SHE-Park Street Bridge PID 101705 SFN 7560710
The City of Sidney proposes to address the deteriorated condition of the Park Street Bridge over
the CSX rail line in the City of Sidney. Park Street is an urban local road with an average daily
traffic of approximately 3200 vehicles.
The existing bridge is a steel beam superstructure with concrete deck on stone wall type
abutments. The bridge was constructed in 1920 and rehabilitated in 1979. The bridge has a clear
span of 58’. The roadway width is 24’ toe-to-toe of curb, with 5’ sidewalks on each side.
The structure has a sufficiency rating of 55 and a general appraisal rating of 5 (fair). The bridge
is posted for 75% of legal load. The bridge has spalling concrete and exposed steel with
corrosion. Spalling concrete is a potential hazard for railroad personnel and equipment.
The anticipated replacement will be a simple span pre-stressed box beam superstructure with
composite concrete deck on integral stub abutments on H-piles. The new structure will provide
design standard load rating (HL93). The clear span will be increased to 78’. The roadway width
will remain 24’ toe-to-toe of curb, with 5’ sidewalks on each side.
The existing bridge is nearing the end of its serviceable life. Failure to address the condition of
this structure will result in its continued rapid deterioration, leading to the posting of further load
limits and the eventual closure of the bridge. Renovation and replacement costs for the structure
are similar. Renovation may extend the lifespan of the bridge by 10-20 years, while replacement
will provide a lifespan of 50+ years. Replacement has been determined to be the most prudent
alternative.
The project provides an opportunity to relocate the existing water main from its current location
above the bridge deck to a more protected location under the deck.
Park Street will be detoured during construction. The detour is expected to last approximately
three months.
Construction is expected to require approximately 0.2-acre of permanent right-of-way and
approximately 0.5-acre of temporary right-of-way. Permanent acquisition is expected to be
limited to the existing railroad property.
The project is located in an area of manufacturing and industrial development, with a few 1920s
housing to the southwest. Within the project area, there are no National Historic Landmarks,
sites listed or known eligible for the National Register of Historic Places (NRHP), or sites for
which Ohio Historic/Archaeological Inventory forms have been completed. The Ohio Historic
Bridge Inventory indicates this bridge is recommended not eligible for the NRHP.
The project will not involve work within waterways or wetlands. The project will impact
suitable wooded habitat for the Indiana and northern long-eared bats. The project will be subject
to cutting restriction dates to protect the Indiana and northern long-eared bats.
The project will be constructed with federal City Local Bridge funds and local funds.
Environmental clearance is scheduled for 05/01/2017. The project is currently expected to award
in January 2019.
s
s
s
s
s
.
s.
s
s
s
s
s
ss
ss
s
.
s
s
.
s
s
s
s
s
s
s
.
s
s
s
s
s s
s
r
r
r
r
r
-
r-
r
r
r
r
r
rr
rr
r
-
r
r
-
r
r
r
r
r
r
r
-
r
r
r
r
r r
r
47
48
66
66
47
75
47
75
29D
705
66
362
274
705
119
29
705
29
75
119
75
29
274
75
219
47
29
589
29
706
119
47
47
65
274 274
65
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
47
48
66
66
47
75
47
75
29D
705
66
362
274
705
119
29
705
29
75
119
75
29
274
75
219
47
29
589
29
706
119
47
47
65
274 274
65
SHELBY COUNTYUnincorporated Places
Airports
Interstate Routes
Proposed Interstate Routes
U S Routes
Proposed U S Routes
State Routes
Proposed State Routes
Ramps
County Roads
County Sub Division Streets
Proposed County Roads
County Roads (Right of Way only)
Township Roads
Township Sub Division Streets
Township Roads (Right of Way only)
Proposed Township Roads
Municipal Streets
Railroads
County Boundary
City Boundary
Township Boundary
1
2
3
4
0 1 2 3 4 5
Miles
Revised: April - 2015
´ 0 1,000 2,000 3,000 4,000 5,000Feet
SHE-Park Street BridgePID 101705
Sidney, Ohio Quadrangle
´ 0 150 300 450 600 750Feet
SHE-Park Street BridgePID 101705
Sidney, Ohio Quadrangle
STATE OF OHIO
DEPARTMENT OF TRANSPORTATION
CO
NS
TR
UC
TIO
N P
ROJE
CT
NO.
RAIL
RO
AD IN
VO
LV
EM
EN
T
FE
DE
RA
L P
ROJE
CT
NO.
N
APPROVED
DATE DISTRICT DEPUTY DIRECTOR
DATE DIRECTOR, DEPARTMENT OF
TRANSPORTATION
Q:\
City of
Sid
ney\
0109205
A.0
0 -S
HE
Parks
Street\
1017
05\road
way\sheets\
1017
05
GT001.d
gn 6/1/2016 3:5
1:5
4
PM jdela
ney
PID
NO.
