Date post: | 17-Mar-2016 |
Category: |
Documents |
Upload: | shaylor-group-plc |
View: | 234 times |
Download: | 1 times |
The Pigeon, a misunderstood creature.
SHAYLOR GROUP BUILDING A BETTER FUTURE | CONSTRUCTION | REFURBISHMENT | INTERIOR FIT OUT | REPAIR AND MAINTENANCE
The Pigeon, a bird with beautiful plumage but often known for other characteristics?
Well, they have a place in this great world and for thousands of years they have played
a vital role as messengers delivering often important communication.
Shaylor’s Business Development Team wants to communicate with you but
we don’t want to become a distraction as our feathered friend can occasionally be. You see, just like the pigeon we actually
have a lot more to offer than first perceived, in fact we have an array of construction
expertise that we really thought you should see.
Why not sit back and take two minutes to flick through the following pages and next time one of our Business Development Team ring,
you’ll know why they’re so keen.
1
4
7
2
5
8
3
6
9
1 King Edwards SchoolNew Performing Arts Centre
Client: King Edwards School
Value: £7.2 million
Shaylor are currently constructing a new 4 storey structure to provide a 500 seat auditoria, a 140 seat studio theatre, a multi-use rehearsal room, several teaching suites, a feature foyer and associated landscaped grounds.
Shaylor assisted the client in reducing budget by over £1 million pounds to achieve their target cost.
42 University of Wales, Powys
Gregynog Hall
Client: University of Wales
Value: £60,000
Minor refurbishment works along with new heating and electric system. External works to DPC plus ceiling works and relaying paving slabs. The project also included full internal decoration to the Music Room.
3 CoRECentre of Refurbishment Excellence
Client: Stoke on Trent City Council
Value: £2.4 million
The £2.4 million CoRE project will create a skills and learning facility, visitor hub and will be part of a unique group of “living” demonstration buildings on the 6,000 m² site.
With funding from the Department of Children, Schools and Families (DCSF), the first phase of this unique development began on site on 7 February 2011.
4 Colmore GateBirmingham
Client: CIP Property ( AIPT ) Ltd Aviva Investors
Value: £1 million
Design & Build project to refurbish the main reception and lift lobby of a city centre office block, including external cladding & glazing.
5 35 Calthorpe RoadBirmingham
Client: Calthorpe Estates
Value: £845,000
Complete refurbishment of this Grade II* listed building with a new build two storey extension in keeping with the style of the existing building. A full mechanical and electrical refit throughout has been carried out incorporating modern lighting, air conditioning and heating.The majority of the work in this building has been restoration, with specialist rendering work a necessity. Internal restorations were carried out in accordance with the planning and conservation requirements, which incorporated traditional lime and horsehair plaster works and specialist paints in accordance with heritage listing requirements.
7
6 Highways AgencyThe Cube Birmingham
Client: Buildability
Value: £1.3 million
Formation of flagship Cat A & B office accommodation for our client and the Highways Agency.The works included fit out of the reception to a high standard with oak panel finishes to walls & ceilings, glass feature walls and reception desk.
7 100 Hagley RoadBirmingham
Client: Calthorpe Estates
Value: £6.4 million
A Design & Build project to rebuild & remodel an existing five storey concrete framed office building to BREEAM Very Good Rating.
The Build required a close working relationship with client to deliver on time and on budget.
8 Hillingdon LibrariesLondon
Client: London Borough of Hillingdon
Value: £1 million
Shaylor Interiors multi-site refurbishment programme for the London Borough of Hillingdon.
Projects included:
Yiewsley Library
Oaklands Gate Library
Kingshill Library
Ickenham Library
9 Goals Soccer CentreSpeke, Liverpool
Client: Goals Soccer Centres Plc
Value: £1.7 million
The project consists of the construction of 8 five-a-side and 2 seven-a-side all weather floodlit football pitches.
The construction of the amenities provides the Changing Rooms, Showers, Toilets, Bar/Lounge area, Meeting room, Staff office, Kitchen, chilled cellar and plant room. All of the facilities are DDA compliant for disabled access and use.
Access roads, footpaths, parking bays have been constructed to incorporate cycle shelters and motor bike parking.
SHAYLOR GROUP BUILDING A BETTER FUTURE | CONSTRUCTION | REFURBISHMENT | INTERIOR FIT OUT | REPAIR AND MAINTENANCE
Cooh, Cooh...Like what you see?
If so and you have a project you would like to discuss then give
Ben Burton or Ian Kilvington a call on: 0121 633 5800
Alternatively you can email them: [email protected]
GROUP
SHAYLOR GROUP BUILDING A BETTER FUTURE | CONSTRUCTION | REFURBISHMENT | INTERIOR FIT OUT | REPAIR AND MAINTENANCE
www.shaylorgroup.com