential areas. For the strictly demanding
sections, transport at night according to the actual
situation. Timely clean up the spilling lime soil
during transition to reduce dust pollution.
(12) On the excavating road, set the warning sign
and night lighting up for hint;
Hazardous waste and
inflammable and explosive
materials
(1) When gasoline and diesel are delivered to the
site, the inspectors shall carefully inspect the
packaging to see if it is intact, if it leaks, if any,
shall reject and return.
(2) Oil and chemical solvents stored in the
construction area shall have a special storehouse,
and equipped with warning signs, the ground
anti-seepage treatment shall be done and prepare emergency materials such as adsorption packets /
sand / sawdust, etc.
(3) Prepare emergency plans, and provide training
to the workers before construction.
Public participation (1) Set a bulletin board at the entrance of the
construction site, showing the project name, main
construction content, construction time, etc., and
telling the contact person and telephone for
complaints and recommendations.
(2) Arrange environmental protection professional
and technical personnel to answer public questions
about environmental protection.
(3) For continuous construction at night, you shall
go through relevant procedures and inform the
surrounding residents; the bulletin information shall
include the starting and ending time of the
continuous operation and the night construction
certificate issued by the environmental protection
agencies.
(4) If, there is need to interrupt the municipal
services (including water, electricity, telephone and
bus lines, etc.) because of the construction, you
shall post a notice to inform the public of that in the
project sites, affected households and enterprises
before 5 days at least, and indicate the starting and
ending time of the interruption.
(5) All the comments and issues of the public shall
be documented, and the issues raised by the public
shall be answered or responded in a timely manner,
and all the answers to the comments, the results
responded shall be recorded and archived, and
accept the checking of the supervision institutions.
Impact co
ntro
l of so
cial
enviro
nm
ent
(1) Strictly comply with the subsidy standards
stipulated by the nation and Jiangxi Province,
combining with the local reality, and agreements
signed those whose land was acquired and those
who were relocated, to distribute the land and
relocation subsidy expenses to the relevant village
groups and individuals immediately. Must carry forward the democracy fully and respect the
citizen’s basic rights to distribute and use subsidy
expenses rationally; allocate the farmlands and
place labor forces reasonably and implement
relevant policies.
(2) Construction transport vehicles should avoid the
local road traffic peaking hours, to prevent traffic
congestion and safety incidents.
(3) The occupied or destroyed local roads in the
construction of the future roads shall be moved or
protected after the completion of the construction,
and carry out the restoration and the afforestation of
the road surface, and pay the local authority certain
compensation expense to maintain the right benefits
of the local authority and inhabitants.
Impact co
ntro
l of lan
dscap
es
(1) In order to strengthen the integration,
coordination of the project and the peripheral
landscapes, the side slope of earth-filling ,excavation must meet the natural ground edge, and
the circular arc may be used on the side slope to
improve its visual effects. The side slope surface
shall maintain rough, in order to take protection
measures or plant grass measures in the surface.
The retaining wall may use the shelter planting
method to plant bushes and the evergreen trees to
cover it, also can plant the climbers to improve the
visual effects.
(2) In view of the fact that the construction detours
are built along both sides of the road, it shall be
suggested to enhance the environmental protection
propaganda to improve the environmental
protection consciousness of the administrative personnel and constructors. Forbid abandoning the
life and the production wastes at will.
(3) For the abandoned dreg sites and temporary
stack sites of the construction materials, they shall
work strictly within the area, forbidding polluting
the landscape environment by random discarding.
(4) After the completion of the project, clean up
timely the greasy dirt and trash in the abandoned
dreg sites, material sites, construction detours and
construction site, smooth the ground to restore the
original landform and the vegetation as far as
possible, making the engineering construction
coordinate with the peripheral natural environment.
Construction security (1) In the construction site, warning marks or
warning description shall be made on the operation
posts, equipment and sites that may cause
occupational disease harms easily.