APPROVED
PROJECT EARTH DISTURBED AREA:
NOTICE OF INTENT EARTH DISTURBED AREA:
SCALE IN MILES
0 1 2 3 4
PORTION TO BE IMPROVED
INTERSTATE HIGHWAY
COUNTY & TOWNSHIP ROADS
OTHER ROADS
DIRECTIONAL DISTRIBUTION
TRUCKS (24 HOUR B&C)
DESIGN SPEED
LEGAL SPEED
DESIGN FUNCTIONAL CLASSIFICATION:
NHS PROJECT
SIGNED:
DATE:
SIGNED:
DATE:
STANDARD CONSTRUCTION DRAWINGS
FEDERAL ROUTES
STATE ROUTES
ENGINEERS SEAL:
ENGINEERS SEAL:
LOCATION MAP
DESIGN DESIGNATION
DESIGN EXCEPTIONS
INDEX OF SHEETS:
PROJECT DESCRIPTION
SPECIFICATIONS
SUPPLEMENTAL
PROVISIONS
SPECIAL
ESTIMATED CONTRACTOR EARTH DISTURBED AREA:
THE STANDARD SPECIFICATIONS OF THE STATE OF
OHIO, DEPARTMENT OF TRANSPORTATION, INCLUDING
CHANGES AND SUPPLEMENTAL SPECIFICATIONS LISTED
IN THE PROPOSAL SHALL GOVERN THIS IMPROVEMENT.
2016 SPECIFICATIONS
O
S
UNDERGROUND UTILITIES
PLAN PREPARED BY:
from such use, reproduction or modification.
and expense, including, but not limited to, reasonable attorney's fees, arising
defend and hold harmless LJB Inc. from and against any and all claims,liability,
this drawing is done at the user's own risk and the user agrees to indemnify,
of LJB Inc. Any such unauthorized use or reproduction of or modification to
reproduced, or modified in any manner without the prior written authorization
2012 LJB Inc. All rights reserved. No part of this drawing may be used, C
DESIGN AGENCY
TITLE SHEET 1
10
17
05
CS
X
LATITUDE: 40°17'32" LONGITUDE: 84°09'49"
CITY OF SIDNEY
SHELBY COUNTY
SHE-PARKS-06.06
SH
E-P
AR
KS-0
6.0
6
SCHEMATIC PLAN 2
TYPICAL SECTIONS
GENERAL NOTES
PLAN AND PROFILE
CROSS SECTIONS
STRUCTURES
TRAFFIC CONTROL
3-4
5
6-7
WATER WORK
8-13
DRIVE DETAILS 14
15-16
17-18
REPLACEMENT OF THE 95 YEAR OLD PARK STREET BRIDGE
OVER THE CSX RAILROAD INCLUDING NEW PRESTRESSED
CONCRETE BOX BEAMS WITH COMPOSITE CONCRETE DECK
ON INTEGRAL STUB ABUTMENTS ON H-PILES. THIS WORK
335 LINEAL FEET OF ROADWAY.
ALSO INCLUDES RECONSTRUCTION OF APPROXIMATELY
CURRENT ADT (2016) 3188
DESIGN YEAR ADT (2036) 3698
25 MPH
25 MPH
DESIGN HOURLY VOLUME (2036)
3%
407
50
NO
NONE REQUIRED
0.73 ACRES
0.13 ACRES
0.86 ACRES
URBAN LOCAL
19-21
I HEREBY APPROVE THESE PLANS AND DECLARE THAT
THE MAKING OF THIS IMPROVEMENT WILL REQUIRE THE
CLOSING TO TRAFFIC OF THE HIGHWAY AND THAT DE-
TOURS WILL BE PROVIDED AS INDICATED ON SHEET .
APPROVED
APPROVED
DATE CITY OF SIDNEY PUBLIC WORKS DIRECTOR
DATE ENGINEERING MANAGER, CITY OF SIDNEY
JUNE 1, 2016
STAGE 1 SUBMITTAL
3633
3534
30
25
23
22
28
26
27
2421
25
16
13
13
19
14
20
9
8
7
16
1
2
3
4
5
36
35
34
33
31
29
28
27
26
25
14
15
30
10
119
1
23
4
32
10
Creek
Mill
Bra
nch
Cre
ek
Creek
Mannin
g
Creek
Brush
Line
Run
Run
Ditc
h
Ernst
Dit
ch
PAS
DINGMAN SLAGLE
RD
C-18
W MASON RD
RIV
ER
RD
C-40
FR
