2
The project involves building approximately one-half mile of new 138-kilovolt (kV) transmission line and adding about 4 miles of new wires to existing steel lattice towers. Additional or supplemental easements may be required in some areas along the existing line route to ensure clearances meet current safety standards. The upgraded transmission facilities will support an interconnection with an independent power provider. Adding an additional circuit strengthens the power grid in northern Ohio. The transmission line starts in Sharon Township in Richland County and continues west to Vernon Township in Crawford County. WHAT WHY WHERE PROJECT SCHEDULE PROJECT ANNOUNCEMENT August 2018 RIGHT-OF-WAY COMMUNICATION BEGINS August 2018 ACCESS ROAD INSTALLATION January 2019 TRANSMISSION LINE CONSTRUCTION Early 2019 PROJECT COMPLETION Summer 2019 *Timeline subject to change. *Timeline subject to change. 2018 2019 2020 SHARON TOWNSHIPVERNON TOWNSHIP TRANSMISSION LINE PROJECT The Sharon Township - Vernon Township Transmission Line Project involves building approximately one-half mile of new 138-kilovolt (kV) transmission line and adding about 4 miles of new wires to existing steel lattice towers. Construction is expected to begin in early 2019 and complete summer 2019.
Transcript
Page 1: SHARON TOWNSHIP˜VERNON TOWNSHIP · The Sharon Township - Vernon Township Transmission Line Project involves building approximately one-half mile of new 138-kilovolt (kV) transmission

The project involves building approximately

one-half mile of new 138-kilovolt (kV)

transmission line and adding about 4 miles of

new wires to existing steel lattice towers.

Additional or supplemental easements may

be required in some areas along the existing

line route to ensure clearances meet current

safety standards.

The upgraded transmission facilities will

support an interconnection with an independent

power provider. Adding an additional circuit

strengthens the power grid in northern Ohio.

The transmission line starts in Sharon

Township in Richland County and continues

west to Vernon Township in Crawford County.

WHAT WHY WHERE

PROJECT SCHEDULE

PROJECT ANNOUNCEMENTAugust 2018

RIGHT-OF-WAY COMMUNICATION BEGINSAugust 2018

ACCESS ROAD INSTALLATIONJanuary 2019

TRANSMISSION LINE CONSTRUCTIONEarly 2019

PROJECT COMPLETIONSummer 2019

*Timeline subject to change.*Timeline subject to change.

2018 2019 2020

SHARON TOWNSHIPVERNON TOWNSHIPTRANSMISSION LINE PROJECT

The Sharon Township - Vernon Township Transmission Line Project involves building

approximately one-half mile of new 138-kilovolt (kV) transmission line and adding about 4

miles of new wires to existing steel lattice towers. Construction is expected to begin in

early 2019 and complete summer 2019.

Page 2: SHARON TOWNSHIP˜VERNON TOWNSHIP · The Sharon Township - Vernon Township Transmission Line Project involves building approximately one-half mile of new 138-kilovolt (kV) transmission

SHELBYSHELBY

61

96

598

46

314

39

CR

AWFO

RD

CO

UN

TYC

RAW

FOR

D C

OU

NTY

RIC

HLA

ND

CO

UN

TYR

ICH

LAN

D C

OU

NTY

HIN

ES R

DH

INES

RD

HOWARDSUBSTATION

AEP OHIO VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary

08/15/201808/15/2018

An additional 138 kV circuit will be added to the existing steel lattice towers that stand about 90 feet tall. The structures will remain in the approximate 100-foot wide right-of-way corridor.

Structure Height: 90 feetRight-of-Way Width: 100 feet

TYPICAL STRUCTURES

AEP Ohioc/o Joe Demaree8600 Smiths Mill RoadNew Albany, OH 43054

@ [email protected]

(380) 205-5046

AEPOhio.com/Sharon-Vernon

SHARON TOWNSHIPVERNON TOWNSHIP TRANSMISSION LINE PROJECT

EXISTING SUBSTATIONTRANSMISSION LINE TO BE BUILT

CIRCUIT TO BE ADDED TO EXISTING TRANSMISSION LINE

POINT OF INTERCONNECTION

EXISTING TRANSMISSION LINE

N


Recommended