(2) Carry out regular personnel training and
examination of occupational health for those
engaged in toxic and hazardous operations, guide
the operators to properly use occupational
protective equipment and personal labor protection
supplies.
(3) The construction unit shall provide construction
workers helmets, safety belts and safety shoes,
overalls matching with the types of jobs in which
they are engaged in and other individual labor
protection articles.
(4) Low noise equipment shall be used in the
construction sites. Promote the use of automation, a
closed construction technology to reduce the
mechanical noise. During the operations, operators
shall wear earplugs to protect their hearing.
(5) The work areas that can not be ensured good
natural ventilation for anticorrosive and
waterproofing work in the basement shall be
equipped with forced ventilation facilities.
Operators shall wear gas respirators or protective masks when they are working in the workplace full
of toxic and harmful gases.
(6) In the dust workplace, watering shall be taken to
reduce the dust concentration, and operators shall
wear dust masks; in welding operations, operators
shall wear protective masks, goggles, gloves and
other personal protective articles.
(7) When operating in high-temperature, there shall
be summer cooling products in the construction site,
and work schedules shall be reasonably arranged.
San
itary an
d M
edical S
ervices
(1) Meals, drinking water and resting place for the
personnel at the construction site shall be consistent
with the hygienic standard.
(2) Dormitories, canteens, bathrooms and toilets
should be equipped with ventilation and lighting
facilities, and special personnel shall be assigned to
be responsible for routine maintenance.
(3) Dormitories at the construction site must be
installed with open windows, and the dormitory
beds shall not be more than 2 layers, and a wide bed
for a number of people is not allowed.
(4) Canteen shall have valid hygienic license issued
by the relevant departments, and all kinds of
appliances shall be standard and clean. The cook
shall hold valid health certificate.
(5) Canteen shall be in a place away from sources
of pollution like toilet, garbage station, toxic and
hazardous places.
(6) Canteen shall be provided with independent
preparation room and storage room, and a rat guard
not less than 0.2m shall be installed at the bottom of
the door leaf.
(7) Toilet, sanitary fixture, drainage ditch and dark
and wet area shall be disinfected regularly.
(8) The living area shall be equipped with closed
container, and undergo regular fly disinfestation and
timely removal and transportation.
(9) Construction site shall be equipped with
infirmary, health kits, commonly used drugs and bandage, tourniquet, neck collar, stretcher and other
emergency equipments.
(10) When construction workers suffer infectious
diseases, food poisoning and acute occupational
poisoning, it shall be promptly reported to the local
health and epidemic prevention department and
competent building department, and disposal shall
be done in accordance with the relevant provisions
of the health and epidemic prevention departments.
Operating phase
Environmental Risk
Control
(1) Develop emergency measures against transport
of dangerous goods during the operating period.
Owner
CP
MO
, the o
wner an
d th
e local
env
ironm
ental p
rotectio
n b
ureau
and traffic d
epartm
ent
(county
/city)
(2) Strengthen traffic management, and set markers
like speed limit and No Horn at starting point and
ending point of the project to control traffic noise
pollution.
(3) Set sidewalk (zebra crossing) where schools,
hospitals and large residential quarters locate and
provide signal lamp additionally at a special
environmentally sensitive point to protect the
people traveling.
Appendix 1 Site checklist before construction into the site
Serial
No. Environmental issues Check results (mark “√”) Remark
1
If the project conflicts with the World Bank’s
security policies on natural habitats, material
and cultural resources, involuntary resettlement,
etc.
Yes □ No □ N/A □
2 If there is important vegetation and trees in the
areas occupied by the project Yes □ No □ N/A □
3
If the project construction roads have
significant impact on the surrounding residents
to travel Yes □ No □ N/A □
4
If there is the public vulnerable to the impact of
construction in the vicinity of the project area
(residents, schools, hospitals, office
concentrated areas, etc.)