EY
BU
RG
C-17
MCCLOSKEY SCHOOL RDC-37
25A
PA
SC
OM
ON
TR
AR
DC-16
RD
DEAMRD
C-38
CHIL
DR
EN
SH
OM
ER
DC-41
DEWEESE
C-33
E MASON RD
C-45
GU
YR
D
RUSSELL RD
C-25
A
C-25
A
C-17B
C-2
5A
C-8
LO
CH
AR
D
T-31
MASON RD
SCHENK RD
NK
UT
HE
RR
D
T-4
9
RD
TH
OM
PS
ON
SC
HIFF
RD
GEARHARTRDT-141
SC
OT
T
T-16
6
FR
AZIE
RG
UY
RD
T-14
0
T-45
KN
OO
PJ
OH
NS
TO
NR
D
T-13
9
S
VA
ND
EM
AR
K R
D
T-135
JA
CKS
ON
RD
T-14
3
W RUSSELL RD
T-47
BU
LL
ER
D
KU
TH
ER T-49
LO
CH
AR
DR
D
T-31
KN
OO
P
JOH
NST
ON
RD
T-13
9
WRIG
HT
RD
T-16
7
DO
OR
LE
YR
D
T-14
2
T-14
2
S
KU
TH
ER
RD
T-49
T-49
T-13
5
T-1
39
T-171
T-165
T-33
CH
AR
M
HILL
DR
ST
EP
HE
NS
RD
WOODHAVEN
DR
PO
RT
HA
VE
ND
R
TAW
N
YLE
AFCT
JONATHAN DR
FAWNDALEDR
SUNSET DR
DEER PATH
WAY
LISADR
JASO
NW
AY
7POIN
TCT
LO
GA
N C
T
SH
EP
HE
RD
CT
SIDNEY
PORT
JEFFERSON
CLINTON
Pasco
NM
AIN
AV
E
E
HOE
WISHER
RD
EPARK
WOOD
ST
PARK ST
SP
RU
C
E
AV
E
BR
OA
DW
AY
AV
E
WPA
RK
WO
OD
ST
ST
OL
LE
AV
E
FAIR
OA
KS
DR
OA
KA
VE
MICHIGAN ST
GLEASON ST
BU
CK
EY
E
AV
E
LA
KESID
EVIL
LA
GE
MHP
SHELBYCOUNTY
FAIRGROUNDS
SHIG
HL
AN
DA
VE
BONAI
R
DR
PT
JEFFE
RS
ON
RD
GROVE ST
LESTER
AV
E
NW
ES
TA
VE
PLU
M
RIDGE TRL
SMIA
MI
AV
EN
MIA
MI
AV
E
TA
FT
ST
6T
HA
VE
WEST
WO
OD
DR
WELLS
DR
W
HO
EWIS
HER
RO
YA
N
AV
E
EASTWOODTRL
MIR
ES
LN
MARVA
LN
UNIV
ERSI
TY
RD
FR
AN
KLIN
AVE
BRIDLEWOOD
DR
RIVERBENDBLVD
3R
D
AV
E
2N
D
AV
E
E KOSSUTHST
FIELDING
RD
EV
ER
GREE
ND
R
WESTLA
KE
DR
N
WA
GN
ER
AV
E
CO
NS
TIT
UTIO
N
AV
E
CH
ES
TN
UT
AV
E
MARILYN
DR
LYNN ST
SU
MM
ER
FIE
LD
TR
L
ARROWHEAD
DR
SW
AL
NU
TA
VE
COLO
NIA
L
DR
LINCOLN ST
JO
HNST
ON
DR
JEFFERSON ST
FO
RA
KER
AV
E
AP
AC
HE
DR
E RUTH ST
LIN
DE
N
AV
E
E LYNDHURST ST
TU
RN
ER
DR
STRATFORD DR
IRONWOOD DR
DIXIE
DR
E ROBINWOOD ST
INDUSTRIALDR
S
WA
GN
ER
AV
E
E PINEHURST ST
W NORTH ST
TIM
BERID
GE
DR
CRESCENT
DR
E EDGEWOOD ST
WISCONSIN ST
HOWARD ST
ADDY AVE
APOLLO ST
NW
AL
NU
TA
VE
SW
AL
NU
TA
VE
FO
LK
ERT
HA
VE
SY
CA
MO
RE
AV
E
HA
LL
AV
E
WILS
ON
AV
E
BR
OA
DW
AY
AV
E
CU
MB
ER
LA
ND
AV
E
CO
LLIN
S
DR
ESOUTH ST
KA
RE
NA
VE
ROSSST
COUNTRY SIDE ST
SW
ES
TA
VE
WES
TO
VER
ST
CH
AR
LES
AV
E
FAIR
INGTON
DR
D&
S
VILLAGE MHP
W PINEHURST ST
NO
RW
OO
D
AV
E
WES
TMIN
ST
ER
DR
MAP
LE
LEAF
CT
BEC
K
DR
LUNAR ST
CANAL
ST
GEMINI DR
LETITIA
DR
NEW ST
BELMONT ST
E POPLARST
DINGMAN
ST
HA
WT
HO
RNE
DR
BU
RK
EW
OO
D
DR
LANE ST
HIL
LT
OP
AV
E
FO
XCR
OSSDR
SHELBY ST
AL
DRIN
DR
SHAWNEEDR
ME
AD
OW L
N
AR
MS
TR
ON
G
DR
NORTHWOOD
DR
RAILROAD
ST
OV
ER
LA
ND
DR
CHERRY ST
6T
HA
VE
WINFIELD
CT
HAYES
ST
BOWMAN DR
FAIR
MO
NT
DR
PROGRESS
WAY
EA
ST
AV
E
MAPLEST
AP
PL
E B
LO
SS
OM L
N
E BENNETT ST
NP
OM
ER
OY
AV
E
TAWAWA DR
WIL
DW
OO
D
DR
MC
KIN
LE
Y
AV
E
ALPIN
EC
T
BROOKBURN ST
CLIN
TO
N
AV
E
MO
RRIS
AV
E
EA
ST
AV
E
TA
RG
ET
DR
HIL
LC
REST
CT
HILL
TOPMANOR
APARTMENTS
