+ All Categories
Home > Documents > sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2...

sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2...

Date post: 23-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
9
sheet index DRAWING NUMBER SHEET NAME REV. No. REV. DATE 11749.5 CC L00 landscape cover Page C 15/07/19 11749.5 CC L03 planting palette C 15/07/19 11749.5 CC L04 C 15/07/19 The School of Creative Industries Landscape Document Honeysuckle Drive, Newcastle University of Newcastle 11749.5 CC L01 extent of work C 15/07/19 11749.5 CC L02 landscape layout C 15/07/19 11749.5 CC L05 landscape details C 15/07/19 11749.5 CC L07 material palette C 15/07/19 landscape layout:part 1 landscape layout:part 2 11749.5 CC L08 C 15/07/19 planting layout 11749.5 CC L06 C 15/07/19
Transcript
Page 1: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

sheet indexDRAWING NUMBER SHEET NAME REV. No. REV. DATE

11749.5 CC L00 landscape cover Page C 15/07/19

11749.5 CC L03

planting palette

C 15/07/19

11749.5 CC L04 C 15/07/19

The School of Creative Industries

Landscape Document

Honeysuckle Drive, Newcastle

University of Newcastle

11749.5 CC L01 extent of work C 15/07/19

11749.5 CC L02 landscape layout C 15/07/19

11749.5 CC L05 landscape details C 15/07/19

11749.5 CC L07

material palette

C 15/07/19

landscape layout:part 1

landscape layout:part 2

11749.5 CC L08 C 15/07/19

planting layout11749.5 CC L06 C 15/07/19

Page 2: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

UP

UP

W

O

R

T

H

P

L

A

C

E

H

O

N

E

Y

S

U

C

K

L

E

D

R

IV

E

LOT A2

DP 1163346

LOT B

DP 1226145

north

01 LANDSCAPE LAYOUTextent of works

DATE:DRAWN: SCALE:

PHASE:JOB NUMBER: DWG No: REV:

SITE:

CLIENT:

PROJECT:

revisions15/07/19C

TD11749.5

MA 1:50015/07/19

CL01

L01

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

REV DATE COMMENTS

The School of Creative Industries

Honeysuckle driveNewcastle west

University of Newcastle

Landscape DocumentThe School of Creative Industries

LEGEND

Site extent

Public domainto landscapearchitecture detail

Page 3: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

UP

UP

R

L

+

2

8

0

0

F

F

L

+

2

8

0

0

R

L

+

2

8

0

0

1

:

1

4

1

:

1

4

1

:1

4

1

:1

4

1

:

1

4

1

:

1

6

1

:

1

0

1

:

1

1

RL +2.80

RL +2.80

RL +2.18

EL +1.75

RL +1.75

RL +2.05

W

O

R

T

H

P

L

A

C

E

LOT A2

DP 1163346

LOT B

DP 1226145

RL +1.90 RL +1.90

Mass planting in steps

Patternon pavingcoloured concrete

Concretewide steps

ConcreteSeating edgeswith recycledplastic seating(Nawkaw finish concrete)

Concrete rampwith handrail

Concrete ramp

Potential areafor informalstage/deck

Potential pedestriancrossing in future

north02 LANDSCAPE LAYOUT

plan

DATE:DRAWN: SCALE:

PHASE:JOB NUMBER: DWG No: REV:

SITE:

CLIENT:

PROJECT:

revisions15/07/19C

TD11749.5

MA 1:30015/07/19

CL02

L02

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

REV DATE COMMENTS

The School of Creative Industries

Honeysuckle driveNewcastle west

University of Newcastle

Landscape DocumentThe School of Creative Industries

Concrete steps

Tactile paving

Concrete paving

Colour concrete middenConcrete steps with nosingand tactile

Public domain paving

Band in public domain followingother side of footpath detail

Concrete tier seating

Page 4: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

UP

UP

F

F

L

+

2

8

0

0

1

:1

4

1

:1

4

1

:

1

4

1

:

1

0

PD

1900

P5

W

O

R

T

H

P

L

A

C

E

HR

HR

HR

P1

T1

N

P3

P4

1550

P3

P3

P2

T1

T1

P1

04 RISERS @ 155UPRL+ 2.18

RL+ 2.80

HR

HR

HR

HR

N

MP

N

RL+ 1.75EL+ 1.65

RL+ 1.7507 RISERS @ 150

UP

P1

RP

CE

CE

CE

CE

MPP3

P3

T1

T1

P2RL+ 2.80HR

MP

P4

P1

P1RP

RL+ 2.80

RL+ 2.80

RL+ 2.80

1000

8100

2450

7470

11350

3000

13460

P3

P3

TOW +3.25

TOW +3.25

TOW +2.75TOW +2.25

TOW +3.25

TOW +2.80

RL+ 2.05RL+ 2.0505 RISERS @ 150

UP

T1

LEGEND

MP MASS PLANTINGREFER PLANTING PALETTE

TREESREFER PLANTING PALETTE

RECYCLED PLASTICSEATING ON CONCRETE

P1PLINTH AREA PAVING:CONCRETE PAVINGREFER ARCHITECTURE

PDPUBLIC DOMAINPAVING: CONCRETEWITH STONE BANDSAME OPPOSITE SIDE FOOTPATH

P4RAMP PAVING:CONCRETE

P2PAVEMENT TYPE 2COLOURED CONCRETE MIDDENREFER ARCHITECTURE

P3PAVEMENT TYPE 3COLOURED CONCRETE BANDREFER ARCHITECTURE

HR

T1

HANDRAIL:STAINLESS STEEL

TI- WARNING DISCRETE

Tactile ground surfaceindicator, polyurethane25mm single stem. black

STAIR NOSING

Aluminium/PVC insertcolour blackN

RP

MASS CONCRETE SEATINGEDGE :450MM HIGH FROMADJACENT SURFACE:NAWKAW FINISH

CE

P2APAVING:COLOUR CONCRETEWITH TOOL JOINT

P5BAND PAVING:COLOUR CONCRETE

T TURF:REFER PLANTING PALETTE

CONCRETE TIER SEATING

REFER ARCHITECTURECT

north03 LANDSCAPE LAYOUT:PART 1

landscape plan

DATE:DRAWN: SCALE:

PHASE:JOB NUMBER: DWG No: REV:

SITE:

CLIENT:

PROJECT:

revisions15/07/19C

TD11749.5

MA 1:20015/07/19

CL03

L03

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

REV DATE COMMENTS

The School of Creative Industries

Honeysuckle driveNewcastle west

University of Newcastle

Landscape DocumentThe School of Creative Industries

05L05

06L05

Page 5: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

R

L

+

2

8

0

0

F

F

L

+

2

8

0

0

R

L

+

2

8

0

0

1

:

1

4

1

:

1

4

1

:1

4

1

:1

4

1

:

1

6

1

:

1

0

1

:

1

1

P5

T

15490

1900

P3

P5

P5

P5

P5

P5

P2A

P3

P3

P5

P3

W

O

R

T

H

P

L

A

C

E

LOT B

DP 1226145

N

RL+ 1.75EL+ 1.65

RL+ 1.7507 RISERS @ 150

UP

P1

RP

CE

MPP3

P3

T1

T1

P2RL+ 2.80HR

MP

P4

P4

P1

P1

P1

CE

RP

RP T1

T1

T1

N

N

HR

HR

P1

CT

CEHR HR

HR

HR

HR

MP

MP

CE

RP

T1RL+ 1.90

06 RISERS @ 150

UP

T1

RL+ 2.80

RL+ 2.80

RL+ 1.9006 RISERS @ 150

UPMP

CE

CE

RP

RL+ 1.90 RL+ 1.90

CE

MP

RL+ 2.80

RL+ 2.80

RL+ 2.75

RL+ 2.75

RL+ 1.85

8100

2450

7470

11350

3000

479013460

7680

1500

1500

22251500

11350

8850

1650

7200

2400

6480

7590

7125

11868

6275

3000

1550

P2

P2

P2

P2

P2A

P3

P3

TOW +2.25

TOW +3.25

TOW +2.80TOW +2.25

TOW +3.25

TOW +3.25

LEGEND

MP MASS PLANTINGREFER PLANTING PALETTE

TREESREFER PLANTING PALETTE

RECYCLED PLASTICSEATING ON CONCRETE

P1PLINTH AREA PAVING:CONCRETE PAVINGREFER ARCHITECTURE

PDPUBLIC DOMAINPAVING: CONCRETEWITH STONE BANDSAME OPPOSITE SIDE FOOTPATH

P4RAMP PAVING:CONCRETE

P2PAVEMENT TYPE 2COLOURED CONCRETE MIDDENREFER ARCHITECTURE

P3PAVEMENT TYPE 3COLOURED CONCRETE BANDREFER ARCHITECTURE

HR

T1

HANDRAIL:STAINLESS STEEL

TI- WARNING DISCRETE

Tactile ground surfaceindicator, polyurethane25mm single stem. black

STAIR NOSING

Aluminium/PVC insertcolour blackN

RP

MASS CONCRETE SEATINGEDGE :450MM HIGH FROMADJACENT SURFACE:NAWKAW FINISH

CE

P2APAVING:COLOUR CONCRETEWITH TOOL JOINT

P5BAND PAVING:COLOUR CONCRETE

T TURF:REFER PLANTING PALETTE

CONCRETE TIER SEATING

REFER ARCHITECTURECT

north04 LANDSCAPE LAYOUT:PART 2

landscape plan

DATE:DRAWN: SCALE:

PHASE:JOB NUMBER: DWG No: REV:

SITE:

CLIENT:

PROJECT:

revisions15/07/19C

TD11749.5

MA 1:20015/07/19

CL04

L04

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

REV DATE COMMENTS

The School of Creative Industries

Honeysuckle driveNewcastle west

University of Newcastle

Landscape DocumentThe School of Creative Industries

07L05

Page 6: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

concrete slab toenginner details.

recycle plasticseat on concrete

Finish Level+2800P1

400

50

600

450

75mm mulch

top 300mm withorganic soil

General purpose soil.

FALL

05 Seating edge detail Typical SectionScale 1:20 @ A3

Sheeting to protectplinth water proofingto be confuted orequal appoved

polypropylenesheeting.

Existing Level+1750

Species as per plantschedule.

skate deterrentson concrete seatmarine grade stainless steel.colour: silver

Subsoil drainage tostormwater pits (locationvaries, as per engineersdetails).Providegeofabric layer betweendrainage trench and soil.

concrete edge

Level+1750

450

500

500

general purpose soil with a minimumorganic matter (OM) of 5% asspecified.

top 300mm with organic soil asspecified

top of rootball level with top of soilsurface.

break up base of planting pit. applygypsum to base of pit as specified.

hessian ties in figure of eight patternaffixed to stakes. ensure stemmovement permitted in light windconditions.

75mm mulch as specified. ensuremulch is keep 150mm away from thebase of tree trunk.

scheduled trees to meet NATSPECguildlines as per specifications. writtencertification required from purchaserprior to installation.

provide 2 x 50 x 50 x2400mmhardwood stakes. drive into solideground, ensure root ball in notpenetrated.

07 Tree in Mass Planting Typical SectionScale 1:40 @ A3

top 300mm with organic soil as specified

finished ground level. set top of plant rootball tothis level.

300

plants to be healthy and vigorous, trees musthave single terminal shoot (unless documentedtypical of plant type), shrubs bushy in characterand no insect damage found on plant. refer toNATSPEC plant guidelines.

check plant for rootbinding. where unacceptableaccording to NATSPEC, reject.

mulch to be placed around the base of plants,75mm min depth, to be kept 150mm away frombase of trees/shrubs. mulch all planted areasunless specified.

FALL

general purpose soil with a minimum organic matter(OM) of 5% as specified.

08 Mass Planting Typical SectionScale 1:40 @ A3

Mass concrete steps

Finish Level+2800

Finish Level+1750

concrete slab toenginner details.

Non-slip stair nosingsaluminium/PVC insert.Colour: black

TGSIwarning discrete tactile groundsurface indicatorpolyurethane 25mm single stemColour: black

TGSIwarning discrete tactile groundsurface indicatorpolyurethane 25mm single stemColour: black

06 Step detail:Typical SectionScale 1:20 @ A3

north

DATE:DRAWN: SCALE:

PHASE:JOB NUMBER: DWG No: REV:

SITE:

CLIENT:

PROJECT:

revisions15/07/19C

TD11749.5

MA AS SHOWN15/07/19

CL05

L05

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

REV DATE COMMENTS

The School of Creative Industries

Honeysuckle driveNewcastle west

University of Newcastle

Landscape DocumentThe School of Creative Industries

Page 7: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

UP

UP

R

L

+

2

8

0

0

F

F

L

+

2

8

0

0

R

L

+

2

8

0

0

1

:

1

4

1

:

1

4

1

:1

4

1

:1

4

1

:

1

4

1

:

1

6

1

:

1

0

1

:

1

1

W

O

R

T

H

P

L

A

C

E

LOT A2

DP 1163346

LOT B

DP 1226145

north09 PLANTING LAYOUT

plan

DATE:DRAWN: SCALE:

PHASE:JOB NUMBER: DWG No: REV:

SITE:

CLIENT:

PROJECT:

revisions15/07/19C

TD11749.5

MA 1:30015/07/19

CL06

L06

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

REV DATE COMMENTS

The School of Creative Industries

Honeysuckle driveNewcastle west

University of Newcastle

Landscape DocumentThe School of Creative Industries2 NOS

Ulmus parvifolia

1 NOUlmus parvifolia

1 NOUlmus parvifolia

1 NOUlmus parvifolia

1 NOTristaniopsis laurina

1 NOTristaniopsis laurina

1 NOBanksia integrifolia

2 NOSTristaniopsis laurina

3 NOSTristaniopsis laurina

TURFin 100 sqm

20 NOSBanksia collina

Ipomea pes-capraeat 90 sq m

50 nos. Lomandra longifolia

8 NOS.Carpobrotus glaucescens

6 NOS.Carpobrotus glaucescens

6 NOS.Lomandra longifolia

6 NOS.Carpobrotus glaucescens

6 NOS.Lomandra longifolia

15 NOSCorrea alba

20 NOSCorrea alba

150 nos. Lomandra longifolia

150 nos. Carex appressa

60 nos. Lomandra longifolia

60 nos. Carex appressa

Page 8: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300

TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

DRAWN: DATE: SCALE:MA 15/07/2019

JOB NUMBER: PHASE: DWG No: REV:

11749.5 TD L0 C

REV DATE COMMENTS

PROJECT

The School of Creative Industries

SITE:

Honeysuckle DriveNewcastle West

C 15/07/2019 REVISION

Landscape DocumentThe School of Creative Industries

L07

Banksia integrifoliaTristaniopsis laurina Ulmus parvifolia

planting palette

Correa alba Carpobrotus glaucescens Ipomea pes-caprae

Lomandra longifolia Carex appressa Banksia collina

Plant schedule

No. Botanical Name Height Width Nos.Tristaniopsis laurina

Ulmus parvifolia

Banksia integrifolia

Lomandra longifolia

Correa alba

Ipomea pes-caprae

Banksia collina

Carex appressa

Carpobrotus glaucescens

01

02

03

04

05

06

07

08

09

10

Trees

08 m

13 m

10 m

0.7 m

01 m

0.2 m

01 m

01 m

0.2 m

07 m

10 m

05 m

Shrub and groundcover

Turf

7

07

05

01

270

35

90 sq m

20

210

20

100 sq mStenotaphrum secundatum

Page 9: sheet index · rl+ 1.75 el+ 1.65 rl+ 1.75 07 risers @ 150 up p1 rp ce ce ce ce mp p3 p3 t1 t1 p2 hrrl+ 2.80 mp p4 p1 p1 rp rl+ 2.80 rl+ 2.80 rl+ 2.80 1000 8100 2450 7470 11350 3000

412 KING STREET NEWCASTLE NSW AUSTRALIA 2300

TERRAS.COM.AU PH: 49 294 926 FAX: 49 263 069

DRAWN: DATE: SCALE:MA 15/07/2019

JOB NUMBER: PHASE: DWG No: REV:

11749.5 TD L0 C

REV DATE COMMENTS

PROJECT

The School of Creative Industries

SITE:

Honeysuckle DriveNewcastle West

C 15/07/2019 REVISION

Landscape DocumentThe School of Creative Industries

Material palette

P1Material: Concrete pavingSize: 600x600x40,

Ramp and steps Angular planters & seating Recyled plastic and concrete seat

Landscape elements

P5 Band paving: insitu concrete/ coloured concrete solutions (CCS) :Colour/Size: kalgoorlie full body oxide colour

P2 Midden & public domain paving: insitu concrete/ coloured concrete solutions (CCS) :Colour/Size: Apollo

P3Midden & public domain paving: insitu concrete/ coloured concrete solutions (CCS) :Colour/Size: Ghost gum

L08

8


Recommended