Yes □ No □ N/A □
5 It may result in the deterioration of the quality
of life of the towns nearby Yes □ No □ N/A □
6
If the construction of the project needs to
interrupt the municipal services (including
water, electricity, telephone, bus routes, and so
on)
Yes □ No □ N/A □
7 If the construction of the project requires
removal Yes □ No □ N/A □
8
If it may be affected by the flood in the rainy
season
Yes □ No □ N/A □
9
If the temporary land occupancy by the project
will affect other lands Yes □ No □ N/A □
10
If pipelines involving electricity,
telecommunications and other municipal
services are within the project construction
scope and nearby
Yes □ No □ N/A □
11 If there is surface water body within the project
construction scope and nearby Yes □ No □ N/A □
Others Yes □ No □ N/A □
Appendix 2 Environment checklist of construction site
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
I. Gen
eral requirem
ents
1.1 If there are effective measures to prevent and
control air, water and soil, and noise pollutions and
improve environmental hygiene in the project
construction organization design
1.2 If the environmental protection, environmental
hygiene management and inspection systems are
established for the construction site
1.3 If there are inspection records of environmental
protection and environmental hygiene management
of the construction site
1.4 If the operating personnel are provided with the
necessary protective equipment, and effective
protective measures against occupational diseases
have been taken
1.5 If the operating personnel engaged in the work
exposed to occupational hazards undergo periodic
medical examinations and trainings (the related
medical examination certificate and training
records shall be provided)
1.6 If dietetic hygiene, heatstroke prevention,
winter protection, anti-gas poisoning, epidemic
prevention and other measures are provided to the
operating personnel combining the features of each
season
1.7 If the educational training and assessment
provided to the operating personnel at the
construction site include laws and regulations on
environmental protection, environmental hygiene,
etc. (the supporting documents such as records
shall be provided)
Others (detailed description shall be provided)
II. Site L
ayou
t
and C
on
structio
n
of T
empo
rary
Facilities
2.1 If the construction area of the construction site
is clearly separated with the office and living areas
with appropriate isolation measures
2.2 If construction area is clean and orderly
2.3 If there is corporate name or corporate logo at
the entrance of the construction site, and the main
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
entrances are provided with project overview board
in compliance with requirements
2.4 If the public is informed in advance of
interruption of municipal services (including water,
electricity, telephone and bus routes) due to
construction
2.5 If the existing housing and infrastructure at the
construction site are used for temporary facilities
2.6 If the new temporary housing is reasonable in
land occupancy and meet the security and fire
protection requirements (the relevant proof shall be
provided)
2.7 If the clay bricks are used for the construction
of temporary facilities
2.8 If the oil, chemical solvents, and other items
stored at the construction site which are provided
with special storage and warning signs.