EN
TERPRIS
EA
VE
VILLAGEGREENDR
HA
ZE
LN
UT
LN
AMHERSTDR
CIN
NA
MO
NRID
GE
LN
HA
RV
AR
DA
VE
W SOUTH ST
DOERING ST
CR
EE
KSID
E
CT
CL
EV
EL
AN
D
AV
E
CE
DA
RB
RO
OK
PL
MAPLE ST
FOREST ST
STE
WA
RT
DR
HANCOCKST
FER
GU
SO
NCT
GA
RFIE
LD
AV
E
MERRI
LN
FAIR
VIE
W
AV
E
WILLIAMSST
NO
RC
OL
D
DR
FOREST ST
TER
RY
HAW
K
DR
W
WALL
CHERYL DR
SCHLATER DR
HA
MIL
TO
NA
VE
KA
TH
Y
AV
E
TAYLOR DR
CAREY ST
WASHINGTONST
E DALLAS ST
QUEEN ST
ECLAY ST
PIPER
ST
ST
MA
RY
S
AV
E
RUTLEDGEST
W EDGEWOOD ST
MIL
LIG
AN
CT
TU
LL
Y
DR
WILLOWPL
CULVERTST
5T
H
AV
E
DANIELDR
BO
N
AIR
CIR
W ROBINWOODST
GREENACREST
THOMAS DR
DR
CH
ER
OK
EE
DR
ERIEDR
CO
UR
TE
R
AV
E
SUMMIT ST
W FRONT ST
SO
PHIA
AV
E
GRANDST
OA
KL
EA
F
CT
WINDSORPARKE
DR
RIDGEWAYDR
SHIE
AV
E
SH
ER
RI
AN
N
AV
E
ST
CLAIR
DR
RAUTH ST
CE
NTER
AV
E
FOSTER
AV
E
GOODEST
HURON CT
VIC
TO
RIA
CT
CO
MM
ER
CE
DR
HID
DE
NRID
GE
DR
GROVE ST
OLD
VA
ND
EM
AR
KR
D
DRIF
TW
OO
DTRL
OL
DH
AM
AV
E
SUNSHINEDR
D
ARTMOUTHST
SPYGLASSCT
CARROLST
W RUTH ST
DAYTON
AV
E
HIG
H
AV
E
SUPERIOR
CT
LANGDONDR
VIRGINIAAVE
HAMPT
ON
CT
REES DR
VILLAGEWESTAPARTMENTS
W
POPLAR ST
GRANT ST
AU
RO
RA
CT
MAXWELL PL
BAY ST
MO
NT
RO
SE
AV
E
ROBERTDR
OL
DE
NG
LIS
HCT
BEEC
HW
OO
DTRL
TIM
BERLEA
TRL
EL
M
HIL
L
AV
E
FULTON ST
CLEA
RST
MONROEST
ONTARIOCT
W CLAY ST
TO
MA
HA
WK
CT
ELM ST
TERRACE
DR
ARDISSPL
CANAL
ST
RONANST
GLENNDR
SP
EA
RH
EA
D
CT
AN
NPL
LIN
DE
NA
VE
MOUND ST
MA
YW
OO
D
PL
UR
BA
NA
VE
NHIG
HL
AN
DA
VE
TWINBROOK PL
MO
NTEREY
DR
BEL
AIR
DR
WASHINGTONST
GREE
N
BRIERCT
SANDLEWOODPL
TA
BIT
HA
CT
HE
LE
N C
T
SHROYER
PL
RIV
ER
AV
E
W
BENNETT ST
NUTMEG
LN
BEECH
ST
JUNIP
ER
WA
Y
W
DALLAS ST
OA
KM
ON
TCT
MA
GN
OLIA
DR
JO
N
AV
E
INDEPENDENCE
CT
NEW COLUMBIA
BLVD
MULBERRY PL
PAULST
AMELIACT
KE
NW
OO
DD
R
DOORLEYPL
FOXDALEPL
CH
EST
NU
TA
VE
FOREST ST
FERREEPL
KIN
GCT
RA
VE
NW
OO
DT
RL
CA
R
LY
LN
GRANDVIEW
ST
ELIZABETHCT
TR
AN
QUILIT
Y
CT
MA
DIS
ON C
T
HOLLY
PL
MO
NT
RO
SE
AV
E
GRACELAND
PL
FULTON
ST
S P
OM
ER
OY
AV
E
LAKEPL
MERCURY
CT
ASH
PL
ADAMS ST
EA
ST
AV
E
JENNIEWAY
COLE
CT
E FRONT ST
CHASE
AVE
CYPRESS
PL
CATALPA
PL
MARVIN
GENE C
T
PU
RD
UE
AV
E
ARTHURCT
LESLIE
LN
KRIS
TY
WA
Y
EA
ST
AV
E
NORRISDR
HILL
PL
LORI
CT
WAP
AK
ON
ET
A
AV
E
BR
OO
KL
YN
AV
E
S
OHIO
AV
E
NMIA
MI
AV
E
CAMPBELL RD
FAIR
RD
S
MAIN
AV
E
CHIL
DR
EN
S
HO
ME
RD
BR
OA
DW
AY
AV
E
SWIL
KIN
SO
NA
VE
PT
JEFFE
RS
ON
RD
W
NORTH ST
PA
SC
OM
ON
TR
AR
D
SMIA
MI
AV
E
PT
JEFFERSO
N
RD
N
OHIO
AV
E
W WATER ST E WATER ST
N
WES
T
AV
E
E POPLARST
S
WES
T
AV
E
FAIR
RD
W
POPLAR ST
N
WIL
KIN
SO
NA
VE
S4
TH
AVE
N
VANDEMARK
RD
4T
HA
VE
SV
AN
DE
MA
RK
RD
W RUSSELL RD E RUSSELL RD
SK
UT
HE
RR
D
GEARHART
RD
DO
ORLE
Y
RD
E HOEWISHER RD
CL
EM
RD
WRIGHT RD
W RUSSELL RD
BR
OA
DW
AY
AV
E
BR
OA
D
GOODE
ST
CSX
Transportation, Inc.
Creek
River
Tawawa
SIDNEY
MUNICIPAL
AIRPORT
75
29
47
47
29D
BEGIN PROJECT END PROJECT
STA. 1770+20.00 STA. 1774+65.00
1
21
SC
HE
MA
TIC
PL
AN
Q:\
City of
Sid
ney\
0109205
A.0
0 -S
HE
Parks
Street\
1017
05\road
way\sheets\
1017
05
GB001.d
gn 6/1/2016 3:5
1:5
8
PM jdela
ney
0
HO
RIZ
ON
TA
L
SC
AL
E IN F
EE
T
SH
E-P
AR
KS-0
6.0
6
N
25
50
100
1767 1768 1769 1770 1771 1772 1773 1774 1775 1776 1777 1778
NO C
UR
VE
¬ = 00°10'2
3"
LT.
P.I. S
TA. 17
72+61.
51
BEGIN WORK BEGIN PROJECT END PROJECT END WORK
STA. 1770+05.00 STA. 1770+20.00 STA. 1774+65.00 STA. 1775+50.00
STRUCTURE NO. 7560710
LIN
DE
N S
TR
EE
T
AL
LE
Y
OA
K
AV
EN
UE
CS
X R
OAIL
RO
AD
NO C
UR
VE
¬ = 00°07'19"
RT.
P.I. S
TA. 17
71+
59.94
AREAS WITHIN THE WORK LIMITS
THERE ARE NO EXISTING LANDSCAPED
SE CORNER OF PARK AND LINDEN
FLANGE OF THE FIRE HYDRANT AT THE
BOLT AT TIP OF ARROW ON THE TOP
BM #1 ELEV. 1039.71
WEST SIDE OF ROSS ALUMINUM
FLANGE OF THE FIRE HYDRANT AT
BOLT AT TIP OF ARROW ON THE TOP
BM #2 ELEV. 1030.61
CORNER OF PARK ST. AND OAK AVE.
FLANGE OF THE FIRE HYDRANT AT NE
BOLT AT TIP OF ARROW ON THE TOP
BM #3 ELEV. 1027.86
P.O.T. S
TA. 17
66+31.
64
P.O.T. S
TA. 17
78+29.86
P.O.T. STA. 1766+31.64
CENTERLINE OF CONSTRUCTION REFERENCES
232433.4726 1503804.6380
P.I. STA. 1771+59.94 232434.1857 1504332.9400
P.I. STA. 1772+61.51 232434.1068 1504434.5109
P.O.T. STA. 1778+29.86 232435.3825 1505002.8572
NORTHING EASTINGDESCRIPTION
2
21
1767 1768 1769 1770 1771
CO
CB
CB
DS
CO
SA
SA
SA
8"8"
CA
LC
UL
AT
ED
CH
EC
KE
D
Q:\
City of
Sid
ney\
0109205
A.0
0 -S
HE
Parks
Street\
1017
05\road
way\sheets\
1017
05
GP001.d
gn 6/1/2016 3:5
2:0
4
PM jdela
ney
0
HO
RIZ
ON
TA
L
SC
AL
E IN F
EE
T
PL
AN
AN
D
PR
OFIL
E - P
AR
K
ST
RE
ET
SH
E-P
AR
KS-0
6.0
6
N
10
20
40
ST
A.
17
70
+0
5.0
0
TO
ST
A.
17
72
+0
0.0
0
DM
A
GK
B
1036.63
1036.93
1036.88
1036.59
1036.25
1035.95
1035.67
1035.47
1035.33
1035.34
1035.52
1035.85
1036.24
1036.57
120.00' VC
K = 26
1035.48
1035.50
1035.76
1036.26
1037.00
1037.95
1038.89
1039.38
-0.57% +3.99%
ELEV. 1035.16PVI STA. 1770+80.00
EL
EV. 10
37.55
PV
T S
TA. 17
71+
40.00
EL
EV. 10
38.45
ST
A. 17
71+
62.50
PV
C
125.00' VC
1035.50
-0.56%
EXISTING PROFILE GRADE
PROPOSED PROFILE GRADE
ME
ET E
XIS
TIN
G
EL
EV. 10
35.50
PV
C S
TA. 17
70
+20.00
+3.99%
1036.54
1011.09
36' - 12" TYPE B @ 1.40%
INV. 6" E & W=1032.29
INV. 12" S=1031.75
GRATE=1034.95
STA. 1770+35.00, 18.00' LT
CB-1
5' - 12" TYPE C @ 1.40%
INV. 6" E & W=1032.29
INV. 12" SE=1031.25
INV. 12" N=1031.25
GRATE=1034.95
STA. 1770+35.00, 18.00' RT
CB-1
BOTTOM=1025.00
INV. 12" NW=1031.18
TOP=1035.53
STA. 1770+40.00, 24.00' RT
DRYWELL
NO C
UR
VE
¬ = 00°07'19"
RT.