2.9 If the floors of the storages for oil and
chemicals undergo anti-seepage treatment, and the
storages are provided with adsorption packet/sand
/sawdust and other materials for emergencies
2.10 If dormitories are set up in the buildings that
are not yet completed
2.11 If temporary facilities were removed within
one month after the project is completed
Others (detailed description shall be provided)
III. Op
erating
Cond
ition
s and
En
viro
nm
ental S
afety
3.1 If closed color steel enclosure not less than
2.5m in height, not be less than 3m in sensitive
sections is provided at the construction site
3.2 If the bulletin board meeting the requirements is
provided at the construction site, which shows
environmental conservation, civilized construction
system, emergency disposal process and other
information
3.3 If the construction unit has taken protective
measures to ensure the safety of buildings and
structures adjacent to the project under
construction, and the underground pipelines
3.4 If the large machinery and equipment such as
high scaffolding and tower crane at the construction
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
site are kept a safe distance from overhead
transmission wires, and high voltage lines adopt
insulating materials for security
3.5 If the hard security measures are taken at the
temporary street sidewalks and road vehicle
entrances near the project under construction and
indicating device at night is provided
3.6 If significant safety warning signs in line with
national standards are installed at the dangerous
parts of construction site
3.7 If appropriate security measures are taken at the
construction site based on seasonal variation to
achieve safe construction conditions
3.8 If the extinguishing equipment is properly
maintained, and escape way is unobstructed
Others (detailed description shall be provided)
IV. D
ust P
ollu
tion C
ontro
l
4.1 If the construction site roads properly use the
surrounding existing or proposed roads of the site
and nearby
4.2 If new construction of access road, it undergoes
hardening treatment based on its purpose, and the
dust production sections undergo sprinkling for
dust suppression
4.3 If the materials at the construction site are for
concentrated stacking
4.4 If selection of the second site for material
stacking is reasonable
4.5 If material storage area, processing area, and
large template storage site are flat and solid
4.6 If materials easy for flying and with fine
particles at the construction site are for sealed
storage, and are covered for loading and unloading,
and handling operations
4.7 If the earthwork which is piled up in centralized
way is covered, cured or greened
4.8 If the spoil is for comprehensive utilization or
delivered to a special place for disposal
4.9 If the exposed parts of office and living areas at the construction site undergo water spray for dust
suppression and greening and landscaping taking
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
into consideration of the actual situation
4.10 If the closed transport vehicles are used for
transportation of earthwork, muck and construction
waste
4.11 If the facilities for washing vehicles are
provided at the access into the construction site and
the bypaths to the site are laid with concrete,
asphalt, grass mats or brickbat cushion to avoid the
sediment from being carried out of the site
4.12 If the ready-mixed concrete and ready-mixed
mortar are used at the construction site
4.13 If the dust-control and removal measures are
taken in case of mixing concrete and mortar
4.14 If the earthwork backfilling, transfer, and other
construction that may generate dust pollution are
prohibited in case of force 4 wind or above
Others (detailed description shall be provided)
V. H
armfu
l Gas E
missio
n C
ontro
l
5.1 If various types of waste are burnt at the
construction site
5.2 If the construction vehicles, machinery and
equipment, etc. are maintained in good operating
conditions, and their exhaust emissions are in line
with the national emission standard
5.3 If the decoration materials are qualified
construction materials after testing by a statutory
testing unit (the materials shall have certificate of
conformance)
5.4 If the boards and other wood materials for
interior decoration are prohibited in the use of
anti-corrosion, moisture-proof treatment agents like
asphaltic bitumen and coal tar.
5.5 If the kitchen in the living area of the
construction site is required for installation of fume
treatment facilities
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
Others (detailed description shall be provided)
VI. W
ater Pollu
tion C
ontro
l
6.1 If the settling ponds are provided at the
foreground of mixer and transport vehicle wash at
the construction site
6.2 If the wastewater is discharged directly into the
municipal sewer system or rivers
6.3 If the wastewater after secondary sedimentation
is recycled or used for water spray and dust
depression
6.4 When sediment reaches 1/4 of the depth of
settling ponds, if it undergoes sediment removal
and the sediment in the settling ponds is delivered
to the designated location
6.5 If the canteen is provided with oil interceptor,
and is promptly cleaned up by a qualified cleaning
and transportation unit entrusted
6.6 If the closed swill bucket is provided outside
the canteen, and is for timely removal and
transportation
6.7 If the septic tank for temporary toilet at the
construction site undergoes anti-seepage treatment
6.8 If the drain ditch shall be provided at the
construction site, wastewater is discharged into the
municipal sewer system or rivers after
sedimentation, and drainage of drain ditch is
smooth
Others (detailed description shall be provided)
VII. N
oise p
ollu
tion co
ntro
l
7.1 If follow the construction time requirement
strictly
7.2 If make the surrounding residents noticed and
conduct relevant procedure when construct in night
7.3 If adopt sound absorption and insulation
measures such as sheltering, closing, and
afforestation on construction site.