P.I. S
TA. 17
71+
59.94
1769 1770 1771 1772
1040
1035
1030
1025
1020
1015
1010
1040
1035
1030
1025
1020
1015
1010
| CONSTRUCTION PARK STREET
10451045
17681767
FIR
E
LIN
E5'5'
3'5'
3'3'
5'
16"
2'1'2' 2' 2' 3'
2'2'
2'
2'2'2'
4"1'
26"
14"
ZZZ
PL
PL
PL
PL
PLPL
PL
P LP L
P L
P L
P L
8"
4"
8"
GRAVEL
CONC.
CONC. CONC.
CONC.
12"
10"
8"
8"
16.00'
15.97'
16.50'
16.50'
16.50'
10.50'10.50'
+20
+30
+60
+60
+25
+25
+30
+22.02
B.T.A. T
YP
E 2
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
BEGIN WORK
BEGIN PROJECT
STA. 1770+05.00
90°
90°
STA. 1770+20.00
CO
MM
ER
CIA
L
+65.48
5'
R
CB-1
CB-1
16.50'
12"
12"
BE
GIN
AP
PR
OA
CH S
LA
B
ST
A. 17
71+
56.45
FIR
ST P
OS
T
OFF B
RID
GE
+55.36
TY
PE T
AN
CH
OR
ASS
EM
BL
Y
+33.45
3.6'
R
WALL
RETAINING
CO
MM
ER
CIA
L
+08.58
WELL
DRY
+13.45
+21.
74
B.T.A. T
YP
E 1,
AP
P
FIR
ST P
OS
T
OFF B
RID
GE
+55.45
LIN
DE
N S
TR
EE
T
+70
+70
304 - 10" AGGREGATE BASE
452 - 8" NON-REINFORCED CONCRETE PAVEMENT
608 - 4" CONCRETE WALK
PAVEMENT LEGEND
304 - 6" AGGREGATE BASE
301 - 7" ASPHALT CONCRETE BASE, PG64-22
407 - NON-TRACKING TACK COAT
441 - 1 ƒ" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 (448), APP
407 - TACK COAT
441 - 1 ‚" ASPHALT CONCRETE SURFACE COURSE, TYPE 1 (448), PG64-22
MA
TC
H LIN
E S
TA. 17
72+00 S
EE S
HE
ET 7
6
21
1773 1774 1775 1776 1777
CB
CB
SA
E
SA
CA
LC
UL
AT
ED
CH
EC
KE
D
Q:\
City of
Sid
ney\
0109205
A.0
0 -S
HE
Parks
Street\
1017
05\road
way\sheets\
1017
05
GP002.d
gn 6/1/2016 3:5
2:0
6
PM jdela
ney
0
HO
RIZ
ON
TA
L
SC
AL
E IN F
EE
T
PL
AN
AN
D
PR
OFIL
E - P
AR
K
ST
RE
ET
SH
E-P
AR
KS-0
6.0
6
N
10
20
40
ST
A.
17
72
+0
0.0
0
TO
ST
A.
17
75
+5
0.0
0
DM
A
GK
B
1032.91
1031.
81
1030.79
1030.50
1030.21
1029.91
1029.61
1029.31
1029.01
1028.71
1028.40
1028.10
1027.82
1027.55
1027.31
1027.05
1026.79
1026.52
1036.58
125.00' VC
K = 12
SSD = 169'
130.00' VC
K = 26
1039.36
1038.84
1037.81
1036.34
1034.81
1033.32
1032.04
1031.
01
1030.21
1029.65
+3.99% -6.14%
-6.14%-1.19%
EL
EV. 10
37.11
ST
A. 17
72+87.50
PV
T
PVI STA. 1772+25.00
ELEV. 1040.95
PVI STA. 1774+00.00 ELEV. 1030.20
EL
EV. 10
34.19
ST
A. 17
73+35.00
PV
C
1029.43
-1.19%
PROPOSED PROFILE GRADE
EXISTING PROFILE GRADE
-6.14%
1034.60
1036.39
1009.80
INV. EX. 15" E=1024.88
INV. EX. 12" E=1022.28
TOP=1029.11
STA. 1775+41.26, 17.19' RT
EX MH
INV. 12" W=1022.50
36' - 12" TYPE B @ 1.39%E
LE
V. 10
29.43
ST
A. 17
74+65.00
PV
T
86' - 12" TYPE B @ 2.33%
INV. 6" E & W=1026.44
INV. 12" S=1025.00
GRATE=1029.10
STA. 1774+55, 16.44' LT
CB-1
INV. 6" E & W=1026.44
INV. 12" E=1024.50
INV. 12" N=1024.50
GRATE=1029.11
STA. 1774+55, 16.50' RT
CB-1
1025
1020
1015
1010
1035
1030
1040
1045
1040
1035
1030
1025
1020
1015
1010
1045
1772 1773 1774 1775 1776 1777
| CONSTRUCTION PARK STREET
FIR
E
LIN
E
GRAVEL
3'3'3' 3' 3'3'3'3' 4'
4'
12"
6'
6' GRAVEL
12" 15"
CONC. CONC.
6"
6"
12"
CONC.
8"
21"
21"
12"CONC.CONC.
8"
ASPH.
8"
8"
GRAVEL
P
Z Z
Z
Z Z
L
P L
P L
P LP L
PL
PLPLPL
PLPL
PL
10.50'
15.00'
15.00'
15.00'
14.00'
14.88'
1'
BE
GIN
AP
PR
OA
CH S
LA
B
ST
A. 17
72+52.45
B.T.A. T
YP
E 1
B.T.A. T
YP
E 2
CO
MM
ER
CIA
L
+32.38
CO
MM
ER
CIA
L
+49.23
CO
MM
ER
CIA
L
+25.00
+50
+00
+65
+65
+80
+00
1'
+00
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
10'R
5'R
14.00'
14.67'
END PROJECT
STA. 1774+65.00
END WORK
STA. 1775+50.00
90°
10.5
0'
CB-1
CB-1 12"
12"
+45TY
PE T
AN
CH
OR
ASS
EM
BL
Y
+04.40
FIR
ST P
OS
T
OFF B
RID
GE
+68.46
TY
PE T
AN
CH
OR
ASS
EM
BL
Y
+02.90
FIR
ST P
OS
T
OFF B
RID
GE
+68.52
WALL
RETAINING
NO C
UR
VE
¬ = 00°10'2
3"
LT.
P.I. S
TA. 17
72+61.
51
+75
+95.06
90°
90°
+50
MA
TC
H LIN
E S
TA. 17
72+00 S
EE S
HE
ET 6
7
21
1010
1010
1010
1015
1015
1015
1020
1020
1020
1025
1025
1025
1025
1030
1030
1030
1030
1035
1035
1035
1035
1035
SA
519
1
1773
Z
PL
PL
PLPL
PL
DA
TE
ST
RU
CT
UR
E FIL
E
NU
MB
ER
ST
A.
ST
A.
CH
EC
KE
DR
EVIS
ED
DESIG
NE
DD
RA
WN
RE
VIE
WE
DD
ESIG
N
AG
EN
CY
6-16
PID
No.
101705
SH
EL
BY C
OU
NT
Y
Q:\
City of
Sid
ney\
0109205
A.0
0 -S
HE
Parks
Street\
1017
05\structures\
SH
E-P
AR
KS-0606\sheets\
PA
RK
S_
0606sp001.d
gn 6/1/2016 3:5
2:2
3
PM jdela
ney
SH
E-P
AR
KS-6.0
6S
HE-P
AR
KS 0606
7560710
PA
RK S
T.
OV
ER C
SX R
AIL
RO
AD
DW
S
1771+
71.
45
1772+52.45
BM #1 STA.
BM #2 STA.
BM #3 STA.
BM #4 STA.
, , ,
, , ,
, , ,
, , ,
ELEV. OFFSET
DESIGN TRAFFIC:
EARTHWORK LIMITS SHOWN ARE APPROXIMATE. ACTUAL SLOPES SHALL
CONFORM TO PLAN CROSS SECTIONS.
ELEV. OFFSET
ELEV. OFFSET
ELEV. OFFSET
BENCHMARK DATA
NOTES
TYPE:
LOADING:
SKEW:
APPROACH SLABS:
ALIGNMENT:
CROWN:
DATE BUILT:
DISPOSITION:
ROADWAY:
EXISTING STRUCTURE
PROPOSED STRUCTURE
TYPE:
SKEW:
APPROACH SLABS:
ALIGNMENT:
CROWN:
ROADWAY:
SPAN:
24'-0"` TOE TO TOE OF 5'-0"` SIDEWALKS
UNKNOWN
0°39'10"` RIGHT FORWARD
NONE
TANGENT
STRUCTURE FILE NUMBER:
‚" PER FOOT`
7560710
1920
STONE ABUTMENTS TO REMAIN.