7.4 If make use of low noise equipment and keep
maintenance well for equipment
7.5 If noise producing equipment is set on one side
far away from residential areas
7.6 If take noise reducing measures such as closing
for noise producing equipment
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
7.7 If take the speed limit and forbidden singing
measures for construction vehicles
7.8 If noise producing equipment (air compressor,
generator and so on) is set in closed room.
VIII. W
aste contro
l
8.1 If the construction site has closed refuse storage
area, if the construction refuse and life refuse are
set by classifying and cleared
8.2 If the construction refuse in building are
transported by relevant container and pipeline, and
throwing is forbidden.
8.3 If the waste produced by construction,
removing and site clearing are disposed by
classifying and recovered, recycled
8.4 If the construction waste clearing unit has waste
clearing certification and business certification
approved by relevant department
8.5 If waste oil and chemical solvent is centralized
for storage, and entrusted to the unit with the
qualifications for processing
8.6 If the construction equipment have obvious oil
spatter
8.7 Construction camp shall set up enclosed refuse
storage area, for the collection of living garbage
from the worker, and remove in time in accordance
with the provisions.
8.8 Septic tank should be entrusted for clearing in
time, and be buried after construction.
8.9 If clear all the solid waste produced by the
construction after the project.
Others (detailed description shall be provided)
IX. Water
loss and soil
erosion
control
9.1 If the existing legal earth field and abandoned
dreg site determined by local sanitation department
are made use of
9.2 If the new earth borrowing area has been
approved by the relevant units, and if it is taken
measures for protection of earth field slope
9.3 If pay attention to overburden cleaning, storage,
and ensure vegetation restoration after construction.
9.4 If build intercepting ditch and headrace to lead
away water formed in the rainy season, and avoid
surface runoff scouring to engineering
Others (detailed description shall be provided)
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
X. P
reservatio
n o
f
cultu
ral relics
10.1 During construction, if found suspected
cultural relics, construction should be immediately
stopped for protection of scene, and reported to the
local administrative departments of cultural relics
for processing, and can restore construction after
treatment by the cultural relics management
department
Others (detailed description shall be provided)
XI.. V
egetatio
n p
rotectio
n
11.1 If there is behavior of cutting down trees
outside the construction.
11.2 If the arrangement of the construction site is
reasonable (judged from reducing project
implementation to vegetation damage degree)
11.3 If take effective measures promptly for
construction and destruction of vegetation, and bare
soil, in order to avoid soil erosion, loss (take cover
sandstone, planting grass fast-growing measures)
11.4 If the original vegetation site is restored or
conducted reasonable virescence after the
construction
11.5 If introduce foreign species for vegetation
ecological restoration and greening.
Others (detailed description shall be provided)
XII. Risk
prevention
12.1 If have accident prevention plan.
Others (detailed description shall be provided) X
III occu
patio
nal h
ealth
13.1 If set the warning mark and warning
specifications in the easy
occupational-disease-inductive work post and
equipment, place
13.2 For high noise construction operations, if
operating personnel wear ear plugs for hearing
protection
13.3 For the operating region that can not guarantee
good natural ventilation, such as the basement
anticorrosive, waterproof work and so on, if
equipped with forced ventilation facilities. If
operating personnel in the workplaces with toxic
or harmful gas wear protective mask or respirator
13.4 In dust workplaces, if the operator wear dust
mask
13.5 For welding operations, if operating personnel
wear protective mask, goggles and gloves personal
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
protective equipment
13.6 For high temperature operation, if construction
site is equipped with cooling purposes supplies, and
with reasonable arrangement of work and rest time
Others (detailed description shall be provided)
XIV
. San
itation an
d ep
idem
ic prev
entio
n
14.1 If construction site staff meals, drinking water,
rest area are in compliance with health standards
(health certificate should be provided)
14.2 If dormitory, dining room, bathroom, toilet
have ventilation and lighting facilities, and a
specialist is responsible for maintenance
14.3 If the construction site dormitory meet the
settings of open-type windows, and dormitory bed
must not exceed 2 layers. It is strictly prohibited to
use wide bed requirements
14.4 If the dining room has the effective health
license issued by relevant departments, and if the
cook has valid health certificate.