SUPERSTRUCTURE TO BE REPLACED. EXISTING
WEARING SURFACE: 1"` MONOLITHIC CONCRETE
1979DATE REHABILITATED:
SIMPLE-SPAN PRESTRESSED BOX BEAMS W/COMPOSITE
CONCRETE DECK ON INTEGRAL STUB ABUTMENTS
SPAN:
24'-0" TOE TO TOE OF 5'-0" SIDEWALKS
LOADING: HL93 AND 60 PSF FUTURE WEARING SURFACE
NONE
15'-0" LONG (AS-1-15)
TANGENT
‚" PER FOOT
COORDINATES: LATITUDE 40°17'33" N
LONGITUDE 84°09'50"W
WEARING SURFACE: MONOLITHIC CONCRETE
SHEET
FOR ADDITIONAL BENCHMARK INFORMATION, SEE ROADWAY PLAN
BORING LOCATION
LEGEND
SIT
E
PL
AN
MN
MA
MM
AM
T
PROPOSED MINIMUM VERTICAL CLEARANCE = 23'-1"`
REQUIRED MINIMUM VERTICAL CLEARANCE = 23'-0"
EXISTING MINIMUM VERTICAL CLEARANCE = 21'-0"`
(FORWARD ABUTMENT)
= 18'-8"` EXISTING AND PROPOSED HORIZONTAL CLEARANCE
(REAR ABUTMENT)
= 9'-6"` EXISTING AND PROPOSED HORIZONTAL CLEARANCE
= UNLESS NOTED OTHERWISE
ON H-PILES
78'-0" C/C ABUTMENTS
58'-0"` C/C BEARING
STEEL BEAMS WITH CONCRETE DECK ON STONE
WALL TYPE ABUTMENTS
2016 ADT = 3188 2016 ADTT = 96
2036 ADT = 3588 2036 ADTT = 110
1 21035.85
1036.24
1036.54
1036.39
1034.60
1032.91
1011.09
1009.80
+3.99 % -6.14 %
1037.00
1037.95
1038.89
1039.38
1039.36
1038.84
1037.81
1036.34
1040
1030
1020
1010
1050
1040
1030
1020
1010
1050
G = -6.14%
G = +3.99%
ELEV. = 1040.95
PVI STA. 1772+25.00
125' VERTICAL CURVE
1
2G = +3.99%
G = -0.57%
ELEV. = 1035.16
PVI STA. 1770+80.00
120' VERTICAL CURVE
1
2
ELEV. = 1038.45
PVC STA. 1771+62.50
ELEV. = 1037.11
PVT STA. 1772+87.50
ELEV = 1037.55
PVT STA. 1771+40.00
78'-0"
1772 STA. 1772+52.45
BEGIN APPR. SLAB
STA. 1771+71.45
END APPR. SLAB
PLAN
| EX. RR TRACK
TO BE RELOCATED
EX. 8" WATER LINE
EX. GAS LINE
GAS LINE
EX. ABANDONED
ST
A. 17
71+
71.
45
BRID
GE LI
MIT
ST
A. 17
72+52.45
BRID
GE LI
MIT
ELEV. = 1040.95
PVI STA. 1772+25.00
PROFILE
PROPOSED
ELEVATION (TYP)
EXISTING GROUND
(TYP)
TO REMAIN
ABUTMENTS
EX. BRIDGE
NO C
UR
VE
¬ = 00°07'19"
RT.
P.I. S
TA. 17
71+
59.94
NO C
UR
VE
¬ = 00°10'2
3"
LT.
P.I. S
TA. 17
72+61.
51
PARK STREET
| CONSTRUCTION
N89°52'17"ES89°57'20"EN89°55'22"E
B-001
B-002
STA. 1772+50.95
| FWD. ABUT.
STA. 1771+72.95
| REAR ABUT.
BRIDGE
LINE ATTACHED TO
PROPOSED 8" WATER
5'-
0"
SID
EW
AL
K
5'-
0"
SID
EW
AL
K
PA
RA
PE
T
1'-0"
PA
RA
PE
T
1'-0"
12'-
0"*
12'-
0"*
* = PLUS FIT-UP
36'-
0"*
TO B
E R
EM
OV
ED
EXIS
TIN
G S
UP
ER
ST
RU
CT
UR
E
(TYP)
90°00'00"
10'-
6"
10'-
6"
10'-
6"
10'-
6"
EL. 1033.5
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION
INT.INT.
BRIDGE LIMITS = 81.00'
| REAR ABUT. | FWD. ABUT.
CONCRETE DECK SLAB
6" MIN. COMPOSITE
(TYP)
GRADE ELEVATION
PROPOSED PROFILE
ELEV. = 1035.2`
LOW BEAMELEV. = 1035.2`
LOW BEAM
PROFILE ALONG | CONSTRUCTION
GRADE
EXISTING
6'-0"
TRACK
| EX. RR
(23'-
0"
RE
Q'D)
CL
EA
RA
NC
E = 23'-
1"̀
PR
OP
OS
ED
VE
RTIC
ALEL. 1033.5
BOX BEAM
PRESTRESSED CONCRETE
PROPOSED CB33-48
STA. 1771+55.36
FIRST POST OFF BRIDGE
STA. 1771+55.45
FIRST POST OFF BRIDGE
STA. 1772+68.46
FIRST POST OFF BRIDGE
STA. 1772+68.52
FIRST POST OFF BRIDGE
ASSEMBLY, TYPE 2
MGS BRIDGE TERMINAL
ASSEMBLY, TYPE 1
MGS BRIDGE TERMINAL
ASSEMBLY, TYPE 2
MGS BRIDGE TERMINAL
ESTIMATED PIPE LENGTH = 70'-0" (TYP)
HOLES TO ELEVATION 1005.00
HP10x42 STEEL PILES IN PREBORED
ELEV. = 1033.9`
T/SLOPE
EL. 1028.5
ELEV. = 1033.9`
T/SLOPE
EL. 1028.5
WALL
CAST-IN-PLACE
WALL
CAST-IN-PLACE
WALLS TO REMAIN, U.N.O.
EX. ABUTMENTS AND
TO BE REMOVED
EX. WALL
6'-0"VERTICAL CLEARANCE
POINT OF MINIMUM
¬
¬¬
¬¬
¬
U.N.O.
1772+00 1773+00
ASSEMBLY, TYPE 1, APP
MGS BRIDGE TERMINAL
19
21