14.5 If the dining room meets requirements of
being far away from the toilet, and refuse,
poisonous and harmful place pollution.
14.6 If the dining room sets independent
production, storage room, and if door leaf below is
set rat damper not less than 0.2m.
14.7 If the toilet, sanitation facilities, drain and
damp area are conducted regular disinfection
(related record should be made)
14.8 If the living quarters is set closed container,
and conducted regular fly destroying, timely
transporting.
14.9 If the construction site is set up the infirmary,
and equipped with health kit, commonly used drugs
and bandage, tourniquet, neck collar, stretcher and
other emergency equipments
14.10 When construction personnel suffer
infectious diseases, food poisoning, acute
occupational poisoning, if timely report to the
sanitation and epidemic prevention departments
and the competent department in charge of
construction and is handled in accordance with the
relevant provisions of the health and quarantine
Construction Site Environment Checklist for Sanqingshan Airport Project in Shangrao, Jiangxi
Province with the World Bank Loan
Subproject
name Project site name
The contract
number and
name
Check results
(mark “√”) Remark
Items to be inspected Yes No Not
involved
departments
Others (detailed description shall be provided)
Traffic safety
15.1 If carry out safe education training regularly
for driver emphasised on safe driving.
15.2 If limit driving time, and the driver take turns
for driving; If avoid dangerous road at dangerous
driving time
15.3 Vehicle need periodic maintenance, and if use
the parts approved by manufacturer, timely
purchase parts for vehicle maintenance
15.4 If separate the pedestrian and vehicles
15.5 If cooperate with the local community and the
competent authority to improve road signs, and the
signpost visibility,
15.6 If develop traffic safety and pedestrian safety
education in project peripheral community, school
nearby.
15.7 If maximally purchase and use local materials
15.8 If motor vehicle drivers work with license or
not
Others (detailed description shall be provided)
Others (detailed description shall be provided)
Inspection construction phases:________ Inspection date:________ Inspection time: __________
The weather records: _____________________________________________________________
On-site inspector signatures:____ Person in charge of environmental supervision signature: ________
Notes: ① The remarks can be filled in problems checked, give explanation in view of the unqualified
situation to, and put forward correction, prevention action advice.
② On-site inspection finds out that measures are not qualified or need improvement, environment
supervision shall immediately issue “environmental rectification notice” to the contractor and records
the number of “environmental rectification notice” in the note column. The detailed information of the
contractor's corrective actions should be recorded.
③ The table is general construction site environment checklist for using world bank loan project
construction comprehensive economic development standard town small civil engineering in Jiangxi
province, in view of the specific subproject and specific environmental problems, can be combined
with the local environmental conditions and construction content for the table adjusting, and take
appropriate measures to protect the environment.
Appendix 3 Environmental rectification notice
Environmental rectification notice
No.: ___________________________________________________________________________
The contract number and name: _____________________________________________________
Subproject name: ________________________________________________________________
Project site name: _______________________________________________________________
Current construction phase:
_________________________________________________________
The problems existing in the on-site inspection:
Inspector: __________ Date: __________
The contractor analyzes the reasons of problems and makes improving plan:
Person in charge of the contractor: _________ Date: _______
Environmental supervision opinion:
Person in charge of environmental supervision: ______ Date: ______
The environmental protection departments advice (when necessary):
Contact: ______Date: ______
Modification time limit:
Completed before Date____ Month_____ Year______.
Person in charge of the contractor: ____________Date: __________
Person in charge of environmental supervision: ______Date: _________
Review conclusion:
Reviewer : ______ Date: ________